TE1
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Additional_Question.docx | DOCX document | |
| W911SG-18-Q-0067-0001.pdf | ||
| Questions_and_Answers.docx | DOCX document | |
| Site_Visit_Registration_Form.doc | DOC document | |
| TE_2_-_Westbrook_Base_Camp_-_Maps.pdf | ||
| TE-6_-_Westbrook_Water_Lines.pdf | ||
| TE_3_-_Westbrook_Base_Camp_-_Existing_Utilities_Diagram.pdf | ||
| TE-5_-_Westbrook_Sanitary_Lines.pdf | ||
| TE-4_-_Westbrook_Electrical_Lines.pdf | ||
| W911SG18Q0067.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Manufacture, Delivery and Installation of New Showers, Lavatories, Commodes and Laundry Units.
Installation for Mobilization and Deployment Division, DPTMS.
Westbrook Base Camp Replacement of Existing Containerized Units.
Site Visit/Utilities Survey: The Contractor shall be responsible for verifying all existing utility infrastructures and connections meet or exceed its product specifications. This include transformer sizing, sewer line sizing, gas line sizing, and water line sizing. The Contractor shall verify all dimensions and investigate existing site conditions during the pre-bid site visit/site survey set by the KO. Site visit/site survey is highly recommended.
Existing Units: Billeting area is composed of a group of K-span divided into four pads; PAD A, Pad B, Pad C and Pad D.
Each pad have aligned, on their respective East and West laterals, the existing containerized units. Each section (lateral) is composed of four Units. One laundry unit (6 washers/6 dryers), one lavatories unit (16 lavatories), one latrine unit (5 commodes, 1 urinal and 2 Lavatories) and one shower unit (6 shower heads and 2 Lavatories). This pattern is repeated in each Eat and West lateral section of each pad, for a total of 8 section. Total existing containerized units count is 24 units.
View of existing layout of units (from left to right); laundry unit, commodes unit, sinks unit and showers unit.
View of existing layout of units (from left to right); laundry unit, commodes unit, sinks unit and showers unit.
Front view of existing laundry unit. Refer to breaker panel at the corner of the unit and behind it is the wood panel casing protecting the water backflow preventer.
Front view of existing sinks unit. Refer to breaker panel at the corner of the unit.
View of one of the units showing the gas connection and the water connection coming out of the backflow preventer wood enclosure.
View of one of the units showing the gas, electrical, wastewater and the water connection from each point of connection into the unit.
Existing Water System Utilities: Main source of water is a 250,000 gallons elevated water tank. From the elevated water tank, a 12 inches pipe get reduced into an 8 inches water main going into Westbrook Base Camp. This water main branch in around the pads complex and each unit get serve with a 1 inch pipe.
View of one main source of water, the 250,000 gallons elevated tank.
View of the water backflow preventer at each unit (typical). Pictures shows the typical shut off valves, integral check valve, integral relief valve, air gap fitting, strainer and test cocks.
View of the line coming out of the backflow preventer.
Wastewater System Utilities: Each unit is connected with a 4 inches PVC wastewater sewer pipe into the 4 inches PVC sewer pipe main and lateral, which connect to a 12 inches PVC sewer pipe to an existing Lift Station into Meyer Range
Oxidation Pond.
View of wastewater PVC piping coming out of the unit, its respective clean outs and burying to the ground.
View of concrete pad with clan outs.
View of grey water piping coming out of the unit and burying into the ground.
Electrical System Utilities: Each pad is powered by a three phase 500kVA 208/120V pad mounted transformer, which it get divided into 200 AMP Main Breaker Panel (MDP), one per each lateral section of each pad. Total count of 200 AMP
MDP is 8 unit. From the 200 AMP MDP the four Units are powered.
View of one of the wood pole for the electrical primary lines.
Closer view of one of the wood pole for the electrical primary lines.
Side view of the existing pad mounted transformers (4 pads, each one servicing 2-200 Amps MDP).
View of 200 Amp panel (MDP).
View of existing disconnect breaker panel.
View of indoor secondary breaker panel (laundry).
View of exterior secondary breaker panel.
Propane Gas System: Three out of the four Units per section (Latrine, Shower and laundry) are connected to a 2 inches pipes that comes from the entrance of Westbrook Base Camp where it is established a lot with gas tank for storage.
View of existing propane gas tank.
View of existing propane gas line.