SOLICITATION_AMENDMENT_1_-W911SG-18-B-0022.pdf
PDF 553 KB Posted
- Attached to
- STORM DRAIN SYSTEM Federal contract opportunity
- Solicitation number
- W911SG-18-B-0022
About this file
SOLICITATION AMENDMENT 1
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| ABSTRACT_OF_OFFERS_-_W911SG-18-B-0022.pdf | ||
| Traffic_Control_Coordination.pdf | ||
| SOLICITATION_1-_W911SG-18-B-0022.pdf | ||
| Recycling_Policy_2015.pdf | ||
| As-Built_Requirements.pdf | ||
| Drawings_New_Storm__Drain_Project_001.pdf | ||
| iWATCH_Trng_for_Contractors_20151028.pdf | ||
| Solid_Waste_C&D_Diversion_Guidance_2015.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0011172600
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The reason for this amendment is to:
1. Post the RFI questions and answ ers.
2. Add the Traff ic Control Coordination document
All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 23-Aug-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W911SG18B0022
X 9B. DATED (SEE ITEM 11)
31-Jul-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
23-Aug-2018
CODE
MICC-FT BLISS W911SG
111 PERSHING RD
FT BLISS TX 79916
W911SG 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W911SG18B0022
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00700 - CONTRACT CLAUSES
The following have been modified:
252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)
(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.
(b) The Contractor shall--
(1) Check all drawings furnished immediately upon receipt;
(2) Compare all drawings and verify the figures before laying out the work;
(3) Promptly notify the Contracting Officer of any discrepancies;
(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and
(5) Reproduce and print contract drawings and specifications as needed.
(c) In general--
(1) Large-scale drawings shall govern small-scale drawings; and
(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.
(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.
(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:
Title File Drawing No.
Drawings New Storm Drain System Project 0001
(End of clause)
SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS
The following have been added by full text:
W911SG18B0022
RFI ANSWERS
W911SG-18-B-0022
QUESTIONS AND ANSWERS TO RFI’s
1. Do you have the location of the bench mark for elevations?
The bench mark is located on the median of Sergeant Major Boulevard, between the Access Control Point and Luke Street. Please refer to attached map.
2. Our company will be teaming with a sub, can their bonding take care of their portion and with mine cover the remaining of the project?
Answer:
Either one of these is acceptable.
* Subcontractor/Teaming partner indemnifies the company
* Subcontractor/Teaming partner enter into a co-surety agreement
3. As per drawings, we will be digging lower than 10ft, do you have a list of expected requirements?
Even though we are showing a trench detail on the drawings, we would like for the Contractor to obtain an approved trench dimensions from a Professional to avoid any accident. This document will have to be submitted to the COR before the NTP. Also, the Contractor needs to comply with OSHA Standards and get the Safety Plan approved by the Safety Officer.
4. Would you be providing an electronic copy of the plans to assist with the As builts?
The government will provide the proposed AutoCAD files for this project.
5. Will the contractor be required to include lighting/lights with the temporary chain link fencing?
No additional lights will be required, the traffic control plan should have devices with appropriate reflectorized features in compliance with MUTCD to safely direct the traffic at night.
6. Should the temporary fencing be damaged by passing traffic and outside the contractors’ control, who will be responsible for additional cost of repair/replacement of temporary fencing?
Contractor shall be responsible to secure the working area at all times and replace any damage equipment during construction. The Temporary chain link fence shall be properly secured with no afterhour’s access and shall have privacy screen.
7. Please provide the high traffic (drop-off/pick-up) times for the school so that optimal work hours may be determined.
The Milam School hours are from 7:30 AM to 3:30 PM and the Daycare hours are from 5:30 AM to 6:00 PM. We would like to have a meeting with the school and daycare authorities to coordinate the construction before the NTP.
(End of Summary of Changes)
File details come from the government source that posted it.