STATEMENT OF WORK (SOW)

FOR

RETROFIT MODEL TITAN V6, IPSEN INC FURNACE, WV12809

AT

Watervliet Arsenal

W16H1F9203005J Support Division (TAWV-ODR)

PART 1 GENERAL

1.01 Overview.

A. This Statement of Work (SOW) defines the effort required to Retrofit Model Titan V6, WV12809.

1.02 Hours of Operation.

A. Normal duty hours are 7:00 AM through 4:30 PM, Monday through Thursday, and 7:00 AM through 3:30 PM on select Fridays (the arsenal is closed every-other Friday). Federal holidays are non-work days. If a federal holiday falls on a Saturday or Sunday, the preceding Friday or following Monday is a work holiday.

1.03 General Requirements.

A. The contractor shall perform all work in strict conformance with Watervliet Arsenal Instructions for Contractors (WAIC). The contractor shall read and understand this document prior to submitting a proposal. The WAIC is publically available at:

http://www.wva.army.mil/Documents/Contracting/WAIC.pdf B. The contractor shall supply all tools, materials, supplies, equipment, labor, temporary utilities and supervision necessary for the complete execution of the requirements within the contract documents and requirements of this SOW.

1.04 Safety Requirements.

A. General.

1. The contractor shall be responsible for complying with all DOD, Army, Federal, and State health and safety requirements which are applicable to this project, and shall use all means and precautions available to ensure the safety of the occupants and protection to the existing buildings and structures.

1.05 Applicable Documents.

A. Watervliet Arsenal Instructions for Contractors (WAIC).

B. All applicable OSHA, CMAA and ASME Specifications and Standards C. NFPA 70 – National Electric Code (NEC), NFPA 33, OSHA 1910.107.

1. (2014; AMD 1 2013; Errata 1 2013; AMD 2 2013; Errata 2 2013; AMD 3 2014; Errata 3-4 2014; AMD 4-6 2014).

PART 2 ITEMS OF WORK

A. General.

STATEMENT OF WORK

2.01 Retrofit Model Titan V6, Ipsen Inc Furnace, WV12809.

A. Provide New Complete Emerson Servo Drive System, which includes:

1. New Emerson enclosure with the following features:

a. Master and Slave Servo Drives

b. Subsequent Unidrives, Encoders, Unimotors and Modules

c. 4.3” color display screen for operator controls

d. Ventilation Fan

e. All Communication Cables

2. (2) New Emerson Servo Motors

3. Appropriate Proximity and positional switches

4. Required engineering and software programming

5. One set of installation drawings B. On-site installation of the above items, removal of existing parts as appropriate, start-up and initial training by Field Service Engineer C. Provide and Install VacuProf Version 4.2 Upgrade:

1. Modify the furnace controls D. Provide a listing of all parts installed with Part #s and costs along with a suggested spare parts listing

PART 3 Background:

3.01

PART 4 Applicable Documents: None

PART 5 Scope/Objective:

PART 6

PART 7 Requirements:

PART 8

PART 9