Attachment_0003_-_Public_Works_Engineering_Requirements.docx
DOCX document 15 KB Posted
- Attached to
- 39 Foot CNC Horizontal Broach/Rifling Machine Federal contract opportunity
- Solicitation number
- W911PT-17-Q-0046
About this file
Attachment 0003 - Public Works Engineering Requirements
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W911PT-17-Q-0046.pdf | ||
| Attachment_0004_-_Compliance_sheet_-_39'_CNC_RIFLER.xls | XLS spreadsheet | |
| Attachment_0002_-_List_of_Restricted_Class_I_CFC's_and_Halons.docx | DOCX document | |
| Attachment_0001_-_Required_Lubricants,_Hydraulic_Fluids,_Oils_and_Coolants.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Equip Engr. Spec #19-17-3416 Dated 7 February 2017 Attachment 0003
In order for Public Works to be able to provide timely support services to the Operation Deteriorate, the following minimum information is required for electrical service to all new machines.
Public Works Engineering requires the following minimum information for each machine:
1. Full Power Load (FLA)
2. Start-up (surge) current
3. Average Power requirement (75%)
4. Standby power load at idle (if applicable)
5. Power Factor Information (efficiency)
6. Wiring schematics
7. Size of largest motor
8. Number of motors
9. Type of motor
a. Synchronous
b. Induction
10. Equipment Manufacturer contact information:
a. Point of contract for equipment electrical power requirements
i. Telephone Number
ii. Email address
11. Manufacture’s Recommendations for Installation
a. Electrical Manual
b. Manufacture’s Point of contact
i. Telephone Number
ii. Email address
File details come from the government source that posted it. Updated .