W911SA-18-B-2006_Attachment_1_Specifications.pdf
PDF 478 KB Posted
- Attached to
- Construct Training Ammunition Supply Point (ASP) at Fort McCoy, WI Federal contract opportunity
- Solicitation number
- W911SA-18-B-2006
About this file
Specifications
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W911SA-18-B-2006_Bid_Abstract.pdf | ||
| W911SA-18-B-2006_Amendment_0001.pdf | ||
| W911SA-18-B-2006_Site_Visit_Sign_in_Sheet_1.24.18.pdf | ||
| W911SA-18-B-2006_Attachment_4_Wage_Rate_Requirements.docx | DOCX document | |
| W911SA-18-B-2006_Solicitation_(f).pdf | ||
| W911SA-18-B-2006_Attachment_2_ATOPSEC.pdf | ||
| W911SA-18-B-2006_Attachment_3_Drawings.pdf | ||
| W911SA-18-B-2006_Attachment_5_SF24.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
July 2017 Training ASP
SPECIFICATIONS
TRAINING ASP
FORT MCCOY, WISCONSIN
PROJECT NO: GC-1524-16J
DRAWING NO: 47-018-1511
100% Submittal
July 2017 Training ASP
00002 - 1
SECTION 00002
TABLE OF CONTENTS
DIVISION 1- GENERAL REQUIREMENTS
Section 01000 General Requirements Section 01007 Industry Standard Abbreviations and Codes Section 01019 Contract Considerations Section 01300 Submittals Section 01400 Special Safety Requirements
DIVISION 2 – SITE CONSTRUCTION
Section 02010 Site Preparation Section 02015 Environmental Controls and Monitoring Section 02310 Base Aggregate Section 02315 Excavation Section 02334 Preparing the Foundation Section 02336 Test rolling Section 02348 Geosynthetics Section 02371 Medium Riprap Section 02610 Pipe Culverts Section 02923 Landscape Preparation Section 02930 Seeding - Maintained Areas Section 02950 Surface Facility Restoration
APPENDICES
Appendix A Geotechnical Investigation Report
SPECIFICATIONS
TRAINING ASP
FORT MCCOY, WISCONSIN
PROJECT NO: GC-1524-16J
DRAWING NO: 47-018-1511
July 2017 Training ASP
00002 - 1
SECTION 00002
TABLE OF CONTENTS
DIVISION 1- GENERAL REQUIREMENTS
Section 01000 General Requirements Section 01007 Industry Standard Abbreviations and Codes Section 01019 Contract Considerations Section 01300 Submittals Section 01400 Special Safety Requirements
DIVISION 2 – SITE CONSTRUCTION
Section 02010 Site Preparation Section 02015 Environmental Controls and Monitoring Section 02310 Base Aggregate Section 02315 Excavation Section 02334 Preparing the Foundation Section 02336 Test rolling Section 02348 Geosynthetics Section 02371 Medium Riprap Section 02610 Pipe Culverts Section 02923 Landscape Preparation Section 02930 Seeding - Maintained Areas Section 02950 Surface Facility Restoration
APPENDICES
Appendix A Geotechnical Investigation Report
01000 - 1
SECTION 01000
GENERAL REQUIREMENTS
PART 1 GENERAL
1.01 SUMMARY
A. GENERAL
1. All construction debris shall be cleaned up daily.
2. Secure all tools and equipment offsite at the end of each work day.
B. REMOVAL WORK: Remove all items indicated on the drawings and in the specifications and dispose of at the Ft McCoy recycling facility:
1. Grubbing of stumps.
C. NEW WORK: Contractor shall provide all labor, equipment, materials, transportation, and supervision necessary to perform the work under this contract including but not limited to:
1. All work as included in the plans and specifications.
a. Project 1 includes rough grading of entire site, stormwater management and biorentention devices, fine grading and placing dense aggregate in areas highlighted as “Project 1” on plan sheet C1.3. All other disturbed areas shall be restored with topsoil and seed. Erosion control shall be used on the entire site.
D. REPAIR WORK: Contractor shall repair any damages caused by this construction, including but not limited to;
1. Repair any existing construction which is damaged.
2. Repair any landscaping including trees, shrubs, flowers, and grass.
3. Repair vehicle ruts. Level the ruts, place topsoil, and seed the disturbed areas according to the specifications.
1.02 ABBREVIATIONS
A. “KO” = Contracting Officer.
B. “COR” = Contracting Officer’s Representative.
C. Industry Standard Abbreviations - See Section 01007.
1.03 TEMPORARY UTILITIES AND FACILITIES
A. General: This section is intended to include temporary utilities and temporary construction facilities to be provided by the Contractor unless otherwise stated below.
B. Temporary heating, cooling, and ventilation
1. Furnish, install, and maintain all temporary systems and equipment required to maintain specified or required environmental conditions during the progress of the work. Remove upon completion of work at the expense of the Contractor.
01000 - 2
2. Government provided electricity will not be used for heating.
C. Temporary Telephone Service
1. If the Contractor requires phone service for this project, the Contractor must contact the phone company business office:
Century Telephone 205 5th Avenue LaCrosse, Wisconsin 54601
(800) 872-4017
2. The Contractor shall pay for all telephone installation, maintenance, removal, and usage charges.
3. The Contractor is responsible for providing and paying for any and all subcontractor’s calls.
4. Existing telephones owned or rented by the Government will not be used by the Contractor under any circumstances.
D. Temporary Water
1. Water for construction purposes is available from an existing water connection in the building scheduled for work to be performed. Capacity is estimated to be not less than 10 GPM at 45 psi. Water is city water quality and contains sodium hypochlorite.
