W911PT-17-Q-0046.pdf

PDF 471 KB Posted

Attached to
39 Foot CNC Horizontal Broach/Rifling Machine Federal contract opportunity
Solicitation number
W911PT-17-Q-0046
Issued by
Department of the Army Materiel Command Contracting Command Detroit Arsenal

About this file

Solicitation W911PT-17-Q-0046

View the file

Other files for this federal contract opportunity

Other files attached to 39 Foot CNC Horizontal Broach/Rifling Machine, newest first.
File Type Posted
Attachment_0003_-_Public_Works_Engineering_Requirements.docx DOCX document
Attachment_0001_-_Required_Lubricants,_Hydraulic_Fluids,_Oils_and_Coolants.docx DOCX document
Attachment_0004_-_Compliance_sheet_-_39'_CNC_RIFLER.xls XLS spreadsheet
Attachment_0002_-_List_of_Restricted_Class_I_CFC's_and_Halons.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUM

(No Collect Calls)

W911PT-17-Q-0046 06-Jun-2017

b. TELEPHONE NUMBER

586-282-3545

8. OFFER DUE DATE/LOCAL TIME

01:00 PM 07 Jul 2017

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W911PT9. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

PATRICK BROWN

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

W16H1F17033036

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED ORX

SMALL BUSINESS

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

ARMY CONTRACTING COMMAND-WARREN (WVA)

ATTN: CCTA-HDW/BLDG 10

1 BUFFINGTON STREET

WATERVLIET NY 12189-4000

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS AX

13b. RATING

DO-A5

CODE15. DELIVER TO CODE W16H1F 16. ADMINISTERED BY

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

TRANSPORTATION OFFICER

MARISSA BATTISTO

WATERVLIET ARSENAL

TAWV-IML-S/BLDG 35

SHIPPING AND RECEIVING

WATERVLIET NY 12189-4000

TEL: 518-266-4227 FAX:

FAX:

TEL: SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

NAICS:

333517

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF71

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

W911PT-17-Q-0046

Section SF 30 - BLOCK 14 CONTINUATION PAGE

NARRATIVE A00001

1. This solicitation, W911PT‐17‐Q‐0046 is for the procurement of one new 39’ heavy duty CNC horizontal Broach/Rifling machine.

2. This solicitaition will be based on Brand Name or Equal and will result in a firm‐fixed price contract. The preferred machine is a Varrinelli model 70kN X 12,000 or equal.

3. Specification #19‐17‐3416 defines all requirements for this action.

4. Offeror shall reference INSTRUCTIONS TO OFFERORS for additional guidance relative to the structure of its Technical proposal.

5. Award of this contract will be on a Lowest Price Reasonable basis.

INSTRUCTIONS TO OFFEROR

INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

1 Instructions to Offerors. The purpose of these instructions is to provide prospective contractors with additional guidance relative to the structure of their technical proposals.

1.1 Contents of Proposals. All proposals must as a minimum include:

A. A fully executed solicitation (SF 1449 Form) with all pricing and clause fill-ins completed

B. A complete statement of compliance (see L.1.2) C. A complete supplementary questionnaire (see L.1.3) D. Prior customer list (see L.1.4) E. Foundation information (if instruction L.1.5 is included) F. MSDS sheets (see 3.1.9.6)

Note: Failure of any proposal to meet the above minimum requirements may render that proposal technically unacceptable. In addition, brochures, illustrations, narratives, drawings and sketches pertinent to the equipment being offered are permissible and are encouraged. Offerors are cautioned, however, to screen such materials carefully before submission to insure that they will not introduce any of the deficiencies described in the request for technical proposals.

Generalized information not pertinent to the equipment being offered is not encouraged and will not be evaluated.

1.2 Offeror's Statement of Compliance. Enclosed with the specification is a prepared form entitled "Offeror's Statement of Compliance". The left hand margin of this form lists, in order, the number of all the paragraphs in the specification containing requirements which must be addressed by offerors. To the immediate right of each paragraph number is two blocks headed "comply" and "non-comply". The entry of "x" or a check mark is required in one of these two blocks for each numbered paragraph of the form. However, offerors are advised that the checking of the "non-comply" blocks for any paragraph will result in non-acceptance of the offer unless explanation is provided and deemed acceptable by the Arsenal. For this reason, space is also provided on the form for offerors to explain any entry of "non-comply". This explanation should point out the degree of, and reason for, non-compliance, and it should explain what is being offered as an equal or better alternative to the specified requirements. Furthermore, checking of “comply” without providing the pertinent supporting information is not acceptable.

A thorough explanation of how compliance will be achieved is required. Space provided for comply/non-comply explanations on the form is limited. If additional space is required, a separate sheet may be used to continue the explanation. If such a continuation sheet is used, it should refer to the paragraph number being explained. Offerors are further advised that although specified requirements are mandatory, they normally stem from performance needs at the Arsenal. Thus, when an offeror must take exception to a specified requirement he/she is well advised to provide as much information as possible about what he/she is offering so that the Arsenal can judge the impact, if any, upon the equipment’s performance, as well as the builders adherence to proper design practices. On the lower right hand corner of each page of the form is a signature block. Each page of the form should be signed by the offeror or his/her authorized representative.

