W911RQ-20-R-0009_Paint Kitchens for RRAD.pdf
PDF 164 KB Posted
- Attached to
- RRAD Industrial Paint Kitchens
- Solicitation number
- W911RQ-20-R-0009
View the file
Other files
| File | Type | Posted |
|---|---|---|
| QnAs_W911RQ20R0009_19MAY2020.pdf | ||
| FAR 52.212-3.pdf | ||
| Building 1184 Paint Kitchen Location.pdf | ||
| Building 591-1 Paint Kitchen Location.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(A) This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued.
(B) Solicitation number W911RQ-20-R-0009 is issued as a request for quotation (RFQ).
(C) This solicitation document and incorporated provisions and clauses are in effect through Federal Acquisition Circular 2020-06.
(D) This is a total small business set-aside for NAICS code 332311 with a small business size standard of 750 employees.
(E) There will two CLINs:
CLIN 1 - Paint Kitchen for Bldg. 1184 ; QUANTITY 1 ; UNIT - EACH
CLIN 2 - Paint Kitchen for Bldg. 591-1 ; QUANTITY 1 ; UNIT - EACH
(F) Description of requirements for the items to be acquired:
1. General. This is a brand name or equal purchase description that will define the minimum requirements for the delivery and installation of two (2) factory assembled, interior type industrial paint kitchens complete with features to include prefabricated, factory assembled floor, end walls, side walls, roof, door opening, door assembly with door site glass, accessories and hardware. The industrial paint kitchens shall also be complete with electrical system utilities to include electrical distribution panel, overhead lighting fixtures, electrical controls, electrical receptacles, and grounding system. The paint kitchens shall be complete with fire suppression system, (water type) and containment device that comply with most recent revision codes and standards.
1.1. Place of Performance. The industrial paint kitchens shall be delivered and installed and made fully operational at Red River Army Depot, 100 James Carlow Drive, Texarkana, TX, 75507- 5000.
1.2. Period of Performance. Delivery and installation shall be completed within six (6) months after contract award. All work shall be done Monday-Friday, 0630-1700 Central Standard Time.
1.3. The Government does not work on the following recognized Holidays
1.3.1. New Year’s Day
1.3.2. Martin Luther King Jr. Day
1.3.3. President’s Day
1.3.4. Memorial Day
1.3.5. Independence Day
1.3.6. Labor Day
1.3.7. Columbus Day
1.3.8. Veteran’s Day
1.3.9. Thanksgiving Day
1.3.10. Christmas Day
2. General Requirements.
2.1. Brand Name Equivalent. Equipment specifications shall be equivalent to the following Global Finishing Solutions (GFS) models.
2.1.1. GFS model number PK-20-SP, Hazardous Material Storage Building.
2.1.2. GFS model number PK-10, Hazardous Material Storage Building
2.2. Item Condition. The items offered shall be as new and a current production model. A current production model is defined as the manufacture’s current production model which, on the date the solicitation is issued, has been designed, engineered and sold or being offered for sale through advisements of manufacture’s published catalogues or brochures. The commercial products that include prototype units, pre-production models or experimental units do not qualify as meeting the requirements specified herein. The prefabricated product shall be complete, so that when positioned and installed within desired location the required utilities, and fire safety system can be connected or installed that will produce operational industrial paint kitchens.
2.3. General Safety. The industrial paint kitchens shall be complete with safety devices or covering for any component or parts that may present a safety hazard. The industrial paint kitchens shall include provisions to isolate and lock out/ tag out (all) sources of hazardous energy, either input to the industrial enclosure or generated by the use of standard utilities to ensure operation and maintenance personnel.
2.4. General Standard Compliance. General compliance to include, but not necessary be limited to the following.
2.4.1. Occupational Safety and Health Administration (OSHA) 29CFR 1910: Code of Federal Regulations, Occupational Safety and Health Standards.
2.4.2. National Fire Protection Agency (NEPA) 7: National Electric Code (NEC) that comply and meet most recent revision codes and standards.
