17-R-0013-0002.docx
DOCX document 30 KB Posted
- Solicitation number
- W911PT17R0013
About this file
Amendment for Requests for Information Answered
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W911PT-17-R-0013-0003_(04).docx | DOCX document | |
| W911PT-17-R-0013-0001_(Conform).docx | DOCX document | |
| W911PT-17-R-0013-0001.docx | DOCX document | |
| NY2WageDetermination.pdf | ||
| SITEVISIT.doc | DOC document | |
| W911PT-17-R-0013.docx | DOCX document | |
| 6PW011_SOW_Repair_Masonry,_Postwide_(Rev_1).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W911PT-17-R-0013
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
RFIS
Amendment is issued for answering the following RFIs:
RFI #1- What is the highest lift a contractor will require for the above 24'?
Answer- This will need to be evaluated by inventory of the post and the contractor's estimates, however, most buildings can be reached by a 60' lift.
RFI #2- Are contractors allowed to leave equipment on post between task orders?
Answer- The Watervliet Arsenal does not allow for equipment storage on post. Doing so without a current active task order is at the risk of damage and/or theft.
RFI #3: Can the Watervliet Arsenal provide examples of buildings that require work?
Answer: The intent of the contract is to utilize the contracted services required on any surface or structure. This is not currently known at this time. Please ensure the scope of work is reviewed and understood.
(End of Summary of Changes) image1.wmf