W911W620R0007 QA 2 v2.docx

DOCX document 13 KB Posted

Attached to
POWER AND THERMAL MANAGEMENT - COMPONENT DEVELOPMENT Federal contract opportunity
Solicitation number
W911W6-20-R-0007
Issued by
Department of the Army Materiel Command Contracting Command Redstone Arsenal

About this file

This solicitation calls for proposals to develop component technologies for power and thermal management systems applicable to future vertical lift aircraft. Technologies of interest include independently controlled cold plates for localized cooling of mission equipment and electronics, as well as components enabling centralized cooling systems. The goal is to advance components from TRL 2/3 to 4/5 through design, fabrication, and validation testing. Approximately $2.6 million is available across multiple awards for efforts lasting up to 42 months. Proposals are due by June 29, 2020 and should not exceed 45 pages. The soliciting agency is the Department of the Army Materiel Command Contracting Command at Redstone Arsenal.

View the file

Other files for this federal contract opportunity

Other files attached to POWER AND THERMAL MANAGEMENT - COMPONENT DEVELOPMENT, newest first.
File Type Posted
W911W6-20-R-0007_Call Questions No 1 (FINAL).docx DOCX document
Ref 2. Statement of Research Effort (for contract proposals).docx DOCX document
Ref 3. PTM-CD Deliverables (for contract proposals) v4.docx DOCX document
Ref 4. TIA Template - Expenditure Based 29 January 2019.doc DOC document
Ref 1. W911W6-20-R-0009_Master BAA.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W911W6-20-R-0007 Q&A #2

1. Is the use of very low Global Warming Potential (GWP) refrigerants a priority?

RESPONSE – Low Global Warming Potential (GWP) refrigerants are not a priority.

2. Should the volume allocation described in the Supplemental Package be considered a contiguous or a distributed volume?

RESPONSE – The volume allocation described in the supplemental package can be considered the total volume goal; a summation of contiguous, distributed, or a combination of both.

3. Is a system controller to be provided or will the requisite logic, I/O, etc. be integrated into the platform/vehicle controller?

RESPONSE – The system controller will not be provided under this project.

4. The solicitation references validation testing in a ‘relevant environment’. Will the government specify this or is this up to the proposer?

RESPONSE – Please see AR 70-35 for a definition of the temperatures an aircraft can experience. Based on the type of technology being proposed applicable temperatures will vary. Describe the anticipated testing conditions to prove out the technology. The exact details can be altered during the course of project if changes are necessary after analysis, prior to the testing.

5. Will the government furnish hardware for loads to be cooled or shall these be simulated by the proposer?

RESPONSE – Simulated loads will be used for the project; no government furnished hardware is anticipated. Please state in the proposal if GFE is required.

6. What is the minimum continuous cooling required (i.e. turn down)?

RESPONSE – A minimum continuous cooling requirement is currently not defined. One of the aspects of the localized thermal control concept may necessitate low “turn-down” operation. It is an open question which needs to be balanced against energy efficiency, weight, and life span impacts from duty cycle choices.

7. Can you extend the suspense date for proposals in order to allow more time to respond and prepare a proposal?

RESPONSE - No, the due date and time for proposals for submissions of proposals is not extended.