EXHIBIT B PRS
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Exhibit_A_PWS_W911RX_18_T_CCTV_IACH_-_PWS.pdf | ||
| Exhibit_C_Brand_Name_Justification_18-T-CCTV_IACH.pdf | ||
| Exhibit_D_Wage_Determination_W911RX_18_T_CCTV_CCTV_IACH.pdf | ||
| Exhibit_E_Pricing_Matrix_and_Buy_Terms_18-T-CCTV,_CCTV_IACH.PDF | ||
| Exhibit_F_Infection_Control_Guidelines_W911RX_18_T_CCTV_IACH.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contract/Task Order Performance Requirement Summary (PRS)
Exhibit B
Required Services Performance Standard
Acceptable Quality Level (AQL)
Method of Surveillance
Incentive (Positive and/or Negative)
5.1.1 System
Validation
The system must be operational to the government's intent prior to acceptance.
AQL 100%
100% verification of work completed.
Positive: Redo task until 100% complete w/o negative rating. Negative:
If system cannot be operational, up to 70% of the contract value may be deducted if not completed on time.
5.1.2 Training
Contractor shall provide one time on-site training the next business day after acceptance of the CCTV system IAW 5.1.1.
work completed.
Positive: Redo task until 100% complete w/o negative rating.
Negative: 5% of the contract value may be deducted if not completed on time..
5.1.3 As built
drawings and manuals
All documentation will be submitted within 30 days of government acceptance.
work completed.
Positive: Redo task until 100% complete w/o negative rating. Negative:
10% of the contract value may be deducted if not submitted on time.
5.2 Labor and Warranty
Document
The Contractor shall provide document stating all warranty coverages within 7 days after Government’s acceptance of the entire system
AQL 100% 100%
verification of work completed with submission of warranty document
Positive: Redo task until 100% complete w/o negative rating. Negative:
10% of the contract value may be deducted if not submitted on time