1.3 Reserved

1.4 Prior Customer List. While the Arsenal is committed to the procurement of the most up-to-date technology, it is our established policy not to finance R&D efforts when an established state-of-the-art technology already exists which will satisfy the requirements of the specification. Consequently, and unless the specified equipment is classified as special (see 3.2.1) offerors are required to submit a list of prior customers to whom they have furnished equipment essentially identical for the rifling of a 155mm canon tube, to that being offered in accordance with the specification. This list will include company names, addresses, and the names of points of contact, and will be used by the Arsenal to complete its evaluation in three areas:

A. It will serve as evidence that new R&D will not be required, and the item to be furnished is proven equipment.

B. It will provide the opportunity for the Arsenal to contact (and possibly visit) the prior customers to confirm that the equipment is, in fact, essentially identical to that being offered and has been successful.

C. It will provide the opportunity for the Arsenal to contact the prior customers for confirmation that the offeror's repair parts and service organization will satisfy the requirements of paragraph 3.1.19 of the specification.

1.5 Special Foundations. Due to the periodic need for machine tools to be relocated because of changing production requirements, it is the Arsenal's preference to avoid special foundations.

The footnote to paragraph 3.1.17(a) of this specification defines the essential properties of the machine shop floors at the Arsenal. It also defines special foundation as any foundation which requires alteration to that floor. That includes not only the installation of deeper concrete footings, and/or isolation pads, but also any excavations within the floor to house chip conveyors, coolant sumps, wire ways, and other items. Consequently, offerors are to provide with their proposals a narrative addressing the foundation requirements for the machine tool being offered. This narrative must address at least the following questions:

A. Will the offered machine tool require a special foundation?

B. If so, why is the foundation required? The response to this question should make clear whether the foundation is required for vibration isolation, retention of leveling and alignment, installation of support hardware of systems or a combination of these.

C. If a foundation is required for vibration isolation or for retention of leveling and alignment, what will be the probable impact upon machine tool performance and longevity if the Arsenal chooses not to provide the foundation?

1.6 Standard or Optional Equipment. The dedicated function of this specification is the acquisition of a machine tool equipped as herein described. All paragraphs are specific in their intent and are not to be misconstrued as requests for options. The machine system described by this specification shall be provided with all required equipment whether or not stated requirements are standard or optional with the machine tool builder/supplier. Proposals which include offers of any specified equipment or specific requirements as an option, or as options at extra cost, may be considered as non-responsive.

1.7 Reserved

1.8 Additional Requirements for Noted Sections of the Specification (#19-17-3416)

Section 3.1.4 - Slideway Design and Construction – Please state in your proposal details of the way system being offered.

Slideway systems other than the three (3) referred to in section 3.1.4 may be offered provided that their design is consistent with all specified performance characteristics of the machine.

Section 3.2.2.0 - Needed Spare Parts – Contractor shall list all available options and pricing with solicitation.

Section SF 1449 - CONTINUATION SHEET

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Each CNC Rifler for WVA

FFP

One Each New CNC Rifler per Watervliet Arsenal Equipment Engineering Specification #19-17-3416 dated 7-February-2017.

MISC #

FOB: Destination

NSN: W16H1F17033036

MILSTRIP: To be Determined

PURCHASE REQUEST NUMBER: W16H1F17033036

NET AMT

SPECIFICATION #19-19-3416

U. S. Army Watervliet Arsenal Watervliet, NY Equip Engr. Spec #19-17-3416 Date: 1 June 2017

New 39’ CNC RIFLER

Table of Contents

1. Scope

1.1 Abbreviated Description

2. Applicable Standards and Publications

3. Requirements

3.1 General Requirements

3.2 Specific Requirements

3.3 Controls/Control Systems

3.4 Requirements for Demonstration of Conformance

4. Quality Assurance Provisions

4.1 Responsibility for Inspection

4.2 Preliminary Acceptance Inspection

4.3 Government Participation

4.4 Reinspection Provisions

4.5 Post Inspection Procedures

4.6 Final Acceptance Inspection

4.7 Warranty

5. Preservation, Packaging and Delivery Instructions

6. Instructions for Preparing Technical Offers

1. Scope:

1.1 Abbreviated Description. The machine tool covered by this specification shall be one new 39’ heavy duty CNC horizontal Broach/Rifling Machine (machine). Shall have the capability to push and pull broach rifling for hook and crown cutters. Also to include straight grooves, constant/progressive twist left or right hand. Machine shall be complete with all components necessary to rifle large canon tubes including a set of 155mm push rifling broaches.

The preferred machine is a Varinelli model 70kN X 12,000 or equal.

