WATERVIET ARSENAL

STATEMENT OF WORK

Install Valves Building 135 Cooling Water System WV11770 January 9, 2017

AAS # 180080015

Purpose

To purchase, install, and replace 10 (3”) Worchester (or equal) actuated two-way control valves in Cooling Water system WV11770 in Building 135, Bay E-20 at the Watervliet Arsenal, NY

Description

The contractor will provide a lump sum cost to cover all Travel, Labor, Equipment and Parts/Materials to complete the following work:

-Mobilize to site

- Purchase and install a quantity of 10 Worchester 20755W/AF17-4-120/60 actuators or an equal product, with 3” NIBCO or Milwaukee butterfly valves (or equal product), with mounting brackets, fully assembled tested and included shipping.

- Purchase fabricate and install 10 new spool pieces for in between globe valves and control valves.

- Purchase and Replace existing 3” globe valves.

-Proper removal and disposal of all demolished material.

- Remove two 8” Welded Caps at end of main header, install two welded flanges with blind flanges for future usage.

-Start up system and test.

-Demobilize from site.

Services will be 100% inspected for proper form and fit. Successful measures will be provisions of testing for operation and proper functions.

POC is Rick Goyer, Supervisor Metal Processing