2.4.3. IC-1 Industrial Controls
2.4.4. MG-1 Motors and Generators
2.4.5. NEPA 253.4 (2002) Product Safety Signs and Label NEPA
2.4.6. NEMA 70 National Electrical Code (NEC)
2.4.7. NEPA 70E, (Handbook For, Electrical Safety) in the workplace
2.4.8. Article 250 Grounding
2.4.9. FIRE SAFETY
2.4.10. NEPA 1 Fire Code
2.4.11. NEPA 80 Standard For, Fire Doors and Other Openings Protectives
2.4.12. UFC 3-600-2.3.11.Fire Protection Engineering, For Facilities
2.4.13. NEPA 30 Flammable and Combustible Liquids Code
2.5. Environmental Protection. The industrial paint kitchens shall be designed so that under the operating service, transportation and storage conditions described herein, the industrial paint kitchens shall be equipped with standard devices that control the discharge of materials or solutions that are hazardous to the ecological system as prescribed by federal, state and local law shall comply and meet most resent revision codes and standards.
2.5.1. Compliance with Environmental Laws and Regulations. Contractor shall comply with all federal, state, and local environmental laws, statures, executive orders, permits, Army Regulation (with supplements).
2.5.2. Compliance with Environmental Management Systems: Contractor shall take the necessary actions to identify, monitor, and control those contract operational and activities that may pose risk of contamination, or can negatively impact the natural and/or human environment.
2.6. Hazardous Materials Restriction. The materials and components used to fabricate or construct the industrial paint kitchens shall not contain neither mercury nor mercury compounds, or be exposed to free mercury during manufacturing processes. Asbestos and materials containing asbestos shall not be used on or in the fabrication of components for industrial paint kitchens.
2.7. Lubrication. Means shall be provided to insure adequate lubrication be provided for all moving parts.
2.8. Interchangeability. All parts of the end items shall be manufactured to standards and tolerances that will provide for the interchangeability of respective parts between end items of the same model without modification of the parts or related components of the paint kitchen.
All replacement parts or components shall be commercially available within the continental the United States of America, (USA).
2.9. Controls. All control devices shall comply or meet the most recent revision codes and standards.
2.10. Utilities. All utilities shall comply or meet the most recent revision codes and standards.
2.10.1. The Government will provide main power, water, and other necessary utilities to setup, install, and place the paint kitchens into operation. Connection to all utilities shall be the responsibility of the contractor
2.11. Grounding System. The grounding system shall comply or meet the most recent revision codes and standards.
2.12. Casting and Forgings. All castings and forgings shall be free of defects, scale, and mismatching. No processes such as welding, peening, plugging, or filling with solder or paste shall be used for reclaiming any defective part. Such processes shall be used only for enhancing surface finish and appearance.
3. Salient Characteristics.
3.1. Construction. The industrial paint kitchens parts and related components shall be constructed as new without defects and free of repairs.
3.1.1. The fabrication shall include all components, parts, and features necessary to meet the performance requirements specified herein. All parts and components subject to damage from environmental hazardous to include (dust, debris, or residue) shall be sealed or otherwise protected.
3.1.2. The structure including floor, walls, roof, and entrance door shall withstand all forces encountered during the operation of the industrial paint kitchens to maximum rating and capacity without permanent distortion or failure check.
3.1.3. The industrial paint kitchens shall be complete and capable of having utilities installed including connections for fire suppression system and made operation by the contractor.
3.1.4. Welding. Welding, Brazing, and Soldering shall be employed only where those operations are included in the fabrication of the original design. These operations shall not be employed as repair measures for defective parts.
3.1.5. Surfaces. All surfaces shall be clean and free if harmful or extraneous materials edges shall be either rounded or beveled unless sharpness is required to perform a necessary function.
Except as otherwise specified herein, the condition and finish of all surfaces shall be in accordance with the manufacture’s commercial practices.
3.2. Maintainability. The industrial paint kitchens shall be designed and constructed to permit maintenance personnel to easily service the paint kitchens using a minimal number of tools. All parts subject to ware, breakage, or distortion shall be accessible for adjustment, replacement, or repair. Consistent with required maintenance and design of the paint kitchens, the vendor shall provide special tools required to service the units.
3.3. Technical Requirements. The offer’s paint kitchens shall meet the following minimum specifications. The offeror shall ensure the paint kitchens supplied meets all requirements for containment and mixing of paint reduces and paint.