2. Applicable Standards and Publications. All work performed and procedures followed in association with this project shall meet or exceed all applicable and current Watervliet Arsenal, OSHA, local, state, and federal government codes, and laws relative to fire, safety, environmental, and electrical issues. The quality of all work performed and material provided shall meet or exceed the latest applicable industry standards and engineering practices for this type of equipment and its intended function. In all instances material, quality, and workmanship shall meet or exceed OEM specifications.

2.1 The Following Publication Apply

NAS 966

ISO 1708 AND 230-2

NFPA 79

IEC 60204-1

ANSI/ASME B5

3. Requirements. All requirements are mandatory from the standpoint of intended function.

Wherever a specific requirement would force an offeror to depart from his standard practice or configuration, the Arsenal will accept, for evaluation, alternative offers for achieving the intended function. Any such alternative offers must be accompanied by sufficient technical information to allow the evaluator to reach a definite conclusion that the alternative is equal to or better than that specified.

3.1 General Requirements.

3.1.1 Design and Engineering. The machine shall be designed and engineered in accordance with latest standards recognized or adopted by the Association for Manufacturing Technology (formerly the National Machine Tool Builders Association). The design and engineering shall incorporate only concepts, systems, materials, and new components which have been proven in prior use.

3.1.2 Materials. Materials incorporated in the construction of the machine shall be of sound and uniform quality, free from defects and shall conform in specification, heat treatment, and suitability.

3.1.3 Construction. All parts of the machine shall be new and unused and shall be constructed so as to be capable of withstanding all forces encountered during operation to its maximum rated capacity. The structure and assembly of the machine and its components shall be sufficiently rigid that workpiece finish and accuracy are not impaired by machine vibrations.

3.1.3.1 Alignment Retention. Non-integral machine components, including but not limited to columns, heads, and ways which are separately assembled and whose alignments determine the squareness and/or parallelism of machine geometry shall utilize a positive means for retaining alignments and regaining them in the event of accidental dislocation.

3.1.3.2 Construction of Major Components. All major machine components such as beds, saddles, columns, etc. are castings either of iron or semi-steel, or shall be constructed as mild steel weldments. Weldments, if used, shall be braced, ribbed and gusseted to obtain strength equal to or better than the strength of castings, and shall be thermally stress relieved to preclude spontaneous distortion. All hollow base castings or weldments shall be filled with vibration absorbent polymer.

3.1.4 Slideway Design and Construction. All precision ways which guide and bear the rated design loads shall adhere to the hardness criteria shown in the following examples of acceptable way systems.

A. Integral cast iron ways shall be hardened to RC 50 to RC 54 to a depth of .100 inch or more.

B. Hardened and ground steel ways for mating with Turcite, Rulon or other such low friction forgiving materials shall be hardened within the range of RC 55 to RC 62. Actual hardness within this range shall not very more than 5 RC points.

C. Hardened and ground steel linear guide ways for use with anti-friction roller bearings shall be to a hardness of RC 62 to RC 65 to a depth of 1/8 inch or more. For this machine a 65mm minimum linear guide way of high quality shall be acceptable.

All slideway systems having less than a 60-degree incline to the horizontal shall be protected by way covers unless it can be substantiated that covers will interfere with the functions of the machine.

3.1.4.1 Way Wipers. All way systems, regardless of type shall be equipped with wipers designed to prevent intrusion of foreign material. Wipers shall be adjustable to compensate for wear. Wipers shall also be easily removable and replaceable.

3.1.5 Workmanship. Workmanship throughout the machine and its equipment shall be of good quality and in conformance to the manufacturer's engineering drawings and to standards recognized or adopted by the Association for Manufacturing Technology.

3.1.5.1 Shimming. Shims that do not appear on the engineering drawings shall not be incorporated in the machine.

3.1.5.2 Spacing. Spacers that do appear on the engineering drawings are permissible.

3.1.6 Maintainability. All parts subject to wear, distortion, or failure and all parts which require periodic adjustment shall be readily and safely accessible for repair, replacement, or adjustment as applicable. Instructions for maintenance and adjustments shall be clear, concise, and definite in application.

3.1.7 Interchangeability. All parts bearing the same part number shall be functionally interchangeable.

3.1.8 Applicable Power Source. The power source to which the machine will be connected furnishes a nominal 480 volts, 3 phase, 60 Hz AC. However, the machine shall be tolerant enough of line fluctuations to operate normally at source voltages ranging from 432 to 504 volts. No internal or external transformers will be acceptable to convert to lower supply voltage.

3.1.8.1 Electrical Safety Devices. The machine and its equipment shall be protected with circuit breakers which comply with NEMA standards for thermal magnetic types and shall have a minimum interrupting capacity of 25,000 RMS symmetrical amperes for 480 volt, 3-phase system. Breaker terminals shall be UL listed as suitable for the type of conductors provided. Plug-in circuit breakers or current-limiting fuses are not acceptable.

