This document outlines revisions to specifications for two contract packages to construct a fire training site at Fort McCoy, Wisconsin. Package A requires deleting installation of a 1,000 gallon propane tank and foundation, and adding installation of a new 3-phase 400 Amp feed between an existing service. Package B requires deleting installation of a 3,000 gallon propane tank, an ARFF pad and propane tank foundation, and installing vapor and liquid LP piping, propane pumping, electrical feeder, grounding, cathodic protection, bollards, and adjustment of a water valve and installation of a frost-free yard hydrant and hose bib.

The related federal contract opportunity is solicitation number W911SA23B2009 to construct the fire training site infrastructure for packages A and B under NAICS code 238190. The requirement will be awarded as a single fixed-price contract through full and open competition. The period of performance is 195 days after notice to proceed. The solicitation will be issued by the Mission and Installation Contracting Command at Fort McCoy, Wisconsin for between $1-5 million.

View the file

Other files for this federal contract opportunity

Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Revisions to Contract Specifications SOW Fire Training Site

Bid Package A The bidders are directed to Section 01 12 10 Contract Considerations:

Delete the language in 1.01, Subpart C, i in its entirety and insert the following language in its place:

C.Variance from Drawings:
i.Delete installation of 1,000 gallon propane tank, 10 foot by 28 foot 1,000 gallon propane tank concrete foundation.
II.Install LP piping, propane pumping, electrical feeder, grounding, cathodic protection, bollards, and all components complete as specified. Install 1 inch diameter water service and curb stop and box stub associated with ARFF area (note found on sheet C1.22 grid D 4).
iii.Add the installation of new 3 phase 400 Ampere feed between existing service with parallel (2) runs of 3-inch diameter schedule 80 NMC with each run containing (4) 3/0 AL and (1) #3 AL ground. Refer to Exhibit A for location. Exhibit A is excerpted from Sheet E1.6.

Bid Package B The bidders are directed to Section 01 12 10 Contract Considerations:

Delete the language in 1.01 Subpart C i in its entirety and insert the following language in its place:

C.Variance from Drawings:
i.Delete the installation of 3,000 gallon propane tank. Delete 28’ by 50’ concrete pad for ARFF. Delete 12’ by 40’ concrete foundation for propane tank.
ii.Install vapor and liquid LP piping, propane pumping, electrical feeder, grounding, cathodic protection, bollards, adjustment of water valve, and frost-free yard water hydrant and hose bib and all components complete as specified.