2. The Contractor shall furnish anti-siphon and backflow prevention devices on all temporary water connections. Proof of certification is required.
3. Contractor shall not cause water to be wasted or left running when not in use.
Leaks will be repaired immediately. Freeze protection shall be provided by the contractor.
4. The water used will be furnished by the Government.
E. Temporary Sanitary Facilities
1. Existing sanitary facilities in Government building(s) will not be used by the Contractor’s personnel.
2. The Contractor shall be responsible for providing and paying for temporary toilet and sanitary facilities. The Contractor shall pay rental fees and cleaning charges and shall remove the facilities when the project is completed.
3. The COR or Construction Inspector shall approve the site location for all temporary sanitary facilities.
4. Contractor shall maintain all such facilities used in a clean and sanitary condition.
F. Barriers and Fences
1. Contractor shall provide, install, maintain, and remove suitable barriers to prevent public entry and to protect the work site.
2. Such barriers shall be erected to provide a safety barrier around such portions of the project that could cause injury or destruction of property and to provide general security for the affected project site.
01000 - 3
3. Materials to be used are at the Contractor’s option and expense.
4. Barriers and fence shall be posted with appropriate warning signs. Place warning signs at the construction area perimeter designating the presence of construction hazards requiring unauthorized persons to keep out. Signs must be placed on all sides of the project, with at least one sign every 300 feet. All points of entry shall have signs designating the construction site as a hard hat area.
5. Fencing shall be provided along the construction site at all open excavations and tunnels to control access by unauthorized people. Fencing must be installed to restrain a lateral force of at least 200 pounds.
G. Security
1. The Contractor shall provide all materials, labor, and equipment to protect the project site from theft and vandalism.
2. Existing Government buildings and facilities shall be protected by the Contractor during the contract when the work involves openings into existing Government buildings. The degree of protection shall not be less than what currently exists.
3. Storage of construction materials is at the risk of the Contractor.
H. Access Roads and Parking Areas
1. Contractor’s private vehicles shall be parked at locations designated by the COR.
2. All construction vehicles and Contractor’s private vehicles will be parked in an orderly manner at all times and will not block normal traffic in the area. Private vehicles belonging to the contract personnel will be parked in designated parking areas and in no case on grass areas, adjacent to buildings, or along streets.
3. Contractor is responsible for any snow removal required for access or site work.
I. Access and General Protection/Security Policy and Procedures
1. The contractor and all associated subcontractors’ employees shall provide all information required for background checks to meet installation access requirements to be accomplished by Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. The contractor and all associated subcontractors’ employees shall also comply with adjudication standards and procedures using the National Crime Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation /facility access and local security policies and procedures (provided by government representative). In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes. The Government may require monthly participation in the Installation Random Antiterrorism Program.
J. Contractor’s Requiring Common Access Card (CAC)
1. Before CAC issuance, the contractor employee requires, at a minimum, a favorably adjudicated National Agency Check with Inquiries (NACI) or an equivalent or higher investigation in accordance with Army Directive 2014-05.
01000 - 4
The contractor employee will be issued a CAC only if duties involve one of the following: (1) Both physical access to a DOD facility and access, via logon, to DOD networks on-site or remotely; (2) Remote access, via logon, to a DOD network using DOD-approved remote access procedures; or (3) Physical access to multiple DOD facilities or multiple non- DOD federally controlled facilities on behalf of the DOD on a recurring basis for a period of 6 months or more. At the discretion of the sponsoring activity, an initial CAC may be issued based on a favorable review of the FBI fingerprint check and a successfully scheduled
NACI.
K. Traffic Work
1. All work around or involving roadways, to include roadway excavations and utility crossings, will be conducted in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) – FHWA, Latest Edition.
2. The Contractor shall provide and ensure appropriate road closure and detour signs are established as necessary for traffic management. All road closures shall be coordinated with the Contracting Officer in advance. Road closures shall require a road closure plan showing the location of signage.
L. Waste Reporting
1. The Army has established the requirement for a 50 percent minimum diversion rate by weight of C&D waste from landfill disposal. In order to achieve those results the Contractor shall submit a solid waste management plan as a required submittal for projects costing over $100,000. At a minimum, the solid waste plan shall include the anticipated waste streams and disposal/recycling facilities. No work shall begin until the Contractor has an approved plan.
2. The Contractor shall submit reports to the Contracting Officer quantifying the total pounds of hazardous, universal, recycled, and non-regulated waste disposed of during the duration of the contract. Contractor shall also submit material(s) disposal location(s).
3. Reporting shall be specific to the month in which waste was disposed of and separated per waste type for Fort McCoy’s reporting requirements.
4. Reporting for recycled waste shall also be specific to how much revenue the Contractor received for each type of recycled material.
M. Refuse Disposal and Recycling
1. Provide all solid waste disposal associated with this contract, including but not limited to the container delivery, removal, and disposal fees. Items included under this section are all solid wastes as defined by Wisconsin State Statute
289.01 (33). These items shall be disposed in a licensed sanitary landfill or recycling center in accordance with State of Wisconsin Administrative Code Chapter NR500 series.