3.1.8.2 Motors. All motors provided shall be of the optimum type and horsepower rating to meet intended application and usage based on accepted engineering practice. All motors shall be equipped with thermal overload protection. All motors shall be housed in enclosures of the appropriate NEMA type for the class and severity of service. Each motor shall bear an identification plate containing, as a minimum, the identity of the manufacturer, the model, serial number, input voltage, amperage, horsepower, phase, frequency and frame or mounting. All AC unidirectional motor housings shall bear a directional arrow to indicate proper rotation direction when correctly wired. All AC motors rated at 25 hp or greater shall be equipped with a "soft start" mechanism which provides for reduced voltage starting. All polyphase AC motors rated at 1 Hp or greater shall be of the high efficiency type.

Note: All motors are to be permanently lubricated and sealed unless the contractor can substantiate that this feature cannot be offered by two (2) or more major motor manufacturers.

3.1.8.3 Operator Control Voltage. All electrical controls meant for use by the operator of the machine shall carry 120 volts AC maximum.

3.1.8.4 Utility Outlet. The machine shall be provided with an operational 120-volt single-phase, 20-ampere dual-receptacle 3-wire utility outlet. This outlet shall be protected by a ground-fault interrupter and shall be externally mounted and easily accessible. A “noise" suppression device shall be provided.

3.1.9 Safety and Environmental Features.

3.1.9.1 Protection of Machine Operator. Protection of the machine operator and other personnel shall be accomplished in accordance with all pertinent state, federal, local laws and regulations.

3.1.9.2 Protection of the Machine. The machine shall be fully equipped with the devices necessary to prevent self-damage in the event of malfunction and/or ordinary operator negligence insofar as practical.

3.1.9.3 Noise Levels. The government's preference is to achieve noise levels not in excess of 80 dba and shall be accomplished at no additional expense to the Government. Noise levels shall be measured under load during the test of conformance to specified ranges and capacities (see 3.4.1.2), and shall be measured at any or various times during this test at the discretion of the Technical POC or other appointed representatives. Noise levels at a distance not exceeding one meter from the nearest point on the machine shall, under no circumstances, exceed a maximum of 85 dba when measured by a properly calibrated sound level meter set for "A" weighting and slow response. Any shields, baffles, enclosures or other devices required to bring the machine into conformance with this noise level requirement shall be furnished by the contractor. Any such devices shall not interfere with the proper operation of the machine and shall be designed to preserve the visibility needed for safe operation and ease of maintenance.

3.1.9.4 Ozone Depleting Substances. Section 326 of Public Law 102-484 precludes the Dept. of Defense from awarding any contract that directly or indirectly requires the use of a class I ozone-depleting substance within the Government specification or standards set forth in the contract. Attachment 0002 is a list of the restricted Class 1 CFC’s and Halons. All shall be replaced by new functionally equivalent substances or systems that are approved for use by the Environmental Protection Agency (EPA) and have an "Ozone-Depletion-Potential" (ODP) rating of zero. Material Safety Data sheets (MSDS) shall be submitted for approval to Watervliet Arsenal at the time of the submission of proposal (CDRL A001).

Definition: Ozone-Depletion-Potential (ODP). The relative capacity of a substance, per unit weight, for destroying the earth's stratospheric ozone layer, in comparison with CFC-11, CFC-12 and CFC- 114, each having been assigned an ODP of 1.00.

Note: Offerors are responsible to obtain and adhere to the most current list of prohibited substances.

3.1.9.5 Asbestos and Mercury Free Certification. All materials utilized in the system shall be certified as asbestos and mercury free unless substitute materials do not exist.

This certification shall be provided prior to machine delivery (CDRL A002).

3.1.9.6 Lead-Free and Chromium-Free Paint Certification. All paints and primers applied to the system shall be certified as lead free and chromium-free. Lead based paint is paint that contains more than six one hundredths of one percent (0.06%) lead by weight. This certification shall be provided prior to machine delivery (CDRL A003).

3.1.9.7 PCB-Free Certification. To the extent that the machine may have been charged with lubrication and/or hydraulic fluids at the contractor's plant for preliminary acceptance inspection (see section 3.4), these fluids shall not contain Polychlorinated Biphenyl’s (PCB’s). The machine and its equipment shall be certified as PCB-free prior to being shipped.

3.1.9.8 Lockout/Tagout Procedures. The manufacturer is required to provide the proper control of hazardous energy (lockout/tagout) per OSHA 29 CFR 1910.147. This information shall be incorporated into the maintenance manual. The control of hazardous energy sources includes electrical, pneumatic, hydraulic, chemical, mechanical, UV, electromagnetic and thermal.

3.1.10 Identification Plate. A corrosion-resistant metal plate shall be securely attached to the machine in a visible location in the vicinity of the operator's workstation. This plate shall bear, as a minimum, the information called for as follows, with space at the bottom for one additional line of information to be applied by the government.

Nomenclature Manufacturer's name Model Manufacturer's Serial Number Power Input (voltage, phase, frequency, and total amps) Government Contract Number Date of Manufacture

3.1.11 Lubrication. The machine shall be equipped to provide sufficient lubrication to every moving part where lubrication is essential to prevent damage. Slideways shall be lubricated by an automatically cycled distribution system such as that manufactured by Trabon Inc. Gearboxes or transmission cases shall be lubricated by the wet-sump splash method.

