This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested and a written a solicitation will not be issued.
The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2005-95.
1. Solicitation Number: W911S2-18-U-6007
2. Solicitation Issue Date: 2 July 2018
3. Contract Specialist: Michelle Shoshone
4. Quote Due Date/Local Time: 1 8 J u l y 2018 by 1000 EST. All quotes must be submitted electronically to michelle.l.shoshone.civ@mail.mil by the quote due date above. The email subject field shall contain the solicitation number. The email body shall include the Contractor name, address, phone number, and email address. PAPER COP Y QUOTES
WILL NOT BE ACCEPTED.
5. SITE VISIT: There will be no site visit for this requirement.
6. Questions: All questions shall be in writing and e-mailed to michelle.l.shoshone.civ@mail.mil Questions concerning this solicitation will be accepted up to the Close of Business (1600 EST) on 13 July 2018. Fort Drum does not commit to providing responses to questions submitted after this date; however attempts to answer questions will be made. If needed a solicitation amendment will be posted by 20 July 2018.
7. Issued By:
W911S2
MICC
31 Quartermaster Road Fort Drum, NY 13602
8. This Acquisition is Set Aside 100% for Small Business Concerns under NAICS Code 325120, size standard of 1,000 Employees.
9. Discount Terms:
10. Method of Solicitation: RFQ
11. The Solicitation incorporates by reference FAR 52.212-4, 52.225-25, and 52.228-5.
Addenda are a t tached .
12. Deliver To:
Fort Drum NY.
mailto:michelle.l.shoshone.civ@mail.mil mailto:michelle.l.shoshone.civ@mail.mil
13. Contractor/Offeror:
14. Total Price:
15. The Contractor Is Required To Sign This Document And Return 1 Copy To The Issuing Office. The Contractor Agrees To Furnish And Deliver All Items Set Fort Or Otherwise Identified Above And On Any Additional Sheets Subject To The Terms And Conditions Specified Herein. POC for this requirement is Michelle Shoshone.
16. Signature of Offeror/Contractor:
17. Name and Title of Signer (Type or Print)
18. Date Signed:
W911S218U6007
Section SF 1449 - CONTINUATION SHEET
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government 1001 Destination Government Destination Government 2001 Destination Government Destination Government 3001 Destination Government Destination Government 4001 Destination Government Destination Government 7500 N/A N/A N/A N/A 7501 N/A N/A N/A N/A 7502 N/A N/A N/A N/A 7503 N/A N/A N/A N/A 7504 N/A N/A N/A N/A
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 POP 01-SEP-2018 TO
31-AUG-2019
N/A PUBLIC WORKS
PUBLIC WORKS
4896 FORT DRUM
FORT DRUM NY 13602
FOB: Destination
W8100J
1001 POP 01-SEP-2019 TO
31-AUG-2020
N/A (SAME AS PREVIOUS LOCATION)
2001 POP 01-SEP-2020 TO
31-AUG-2021
N/A (SAME AS PREVIOUS LOCATION)
3001 POP 01-SEP-2021 TO
31-AUG-2022
N/A (SAME AS PREVIOUS LOCATION)
4001 POP 01-SEP-2022 TO
31-AUG-2023
N/A (SAME AS PREVIOUS LOCATION)
7500 N/A N/A N/A N/A
7501 N/A N/A N/A N/A
7502 N/A N/A N/A N/A
7503 N/A N/A N/A N/A
7504 N/A N/A N/A N/A
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 175,000 Gallon Furnish, Install, Fill and Maintain LPG
FFP
Furnish, Install, Fill and Maintain LPG System in accordance with extended terms and conditions of the PWS.
PSC CD: 6830
NET AMT
1001 175,000 Gallon OPTION Furnish, Install, Fill and Maintain LPG
FFP
Furnish, Install, Fill and Maintain LPG System in accordance with extended terms and conditions of the PWS.
2001 175,000 Gallon OPTION Furnish, Install, Fill and Maintain LPG
FFP
Furnish, Install, Fill and Maintain LPG System in accordance with extended terms and conditions of the PWS.
3001 175,000 Gallon OPTION Furnish, Install, Fill and Maintain LPG
FFP
Furnish, Install, Fill and Maintain LPG System in accordance with extended terms and conditions of the PWS.
4001 175,000 Gallon OPTION Furnish, Install, Fill and Maintain LPG
FFP
Furnish, Install, Fill and Maintain LPG System in accordance with extended terms and conditions of the PWS.
Contractor Manpower Reporting
FFP
Contractor is required to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the PWS.
Instructions, including the Contractor and Subcontractor User Guides, are available at http://www.ecmra.mil. Contractors filing their Contractor Manpower Reports will receive immediate e-mail confirmation that their reports have been received in the system. This shall be uploaded into Wide Area Work Flow to facilitate final contract payment.
OPTION Contractor Manpower Reporting
FFP
Contractor is required to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the PWS.
Instructions, including the Contractor and Subcontractor User Guides, are available at http://www.ecmra.mil. Contractors filing their Contractor Manpower Reports will receive immediate e-mail confirmation that their reports have been received in
OPTION Contractor Manpower Reporting
FFP
Contractor is required to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the PWS.