2. The Contractor is allowed to use Fort McCoy recycling facilities for concrete, mixed paper, plastics (PETE#1 and HDPE#2), cardboard, trees/woody waste, metals, and aluminum cans. If materials are recycled at Fort McCoy, provide all labor and delivery to the designated recycling facilities. Materials shall be weighed and weigh slips provided to the COR to receive credit toward the 50 percent requirement in “Waste Reporting” above. Materials not weighed can
01000 - 5 be delivered to the designated recycling facilities, but the material will not count toward the 50 percent waste reporting requirement.
3. Provide for the recycling of all other construction/demolition debris including drywall, lumber, reinforcing steel, piping, wiring, brick, plaster, wall board, roofing material, insulation, plumbing fixtures, doors, and windows to the greatest extent possible . Only utilize licensed recycling facilities.
4. Provide a certificate of recycling for universal waste as defined in Wisconsin Administrative Code Chapter NR600.
N. Material Sales
1. Materials shall not be stockpiled for sale purposes on Post.
2. Public advertised sales of materials will not be permitted on Post.
3. Prior arranged sale of materials may be permitted on Post.
1.04 QUALITY CONTROL
A. The Contractor is responsible for quality control and shall establish and maintain an effective quality control system in compliance with the Contract Clause titled “Inspection of Construction.” The Contractor Quality Control (CQC) Plan shall include, as a minimum, the following to cover all construction operations, both onsite and offsite, including work by subcontractors, fabricators, suppliers, and shall be keyed to the proposed construction sequence. The plan shall identify personnel, procedures, control, instructions, tests, records, and forms to be used. The site project superintendent is responsible for the quality of work on the job and is subject to removal by the Contracting Officer for non-compliance with the quality requirements specified in the contract.
1.05 APPLICABLE STANDARDS, GUIDES AND SPECIFICATIONS
A. References are made in these specifications to published codes, standards, and specifications of manufacturers’ societies, associations, and other standards. All referenced documents are included in this specification as if written in their entirety.
B. Where referenced documents are not specified by date, the WISDOT 2017 Standard Specifications shall apply.
1.06 DELIVERY AND STORAGE
A. Contractor shall insure that any items which are stored at the site prior to installation are stored in an environment that will not cause rusting, warping, staining, or any physical breakage or damage.
B. All labor and equipment required for loading, unloading, transporting, and moving materials shall be provided by the Contractor.
C. Storage buildings will not be provided by the Government.
1.07 TRAILERS OR STORAGE BUILDINGS, INCLUDING OFFICE TRAILERS
A. Trailers or storage buildings will be permitted, where space is available, subject to the approval of the COR.
B. The trailers or buildings shall be in good condition, free from visible damage, rust, and deterioration, and meet all applicable safety requirements. Trailers shall be roadworthy and comply with all appropriate State and local vehicle requirements. Failure to maintain
01000 - 6 storage trailers or buildings to these standards shall result in the removal of non-complying units at the Contractor's expense.
C. A sign not smaller than 2-feet by 2-feet shall be conspicuously placed on the trailer depicting the company name, business phone number, and emergency phone number.
D. Trailers shall be anchored to resist high winds and must meet applicable state and local standards for anchoring mobile trailers.
E. Provide metal or fiberglass skirting completely around office trailers within 30 days after placement of the trailer on the lot and after being approved by the COR.
F. Grass and weeds shall be cut weekly or as needed to a height not to exceed three inches.
Trash shall be picked up and disposed of properly on a daily basis.
G. The Contractor shall be responsible for the installation and removal of all temporary utility connections at no cost to the Government.
1.08 STORAGE SITE
A. All stored materials shall be neatly stacked at all times.
B. Trash shall be picked up and properly disposed of on a daily basis.
C. Grass and weeds shall be cut on a regular basis to a height not to exceed three inches. In Cantonment, uncut height shall not exceed 6 inches. Outside Cantonment, uncut height shall not exceed 12 inches.
D. Welding equipment shall be handled and stored in accordance with applicable regulations.
E. Fire extinguishers shall be provided where flammable liquids are stored.
1.09 SCHEDULING AND COORDINATING WORK
A. Contractor shall submit the proposed construction schedule, in accordance with the FAR clause entitled schedule for construction contracts. Attached to the construction schedule shall be a horizontal bar chart with a separate line for each major portion of work, identifying the first work day of each week. Distribute copies of the approved schedule to the project site file, subcontractors, suppliers, and other concerned parties.
1. The Contractor shall at the Pre-construction Conference or if no Pre-con is held, within 20 calendar days of award, prepare and submit their schedule in the form of a Gantt Chart for approval. This schedule shall show at a minimum critical path, float, owner of float, milestones, baseline, elements of work, and duration of each significant element of work. The submitted schedule shall be approved prior to beginning work.
2. The Contractor shall maintain the original schedule/Gantt Chart throughout the life of the project and show actual schedule achievement in tandem with the original schedule and shall update the approved schedule bi-weekly to display time gained or lost against the original schedule. If in the opinion of the Contracting Officer the Contractor falls behind the approved schedule, the Contractor shall take steps necessary to improve progress, including those steps that may be required by the Contracting Officer, without additional cost to the Government. The Contracting Officer may require the Contractor to increase the number of shifts, overtime operations, days of work, and/or the amount of construction plant, and to submit for approval any supplementary schedule or https://focusonenergy.com/
01000 - 7 schedules in chart form as the Contracting Officer deems necessary to demonstrate how the approved increased effort shall regain the original schedule of progress. FAR 52.236-15
B. The Contractor shall be specifically responsible for the coordination of all phases of work under this contract within the approved construction schedule.
C. The Contractor may be required to allow Government personnel or other Contractors to carry out work within the work site. Such work will be scheduled and coordinated through the COR.
D. The Contractor shall provide a phone number and address where a key, and/or approval, to enter may be obtained for the work sites during the work day for times when the Contractor may not be at the work site.
E. The Contractor shall provide 10 working days notice for any utility outage. Outages shall be shown on the schedule provided. Emergency utility outages shall be reviewed by the Contracting Officer/Inspector prior to utility outage. Expenses/damages caused by unscheduled or unapproved utility outages shall be chargeable to the Contractor.
1.10 WARRANTIES
A. All materials and workmanship shall be warranted by the Contractor for a period of not less than one year from the date of final acceptance by the Government, except when longer warranties are required from the Contractor as stated in each specification section.
B. For products and materials that are normally warranted by the manufacturer or supplier for more than one year, the Contractor shall provide the Government with a written warranty, or certification, indicating the manufacturer’s or supplier’s terms and conditions of the warranty.
C. The Contractor shall populate and submit a Warranty Item Tracking spreadsheet; that which is covered under part A. The spreadsheet shall be provided to the contractor upon request of the government COR. The spreadsheet shall outline each piece of extended warranty equipment provided. Extended warranty shall be anything beyond one calendar year from the Beneficial Occupancy Date. Item information will include the following:
warranty item, equipment description, make, model, serial number, capacity, capacity unit of measure, warranty start date, warranty length, and Maintenance Information as indicated on the Provided Spreadsheet.
PART 2 PRODUCTS
2.01 EXISTING MATERIALS
A. Materials to be demolished:
1. None
B. Existing materials may only be reused/relocated as specifically allowed per the contract drawings and specifications.
2.02 NEW MATERIAL AND EQUIPMENT
A. Materials and equipment shall be essentially the standard products of a manufacturer regularly engaged in the manufacture of those products, shall meet the requirements of the specification, and shall essentially duplicate material and equipment that have been in satisfactory use.
01000 - 8
B. All materials shall be of the latest type or model currently being produced by the manufacturer.
C. Seconds or otherwise substandard materials will not be allowed.
D. Where applicable, proposed new doors, windows, insulation, electrical, heating, cooling and plumbing equipment shall be eligible for energy efficiency incentives available through Wisconsin’s Focus on Energy program. Equipment shall be proposed that meet all of Focus on Energy’s requirements for incentives. Proposals shall include the appropriate corresponding incentive codes, model numbers and cut sheets for each proposed lighting component. Further information concerning Focus on Energy’s requirements can be found in their lighting catalog which can be found on-line at https://focusonenergy.com.
PART 3 EXECUTION
3.01 INSPECTION
A. The Contractor shall not begin successive phases of work until an inspection has been completed and the work is accepted by the COR. Notify the COR 48 hours prior to completing a phase requiring inspection.
1. Any work that will be covered by successive work must be inspected prior to performing successive work.
2. Work to be covered includes, but is not limited to, underground utilities, utilities located behind walls, and work located below finish floors.
B. When the contractor considers the work complete, submit written certification confirming:
1. Contract documents have been reviewed.
2. Project submittals have been completed.
3. Work has been inspected by the Contractor for compliance with the contract.
4. Work is complete and ready for final inspection.
5. Contractor shall provide a requested date for punch list inspection to the Contracting Officer, in writing, not less than 7 working days prior to the proposed date of inspection. Punch list inspections shall be scheduled and conducted to ensure compliance with the contract completion date.
C. The COR will coordinate with the members of the inspection party and establish the punch list inspection date.
1. Should the COR consider the work incomplete or defective, a written punch list will be provided to the Contractor from the Contracting Officer.
2. The Contractor will be given 10 calendar days, unless otherwise determined by the Contracting Officer, to remedy the stated deficiencies.
3. The Contractor shall provide a second written certification and request re-inspection to be scheduled not later than the 10 calendar days, unless otherwise determined by the Contracting Officer. This re-inspection shall also be completed during the contract performance period to be in accordance with the contract.
01000 - 9
4. If any further re-inspections are required the Contractor may be charged the additional cost of the inspections.
5. Final acceptance of the work occurs upon the Contracting Officer’s acceptance of the work subsequent to successful final inspection by the COR and receipt of all contract requirements.
6. If final acceptance does not occur prior to the contract completion date, liquidated damages may be applicable in accordance with the liquidated damaged clause.
D. If the Government requires beneficial occupancy of the facility prior to completion of the work by the Contractor, an inspection shall be conducted by the COR to determine the completed work, and either accept or document any work not complete. The Contractor will then complete the remaining work and correct any deficiencies.
3.02 TRANSITION FROM EXISTING TO NEW WORK
A. When new work abuts or finishes flush with existing work, make a smooth transition.
Patched work shall match existing adjacent work in texture and appearance.
B. When finished surfaces are cut in such a way that a smooth transition with new work is not possible, terminate existing surface along a straight line at a natural line of division and provide trim appropriate to the finished surface.
3.03 OPERATING TESTS
A. After equipment installations are completed, the Contractor shall conduct an operating test for approval. The test shall demonstrate that the operating and installation requirements of the specifications have been met. The test shall be performed in the presence of the COR.
3.04 ENVIRONMENTAL CONSIDERATIONS
A. Migratory Bird Nesting Season
1. This project is subject to the Migratory Bird Treaty Act. Land clearing activities for construction, maintenance, and repair activities should generally be scheduled outside the migratory nesting season which is generally considered to be from 1 May thru 30 August. If the contractor intends to disturb or clear any project area of undeveloped land or demolish any trees, bushes or potential nesting sites they shall submit a Migratory Bird Treaty Act Deconfliction Notification. The notification shall be submitted not later than two weeks prior to schedule clearing activities. Contractors are not allowed to proceed with construction until after the site has been cleared by the Fort McCoy Natural Resources Branch. The Submittal Notification shall state: “This project is subject to the Migratory Bird Treaty Act. Request that Fort McCoy, DPW, Natural Resources Branch if necessary, conduct a site investigation to ensure the project location(s) does not have naturally conflicting species.”
B. Northern Long-Eared Bat
1. In May 2015, the Northern Long-Eared Bat (NLEB) was listed as a federally endangered species. As a result of this listing, tree removal is temporarily prohibited unless a survey is conducted to determine if bats are present. Fort McCoy biologists will conduct these surveys. The contractor shall submit an
01000 - 10
Endangered Species Act Deconfliction Notification a minimum of 14 days prior to the scheduling of any tree clearing activities. The notification shall state: “This project is subject to the Endangered Species Act. Request that Fort McCoy, DPW, Natural Resources Branch approve the removal of trees as required by the project specifications.” At that point an evening survey will be scheduled to determine if bats are present. If no bats are observed, the Contractor will be required to remove the trees the following morning. If bats are observed, further consultation will be required with the U.S. Fish and Wildlife Service and the tree clearing will be delayed.
C. State Listed Species
1. Reducing or avoiding impact to state listed species, though not required, is preferred. According to the Natural Heritage Inventory database, several state listed endangered, threatened, and special concern species have been recorded in the township and range of this project. While many species are listed within the township and range of this project, the habitat types found on the site do not support many of the species listed.
2. Onsite monitoring of animal species indicates that some state listed species have been observed within a mile of the project sites. This includes the special concern Blanding’s turtle (Emydoidea blandingii), the threatened wood turtle (Glyptemys insculpta), endangered phlox moth (Schinia indiana) site, the special concern bog bluegrass (Poa paludigena), and the special concern golden winged warbler (Vermivora chrysoptera).
3. Blanding's turtles over-winter in open water as well as in streambanks and are active at Fort McCoy from early April to mid-October. These turtles spend much of the summer out of the water in the riparian area next to streams. They especially prefer wet meadows and sedge meadow habitats and the backwaters of rivers. These turtles strongly prefer to nest in sandy soil and are most likely to be found within 900 feet of riparian zones or wetland habitat, although telemetry data has shown that they can travel long distances between said habitats.
Blanding’s turtles take 17-20 years to reach sexual maturity, and mortality of only a few turtles from a population can have a significant impact on the overall population. Blanding’s turtles display nest site fidelity, returning to nest in the same location each year (WDNR, 2016). According to Mr. Tim Wilder, Fort McCoy Natural Resources Biologist, the Installation has conducted ample telemetry monitoring of Blanding’s turtles surmise that Blanding’s turtles occasionally move through the area but do not spend significant time in the project area. This project would impact upland nesting habitat for this species.
Figure 6 shows that the majority of the project site for the proposed action and alternative action 1 falls within a 300 meter buffer zone. This buffer zone is established to protect the species during the mating season. Construction projects may not proceed within the buffer zone from April to October without installing and maintaining avoidance measures. Section 8.0 provides further detail regarding avoidance measures.
4. Wood turtles occur at low densities on the installation and are known to occur in the Stillwell Creek drainage in small numbers. Wood turtles over-winter in stream banks and are active from April through mid-October. Habitat consists of rivers and streams with adjacent wetlands and upland forests. The species especially prefer open wet meadows and shrub-carr habitats. Wood turtles tend to
01000 - 11 stay within 300 meters of rivers and streams, however telemetry data collected at the Installation has documented numerous occasions where wood turtles have been located more than 1,000 meters from the closest stream. Nesting occurs during late-May and into June in sand or gravel areas. The Wood turtle nests are typically located very close to water. Wood turtles take 12-20 years to reach sexual maturity, and mortality of only a few turtles from a population can have a significant impact on the overall population. Wood turtles are known to occur within Stillwell Creek, adjacent to the project site. This project is expected to impact upland nesting habitat for this species. Figure 6 shows that the majority of the project site for the proposed action and alternative action 1 falls within a 300 meter buffer zone. This buffer zone is established to protect the species during the mating season. Construction projects may not proceed within the buffer zone from April to October without installing and maintaining avoidance measures. Section 8.0 provides further detail regarding avoidance measures.
5. The golden winged warbler breeds in dense thickets of deciduous shrubs and saplings. Sightings of this bird have not been recorded within the proposed or alternative areas, however they have been reported south of the site along side of the main railroad tracks. This species often uses wetland habitats such as alder thickets and willow stands. Habitat loss has been a main threat to this species.
Clearcutting and burning to open forests can improve habitat for this species, although keeping mature forest nearby is also required. Because the golden-winged warbler has been noted in the vicinity of the project, it is possible that the proposed action could impact the species. Mr. Wilder noted that additional survey work may be appropriate to assess the presence of the species within the work area.