Spindle bearings shall be lubricated by recirculating pressure spray systems. Systems of the foregoing types are considered automatic systems and they shall be equipped to be fail safe to the maximum extent possible. Any sensors or other devices used to detect the presence (or absence) of lubrication shall be accessible for test or replacement without major disassembly. Manual lubrication methods (e.g. Grease fittings, oil cups etc.) are permissible for lubrication points not practically served by automatic systems. For non-recirculating automatic systems (such as slideway lubrication), the reservoirs shall be sized to provide lubrication reserve equivalent to 80 operating hours and shall be located at floor level. For recirculating automatic systems (such as pressure spray), easily cleanable or replaceable filtration devices shall be provided. Wet-sump type systems shall be equipped with means to confirm proper oil level. Sight gages, if used, shall be of the external standing tube type rather than the flush-mounted porthole type. Standing tube sight gages shall be protected against accidental breakage.

3.1.11.1 Lubrication Plate. A lubrication plate (or plates) shall be permanently fastened to the machine and shall clearly indicate the type and viscosity of lubricant and the service interval for all automatic and manual lubrication reservoirs and fittings. The plate shall include a simple diagram which depicts the physical location of all lubrication points on the machine structure.

3.1.11.2 Lubricants, Hydraulic Fluids, Oils and Coolants. Watervliet Arsenal established a standardized list of lubricants, hydraulic fluids, oils and coolants. The contractor is requested to choose the required lubricants, hydraulic fluids, oils and coolants from Attachment 0001, enclosed or where designated (*see note) approved industry/commercial equivalents. If a substitute is required, the contractor shall provide, at time of machine delivery, justification which shall include the manufacturer, type and specification number as well as the reason for the substitution.

3.1.12 Hydraulic System. Hydraulic systems provided shall be sized and powered for the intended application and shall conform industry standards. The system shall incorporate cleanable or replaceable filtration devices to insure fluid cleanliness. Reservoirs shall be equipped with easily visible gages to indicate fluid level. An appropriately sized refrigeration system shall be provided to ensure the hydraulic fluid does not exceed 120 degrees f in temperature. The hydraulic system shall be protected against overpressure as well as under pressure. System pressure in any hydraulic device shall be as low as is practical for the intended application but shall not exceed 3000 PSI in any case. In any system which utilizes hydraulics to produce thrust or direct linear motion, anti-surge devices or circuits shall be incorporated to insure uniformity of motion under varying loads. These devices or circuits shall be adjustable.

All reservoirs shall be easily accessible for cleaning and flushing and shall be located at floor level.

3.1.13 Painting. All exterior machine surfaces shall be painted except where bright metal is required for machine function or to otherwise adhere to the requirements of this specification. Paint shall be chromium-free and lead-free. Quality and manner of application shall be such as to afford protection throughout the normal life of the machine. Paint shall be "semi-gloss", and selected by the Government, from a list of standard colors supplied by the offeror with their proposal. This selection shall be made after contract award. Danger areas shall be painted red and caution areas shall be painted yellow in accordance with OSHA Standard 1910.144. Appropriate warning signs, tags, or emblems will be affixed to respective areas of the machine in accordance with OSHA Standard 1910.145.

3.1.14 Machine Hold Down and Leveling. The machine base shall be provided with sufficient and properly located holes for positive hold-down when operating at full rated capacity. In addition, for each hole in the machine base, the contractor shall provide a set of his recommended hold-down and leveling hardware.

Note: All hold-down and leveling hardware shall be delivered 30-days prior to scheduled delivery of the machine.

3.1.15 Gears. All gears used in the machine and its components shall meet or exceed the standards recommended by the American Gear Manufacturers Association for the type and severity of service required.

3.1.16 Handwheels. Where power feed and/or rapid traverse of a machine component is provided or specified, associated handwheels or cranks, if any, shall not rotate when power feed or rapid traverse is engaged.

3.1.17 Technical Data. All data shall be in the English language and shall be furnished in accordance with the quantities, formats and delivery dates below. All data shall be packaged and delivered separately from the machine itself marked to the attention of the Technical POC.

a. Foundation Drawings, Standard or Special (see note): Shall be complete in all construction detail to permit pricing and construction by a general contractor and shall be furnished as soon as possible by e-mail to POC after contract award not to exceed 30 calendar days past award (CDRL A004). All drawings shall be dimensioned in English units. One electronic copy on CD in AutoCAD .dwg or .dxf format shall be provided. AutoCAD drawings shall not utilize the color yellow or any other colors that cannot be made readily visible when plotted out in color. When drawings are finalized the contractor shall certify the accuracy of the drawings by providing a stamped and signed hard copy of the drawings to the Watervliet’s

POC.

If a special foundation (see note) is required and the vendor/contractor refuses to provide the detailed drawings required then this shall be grounds for disqualification from further consideration in the machine tool procurement. Vendor proposals submitted shall be clear in their response to this requirement.