3.3.1. Paint Kitchen Dimensions for Bldg. 1184
3.3.1.1 Width: 8’ x Length: 10’ x Height: 9’ 6” (Max)
3.3.2 Paint Kitchen Dimensions for Bldg. 591-1
3.3.2.1 Width: 20’ x Length: 15’ x Height: 11’ (Max)
3.3.3 Paint Kitchens Features. The industrial paint kitchens shall be factory constructed complete with covered floor, end walls, side walls, ceiling, roof, door assembly, door site glass, door hardware, electrical system, overhead lighting system, exhaust system, ground system, fire suppression system and containment device that comply or meet the most recent revision codes and standards.
3.3.4 Paint Kitchen Electrical. The industrial paint kitchens shall be complete with electrical distribution panel, electrical conduit raceway system, overhead lighting system, electrical receptacles, fan exhaust system, grounding system, containment device, and fire suppression system that comply or meet the most recent revision codes and standards.
3.3.5 Paint Kitchen Electrical Receptacles. Each paint kitchen electrical receptacles shall be installed with the following specifications.
3.3.5.1 Building 1184 shall be complete with four (4) each, wall mounted, equally spaced, female 110/120 Volts, 20 Amps, 1 Phase, 60 Hz. electrical receptacles.
3.3.5.2 Building 591-1 shall be complete with eight (8) each, wall mounted, equally spaced, female 110/120 Volts, 20 Amps, 60 Hz. electrical receptacles.
3.3.6 Paint Kitchen Electrical Utilities. The electrical utilities shall be of (Class 1, Division 2, Group D, Explosion Proof, Applicable Code, OSHA-O-191-1212) type that comply or meets most recent revision codes and standards.
3.3.7 Technical Drawings. Preliminary drawings shall be provided to the Government point of contract (POC) prior to delivery. All drawings shall be coordinate with and approved by Government POC before installation.
4. Shipment. Upon on contract award, a Government POC will be provided for coordination of delivery and installation.
4.1. Markings and Shipping. The shipping and containment devices shall be marked in accordance with MIL-STD-125 Standard.
5. Final Test, Inspection, and Acceptance. Upon completion of installation, the contractor shall operate each paint kitchen to demonstrate full and complete, and reliable operation to verify that each paint kitchen are capable of performing per this purchase description.
6. Warranty. The industrial paint kitchens furnished under this purchase description shall be guaranteed for a period of time equal to commercial manufacture’s normal warranty or for a period of at two (2) years whichever is longer against defective components, parts, materials, and workmanship.
6.1. Upon receipt of notice from the Government of any defect or system failure of the industrial paint kitchens during the warranty period that system including related components shall be replaced promptly with as new system components by and at the expense of commercial vendor or the contractor.
(G) Delivery and installation shall be completed with six (6) months after contract award at Red River army Depot (RRAD), 100 James Carlow Drive, Texarkana, TX 75507-5000. FOB point: Destination
(H) Provision at 52.212-1, Instructions to Offerors-Commercial, applies to this acquisition.
(I) The provision at 52.212-2, Evaluation-Commercial Items is applicable to this acquisition.
52.212-2 EVALUATION--COMMERCIAL ITEMS (OCT 2014)
(a) The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. Evaluation of quotations will done using procedures at FAR 13.106-2. The following factors shall be used to evaluate offers and are not listed in order of importance:
(i) technical capability of the item offered to meet the Government requirement;
(ii) price;
(iii) delivery.
(b) The Government may determine that an offer is unacceptable if the prices are significantly unbalanced.
(c) A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer's specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.
(End of provision)
(J) All offerors must include a completed copy of the provision at 52.212-3, Offeror Representations and Certifications-Commercial Items, with its offer.
(K) The clause at 52.212-4, Contract Terms and Conditions-Commercial Items, applies to this acquisition.
(L) The clause at 52.212-5, Contract Terms and Conditions Required To Implement Statutes or Executive Orders-Commercial Items, applies to this acquisition:
52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR
EXECUTIVE ORDERS--COMMERCIAL ITEMS (MAR 2020)
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).
(2) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (Jul 2018) (Section 1634 of Pub. L. 115- 91).
(3) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (AUG 2019) (Section 889(a)(1)(A) of Pub. L. 115-232).
(4) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015).
(5) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).
(6) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Public Laws 108-77 and 108-78 (19 U.S.C. 3805 note)).
(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
(Contracting Officer check as appropriate.)
___ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Sept 2006), with Alternate I (Oct 1995) (41 U.S.C. 4704 and 10 U.S.C. 2402).
____ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (Oct 2015) (41 U.S.C. 3509).
____ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (June 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)
_X__ (4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (Oct 2018) (Pub. L. 109-282) (31 U.S.C. 6101 note).
___ (5) [Reserved]
___ (6) 52.204-14, Service Contract Reporting Requirements (Oct 2016) (Pub. L. 111-117, section 743 of Div. C).
___ (7) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (Oct 2016) (Pub. L. 111-117, section 743 of Div. C).
__X_ (8) 52.209-6, Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (Oct 2015) (31 U.S.C. 6101 note).
____ (9) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters
(OCT 2018) (41 U.S.C. 2313).
____ (10) [Reserved]
____ (11)(i) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (MAR 2020) (15 U.S.C.
657a).
____ (ii) Alternate I (MAR 2020) of 52.219-3.
____ (12) (i) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (MAR 2020) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).
____ (ii) Alternate I (MAR 2020) of 52.219-4.
____ (13) [Reserved]
__X_ (14)(i) 52.219-6, Notice of Total Small Business Set-Aside (MAR 2020) (15 U.S.C. 644).
____ (ii) Alternate I (MAR 2020).
____ (15)(i) 52.219-7, Notice of Partial Small Business Set-Aside (MAR 2020) (15 U.S.C. 644).
____ (ii) Alternate I (MAR 2020) of 52.219-7.
____ (16) 52.219-8, Utilization of Small Business Concerns (OCT 2018) (15 U.S.C. 637(d)(2) and (3)).
____ (17)(i) 52.219-9, Small Business Subcontracting Plan (MAR 2020) (15 U.S.C. 637(d)(4)).
____ (ii) Alternate I (NOV 2016) of 52.219-9.
____ (iii) Alternate II (NOV 2016) of 52.219-9.
____ (iv) Alternate III (MAR 2020) of 52.219-9.
____ (v) Alternate IV (AUG 2018) of 52.219-9.
____ (18) 52.219-13, Notice of Set-Aside of Orders (MAR 2020) (15 U.S.C. 644(r)).
____ (19) 52.219-14, Limitations on Subcontracting (MAR 2020) (15 U.S.C. 637(a)(14)).
____ (20) 52.219-16, Liquidated Damages—Subcontracting Plan (Jan 1999) (15 U.S.C.
637(d)(4)(F)(i)).
____ (21) 52.219-27, Notice of Service-Disabled Veteran-Owned Small Business Set-Aside (MAR 2020) (15 U.S.C. 657f).
____ (22) (i) 52.219-28, Post Award Small Business Program Rerepresentation (MAR 2020) (15 U.S.C. 632(a)(2)).
____ (ii) Alternate I (MAR 2020) of 52.219-28.
____ (23) 52.219-29, Notice of Set-Aside for, or Sole Source Award to, Economically Disadvantaged Women-Owned Small Business (EDWOSB) Concerns (MAR 2020) (15 U.S.C.
637(m)).
____ (24) 52.219-30, Notice of Set-Aside for, or Sole Source Award to, Women-Owned Small Business Concerns Eligible Under the Women-Owned Small Business Program (MAR 2020) (15 U.S.C. 637(m)).
____ (25) 52.219-32, Orders Issued Directly Under Small Business Reserves (MAR 2020) (15 U.S.C. 644(r)).
____ (26) 52.219-33, Nonmanufacturer Rule (MAR 2020) (15 U.S.C. 637(a)(17)).
____ (27) 52.222-3, Convict Labor (JUN 2003) (E.O. 11755).
_X__(28) 52.222-19, Child Labor--Cooperation with Authorities and Remedies (JAN 2020) (E.O.
13126).
____ (29) 52.222-21, Prohibition of Segregated Facilities (APR 2015).
_X__ (30)(i) 52.222-26, Equal Opportunity (SEPT 2016) (E.O. 11246).
____ (ii) Alternate I (FEB 1999) of 52.222-26.
_X__ (31)(i) 52.222-35, Equal Opportunity for Veterans (OCT 2015)(38 U.S.C. 4212).
____ (ii) Alternate I (JUL 2014) of 52.222-35.
_X__ (32)(i) 52.222-36, Equal Opportunity for Workers with Disabilities (JUL 2014) (29 U.S.C.
793).
