W911SD-22-R-0165 Solicitation Amend 0003 D-FINAL CEAC Soil Disposal.pdf
PDF 141 KB Posted
- Solicitation number
- W911SD-22-R-0165
About this file
This document contains an amendment to a solicitation for U.S. Army West Point Material Disposal Services. The amendment revises the questions and answers section of solicitation number W911SD-22-R-0165, which seeks disposal services for approximately 33,000 tons of fill material located at West Point, New York. The period of performance is from October 30, 2022 to April 30, 2023. Offerors must be registered as a small business under NAICS code 562910 for soil remediation services with a size standard of $20 million to be eligible for award. The amendment provides additional details on allowable work hours and processes for submitting supplemental plans.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0011677494
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to revise the RFI Questions- Prepare Spreadsheet breaking dow n the costs, no other changes.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 13-Sep-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911SD22R0165
X 9B. DATED (SEE ITEM 11)
17-Aug-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
13-Sep-2022
CODE
MICC - WEST POINT
681 HARDEE PLACE
WEST POINT NY 10996-1514
W911SD 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W911SD22R0165
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been modified:
RFI Q & A
W911SD-22-R-0165 RFI Q & A
1. Is attendance sheet from site walk Aug 24 available.
Shall be incorporated into the amendment number 0001 (Separate Attachment)
2. Would outside parties be able to submit bids or only those that participated in site walk (Aug 24).
Per the solicitation, In order to be considered for award, offeror(s) must attend the Site Visit
3. Regarding tarps ? during visit each pile was provided with tarp control/covering, it is understood this effort will continue and be maintained throughout the project. For bid purposes we would include the costs of additional tarp covering utilizing same type and material seen onsite. Please confirm introducing the same blue type (6mil) tarp seen onsite would be sufficient for added covering.
Yes
4. Project is estimated at ~ 5 months. To confirm: due to winter weather, or other unforeseen factors/delays, project length could pass 5 months and no penalty would apply.
Correct- Upon award, a review and action will be executed to support extending project length performance further than five (5) months based upon constraining conditions.
5. Disposal soil facility (facilities) chosen would be included in bid and be pre-approved prior to onsite efforts. Would disposal facility choice rely on DOD approved status. Is there a list of pre-approved DOD soil accepting facilities?
There are no DOD approved disposal facilities for this project. The contractor must demonstrate the disposal facility meets NYSDEC, EPA, and destination state regulations as applicable.
6. Onsite hours of operations would be: 7am ? 5pm. (Mon-Fri) ? Would Saturday or possibly Sunday efforts be considered/accepted?
Regular work hours are 7:30AM to 4:30PM M-F. WEEKEND HOURS TBD
**REVISED** Regular work hours are 7:30AM to 4:30PM M-F. Weekend work is acceptable with prior approval.
7. Additional lab analysis might be necessary to meet disposal facility needs. Current lab data shows no limits above ‘haz waste’ limits. If added sampling/lab analysis required and - If hazardous levels would be found or elevated PCB, would a change order be utilized to reflect additional disposal costs?
W911SD22R0165
The PWS assumes the fill material does not exceed EPA or NYSDEC hazardous waste limits. If additional sampling finds fill that meets hazardous waste limits, a change order would be utilized if additional funding is available.
8. Sample plan, disposal plan, Health/Safety plan, Stormwater Control Plan, Traffic control plan would be required to pursue efforts. Would these be reviewed by only West Point reps or other local/county/state officials?
Plans will be reviewed by West Point representatives. Orange County will require a permit to access the site from a county road. The contractor is responsible for preparing the permit application and submitting it to West Point for review and Orange County for approval.
9. RE: Stormwater Protection: Can you confirm that the only contractor requirement regarding storm water protection is to maintain the cover on the soil piles as well as to maintain the soil berms surrounding them.
There will be no weekly inspections or reporting.
Correct.
10. Will there be any type of ‘bonding’ associated with this project - ?
Bonding is not required for fill removal and disposal. Orange County will require a permit to access the site from a county road and may require bonding as part of the permit to cover repairs, modifications, or damage to the road.
11. Will contractor be given unlimited site access to include a gate key?
Yes.
12. Will contractor be allowed to store equipment onsite (excavator, water trailer etc)?
Yes.
13. 13For the purposes of completing the Pricing Schedule (Volume IV). Is the pricing schedule on page 40 of 117? This bid schedule has only one line item for bidding purposes.
Page 4 paragraph 7.a.of the solicitation, asks for mobilization and demobilization pricing, while line b. of the same paragraph, asks for the unit price per ton for loading, transporting and disposal of fill material.
Is it acceptable to prepare an excel spreadsheet breaking out these two items and using the 33,000 ton estimate?
Prepare a spreadsheet breaking down the costs, and provide the one price for the service on the CLIN Line
(End of Summary of Changes)