Note: Typical floor thickness at Watervliet is 8”-10”. A special foundation is one which exceeds thickness, load bearing capability and vibration insulation of Watervliet Arsenal's standard monolithic concrete flooring of 1,000 pounds per square foot load rating and/or one which requires a specific thickness, specifically-shaped excavations for coolant housings, chip conveyors, electrical circuits and conductors, etc.

The soil (sub-straight) for a foundation is assumed to be medium dense gravel or medium dense gravel and sand with a minimum bearing capacity of 4,000 PSF. Should the contractor disturb the soil below the yet to be constructed concrete foundation then the contractor shall compact the disturbed soil to achieve at least 2,000 pounds per square foot (PSF) bearing capacity.

Important: See instructions section L.1.5

Foundation Drawings details shall include at least:

1) At least one drawing shall depict an over-lay top view of the machine foundation outline, machine general arrangement drawing (including all ancillary equipment) and the anchor bolt whole pattern.

2) The foundation drawings shall include 100% complete foundation details necessary for Watervliet Arsenal to directly hand over to a General Contractor for construction.

This detail shall include, but not be limited to, complete foundation dimensions, rebar locations, rebar size, rebar pattern, concrete PSI requirements, and load bearing specs.

Shall have no extra layers just what is needed for the completion of the foundation.

b. Machine and Equipment Floor Plan: A digitized machine and equipment floor plan in AutoCAD shall be provided on a CD (CDRL A005). This plan shall contain the dimensioned bolt-hole pattern of the holddown bolts for the machines. This AutoCAD drawing(s) shall also contain information that indicates the type, magnitude, and connection points of all plant utilities (electrical power, air, water, etc.) required to operate the machine. This data shall be furnished as soon as possible after contract award or at least within 30 days WITH Attachment 0003. One reproducible hardcopy and one electronic copy on CD in AutoCAD.

c. Catalog of Standard Tooling and Accessories shall be furnished after award of contract

(CDRL A006). For offers of foreign built machine tools (i.e., machines built outside the United States, its possessions or Canada), the catalog shall set forth U.S. domestic sources of supply.

(two copies)

d. Non-Standard (special) Tooling and Accessories. To the extent that this specification requires the development of unique tooling and/or accessories not generally available commercially, a set of drawings and specifications sufficiently complete to permit manufacture of such tooling and accessories shall be furnished at the time of machine delivery (CDRL A007).

Dimensional information shall be in English units. One reproducible hardcopy and one electronic copy on CD in AutoCAD Release 2004 or later.

e. Installation Instructions and Drawings containing all necessary information to install the equipment. This shall include a drawing containing the certified dimensioned locations of all equipment mounting/holddown holes. This data shall be furnished as soon as possible after contract award or at least within 30 days (CDRL A008). Two reproducible hardcopy and one electronic copy on CD in AutoCAD Release 2004 or later.

f. Lubrication Diagram or Instruction. To be delivered at time of machine delivery. Two reproducible hardcopy and one electronic copy on CD in AutoCAD Release 2004 or later

(CDRL A009).

g. Operating Instructions. These instructions shall be in provided in separate manuals from other technical data provided. To be delivered upon machine delivery. Four copies minimum and one electronic copy on CD (CDRL A010).

h. Maintenance and Troubleshooting Instructions for all machine systems. This material shall also include the machines mechanical assembly drawings. To be delivered at time of machine delivery. Two copies minimum of the Maintenance and Troubleshooting Instructions.

Two reproducible hardcopies and one electronic copy on CD in AutoCAD Release 2004 or later or PDF of the machines mechanical assembly drawings (CDRL A011).

i. Electrical and hydraulic schematics to be furnished. To be considered acceptable, these schematics must clearly portray all as-built electrical and hydraulic ties to their respective main systems. Two reproducible hardcopies and one electronic copy on CD in AutoCAD Release 2004 or later. Final as-built drawings to be furnished not later than 30 days after final acceptance of the machine (CDRL A012).

Note: If, during installation and testing, the actual electrical and/or hydraulic systems are configured differently than depicted on the schematics, receipt of the revised "As-Built" schematics shall be a condition of final acceptance.

j. Repair Parts Catalog. This catalog shall encompass every replaceable part in the machine and shall include appropriate identification and ordering data. Items which can normally be purchased locally may be so indicated provided they are sufficiently described. The repair parts catalog shall include illustrations which clearly locate parts within larger sub-assemblies. To be furnished not later than 30 days prior to delivery of the machine. (two copies) (CDRL A013).

k. Programming Manuals. Where a CNC machine is offered or specified, programming manuals shall be supplied. These manuals shall include, or be supplemented by, a clear summary of the control functions actually implemented and usable on the system offered or specified. These manuals shall be delivered at machine delivery. One Fanuc CD-ROM Manual and two Operation and Fanuc Handbooks (CDRL A014).

l. Software Documentation. The offeror shall provide four copies of all system software and/or ladder logic developed to control and interface the new control/drives with the existing machine tool. Two copies shall be on CD and two copies shall be paper (hard) copies. To be delivered to the technical POC 30 days after final acceptance of the machine (CDRL A015).