____ (ii) Alternate I (JUL 2014) of 52.222-36.
____ (33) 52.222-37, Employment Reports on Veterans (FEB 2016) (38 U.S.C. 4212).
____ (34) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act
(DEC 2010) (E.O. 13496).
__X_ (35)(i) 52.222-50, Combating Trafficking in Persons (JAN 2019) (22 U.S.C. chapter 78 and E.O. 13627).
____ (ii) Alternate I (MAR 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).
____ (36) 52.222-54, Employment Eligibility Verification (OCT 2015). (E. O. 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial items as prescribed in 22.1803.)
____ (37)(i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA– Designated Items (MAY 2008) (42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
____ (ii) Alternate I (MAY 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
____ (38) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (JUN 2016) (E.O. 13693).
____ (39) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners (JUN 2016) (E.O. 13693).
____ (40) (i) 52.223-13, Acquisition of EPEAT® Registered Imaging Equipment (JUN 2014) (E.O.s 13423 and 13514).
____ (ii) Alternate I (OCT 2015) of 52.223-13.
____ (41)(i) 52.223-14, Acquisition of EPEAT® Registered Televisions (JUN 2014) (E.O.s 13423 and 13514).
____ (ii) Alternate I (JUN 2014) of 52.223-14.
____ (42) 52.223-15, Energy Efficiency in Energy-Consuming Products (DEC 2007) (42 U.S.C.
8259b).
____ (43)(i) 52.223-16, Acquisition of EPEAT®-Registered Personal Computer Products (OCT 2015) (E.O.s 13423 and 13514).
____ (ii) Alternate I (JUN 2014) of 52.223-16.
__X_ (44) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging While Driving (AUG 2011) (E.O. 13513).
____ (45) 52.223-20, Aerosols (JUN 2016) (E.O. 13693).
____ (46) 52.223-21, Foams (JUN 2016) (E.O. 13693).
____ (47)(i) 52.224-3, Privacy Training (JAN 2017) (5 U.S.C. 552a).
____ (ii) Alternate I (JAN 2017) of 52.224-3.
____ (48) 52.225-1, Buy American--Supplies (MAY 2014) (41 U.S.C. chapter 83).
____ (49) (i) 52.225-3, Buy American--Free Trade Agreements--Israeli Trade Act (MAY 2014) (41 U.S.C. chapter 83, 19 U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, Pub. L. 103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, and 112-43.
____ (ii) Alternate I (MAY 2014) of 52.225-3.
____ (iii) Alternate II (MAY 2014) of 52.225-3.
____ (iv) Alternate III (MAY 2014) of 52.225-3.
____ (50) 52.225-5, Trade Agreements (OCT 2019) 19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).
__X_ (51) 52.225-13, Restrictions on Certain Foreign Purchases (JUNE 2008) (E.O.'s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).
____ (52) 52.225-26, Contractors Performing Private Security Functions Outside the United States (OCT 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).
____ (53) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (NOV 2007) (42 U.S.C. 5150
____ (54) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (NOV 2007) (42 U.S.C. 5150).
____ (55) 52.232-29, Terms for Financing of Purchases of Commercial Items (FEB 2002) (41 U.S.C. 4505, 10 U.S.C. 2307(f)).
____ (56) 52.232-30, Installment Payments for Commercial Items (JAN 2017) (41 U.S.C. 4505, 10 U.S.C. 2307(f)).
__X__ (57) 52.232-33, Payment by Electronic Funds Transfer—System for Award Management
(OCT 2018) (31 U.S.C. 3332).
____ (58) 52.232-34, Payment by Electronic Funds Transfer—Other than System for Award Management (JUL 2013) (31 U.S.C. 3332).
____ (59) 52.232-36, Payment by Third Party (MAY 2014) (31 U.S.C. 3332).
____ (60) 52.239-1, Privacy or Security Safeguards (AUG 1996) (5 U.S.C. 552a).
____ (61) 52.242-5, Payments to Small Business Subcontractors (JAN 2017)(15 U.S.C.
637(d)(13)).
____ (62)(i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (FEB 2006) (46 U.S.C. Appx. 1241(b) and 10 U.S.C. 2631).
____ (ii) Alternate I (APR 2003) of 52.247-64.
____ (iii) Alternate II (FEB 2006) of 52.247-64.
(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items: (Contracting Officer check as appropriate.)