Instructions, including the Contractor and Subcontractor User Guides, are available at http://www.ecmra.mil. Contractors filing their Contractor Manpower Reports will receive immediate e-mail confirmation that their reports have been received in
OPTION Contractor Manpower Reporting
FFP
Contractor is required to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the PWS.
Instructions, including the Contractor and Subcontractor User Guides, are available at http://www.ecmra.mil. Contractors filing their Contractor Manpower Reports will receive immediate e-mail confirmation that their reports have been received in
OPTION Contractor Manpower Reporting
FFP
Contractor is required to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the PWS.
Instructions, including the Contractor and Subcontractor User Guides, are available at http://www.ecmra.mil. Contractors filing their Contractor Manpower Reports will receive immediate e-mail confirmation that their reports have been received in
CLAUSES INCORPORATED BY REFERENCE
52.203-3 Gratuities APR 1984 52.212-4 Contract Terms and Conditions--Commercial Items JAN 2017 52.225-25 Prohibition on Contracting with Entities Engaging in Certain
Activities or Transactions Relating to Iran-- Representation and Certifications.
OCT 2015
52.228-5 Insurance - Work On A Government Installation JAN 1997 52.229-3 Federal, State And Local Taxes FEB 2013 52.232-17 Interest MAY 2014
52.232-37 Multiple Payment Arrangements MAY 1999 52.237-2 Protection Of Government Buildings, Equipment, And
Vegetation
APR 1984
52.242-13 Bankruptcy JUL 1995 52.247-21 Contractor Liability for Personal Injury and/or Property
Damage
APR 1984
252.201-7000 Contracting Officer's Representative DEC 1991 252.203-7000 Requirements Relating to Compensation of Former DoD
Officials
SEP 2011
252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013 252.204-7008 Compliance With Safeguarding Covered Defense Information
Controls
OCT 2016
252.205-7000 Provision Of Information To Cooperative Agreement Holders DEC 1991 252.209-7004 Subcontracting With Firms That Are Owned or Controlled By
The Government of a Country that is a State Sponsor of Terrorism
OCT 2015
252.223-7006 Prohibition On Storage, Treatment, and Disposal of Toxic or Hazardous Materials
SEP 2014
252.225-7001 Buy American And Balance Of Payments Program-- Basic (Dec 2017)
DEC 2017
252.225-7002 Qualifying Country Sources As Subcontractors DEC 2017 252.225-7012 Preference For Certain Domestic Commodities DEC 2017 252.226-7001 Utilization of Indian Organizations and Indian-Owned
Economic Enterprises, and Native Hawaiian Small Business Concerns
SEP 2004
252.232-7003 Electronic Submission of Payment Requests and Receiving Reports
JUN 2012
252.232-7010 Levies on Contract Payments DEC 2006 252.243-7001 Pricing Of Contract Modifications DEC 1991 252.243-7002 Requests for Equitable Adjustment DEC 2012 252.247-7023 Transportation of Supplies by Sea APR 2014
CLAUSES INCORPORATED BY FULL TEXT
52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR
EXECUTIVE ORDERS--COMMERCIAL ITEMS (JAN 2018)
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L.
113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).
(2) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015).
(3) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).
(4) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Public Laws 108-77 and 108-78 (19 U.S.C. 3805 note)).
(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items: (Contracting Officer check as appropriate.)
X (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Sept 2006), with Alternate I (Oct 1995) (41 U.S.C. 4704 and 10 U.S.C. 2402).
(2) 52.203-13, Contractor Code of Business Ethics and Conduct (Oct 2015) (41 U.S.C. 3509).
____ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (June 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)
X (4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (Oct 2016) (Pub. L. 109-
282) (31 U.S.C. 6101 note).
___ (5) [Reserved]
X (6) 52.204-14, Service Contract Reporting Requirements (Oct 2016) (Pub. L. 111-117, section 743 of Div. C).
___ (7) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (Oct 2016) (Pub.
L. 111-117, section 743 of Div. C).
X (8) 52.209-6, Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (Oct 2015) (31 U.S.C. 6101 note).
X (9) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (July 2013) (41 U.S.C. 2313).
____ (10) [Reserved]
____ (11)(i) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (NOV 2011) (15 U.S.C. 657a).
____ (ii) Alternate I (NOV 2011) of 52.219-3.
____ (12) (i) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (OCT 2014) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).
____ (ii) Alternate I (JAN 2011) of 52.219-4.
____ (13) [Reserved]
X (14)(i) 52.219-6, Notice of Total Small Business Set-Aside (NOV 2011) (15 U.S.C. 644).
____ (ii) Alternate I (NOV 2011).
____ (iii) Alternate II (NOV 2011).
____ (15)(i) 52.219-7, Notice of Partial Small Business Set-Aside (June 2003) (15 U.S.C. 644).
____ (ii) Alternate I (Oct 1995) of 52.219-7.
____ (iii) Alternate II (Mar 2004) of 52.219-7.
X (16) 52.219-8, Utilization of Small Business Concerns (Nov 2016) (15 U.S.C. 637(d)(2) and (3)).
____ (17)(i) 52.219-9, Small Business Subcontracting Plan (Jan 2017) (15 U.S.C. 637(d)(4)).
____ (ii) Alternate I (Nov 2016) of 52.219-9.
____ (iii) Alternate II (Nov 2016) of 52.219-9.
____ (iv) Alternate III (Nov 2016) of 52.219-9.
____ (v) Alternate IV (Nov 2016) of 52.219-9.
____ (18) 52.219-13, Notice of Set-Aside of Orders (NOV 2011) (15 U.S.C. 644(r)).
X (19) 52.219-14, Limitations on Subcontracting (JAN 2017) (15 U.S.C. 637(a)(14)).
____ (20) 52.219-16, Liquidated Damages—Subcon-tracting Plan (Jan 1999) (15 U.S.C. 637(d)(4)(F)(i)).
____ (21) 52.219-27, Notice of Service-Disabled Veteran-Owned Small Business Set-Aside (NOV 2011) (15 U.S.C.
657f).
X (22) 52.219-28, Post Award Small Business Program Rerepresentation (July 2013) (15 U.S.C. 632(a)(2)).
____ (23) 52.219-29, Notice of Set-Aside for, or Sole Source Award to, Economically Disadvantaged Women- Owned Small Business Concerns (Dec 2015) (15 U.S.C. 637(m)).
____(24) 52.219-30, Notice of Set-Aside for, or Sole Source Award to, Women-Owned Small Business Concerns Eligible Under the Women-Owned Small Business Program (Dec 2015) (15 U.S.C. 637(m)).
X (25) 52.222-3, Convict Labor (June 2003) (E.O. 11755).
X(26) 52.222-19, Child Labor--Cooperation with Authorities and Remedies (Jan 2018) (E.O. 13126).
X (27) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).
X (28) 52.222-26, Equal Opportunity (Sept 2016) (E.O. 11246).
X (29) 52.222-35, Equal Opportunity for Veterans (Oct 2015) (38 U.S.C. 4212).
X (30) 52.222-36, Equal Opportunity for Workers with Disabilities (July 2014) (29 U.S.C. 793).
X (31) 52.222-37, Employment Reports on Veterans (FEB 2016) (38 U.S.C. 4212).
X (32) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O.
13496).
X (33)(i) 52.222-50, Combating Trafficking in Persons (March 2, 2015) (22 U.S.C. chapter 78 and E.O. 13627).
____ (ii) Alternate I (March 2, 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).
X (34) 52.222-54, Employment Eligibility Verification (Oct 2015). (E. O. 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial items as prescribed in 22.1803.)
____ (35)(i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA–Designated Items (May 2008) (42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
____ (ii) Alternate I (May 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
____ (36) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (June, 2016) (E.O. 13693).
____ (37) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners (June, 2016) (E.O. 13693).
____ (38) (i) 52.223-13, Acquisition of EPEAT® Registered Imaging Equipment (Jun 2014) (E.O.s 13423 and 13514).
____ (ii) Alternate I (OCT 2015) of 52.223-13.
____ (39)(i) 52.223-14, Acquisition of EPEAT® Registered Televisions (Jun 2014) (E.O.s 13423 and 13514).
____ (ii) Alternate I (Jun 2014) of 52.223-14.
____ (40) 52.223-15, Energy Efficiency in Energy-Consuming Products (Dec 2007) (42 U.S.C. 8259b).
____ (41)(i) 52.223-16, Acquisition of EPEAT[supreg]-Registered Personal Computer Products (OCT 2015) (E.O.s 13423 and 13514).
____ (ii) Alternate I (Jun 2014) of 52.223-16.
X (42) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging While Driving (Aug 2011) (E.O. 13513).
X (43) 52.223-20, Aerosols (June, 2016) (E.O. 13693).
X (44) 52.223-21, Foams (June, 2016) (E.O. 13693).
____ (45)(i) 52.224-3, Privacy Training (JAN 2017) (5 U.S.C. 552a).
____ (ii) Alternate I (JAN 2017) of 52.224-3.
____ (46) 52.225-1, Buy American--Supplies (May 2014) (41 U.S.C. chapter 83).
____ (47) (i) 52.225-3, Buy American--Free Trade Agreements--Israeli Trade Act (May 2014) (41 U.S.C. chapter 83, 19 U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, Pub. L.
103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, and 112-43.
____ (ii) Alternate I (May 2014) of 52.225-3.
____ (iii) Alternate II (May 2014) of 52.225-3.
____ (iv) Alternate III (May 2014) of 52.225-3.
____ (48) 52.225-5, Trade Agreements (Oct 2016) (19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).
X (49) 52.225-13, Restrictions on Certain Foreign Purchases (June 2008) (E.O.’s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).
____ (50) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Oct 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).
____ (51) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (Nov 2007) (42 U.S.C. 5150
____ (52) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (Nov 2007) (42 U.S.C.
5150).