3.1.18 Training Required. The contractor shall be responsible for providing acceptable training of Arsenal personnel. The type and extent of training shall depend upon whether the machine specified or offered is equipped with numerical control. All instructions and materials, oral or written, shall be in English. "On-Site" means "At Watervliet Arsenal” and "Off-Site" means "a location within the U.S. away from Watervliet Arsenal as determined and arranged for by the contractor". The quality of the training shall be such that at the conclusion of the specified training time, each individual within their assigned category shall be capable of repairing or operating the machine to its productive capacity. Training shall be in accordance with the applicable areas of the following schedule:

Type of training Number of persons When required Training location

Machine operation 4 During or after machine performance testing

On site

Mechanical maintenance

2 During startup On site

Hydraulic maintenance

(if applicable)

2 During startup On site

Electrical maintenance 2 During startup On site

Electronics (CNC) maintenance

2 During Installation On site

Spindle/Axes Drives (if applicable)

2 During Installation On site

Programming training 1 During Installation ON site

Note: For all types of training, the associated technical data (see 3.1.17) shall be on hand at the time of instruction and its use and interpretation shall be covered during the training. A training schedule showing the hours of training for each person under their assigned category, shall be sent in with proposals for review (CDRL A016).

3.1.19 Repair/Replacement Parts and Service. During the warranty period (See item 4.7), the offeror shall provide parts and/or service for the contracted equipment within 72 hrs of notification of a problem. Watervliet Arsenal recognizes that it may be hard to fulfill this requirement for major machine components. If the requirement cannot be adhered to, the offeror shall notify Watervliet Arsenal’s POC within two business days and shall provide a delivery schedule to be approved by Watervliet Arsenal’s POC. The offeror further agrees, as part of the contract, to store complete ordering data to include specifications, engineering drawings, and other information for the contracted machine tools/parts. This data shall be stored within the U.S. or Canada and be sufficient in detail to permit successful acquisition of the parts and associated repair service.

3.1.20 Pneumatic Requirements. If air is needed for any machine operation or function, the machine shall be fully equipped with all necessary piping, valving, etc., fully installed to the point of connection to which the Arsenal will connect shop air. Available shop air at the Arsenal is 80 psi and if higher or lower pressure is needed at the machine, the machine shall be fully equipped with the devices needed to modify the 80 psi supply pressure. The machine shall also be equipped with devices to remove the normal moisture and other contaminants usually present in shop air supplies. Normal moisture is defined as that moisture produced when air at a relative humidity of 75% has been compressed to 80 psig. An external compressor is not acceptable.

3.1.21 Special Tools. If any element of machine operation or maintenance requires the use of specially designed tools, these tools shall be provided with the machine and shall become the property of the Government.

3.1.22 Control of Cutting Fluids. Machine equipped with a coolant system, the contractor shall insure that the machine is designed and equipped to prevent coolant from escaping the confines of the machine or leaking to the floor when producing workpieces of a size within the machine's normal working range. If the coolant reservoir is part of the foundation, the coolant shall be contained in a leak-proof metallic or non-metallic liner.

3.1.23 Site Conditions. The machine covered by this specification will be installed in general machine shop space and there will be no environmental conditioning. Temperatures will range from 65 degrees f. To 95 degrees f. and relative humidity will range from 20% or less to 95%. On any given day, the temperature in the machine shop may change as much as 4 degrees

f. per hour. These are the conditions under which the machine is expected to perform as specified, and the contractor shall be responsible for supplying whatever is required to meet the specified performance. The only permissible exception is positioning accuracy for numerically controlled machines. For this performance factor, allowances may be made for the effects of temperature fluctuation.

3.1.24 Heat Exchange Equipment. Heat exchange equipment shall be furnished with the machine wherever it is needed to keep operating temperatures within design or specified limits. Any heat exchange equipment using water as the heat exchange medium shall be fully recirculating and shall not require the continuing input and discharge of Arsenal water supply.

Waste water systems of any type are not acceptable.

3.1.25 Chip Removal. An automatic, reversible, long drag chain chip removal unit shall be provided, capable of conveying chips from entire work area of machine to a suitable container outside of machine without manual aid. Positive lubrication shall be provided for all bearings and moving parts. The conveyor shall allow for the draining of *excess coolant back into the sump before the chips are discharged. Height of discharge chute from floor shall not be less than 46" nor more than 60". The chip removal unit shall be mounted full length of work area at rear of machine or full length of work area within the confines of the machine bed. The system shall minimize the need for operator intervention to clear jams or free tangles. Conveyor controls shall include Manual/Auto, Fwd/Rev and Stop. There shall be controls located at the conveyor output as well as at the operator’s station. The unit's drive mechanism shall be equipped with an external square or hexagonal extension piece to permit use of wrenches to manually free blockages which stall the drive mechanism. The unit shall operate successfully in a variety of machining environments including dry-cutting, machining with cutting oils and machining with water-extendable oils. The unit shall be reversible to facilitate clearing of blockages. The chip removal unit shall be engineered for the machine so that when fully installed in accord with instructions all points subject to periodic maintenance and lubrication shall be externally accessible and the unit shall be capable of being disassembled and removed without disabling the machine itself.

