W911SG‐20‐B‐0004
REPAIR SIDEWALKS STALLION RANGE CENTER
RFI’S
1. Do you have an area for dumping debris or we must remove it entirely from white sands? If location available, how far?
Answer: There is no area in the Stallion area for dumping debris. All debris including construction debris shall be hauled and disposed of off base.
2. Can you provide more detailed information as far as ADA since there is none of the plans?
Answer: There are no requirements for ADA ramps in this project.
3. Are you requiring a total of 9 densities? And are we allowed to conduct sand cone method?
Answer: 9 densities minimum. Below all sidewalks, curb & gutter 8" compacted thickness subgrade shall be compacted to minimum 95% ASTM D1557. Contractor shall perform compaction testing by nuclear or sand cone method.
4. Are you requiring expansion joints no less than 30 FT? Common practice is every 20FT.
Answer: Install linear expansion joints no less than 20 feet.
5. Are we using a base course, don't see any details at all?
Answer: Base course below sidewalks and curbs is not required.
6. Are we required wire mesh on the sidewalks if we do what size?
Answer: In all new sidewalks install 6x6 W4.0/4.0 welded wire mesh centered in slab
7. Do we have access from Socorro?
Answer: Yes.