REQUEST FOR QUOTE: W911WN-16-Q-2801
CONTRACT LINE ITEMS
| CLIN |
| Description |
| UNIT |
| QTY |
| Unit Price |
| Amount |
EMSWORTH L/D
| 0001 |
| UNDERWATER CONCRETE MIX DESIGN DEVELOPMENT, PER SPECIFICATIONS |
| EA |
| 1 |
| $ |
| $ |
| 0002 |
| SELF CONSOLIDATING CONCRETE MIX DESIGN DEVELOPMENT, PER SPECIFICATIONS |
| EA |
| 1 |
| $ |
| $ |
| 0003 |
| EMSWORTH L/D UNDERWATER CONCRETE; MINIMUM 10 CUBIC YARDS – MAXIMUM 20 CUBIC YARDS, PER SPECIFICATIONS (3-5 TRIPS) |
| YD3 |
| 20 |
| $ |
| $ |
| 0004 |
| EMSWORTH L/D PORTLAND CEMENT, TYPE 1 |
(4 BAGS/DAY*5 DAYS MAXIMUM = 20 BAGS), PER SPECIFICATIONS
| 0005 |
| *EXCESS UNLOADING TIME PER HOUR (MAXIMUM 10 HOURS) |
| HR |
| 10 |
| $ |
| $ |
| 0006 |
| *SMALL LOAD ADDITIONAL CHARGE PER DELIVERY (2 TO 2.75 CUBIC YARDS) |
| EA |
| 5 |
| $ |
| $ |
| 0007 |
| *SMALL LOAD ADDITIONAL CHARGE PER DELIVERY (3 TO 3.75 CUBIC YARDS) |
| EA |
| 5 |
| $ |
| $ |
| 0008 |
| *SMALL LOAD ADDITIONAL CHARGE PER DELIVERY (4 TO 4.75 CUBIC YARDS) |
| EA |
| 5 |
| $ |
| $ |
| 0009 |
| *FUEL SURCHARGE PER TRUCK DELIVERY TRIP |
| EA |
| 5 |
| $ |
| $ |
MONTGOMERY L/D
| 0010 |
| MONTGOMERY L/D UNDERWATER CONCRETE; MINIMUM 15 CUBIC YARDS – MAXIMUM 30 CUBIC YARDS, PER SPECIFICATIONS (4-6 DELIVERIES) |
| YD3 |
| 30 |
| $ |
| $ |
| 0011 |
| MONTGOMERY L/D SELF CONSOLIDATING CONCRETE; MIMUMUM 45 CUBIC YARDS – MAXIMUM 65 CUBIC YARDS, PER SPECIFICATIONS (4-8 DELIVERIES) |
| YD3 |
| 65 |
| $ |
| $ |
| 0012 |
| MONTGOMERY L/D PORTLAND CEMENT, TYPE 1 (4 BAGS/DAY*6 DAYS MAXIMUM = 24 BAGS), PER SPECIFICATIONS |
| EA |
| 24 |
| $ |
| $ |
| 0013 |
| *EXCESS UNLOADING TIME PER HOUR |
| HR |
| 10 |
| $ |
| $ |
| 0014 |
| *SMALL LOAD ADDITIONAL CHARGE PER DELIVERY (2 TO 2.75 CUBIC YARDS) |
| EA |
| 5 |
| $ |
| $ |
| 0015 |
| *SMALL LOAD ADDITIONAL CHARGE PER DELIVERY (3 TO 3.75 CUBIC YARDS) |
| EA |
| 5 |
| $ |
| $ |
| 0016 |
| *SMALL LOAD ADDITIONAL CHARGE PER DELIVERY (4 TO 4.75 CUBIC YARDS) |
| EA |
| 5 |
| $ |
| $ |
| 0017 |
| *FUEL SURCHARGE PER TRUCK DELIVERY TRIP |
| EA |
| 14 |
| $ |
| $ |
OPTION I
| 0018 |
| EMSWORTH L/D SELF CONSOLIDATING CONCRETE; MIMUMUM 2 CUBIC YARDS – MAXIMUM 5 CUBIC YARDS, PER SPECIFICATIONS |
| EA |
| 5 |
| $ |
| $ |
| 0019 |
| *SMALL LOAD ADDITIONAL CHARGE PER DELIVERY (2 TO 2.75 CUBIC YARDS) |
| EA |
| 1 |
| $ |
| $ |
| 0020 |
| *SMALL LOAD ADDITIONAL CHARGE PER DELIVERY (3 TO 3.75 CUBIC YARDS) |
| EA |
| 1 |
| $ |
| $ |
| 0021 |
| *SMALL LOAD ADDITIONAL CHARGE PER DELIVERY (4 TO 4.75 CUBIC YARDS) |
| EA |
| 1 |
| $ |
| $ |
| 0022 |
| *FUEL SURCHARGE PER TRUCK DELIVERY TRIP |
| EA |
| 1 |
| $ |
| $ |
*Additional Quote Items per the Specifications
Please provide the following information for your company:
Company Name (Same as in SAM): _______________________________________
Address (Same as in SAM): ______________________________________________
DUNS: ________________________________________
CAGE: ________________________________________
Point of Contact: __________________________________
POC Phone Number: _______________________________
POC Email: ______________________________________
Our company (does or does not) ___________ fit the Small Business Size Standard listed above.
Company Representative Authorized to Submit Bid: ___________________________________
Signature: _________________________________ Date: ___________________ File: 0257SN.doc jmw, 14MARCH2007
CONCRETE CONTRACT LINE ITEMS