3.1.26 Machine Installation, Startup and Testing.

3.1.26.1 Work to be performed by the Arsenal. Upon receipt of the required installation and foundation drawings (see 3.1.17); Watervliet Arsenal will prepare the intended installation site prior to delivery of the machine. After placement of the machine by the contractor/riggers, Watervliet Arsenal will run utilities (power and air) to first points of connection. However, if the installation instructions supplied by the contractor are incomplete or insufficiently detailed, installation work will stop and the contractor will be required to dispatch a service engineer. Installation will resume upon his arrival and continue under his guidance.

Note: If installation instructions, foundation drawings, and electrical and hydraulic schematics are not delivered at or before the times specified (see 3.1.17), the Government reserves the right to forestall delivery and/or final acceptance testing of the machine by an amount of time equal to the delay in receipt of instructions, drawings, or schematics.

3.1.26.2 Work to be performed by the Contractor. This project will be turn-key with the contractor being responsible for all aspects of the project except as mentioned in par

3.1.26.1 above. If a special foundation is not required the Contractor is responsible for the removal of wood block flooring and existing concrete preparation. Grouting for machine hold downs shall be the contractor’s responsibility regardless of foundation type. The contractor shall provide competent English-speaking service personnel to install the machine, rough and finish level the machine place the machine in operation and conduct the acceptance tests specified in section 4. The contractor, through his own service personnel shall be fully responsible for the startup and testing of the machine, and the service personnel shall remain until the machine activation and testing have been successfully completed. Under no circumstances should the contractor plan on gratuitous Arsenal assistance for diagnosis, troubleshooting, or repair of the equipment during activation and testing. Should such activity prove necessary, it shall be the contractor's responsibility to provide the appropriate labor and materials. If the contractor chooses to request Arsenal assistance in lieu of providing his own resources, the request will be reviewed by the Technical POC who shall reserve the right to impose a charge for the assistance. Approvals, even on a charge basis, should not be taken for granted since there is no guarantee that appropriate Arsenal personnel will be readily available.

In such cases, the Arsenal will not be held responsible for delays in acceptance of the equipment resulting from non-availability of Arsenal personnel or Arsenal-furnished equipment.

Contractor personnel shall be solely responsible for costs associated with shipping, delivery, rigging, installation, and connection. After all required work has been completed, and upon completion of paragraphs 4.2 and 4.5 the contractor shall ship the machine to Watervliet Arsenal.

Contractor personnel shall coordinate the shipment of the machine to Watervliet.

Contractor personnel shall arrange for rigging services to off load the machine and contractor personnel shall be on-site at Watervliet when the machine arrives and is off loaded. Outside rigging services should be advised that only tagged and certified chain hoists are permitted to be used at the Arsenal and that all rigging slings must be tagged and certified for the weights being lifted. Contractor personnel shall supervise the placement of the machine on the installation site by the rigging service. In most cases no Arsenal forklift services and/or Arsenal personnel will be available for the installation. Only propane powered forklifts are permitted and must also be equipped with a roll cage and operator license. Arsenal overhead pendant cranes (within load capacities) can be used by the contractor/rigging service for the installation. The contractor shall provide written certification to the WVA representative that all contractor/rigger personnel are qualified, through either formal training or experience per OSHA, to operate pendant controlled overhead cranes. Contractor personnel shall also adhere to the WVA requirements to wear OSHA approved safety glasses and safety shoes while in the manufacturing shop areas. The contractor shall ensure they bring all equipment/material necessary for the installation of the machine(s). Watervliet does not have the resources to provide such material. Crane capacity within each building is limited (2, 5, 10 or 15 tons) and therefore if not adequate then the contractor will need to provide alternate means necessary for the installation.

IMPORTANT: Under normal circumstances the contractor will be allowed to work as long as is desired during normal work days. Contractor work outside Watervliet’s normal work days cannot be guaranteed. Watervliet is on a condensed work schedule. Normal work hours/days for this schedule are four 9-hour workdays (Friday off) one week and four 9-hour days, one 8-hour day (Friday) the following week. Contractor work on the Friday off and weekends cannot be guaranteed. Contractor’s classified as foreign nationals may further restrict work hours and days available.

If the contractor requests Watervliet Arsenal to ship misc. material via UPS, FedEx or by other similar carrier then the contractor shall provide their carrier account number for this purpose.

3.2 Machine-Specific Requirements.

3.2.1 Machine Tool Description. The machine tool covered by this specification shall be one new 39’ heavy duty CNC horizontal Broach/Rifling Machine (machine). Machine shall have the capability to push and pull broach rifling for hook and crown cutters. Also to include straight grooves, constant/progressive twist left or right hand. Machine shall have a laser measuring unit and tool recovery software.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .