ATTACH_D_LOCAL_COMMANDERS_DOCUMENT_RFC.pdf
PDF 255 KB Posted
- Attached to
- Aviation Maintenance Management Federal contract opportunity
- Solicitation number
- w911sf19r0011
About this file
attachment D 1 of 2
View the file
Other files for this federal contract opportunity
Show all 50
Aviation Maintenance Management has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment D Local Commander’s Mission Capable (MC) definition for Ranger Flight Company (RFC) mission sets, Fort Benning, GA 31905.
1. This memo defines the minimum required equipment for nine (9) different mission sets the RFC will use to accept aircraft. These nine (9) mission sets are PAX, AVT, Para-drops, RIA, PFR, SPIES, FRIES, CGT/Spare, and Rappels. All equipment must be installed and working properly.
A. PAX Missions:
1. Day/Night/NVG Capable
2. All aircraft lighting per AR-95-1, Table 5-2 (Multi-ship)
3. GPS
4. HUD (NG)
5. Radios
a. VHF
b. UHF
c. 1x FM
6. IFR Capable
a. VOR/ILS
b. ADF
7. De-ice/Anti Ice during winter months (NOV- MAR) and when forecasted
8. Seats Installed
B. AVT Missions (Multi-Ship):
1. Day/Night/NVG Capable
2. All aircraft lighting per AR-95-1, Table 5-2 (Multi-ship)
3. GPS
4. HUD (NG)
5. Radios
a. VHF
b. UHF
c. 1x FM
6. IFR Capable
a. VOR/ILS
b. ADF
7. De-ice/ Anti Ice during winter months (NOV- MAR) and when forecasted
8. Cargo Hook
9. Seats Installed
C. Para-drop Missions:
1. All aircraft lighting per AR-95-1, Table 5-2 (Multi-ship)
2. GPS
3. Radios
a. VHF
b. UHF
c. 1 x FM
4. Seats Out
5. IFR Capable
a. VOR/ILS
b. ADF
D. RIA/SPIES/FRIES Missions:
1. All aircraft lighting per AR-95-1, Table 5-2
2. GPS
3. Radios
a. VHF
b. UHF
c. 1x FM
4. IFR Capable
a. VOR/ILS
b. ADF
5. De-ice/ Anti Ice during winter months (NOV- MAR) and when forecasted
6. Cargo Hook (External Load Capable)
7. FRIES Bar Installed
8. Seats Out
E. PFR Missions (Multi-Ship):
2. All aircraft lighting per AR-95-1, Table 5-2 (Multi-ship)
3. GPS
4. HUD (NG)
5. Radios
a. VHF
b. UHF
c. 1x FM
6. IFR Capable
a. VOR/ILS
b. ADF
7. De-ice/ Anti Ice during winter months (NOV- MAR) and when forecasted
8. Cargo Hook (External Load Capable)
9. Seats Installed
F. CGT/Spare Missions:
2. All aircraft lighting per AR-95-1, Table 5-2 (Multi-ship)
3. GPS
4. HUD (NG)
5. Radios
a. VHF
b. UHF
c. 1x FM
6. IFR Capable
a. VOR/ILS
b. ADF
7. De-ice/ Anti Ice during winter months (NOV- MAR) and when forecasted
G. Rappel Missions:
1. Day/Night/NVG Capable
2. All aircraft lighting per AR-95-1, Table 5-2 (Multi-ship)
3. GPS
4. HUD (NG)
5. Radios
a. VHF
b. UHF
c. 1x FM
6. IFR Capable
a. VOR/ILS
b. ADF
7. De-ice/ Anti Ice during winter months (NOV- MAR) and when forecasted
8. Rappel Rings installed and TRQ check signed off NLT 12 hours prior
2. Any deviations to this document requires approval from the COR & RFC
Commander or designated personnel who will speak on the RFC Commander’s behalf prior to scheduling an aircraft for mission.
File details come from the government source that posted it.