Bid Schedule

View the file

Other files

File Type Posted
Appendix_B-1.pdf PDF
Appendix_B.docx DOCX document
Appendix_B.docx DOCX document
Appendix_A.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR QUOTE: W911WN-16-Q-2801

CONTRACT LINE ITEMS

CLIN
Description
UNIT
QTY
Unit Price
Amount

EMSWORTH L/D

0001
UNDERWATER CONCRETE MIX DESIGN DEVELOPMENT, PER SPECIFICATIONS
EA
1
$
$
0002
SELF CONSOLIDATING CONCRETE MIX DESIGN DEVELOPMENT, PER SPECIFICATIONS
EA
1
$
$
0003
EMSWORTH L/D UNDERWATER CONCRETE; MINIMUM 10 CUBIC YARDS – MAXIMUM 20 CUBIC YARDS, PER SPECIFICATIONS (3-5 TRIPS)
YD3
20
$
$
0004
EMSWORTH L/D PORTLAND CEMENT, TYPE 1

(4 BAGS/DAY*5 DAYS MAXIMUM = 20 BAGS), PER SPECIFICATIONS

EA
20
$
$
0005
*EXCESS UNLOADING TIME PER HOUR (MAXIMUM 10 HOURS)
HR
10
$
$
0006
*SMALL LOAD ADDITIONAL CHARGE PER DELIVERY (2 TO 2.75 CUBIC YARDS)
EA
5
$
$
0007
*SMALL LOAD ADDITIONAL CHARGE PER DELIVERY (3 TO 3.75 CUBIC YARDS)
EA
5
$
$
0008
*SMALL LOAD ADDITIONAL CHARGE PER DELIVERY (4 TO 4.75 CUBIC YARDS)
EA
5
$
$
0009
*FUEL SURCHARGE PER TRUCK DELIVERY TRIP
EA
5
$
$

MONTGOMERY L/D

0010
MONTGOMERY L/D UNDERWATER CONCRETE; MINIMUM 15 CUBIC YARDS – MAXIMUM 30 CUBIC YARDS, PER SPECIFICATIONS (4-6 DELIVERIES)
YD3
30
$
$
0011
MONTGOMERY L/D SELF CONSOLIDATING CONCRETE; MIMUMUM 45 CUBIC YARDS – MAXIMUM 65 CUBIC YARDS, PER SPECIFICATIONS (4-8 DELIVERIES)
YD3
65
$
$
0012
MONTGOMERY L/D PORTLAND CEMENT, TYPE 1 (4 BAGS/DAY*6 DAYS MAXIMUM = 24 BAGS), PER SPECIFICATIONS
EA
24
$
$
0013
*EXCESS UNLOADING TIME PER HOUR
HR
10
$
$
0014
*SMALL LOAD ADDITIONAL CHARGE PER DELIVERY (2 TO 2.75 CUBIC YARDS)
EA
5
$
$
0015
*SMALL LOAD ADDITIONAL CHARGE PER DELIVERY (3 TO 3.75 CUBIC YARDS)
EA
5
$
$
0016
*SMALL LOAD ADDITIONAL CHARGE PER DELIVERY (4 TO 4.75 CUBIC YARDS)
EA
5
$
$
0017
*FUEL SURCHARGE PER TRUCK DELIVERY TRIP
EA
14
$
$
TOTAL
$

OPTION I

0018
EMSWORTH L/D SELF CONSOLIDATING CONCRETE; MIMUMUM 2 CUBIC YARDS – MAXIMUM 5 CUBIC YARDS, PER SPECIFICATIONS
EA
5
$
$
0019
*SMALL LOAD ADDITIONAL CHARGE PER DELIVERY (2 TO 2.75 CUBIC YARDS)
EA
1
$
$
0020
*SMALL LOAD ADDITIONAL CHARGE PER DELIVERY (3 TO 3.75 CUBIC YARDS)
EA
1
$
$
0021
*SMALL LOAD ADDITIONAL CHARGE PER DELIVERY (4 TO 4.75 CUBIC YARDS)
EA
1
$
$
0022
*FUEL SURCHARGE PER TRUCK DELIVERY TRIP
EA
1
$
$

*Additional Quote Items per the Specifications

Please provide the following information for your company:

Company Name (Same as in SAM): _______________________________________

Address (Same as in SAM): ______________________________________________

DUNS: ________________________________________

CAGE: ________________________________________

Point of Contact: __________________________________

POC Phone Number: _______________________________

POC Email: ______________________________________

Our company (does or does not) ___________ fit the Small Business Size Standard listed above.

Company Representative Authorized to Submit Bid: ___________________________________

Signature: _________________________________ Date: ___________________ File: 0257SN.doc jmw, 14MARCH2007

CONCRETE CONTRACT LINE ITEMS