____ (53) 52.232-29, Terms for Financing of Purchases of Commercial Items (Feb 2002) (41 U.S.C. 4505, 10 U.S.C. 2307(f)).
____ (54) 52.232-30, Installment Payments for Commercial Items (Jan 2017) (41 U.S.C. 4505, 10 U.S.C. 2307(f)).
X (55) 52.232-33, Payment by Electronic Funds Transfer—System for Award Management (July 2013) (31 U.S.C.
3332).
____ (56) 52.232-34, Payment by Electronic Funds Transfer—Other than System for Award Management (July 2013) (31 U.S.C. 3332).
____ (57) 52.232-36, Payment by Third Party (MAY 2014) (31 U.S.C. 3332).
____ (58) 52.239-1, Privacy or Security Safeguards (Aug 1996) (5 U.S.C. 552a).
____ (59) 52.242-5, Payments to Small Business Subcontractors (JAN 2017)(15 U.S.C. 637(d)(12)).
____ (60)(i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Feb 2006) (46 U.S.C.
Appx. 1241(b) and 10 U.S.C. 2631).
____ (ii) Alternate I (Apr 2003) of 52.247-64.
(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items: (Contracting Officer check as appropriate.)
_____(1) 52.222-17, Nondisplacement of Qualified Workers (May 2014) (E.O. 13495).
_____ (2) 52.222-41, Service Contract Labor Standards (MAY 2014) (41 U.S.C. chapter 67).
_____ (3) 52.222-42, Statement of Equivalent Rates for Federal Hires (MAY 2014) (29 U.S.C. 206 and 41 U.S.C.
chapter 67).
_____ (4) 52.222-43, Fair Labor Standards Act and Service Contract Labor Standards--Price Adjustment (Multiple Year and Option Contracts) (MAY 2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67).
_____ (5) 52.222-44, Fair Labor Standards Act and Service Contract Labor Standards--Price Adjustment (MAY 2014) (29 U.S.C 206 and 41 U.S.C. chapter 67).
X (6) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment--Requirements (MAY 2014) (41 U.S.C. chapter 67).
X (7) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services--Requirements (MAY 2014) (41 U.S.C. chapter 67).
_____(8) 52.222-55, Minimum Wages Under Executive Order 13658 (DEC 2015) (E.O. 13658).
_____ (9) 52.222-62, Paid Sick Leave Under Executive Order 13706 (JAN 2017) (E.O. 13706).
_____ (10) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (MAY 2014) (42 U.S.C. 1792).
_____ (11) 52.237-11, Accepting and Dispensing of $1 Coin (Sept 2008) (31 U.S.C. 5112(p)(1)).
(d) Comptroller General Examination of Record. The Contractor shall comply with the provisions of this paragraph
(d) if this contract was awarded using other than sealed bid, is in excess of the simplified acquisition threshold, and does not contain the clause at 52.215-2, Audit and Records--Negotiation.
(1) The Comptroller General of the United States, or an authorized representative of the Comptroller General, shall have access to and right to examine any of the Contractor's directly pertinent records involving transactions related to this contract.
(2) The Contractor shall make available at its offices at all reasonable times the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR Subpart 4.7, Contractor Records Retention, of the other clauses of this contract. If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement. Records relating to appeals under the disputes clause or to litigation or the settlement of claims arising under or relating to this contract shall be made available until such appeals, litigation, or claims are finally resolved.
(3) As used in this clause, records include books, documents, accounting procedures and practices, and other data, regardless of type and regardless of form. This does not require the Contractor to create or maintain any record that the Contractor does not maintain in the ordinary course of business or pursuant to a provision of law.
(e) (1) Notwithstanding the requirements of the clauses in paragraphs (a), (b), (c), and (d) of this clause, the Contractor is not required to flow down any FAR clause, other than those in this paragraph (e)(1)in a subcontract for commercial items. Unless otherwise indicated below, the extent of the flow down shall be as required by the clause—
(i) 52.203-13, Contractor Code of Business Ethics and Conduct (Oct 2015) (41 U.S.C. 3509).
(ii) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L.
113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).
(iii) 52.219-8, Utilization of Small Business Concerns (Nov 2016) (15 U.S.C. 637(d)(2) and (3)), in all subcontracts that offer further subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds $700,000 ($1.5 million for construction of any public facility), the subcontractor must include 52.219-8 in lower tier subcontracts that offer subcontracting opportunities.
(iv) 52.222-17, Nondisplacement of Qualified Workers (MAY 2014) (E.O. 13495). Flow down required in accordance with paragraph (l) of FAR clause 52.222-17.
(v) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).
(vi) 52.222-26, Equal Opportunity (Sept 2016) (E.O. 11246).
(vii) 52.222-35, Equal Opportunity for Veterans (Oct 2015) (38 U.S.C. 4212).
(viii) 52.222-36, Equal Opportunity for Workers with Disabilities (Jul 2014) (29 U.S.C. 793).
(ix) 52.222-37, Employment Reports on Veterans (Feb 2016) (38 U.S.C. 4212).
(x) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O. 13496).
Flow down required in accordance with paragraph (f) of FAR clause 52.222-40.
(xi) 52.222-41, Service Contract Labor Standards (May 2014), (41 U.S.C. chapter 67).
(xii) _____ (A) 52.222-50, Combating Trafficking in Persons (March 2, 2015) (22 U.S.C. chapter 78 and E.O.
13627).
_____ (B) Alternate I (March 2, 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).
(xiii) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment--Requirements (May 2014) (41 U.S.C. chapter 67.)
(xvii) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services--Requirements (May 2014) (41 U.S.C. chapter 67)
(xiv) 52.222-54, Employment Eligibility Verification (Oct 2015) (E. O. 12989).
(xv)52.222-55, Minimum Wages Under Executive Order 13658 (Dec 2015) (E.O. 13658).
(xvi) (A) 52.224-3, Privacy Training (JAN 2017) (5 U.S.C. 552a).
(B) Alternate I (JAN 2017) of 52.224-3.
(xvii) 52.222-62 Paid Sick Leave Under Executive Order 13706 (JAN 2017) (E.O. 13706).
(xviii) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Oct 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).
(xix) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations. (May 2014) (42 U.S.C. 1792). Flow down required in accordance with paragraph (e) of FAR clause 52.226-6.
(xx) 52.247-64, Preference for Privately-Owned U.S. Flag Commercial Vessels (Feb 2006) (46 U.S.C. Appx 1241(b) and 10 U.S.C. 2631). Flow down required in accordance with paragraph (d) of FAR clause 52.247-64.
(2) While not required, the Contractor may include in its subcontracts for commercial items a minimal number of additional clauses necessary to satisfy its contractual obligations.
(End of clause)
52.216-19 ORDER LIMITATIONS (OCT 1995)
(a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than 100 GALLONS the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.
(b) Maximum order. The Contractor is not obligated to honor -
(1) Any order for a single item in excess of 110% of the total estimated contract value;
(2) Any order for a combination of items in excess of 110% of the total estimated contract value; or
(3) A series of orders from the same ordering office within 10 days that together call for quantities exceeding the limitation in paragraph (b) (1) or (2) of this section.
(c) If this is a requirements contract (i.e., includes the Requirements clause at subsection 52.216-21 of the Federal Acquisition Regulation (FAR)), the Government is not required to order a part of any one requirement from the Contractor if that requirement exceeds the maximum-order limitations in paragraph (b) of this section.
(d) Notwithstanding paragraphs (b) and (c) of this section, the Contractor shall honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within 10 days after issuance, with written notice stating the Contractor's intent not to ship the item (or items) called for and the reasons. Upon receiving this notice, the Government may acquire the supplies or services from another source.
52.216-21 REQUIREMENTS (OCT 1995)
(a) This is a requirements contract for the supplies or services specified, and effective for the period stated, in the Schedule. The quantities of supplies or services specified in the Schedule are estimates only and are not purchased by this contract. Except as this contract may otherwise provide, if the Government's requirements do not result in orders in the quantities described as "estimated'' or "maximum" in the Schedule, that fact shall not constitute the basis for an equitable price adjustment.
(b) Delivery or performance shall be made only as authorized by orders issued in accordance with the Ordering clause. Subject to any limitations in the Order Limitations clause or elsewhere in this contract, the Contractor shall furnish to the Government all supplies or services specified in the Schedule and called for by orders issued in accordance with the Ordering clause. The Government may issue orders requiring delivery to multiple destinations or performance at multiple locations.
(c) Except as this contract otherwise provides, the Government shall order from the Contractor all the supplies or services specified in the Schedule that are required to be purchased by the Government activity or activities specified in the Schedule.
(d) The Government is not required to purchase from the Contractor requirements in excess of any limit on total orders under this contract.
(e) If the Government urgently requires delivery of any quantity of an item before the earliest date that delivery may be specified under this contract, and if the Contractor will not accept an order providing for the accelerated delivery, the Government may acquire the urgently required goods or services from another source.
(f) Any order issued during the effective period of this contract and not completed within that period shall be completed by the Contractor within the time specified in the order. The contract shall govern the Contractor's and Government's rights and obligations with respect to that order to the same extent as if the order were completed during the contract's effective period; provided, that the Contractor shall not be required to make any deliveries under this contract after 31 August 2023.
52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)
(a) The Government may extend the term of this contract by written notice to the Contractor within 30 days;
provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 30 days before the contract expires. The preliminary notice does not commit the Government to an extension.
(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.
(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed five years..
52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
http://farsite.hill.af.mil/vffara.htm and http://farsite.hill.af.mil/vfdfara.htm
252.216-7006 ORDERING (MAY 2011)
(a) Any supplies and services to be furnished under this contract shall be ordered by issuance of delivery orders or task orders by the individuals or activities designated in the contract schedule. Such orders may be issued from September 2018 through August 2023.
(b) All delivery orders or task orders are subject to the terms and conditions of this contract. In the event of conflict between a delivery order or task order and this contract, the contract shall control.
(c)(1) If issued electronically, the order is considered ``issued'' when a copy has been posted to the Electronic Document Access system, and notice has been sent to the Contractor.
(2) If mailed or transmitted by facsimile, a delivery order or task order is considered ``issued'' when the Government deposits the order in the mail or transmits by facsimile. Mailing includes transmittal by U.S. mail or private delivery services.
(3) Orders may be issued orally only if authorized in the schedule.
(End of Clause)
252.232-7007 LIMITATION OF GOVERNMENT'S OBLIGATION (APR 2014)
(a) Contract line item(s) is/are incrementally funded. For this/these item(s), the sum of $0 of the total price is presently available for payment and allotted to this contract. An allotment schedule is set forth in paragraph (j) of this clause.
(b) For items(s) identified in paragraph (a) of this clause, the Contractor agrees to perform up to the point at which the total amount payable by the Government, including reimbursement in the event of termination of those item(s) for the Government's convenience, approximates the total amount currently allotted to the contract. The Contractor is not authorized to continue work on those item(s) beyond that point. The Government will not be obligated in any event to reimburse the Contractor in excess of the amount allotted to the contract for those item(s) regardless of anything to the contrary in the clause entitled "TERMINATION FOR THE CONVENIENCE OF THE GOVERNMENT." As used in this clause, the total amount payable by the Government in the event of termination of applicable contract line item(s) for convenience includes costs, profit and estimated termination settlement costs for those item(s).
(c) Notwithstanding the dates specified in the allotment schedule in paragraph (j) of this clause, the Contractor will notify the Contracting Officer in writing at least ninety days prior to the date when, in the Contractor's best judgment, the work will reach the point at which the total amount payable by the Government, including any cost for termination for convenience, will approximate 85 percent of the total amount then allotted to the contract for performance of the applicable item(s). The notification will state (1) the estimated date when that point will be reached and (2) an estimate of additional funding, if any, needed to continue performance of applicable line items up to the next scheduled date for allotment of funds identified in paragraph (j) of this clause, or to a mutually agreed upon substitute date. The notification will also advise the Contracting Officer of the estimated amount of additional funds that will be required for the timely performance of the item(s) funded pursuant to this clause, for subsequent period as may be specified in the allotment schedule in paragraph (j) of this clause, or otherwise agreed to by the parties. If after such notification additional funds are not allotted by the date identified in the Contractor's notification, or by an agreed substitute date, the Contracting Officer will terminate any item(s) for which additional funds have not been allotted, pursuant to the clause of this contract entitled "TERMINATION FOR THE
CONVENIENCE OF THE GOVERNMENT".
(d) When additional funds are allotted for continued performance of the contract line item(s) identified in paragraph
(a) of this clause, the parties will agree as to the period of contract performance which will be covered by the funds.
The provisions of paragraph (b) through (d) of this clause will apply in like manner to the additional allotted funds and agreed substitute date, and the contract will be modified accordingly.
(e) If, solely by reason of failure of the Government to allot additional funds, by the dates indicated below, in amounts sufficient for timely performance of the contract line item(s) identified in paragraph (a) of this clause, the Contractor incurs additional costs or is delayed in the performance of the work under this contract and if additional funds are allotted, an equitable adjustment will be made in the price or prices (including appropriate target, billing, and ceiling prices where applicable) of the item(s), or in the time of delivery, or both. Failure to agree to any such equitable adjustment hereunder will be a dispute concerning a question of fact within the meaning of the clause entitled "disputes."
(f) The Government may at any time prior to termination allot additional funds for the performance of the contract line item(s) identified in paragraph (a) of this clause.
(g) The termination provisions of this clause do not limit the rights of the Government under the clause entitled "DEFAULT." The provisions of this clause are limited to work and allotment of funds for the contract line item(s) set forth in paragraph (a) of this clause. This clause no longer applies once the contract if fully funded except with regard to the rights or obligations of the parties concerning equitable adjustments negotiated under paragraphs (d) or
(e) of this clause.
(h) Nothing in this clause affects the right of the Government to this contract pursuant to the clause of this contract entitled "TERMINATION FOR CONVENIENCE OF THE GOVERNMENT."
(i) Nothing in this clause shall be construed as authorization of voluntary services whose acceptance is otherwise prohibited under 31 U.S.C. 1342.
(j) The parties contemplate that the Government will allot funds to this contract in accordance with the following schedule:
Dollar value is to be determined on the delivery order or task order.
5152.233-4000 AMC-LEVEL PROTEST PROGRAM (Feb 2014) (LOCAL CLAUSE)
Prior to submitting an agency protest, it is preferable that you first attempt to resolve your concerns with the responsible contracting officer. However, you may also file a protest to the Headquarters (HQ), Army Materiel Command (AMC). The HQ AMC-Level Protest Program is intended to encourage interested parties to seek resolution of their concerns within AMC as an Alternative Dispute Resolution forum, rather than filing a protest with the Government Accountability Office (GAO) or other external forum. Contract award or performance is suspended during the protest to the same extent, and within the same time periods, as if filed at the GAO. The AMC protest decision goal is to resolve protests within 35 calendar days from filing. To be timely, protests must be filed within the periods specified in FAR 33.103. If you want to file a protest under the HQ AMC-Level Protest Program, the protest must request resolution under that program and be sent to the address below.
Headquarters U.S. Army Materiel Command Office of Command Counsel-Deputy Command Counsel 4400 Martin Road Rm: A6SE040.001 Redstone Arsenal, AL 35898-5000 Fax: (256) 450-8840 or email usarmy.redstone.usamc.mbx.protests@mail.mil
The AMC-Level Protest procedures are found at: http://www.amc.army.mil/amc/commandcounsel.html.
If internet access is not available, contact the contracting officer or HQ, AMC to obtain the HQ AMC-Level Protest Procedures.
(End of Clause)
PWS
SECTION 1: PERFORMANCE WORK STATEMENT
PART 1 – GENERAL
1. GENERAL: If there is conflict among any law, regulation, specification, standard, or policy, the most stringent will apply. The following provisions shall apply to the performance of work under this contract:
1.1. SCOPE OF WORK: Provide all resources, except Government Furnished Property (GFP), necessary to Furnish, Install, Fill and Maintain LPG Systems on Fort Drum.
1.2. HOURS OF OPERATION: Contractor operating hours shall be consistent with normal core duty hours of Fort Drum unless otherwise directed by the Contracting Officer (KO) or the Contracting Officer Representative (COR). Normal core duty hours are 7:30 AM - 4:00 PM, Monday through Friday, excluding Government holidays.
1.3. CONTRACTOR PERSONNEL: For the purpose of this contract, the term “Contractor personnel” applies to all Contractor employees, subcontractor employees, or any other person(s) acting for or on behalf of the Contractor to perform work on this contract.
1.3.2. Contractor Employee
1.3.2.1. General Qualifications: Contractor employees shall be trained, qualified, certified and/or licensed under the requirements specified in this contract prior to starting work. The Contractor shall maintain records of training qualifications, certifications, and licenses and provide them to the Contracting Officer upon request. The Contractor shall ensure that the employees remain fully qualified to perform work under this contract. The Contractor shall maintain the work force in such a manner as to ensure that the employees remain fully qualified.
The Contractor shall only employ persons able to speak, read, write, and understand English for those positions interacting with Government personnel, and where English is used or essential to provide the product, record, data, information, or service. Contractor personnel shall be physically capable of performing work under all climatic conditions.
1.3.2.2. Specialized Qualifications: N/A
1.3.3. Employee Conduct: The Contractor shall not allow any employee to perform work who has illegal possession of, or who is under the influence of alcohol or controlled substances.
Government rules, regulations, laws, directives, and requirements, which are in place or issued during the contract term shall be applicable to all Contractor employees or representatives who enter the Installation or who travel using Government transportation. Violation of such rules, regulations, laws, directives, or requirements shall be grounds for removal (permanently or temporarily as the Government determines) from the work site. Individuals who violate such rules, regulations, laws, directives, or requirements may be denied access to the Installation, either temporarily or permanently. Contractor personnel receiving a driving under the influence (DUI) conviction may be prohibited from driving on the installation.
1.3.4. Employee Appearance: Contractor employees shall be appropriately dressed including any necessary individual protective clothing and equipment.
1.3.5. Personnel Constraints/Conflicts of Interest: The Contractor shall not hire for this contract, any person whose employment would result in a conflict of interest, or employment which is prohibited by Department of Defense Regulation 5500.7-R entitled "Joint Ethics Regulation (JER)", Dated November 17, 2011.
1.3.6. Personnel Safety: The Contractor shall be responsible for initiating, maintaining, and supervising all safety precautions and programs in connection with the work. The Contractor shall comply with all applicable federal, state, local, and Fort Drum laws and regulations including, but not limited to environmental, safety, and occupational health laws and regulations.
Except as otherwise stated in the contract, if the Contractor encounters material on the project site reasonably believed to be hazardous (such as ammunitions), the Contractor shall immediately stop work in the affected area and give notice of the condition to Range Control (772-7152) and contact the Contracting Officer or COR. Work in the affected area shall not resume without written permission of the Contracting Officer or COR.
1.4. SERIOUS ACCIDENT AND INCIDENT REPORTING:
1.4.1. The Contractor shall report serious accidents and incidents incurred while performing work under this contract immediately by the most expeditious means possible but not more than one hour following the accident or incident to the Fort Drum Directorate of Emergency Services, the Safety Office, and Contracting Officer. Serious accidents and incidents include, but are not limited to, those defined in AR 385-10 and AR 190-40 respectively or referenced in other applicable directives. Examples are as follows: One or more lives lost, one or more persons critically injured, three or more persons hospitalized due to one incident, property damage estimated to exceed $2,000, fire causing major damage to structures, equipment, or vehicles, and HAZMAT, hazardous substances, and HAZWASTE incidents.
1.4.2. Record of Injury Form: Immediately after a job-connected injury, the Contractor shall prepare a record of the incident/accident and forward it to the COR. The COR will forward the incident/accident report to the Command Safety Office. If more information is required the Command Safety office will coordinate with the COR for the required information.
1.5. CLAIMS LIABILITY ARTICLE: The Contractor shall indemnify, save harmless, and defend the Government from and against any and all claims, damages, actions, debts, liabilities, and attorneys' fees arising out of or in any manner predicated upon loss of or damage to the property of, and injury to or death of any and all persons whatsoever, in any manner caused or contributed to by the Contractor, his agents, servants, employees or subcontractors while in, upon, or about the military installation wherein this work is located, or while going to or departing from the same; and to indemnify and save harmless the Government from, and on account of damage of any kind which the Government may suffer as the result of acts of negligence, fraud or misconduct of any of Contractor's agents, servants, employees, or subcontractors in or about said military installation.
1.6. SECURITY, INSTALLATION ACCESS AND CONTROL, AND TRAINING:
1.6.1. Anti-terrorism (AT) Level I training: This standard language is for contractor employees with an area of performance within an Army controlled installation, facility or area.
Antiterrorism Level I: All contractor employees, to include subcontractor employees, requiring access to Army installations, facilities and controlled access areas shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee in WAWF with their invoice for the applicable invoicing period. If requested by the Contracting Officer, the Contractor shall also submit certificates of completion to the COR or to the contracting officer within 5 days of request. AT Level I awareness training is available at the following website: https://jkodirect.jten.mil
1.6.2. Access and general protection/security policy and procedures.
1.6.2.1 Installation Access and Identification of Contractor’s Employees: Entry to the installation requires the following: current vehicle registration, proof of insurance, valid driver's license for the vehicle driver, and picture identification for other personnel.
Contractors/Subcontractors and their employees requiring access to the installation will be required to comply with the installation access control policy/procedures. The Government will not be responsible for damages due to delay/stoppages caused by failure to comply. Contractors shall be restricted to physically sign in at Paul Cerjan Gate, Gas Alley, or WSAAF Gates for entry unless they have a DoD issued ID card, a local temporary pass, or a local access badge (LAB). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
1.6.2.2. The Contractor shall provide a list of names and dates of birth of all employees that will be working on this contract to include subcontractors. CORs/Contract Technical Representatives are required to complete an IMDR-ES Form 2 (Application for Sponsorship) for all individuals needing access under the contract and submit to usarmy.drum.imcom-atlantic.mbx.des-acp@mail.mil at least 7 days prior to access being needed.
1.6.2.3. RESERVED
1.6.2.4. RESERVED
1.6.2.5. RESERVED
1.6.2.6. RESERVED
1.6.2.7. RESERVED
1.6.2.7.a. RESERVED
1.6.2.7.b. For contractors that do not require CAC, but require access to a DoD facility or installation. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive
2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
1.6.3. RESERVED
1.6.4. RESERVED
1.6.5. RESERVED
1.6.6. RESERVED
1.6.7. RESERVED
1.6.8. RESERVED
1.6.9. RESERVED
1.6.10. RESERVED
1.6.11. RESERVED
1.6.12. RESERVED
1.6.13. RESERVED
1.6.14. RESERVED
1.6.15. Range Access: Where Range Access is required, Fort Drum Range Control will issue a “RANGE PASS” for contractor employees and contractor vehicles for the contract duration of the contract to allow access to perform work in range areas on Fort Drum. The range pass will be shown to any proper military or civilian authority, if requested. The Contractor shall notify Range Control each time they enter and exit the Range area.
1.7. ENVIRONMENTAL COMPLIANCE:
1.7.1. The Contractor shall comply with all Federal, State, and local regulations covering environmental protection. In case of a conflict among these laws and regulations, the most stringent law or regulation shall apply. If a Federal, State, or regulatory agency assesses any fine, penalty, or fee against the Government that is attributable to Contractor noncompliance with any environmental law or regulation, the Contractor shall indemnify the Government for the amount of the fine and other Government costs attributable to the violation (e.g., the cost of cleaning up a hazardous waste spill). In the event of Contractor noncompliance with any applicable environmental law or regulation, the Contracting Officer will determine whether the Government or the Contractor is responsible for abating or correcting the violation. This provision is not intended in any way to waive the Government’s rights under any other provision of this contract.
The Contractor shall fully comply with current and future Fort Drum regulations, plans and changes. Of particular importance are Fort Drum Regulation 420-7 and the most current Endangered Species Act Requirements Implementing Document. All Contractors and Sub- Contractors shall be provided copies of these documents and are required to read and understand all facets.
1.7.2. Cultural Resources: The Contractor shall comply with all laws pertaining to cultural resources while conducting work on Fort Drum, including the National Historic Preservation Act, the Archaeological Resources Protection Act, and the Native American Graves Protection and Repatriation Act. Federal Law mandates that all cultural resources eligible for listing on the National Register of Historic Places must be protected from damage. Cultural resources include, but are not limited to, historic buildings and structures, cemeteries, historic and prehistoric archeological sites. Areas on Fort Drum containing National Register eligible cultural resources are marked with OFF LIMITS signs and/or Seibert Stakes, and shall be avoided. Federal Law prohibits Artifact/relic collecting on any cultural resource located on Fort Drum.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.