6. The phlox moth relies heavily on its host plant, downy phlox (Phlox pilosa), which occurs in pine and oak barrens, and sandy prairies. Downy phlox requires open sunny conditions with some shade, and is susceptible to disturbance as is does not colonize new habitat very quickly. The adult emergence and larval development of the phlox moth coincides with the flowering of downy phlox, which is typically from the end of April through July. Impact to the species can be minimized and by avoiding impact to downy phlox, especially from the end of April through July. The phlox moth has not been sighted on the proposed site and downy phlox has not been mapped in the project area. It not anticipated that impact to the habitat of the phlox moth will occur therefore the overall impact to this species is anticipated to be minimal.
7. Bog bluegrass is found in wetland communities such as northern hardwood swamps and shrub-carr wetlands. According to Mr. Wilder, the only bluegrass that was found in the area was located within the riparian area of Stillwell Creek.
No wetland are anticipated to be impacted as part of the proposed project and the project will not impact Stillwell Creek, therefore it is not anticipated that this species will be impacted by the project.
D. Invasive Species
1. Contractor shall document the washing of equipment prior to arrival on Fort McCoy and upon departure from the work site to control the spread of invasive species. Spotted knapweed, crown vetch, and garlic mustard are documented to be in, adjacent, or near the work site. Any fill material transported to the work site shall be free of invasive weeds and/or seeds to the greatest extent practical.
01000 - 12
E. Oak Wilt Season
1. Contractor shall not perform tree removal during the oak wilt season (April 1 thru 31 July) for tree removal. If tree removal is required during oak wilt season any oak trees not scheduled for removal shall be protected from damage. If non-scheduled live trees are damaged, tree wound dressing shall be immediately applied to the damaged area. All trees and/or stumps that require removal shall be transported to the stump disposal site on South Post or removed from the installation.
3.05 CLEANING
A. During Construction:
1. The Contractor shall at all times keep the work area, including storage areas, free from accumulations of waste materials. The Contractor shall ensure all affected areas are “broom clean” at the end of each work day. Before completing the work, the Contractor shall remove from the work and premises, any rubbish, tools, scaffolding, equipment, and materials that are not the property of the government. Upon completing the work, the Contractor shall leave the work area in a fully cleaned, neat, and orderly condition, satisfactory to the Contracting Officer. FAR 52.236-12.
B. Final Cleaning
1. Final cleaning shall be performed and completed prior to punch list inspection.
2. Clean project site.
a. Sweep paved areas.
b. Rake clean other surfaces.
3. Remove waste and surplus materials, rubbish, and construction facilities from the project and from the site.
3.06 PROJECT COMPLETION
A. Fourteen (14) calendar days prior to the final inspection, submit invoices showing the installed cost of each of the following for the Government to apply for Focus on Energy rebates:
1. See Appendix A; Materials Certification Letter.
END OF SECTION
https://docs.legis.wisconsin.gov/code/prefaces/toc
01007 - 2
AVATI Asphalt and Vinyl Asbestos Tile Institute
AWI Architectural Woodwork Institute
AWS American Welding Society
AWPA American Wood Preservers Association
AWPB American Wood Preservers Bureau
AWPI American Wood Preservers Institute
AWWA American Water Works Association
CRSI Concrete Reinforcing Steel Institute
CS Commercial Standards of U.S. Department of Standards
EIA Electronic Industries Alliance
EPA Environmental Protection Agency
EWA Engineered Wood Association (formerly APA)
FGJA Flat Glass Jobbers Association
FM Factory Mutual
FRP Fiber Reinforced Plastic
FS Federal Specifications
GA Gypsum Association
IEEE Institute of Electrical and Electronic Engineers
MSS Manufacturer’s Standardization Society
NAAMM National Association of Architectural Metal Manufacturers
NBS National Bureau of Standards
NBFU National Bureau of Fire Underwriters
NCMA National Concrete Masonry Association
NEC National Electric Code
NECA National Electrical Contractors Association
NEMA National Electrical Manufacturers Association
NFPA National Fire Protection Association
NFPA National Forest Products Association
NPC National Plumbing Code
NRCA National Roofing Contractors Association
NRMCA National Ready Mixed Concrete Association
NWMA National Woodwork Manufacturing Association
NWAHHA National Warm Air Heating and Air Conditioning Association
OSHA Occupational Safety and Health Administration
PCA Portland Cement Association
01007 - 3
PPI Plastic Pipe Institute
PS Product Standard of NBS
SMACNA Sheet Metal and Air Conditioning Contractors National Association
SPIB Southern Pine Inspection Bureau
SSPC Steel Structures Painting Council
TIA Telecommunications Industry Association
UL Underwriters Laboratories
USAS United States of American Standards (formerly ASA)
WCLIB West Coast Lumber Inspection Bureau
WDNR Wisconsin Department of Natural Resources
WISDOT Wisconsin Department of Transportation (2017)
WWPA Western Wood Products Association (WPA and WCLA)
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION - NOT USED
01019 - 1
SECTION 01019
CONTRACT CONSIDERATIONS
PART 1 GENERAL
1.01 This contract shall have a scheduled completion date of 30 June 2018.
1.02 Liquidated damages will apply for this project. See the contract documents for more information.
PART 2 PRODUCT – NOT USED
PART 3 EXECUTION – NOT USED
01300 - 1
SECTION 01300
SUBMITTALS
PART 1 GENERAL
1.01 SUBMITTALS
The following paragraphs indicate the requirements for submittals by the Contractor. All items listed in the Schedule of Material Submittals shall be submitted in accordance with the following paragraphs.
A. At all times the Contractor remains responsible for ensuring that the work is performed in strict accordance with the contract requirements. The fact that a non-conforming submittal may be accepted and inadvertently approved by the Government does not, in any way, relieve the Contractor of this responsibility.
Approval by the Contracting Officer shall not relieve the Contractor from responsibility for any errors or omissions in the submittals, nor from the responsibility of complying with the requirements of the contract, unless the variations have been described and approved in strict accordance with the procedures set forth in the Code of Federal Regulations, 48CFR 52.236-21, Specifications and Drawings for Construction clause, paragraph (f).
B. Definitions
1. Submittal - General term that includes any item that is required to be provided by the Contractor to the Government to identify product descriptive literature, drawings, sketches, and schematics that indicate and show a fabrication or installation method or technique; or any other model or sample of actual items or methods to include product data sheets, shop drawings, or samples.
2. Product Data - Descriptive literature or data that describes the physical properties of a product or material item that the Contractor intends to use in doing the work. Such descriptive data should enable the Contracting Officer to verify that the intended item meets the necessary requirements of the specifications.
3. Shop Drawings - A sketch, drawing, or schematic that is prepared by or for the Contractor that illustrates or shows how certain products or material items will be assembled, installed, interconnected, or fabricated for this contract.
4. Sample - An actual piece of material, product, or equipment that the Contractor intends to furnish, use, or install on the project.
1.02 PRODUCT DATA
A. Preparation:
1. Clearly mark each copy to identify pertinent products or models.
2. Show performance characteristics and capacities.
3. Show dimensions and clearances required.
4. Show wiring or piping diagrams and controls.
5. Show any other information requested in the specification sections.
01300 - 2
B. Modify drawings and diagrams to delete information that is not applicable to the work.
C. Supplement standard information to provide information specifically applicable to the work.
1.03 SHOP DRAWINGS
A. Drawings shall be presented in a clear and thorough manner.
B. Details shall be identified by reference to sheet, detail, schedule, and room numbers shown on the project drawings.
1.04 SAMPLES
A. Product samples shall be of sufficient size and quantity, unless a size is specified, to clearly illustrate:
1. Functional characteristics of the product with integrally related parts and attachment devices.
2. Full range of color, texture, and pattern.
B. Field samples and mock-ups:
1. Fabricate each sample and mock-up complete and finished.
1.05 CONTRACTOR RESPONSIBILITIES
A. Review shop drawings, product data and samples prior to submission. All submittals shall be made through and approved by the General Contractor.
Submittals will not be accepted directly from sub-contractors.
B. Determine and verify:
1. Field measurement.
2. Field construction criteria.
3. Catalog numbers and similar data.
4. Conformance with specifications.
C. Coordinate each submittal with the requirements of the work and of the Contract Documents.
1.06 SUBMISSION REQUIREMENTS
A. Make submittals promptly in accordance with the approved schedule in such sequence as to cause no delay in the work or in the work of any contractor.
B. Contractor shall develop a complete list of preconstruction and construction submittals. Contractor shall identify required submittals of the RFP and use the list to prepare the submittal register. The list may not be all inclusive and additional submittals may be required by other parts of the contract. The contractor must prepare a Submittal Register listing all submittals, in the format of the attached Schedule of Material Submittals. A preliminary Register is attached to the end of this section; the Designer of Record shall verify its completeness, and make any corrections, or additions required. The Submittal Register shall be submitted to the Contracting Officer for acceptance in accordance with the schedule below. Once accepted by the Government, the contractor shall input the Submittal Register into an Excel spreadsheet suitable
01300 - 3 for use by the contractor and Government. The approved/accepted Submittal Register will serve as a scheduling document for submittals and will be used to control submittal actions throughout the contract period. The submit dates and need dates used in the submittal register shall be coordinated with dates in the Contractor prepared progress schedule. Updates to the submittal Register codes and actual dates shall be submitted monthly or until all submittals have been satisfactorily completed. When the progress schedule is revised, the submittal register shall also be revised and both submitted for approval.
The contractor shall make submittals as required by the specifications. The contracting Officer may request submittals in addition to those specified when deemed necessary to adequately describe the work covered in the respective sections. Units of weights and measures used on all submittals shall be the same as those used on the contract drawings, or required per the contract documents. Each submittal shall be complete and in sufficient detail to allow ready determination of compliance with contract requirements. Prior to submittal, all items shall be checked and approved by the Contractor’s Quality Control (CQC) system Manager and each CQC System Manager indicating action taken. Proposed deviations from the contract requirements shall be clearly identified.
C. Number of submittals required:
1. Shop Drawings: The Contractor shall submit complete shop drawings to demonstrate compliance with the contract drawings. The shop drawings shall include complete details for the installation of the work. Submit one copy of shop drawings.
2. Product Data: Contractor shall receive approval by the COR on each submittal item prior to ordering or installing each item. Submit one copy of product data.
3. Samples: Submit the number stated in each specification section. Samples submitted will not be returned to the Contractor for incorporation into the project. Samples retained by the Government will be used for comparison of materials installed on site.
4. All submittals shall be sent directly to DPW either electronically (preferred method) or in paper copy, but not both. Please do not duplicate as this will cause for delays in the turnaround time of your submittals.
There will be a box at the main entrance desk in Building 2171 for submittals. Electronic submissions shall be sent to:
usarmy.mccoy.imcom-northeast.mail.dpw-inspections@mail.mil .
D. Submittals shall contain:
1. Transmittal cover sheet, ENG FORM 4025-R, Mar 2012.
2. The date of submission and the dates of any previous submissions.
3. The project title and number.
4. Contract identification.
mailto:%20usarmy.mccoy.imcom-northeast.mail.dpw-inspections@mail.mil mailto:%20usarmy.mccoy.imcom-northeast.mail.dpw-inspections@mail.mil
01300 - 4
5. The names of:
a. Contractor.
b. Supplier.
c. Manufacturer.
6. Identification of the product with the specification section number.
7. Field dimensions, clearly identified as such.
8. Applicable standards such as ASTM or Federal Specification numbers.
9. Identification of deviations from Contract Documents.
10. Identification of revisions on re-submittals.
E. Resubmission Requirements:
1. Make any corrections or changes in the submittals required by the COR and resubmit until approved.
01300 - 5
SECTION 01300
SCHEDULE OF MATERIAL SUBMITTALS
A. To be submitted 20 calendar days or sooner after the Notice to Proceed is issued.
B. To be submitted 20 days or sooner after installation or completion of the work.
C. To be submitted at the Pre-Construction Conference.
D. To be submitted 14 days before Final Inspection.
PROJECT DESCRIPTION: PROJECT NUMBER: GC-1524-16J
Fort McCoy, WI FILE# 47-018-1511
ITEM
NO.
SECTION,
PARA NO,
LETTER
DESCRIPTION OF
MATERIAL
DATE DATE DATE SUBMIT CODE COMMENT
REQ Received Returned NO.
1.00 01000,
1.11 A Construction Schedule A
2.00 01400,
1.03 A Accident Prevention Plan C
3.00 02015
1.03 A Confirmation Letter C
4.00 02015
1.03 B Erosion Control Schedule C
5.00 02015
1.03 C
Product Samplers and Manufacturer’s Data: Silt Fence, Erosion Mat & Ditch Checks
C
6.00 02015
1.03 D
Weekly Inspection Reports for Erosion and Sediment Controls D
7.00 02310
1.03 A
Aggregate Material Location and Gradation Data
10 days prior to placement
8.00 02310
1.03 B
Aggregate Material Testing Data
10 days
9.00 02310
1.03 C
Aggregate Material Weight and Delivery Tickets D
10.00 02310
3.03 A Materials Testing Report D
11.00 02348
1.02 A Geosynthetic Product Data C
12.00 02371
1.02 A Medium Riprap Product Data C
13.00 02610
Plant Certifications for Pipe and End Aprons C
14.00 02950
Aggregate Material Location and Gradation Data
10 days
15.00 02950
1.03 B
Asphaltic Mixture Mix Design Report
10 days
01300 - 6
01400 - 1
SECTION 01400
SPECIAL SAFETY REQUIREMENTS
PART 1 GENERAL
1.01 SUMMARY
A. This section provides guidelines for the preparation of accident prevention plans and the implementation of the accident prevention clause which is this specification, Federal Acquisition Regulation (FAR) clause 52.236-13, and the U.S. Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1. The required Safety Plan shall be developed using Appendix A of the latest edition of the EM-385-1-1.
B. The U.S. Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1 is available from Government bookstores operated by the Government Printing Office. Government bookstores are located in most major cities including Milwaukee, Chicago, Kansas City, Denver, and Pueblo, Colorado. An electronic copy of the EM 385-1-1 is available at:
http://www.usace.army.mil/SafetyandOccupationalHealth/SafetyandHealthRequi rementsManual.aspx
1.02 PRECONSTRUCTION CONFERENCE
A. A preconstruction conference will be scheduled prior to beginning of site work at which time the Contracting Officer will review and discuss requirements relative to planning and administration of the overall safety program.
1.03 SUBMITTALS
A. The following shall be submitted in accordance with Section 01300 Submittal Procedures:
1. Accident Prevention Plan
1.04 ACCIDENT PREVENTION PLAN
A. Shall be developed by a qualified person.
B. Shall be job specific.
C. Shall interface with the contractor’s overall safety and health program.
D. Shall meet the minimum basic requirements of an Accident Prevention Plan found in Appendix A of the latest edition of the EM 385-1-1.
1.05 OBJECTS AFFECTING NAVIGABLE AIRSPACE
A. FAA notification is required IAW CFR 14 part 77, Objects Affecting Navigable Airspace for the following:
1. Definition of Construction /Objects
a. Any object of natural growth, terrain, of permanent or temporary construction or alteration, including equipment or materials used therein, and apparatus of a permanent or temporary character.
http://www.usace.army.mil/SafetyandOccupationalHealth/SafetyandHealthRequirementsManual.aspx http://www.usace.army.mil/SafetyandOccupationalHealth/SafetyandHealthRequirementsManual.aspx
01400 - 2
b. Any alteration of any permanent or temporary existing structure by a change in its height (including appurtenances, or lateral dimensions, including equipment or materials used therein.
2. Any construction/object or alteration of more than 200 feet in height above the ground level at its site.
3. Any construction/object or alteration of greater height than an imaginary surface extending outward and upward at the following slopes:
a. 100 to 1 for a horizontal distance of 50,000 feet from the nearest point of the nearest runway of each airport with at least one runway more than 3,200 feet in actual length, excluding heliports.
b. 50 to 1 for a horizontal distance of 10,000 feet from the nearest point of the nearest runway of each airport with at least one runway more than 3,200 feet in actual length, excluding heliports.
c. 25…
This is the start of the file's text. The full file is on GovTribe.