_____ (1) 52.222-17, Nondisplacement of Qualified Workers (MAY 2014) (E.O. 13495).
_____ (2) 52.222-41, Service Contract Labor Standards (AUG 2018) (41 U.S.C. chapter 67).
_____ (3) 52.222-42, Statement of Equivalent Rates for Federal Hires (MAY 2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67).
_____ (4) 52.222-43, Fair Labor Standards Act and Service Contract Labor Standards--Price Adjustment (Multiple Year and Option Contracts) (AUG 2018) (29 U.S.C. 206 and 41 U.S.C.
chapter 67).
_____ (5) 52.222-44, Fair Labor Standards Act and Service Contract Labor Standards--Price Adjustment (MAY 2014) (29 U.S.C 206 and 41 U.S.C. chapter 67).
_____ (6) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment--Requirements (MAY 2014) (41 U.S.C. chapter 67).
_____ (7) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services--Requirements (MAY 2014) (41 U.S.C. chapter 67).
_____(8) 52.222-55, Minimum Wages Under Executive Order 13658 (DEC 2015) (E.O. 13658).
_____ (9) 52.222-62, Paid Sick Leave Under Executive Order 13706 (JAN 2017) (E.O. 13706).
_____ (10) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (MAY 2014) (42 U.S.C. 1792).
(d) Comptroller General Examination of Record. The Contractor shall comply with the provisions of this paragraph (d) if this contract was awarded using other than sealed bid, is in excess of the simplified acquisition threshold, and does not contain the clause at 52.215-2, Audit and Records- -Negotiation.
(1) The Comptroller General of the United States, or an authorized representative of the Comptroller General, shall have access to and right to examine any of the Contractor's directly pertinent records involving transactions related to this contract.
(2) The Contractor shall make available at its offices at all reasonable times the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR Subpart 4.7, Contractor Records Retention, of the other clauses of this contract. If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement. Records relating to appeals under the disputes clause or to litigation or the settlement of claims arising under or relating to this contract shall be made available until such appeals, litigation, or claims are finally resolved.
(3) As used in this clause, records include books, documents, accounting procedures and practices, and other data, regardless of type and regardless of form. This does not require the Contractor to create or maintain any record that the Contractor does not maintain in the ordinary course of business or pursuant to a provision of law.
(e) (1) Notwithstanding the requirements of the clauses in paragraphs (a), (b), (c), and (d) of this clause, the Contractor is not required to flow down any FAR clause, other than those in this paragraph (e)(1)in a subcontract for commercial items. Unless otherwise indicated below, the extent of the flow down shall be as required by the clause—
(i) 52.203-13, Contractor Code of Business Ethics and Conduct (Oct 2015) (41 U.S.C. 3509).
(ii) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).
(iii) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (Jul 2018) (Section 1634 of Pub. L. 115- 91).
(iv) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (AUG 2019) (Section 889(a)(1)(A) of Pub. L. 115-232).
(v) 52.219-8, Utilization of Small Business Concerns (Oct 2018) (15 U.S.C. 637(d)(2) and (3)), in all subcontracts that offer further subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds $700,000 ($1.5 million for construction of any public facility), the subcontractor must include 52.219-8 in lower tier subcontracts that offer subcontracting opportunities.
(vi) 52.222-17, Nondisplacement of Qualified Workers (MAY 2014) (E.O. 13495). Flow down required in accordance with paragraph (l) of FAR clause 52.222-17.
(vii) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).
(viii) 52.222-26, Equal Opportunity (Sep 2016) (E.O. 11246).
(ix) 52.222-35, Equal Opportunity for Veterans (Oct 2015) (38 U.S.C. 4212).
(x) 52.222-36, Equal Opportunity for Workers with Disabilities (Jul 2014) (29 U.S.C. 793).
(xi) 52.222-37, Employment Reports on Veterans (Feb 2016) (38 U.S.C. 4212).
(xii) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O. 13496). Flow down required in accordance with paragraph (f) of FAR clause 52.222- 40.
(xiii) 52.222-41, Service Contract Labor Standards (Aug 2018), (41 U.S.C. chapter 67).
(xiv) _____ (A) 52.222-50, Combating Trafficking in Persons (JAN 2019) (22 U.S.C. chapter 78 and E.O. 13627).
_____ (B) Alternate I (March 2, 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).
(xv) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment--Requirements (May 2014) (41 U.S.C. chapter 67.)
(xvi) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services--Requirements (May 2014) (41 U.S.C. chapter 67)
(xvii) 52.222-54, Employment Eligibility Verification (Oct 2015) (E. O. 12989).
(xviii) 52.222-55, Minimum Wages Under Executive Order 13658 (Dec 2015) (E.O. 13658).
(xix) 52.222-62, Paid Sick Leave Under Executive Order 13706 (Jan 2017) (E.O. 13706).
(xx) (A) 52.224-3, Privacy Training (Jan 2017) (5 U.S.C. 552a).
(B) Alternate I (Jan 2017) of 52.224-3.
(xxi) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Oct 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).
(xxii) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations. (May 2014) (42 U.S.C. 1792). Flow down required in accordance with paragraph (e) of FAR clause 52.226-6.
(xxiii) 52.247-64, Preference for Privately-Owned U.S. Flag Commercial Vessels (Feb 2006) (46 U.S.C. Appx 1241(b) and 10 U.S.C. 2631). Flow down required in accordance with paragraph (d) of FAR clause 52.247-64.
(2) While not required, the Contractor may include in its subcontracts for commercial items a minimal number of additional clauses necessary to satisfy its contractual obligations.
(End of clause)
(M) Additional contract terms and conditions:
252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)
(a) Definitions. As used in this clause—
“Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.
“Document type” means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.
“Payment request” and “receiving report” are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall—
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web- Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.
(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:
(1) Document type. The Contractor shall submit payment requests using the following document type(s):
(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.
(ii) For fixed price line items—
(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.
____COMBO__________________________________________________
(Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.)
(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.
(Contracting Officer: Insert either “Invoice 2in1” or the applicable invoice and receiving report document type(s) for fixed price line items for services.)
(iii) For customary progress payments based on costs incurred, submit a progress payment request.
(iv) For performance based payments, submit a performance based payment request.
(v) For commercial item financing, submit a commercial item financing request.
(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.
[Note: The Contractor may use a WAWF “combo” document type to create some combinations of invoice and receiving report in one step.]
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table*
Field Name in WAWF Data to be entered in WAWF
Pay Official DoDAAC _HQ0303___ Issue By DoDAAC _W911RQ___ Admin DoDAAC** _W911RQ___
Inspect By DoDAAC _W911RQ___ Ship To Code _W45G18___ Ship From Code ____ Mark For Code ____ Service Approver (DoDAAC) ____ Service Acceptor (DoDAAC) ____
Accept at Other DoDAAC ____ LPO DoDAAC _LEAVE BLANK___ DCAA Auditor DoDAAC ____ Other DoDAAC(s) ____
(*Contracting Officer: Insert applicable DoDAAC information. If multiple ship to/acceptance locations apply, insert “See Schedule” or “Not applicable.”)
(**Contracting Officer: If the contract provides for progress payments or performance-based payments, insert the DoDAAC for the contract administration office assigned the functions under FAR 42.302(a)(13).)
(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.
(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s WAWF point of contact.
____ Not applicable___________________________________________________
(Contracting Officer: Insert applicable information or “Not applicable.”)
(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.
(End of clause)
Provisions Incorporate by Reference
FAR 52.204-7 System for Award Management
FAR 52.204-8 Annual Representations and Certifications.
FAR 52.204-16 Commercial and Government Entity Code Reporting
FAR 52.211-6 Brand Name or Equal
FAR 52.219-1 Small Business Program Representations, Alternate I
FAR 52.233-3 Protest after Award
FAR 52.233-4 Applicable Law for Breach of Contract Claim
FAR 52.246-2 Inspection of Supplies-Fixed-Price
DFARS 252.203-7000 Requirements Relating to Compensation of Former DoD Officials
DFARS 252.203-7005 Representation Relating to Compensation of Former DoD Officials
DFARS 252.204-7015 Notice of Authorized Disclosure of Information for Litigation Support
DFARS 252.232-7003 Electronic Submission of Payment Requests and Receiving Reports.
DFARS 252.232-7010 Levies on Contract Payments
DFARS 252.244-7000 Subcontracts for Commercial Items
LOCAL TERMS & CONDITIONS
ENVIRONMENTAL MANAGEMENT SYSTEM
(a) RRAD has implemented an Environmental Management System (EMS), which is based on ISO-14001, and is concerned about environmental issues. RRAD desires to conduct its business operations in an environmentally sound manner. Relevant significant aspects will be communicated to contractors (including those used for outsourcing) and suppliers through the solicitation package where applicable. RRAD expects its suppliers and contractors to provide, at the same quality and price, products and services that have the least environmental consequence of all available options.
(b) Wherever possible, where a supplier’s product is causing a significant environmental aspect at RRAD, RRAD will communicate to that supplier that they should select the available option that minimizes the potential environmental impact of that product. Any contractor with plans to be working six months or longer at RRAD must receive EMS awareness training and information on operational controls where applicable. This training is thirty minutes in duration and will be provided by RRAD. A copy of the RRAD Environmental Policy can be viewed on the Depot Website via the Internet.
PACKAGING & MARKING
Material is to be packaged and packed in a manner to afford adequate protection against damage during shipment from supply source to destination. Package and pack shall conform to the applicable carrier rules, regulations, and tariffs and may be the industry standard commercial practice. All unit, intermediate and exterior packs shall, as a minimum, be marked as follows by any means which provides legibility and durability: Federal Stock Number and/or Manufacturer's Part Number; Noun; Quantity; Purchase Order Number; Requisition Number;
Mark for Bldg; and Ship To. Exterior shipping containers shall contain a packing list or other documentation setting forth contents.
DELIVERIES TO RED RIVER ARMY DEPOT (RRAD)
(a) Effective October 1, 2015 ALL Delivery Appointments must be made through CAS (Carrier Appointment System) at least 24 hours prior to desired delivery date. Carriers arriving without an appointment will experience delays. Carriers can register for CAS at https://eta.sddc.army.mil/ETASSOPortal/Default.aspx.
(b) GPS Address is 100 Armory Drive New Boston, TX 75570. Automated directions 903-334- 3060.
(c) If you do not have access to CAS at this time, you may contact Timothy Hill @ 903-334-1245 for assistance in making an appointment. At this time, 903-334-1242 is not being utilized for appointments.
(d) Sensitive/TPS shipments, DODAAC SV3227 will load/unload at Bldg. 595 telephone number 903 334 3295, FAX Rep-ship for Classified material to 903 334 3620 or DSN 829-3620 or ddrt-repship@dla.mil. DLA RRAD does not accept 1.4S shipments of any kind.
(e) Effective 1 Aug 2015, prohibited items not allowed on depot: firearms, explosive, ammunition, propane over 20 LBS, fuel containers over 5 gallons, illegal knives. Drivers must clear a NCIC Background check for entry onto the facility.
(f) SW3227/W562RM do not accept USPS shipments.
INSURANCE (Fixed Price Contract)
Pursuant to the requirements of the contract clause titled "Insurance-Work on a Government Installation", the contractor shall obtain and maintain at least the following kinds of insurance and minimum liability coverage during any period of contract performance:
a. Workmen's Compensation and occupational disease coverage as required by law except that, if this contract is to be performed in a state which does not require or permit private insurance, then compliance with the statutory or administrative requirements in any such state will be satisfactory. The required Workmen's Compensation Insurance shall extend to cover employers' liability for accidental bodily injury or death and for occupational disease with a minimum liability limit of $100,000.
b. Comprehensive General Liability Insurance in the minimum limit of $500,000 per occurrence for bodily injury liability.
c. Comprehensive Automotive Liability Insurance with minimum limits of $200,000 per person and $500,000 per occurrence for bodily injury, and a minimum limit of $20,000 per occurrence for property damage.
HQ-AMC LEVEL PROTEST PROCEDURES
Complete AMC Protest Procedures can be found at: http://www.amc.army.mil/Connect/Legal- Resources/
An agency protest may be filed with either the contracting officer or to HQAMC but not both following the procedures listed on the website above.
(N) Defense Priorities and Allocations System (DPAS) and assigned rating is not applicable.
(O) The date and time offers are due: May 20, 2020 at 01:00 pm (CPT)
(P) The name and telephone number of the individual to contact for information regarding the solicitation: Gary Richardson at email gary.richardson4.civ@mail.mil.
mailto:gary.richardson4.civ@mail.mil
File details come from the government source that posted it. Updated .