Amendment W911N2-22-Q-0053 0001.pdf
PDF 195 KB Posted
- Attached to
- Charpy V pendulum impact tester
- Solicitation number
- W911N2-22-Q-0053
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment W911N2-22-Q-0053 0001 conformed copy.pdf | ||
| SOLICITATION W911N2-22-Q-0053.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W25G1Q216501R7
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to answ er questions from a prospective offeror and to revise paragraph 4.1.5 of the purchase description. all other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 6
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 31-Aug-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911N222Q0053
X 9B. DATED (SEE ITEM 11)
24-Aug-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
31-Aug-2022
CODE
LETTERKENNY ARMY DEPOT
LETTERKENNY CONTRACTING OFFICE - ACC-RSA-LEAD
1 OVERCASH AVENUE, ATTN: CCAM-MLK, BLDG 2S
CHAMBERSBURG PA 17201-4150
W911N2 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W911N222Q0053
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
QUESTIONS & ANSWERS
1) Our standard equipment utilises a digital display, will this be marked as a non conformance, as it mentions analog in the specs?
A1) A digital display is acceptable.
Q2) What will the maximum energy requirement for the tester be?
A2) An impact tester with maximum energy of 400J (300 ft-lbs) is expected to meet all testing needs of Letterkenny. Maximum energy for the tester should be as close to 400J (300 ft-lbs) as achievable, but not under.
SECTION SF 1449 - CONTINUATION SHEET
The following have been modified:
PURCHASE DESCRIPTION
PRODUCTION ENGINEERING
PURCHASE DESCRIPTION
CHARPY V IMPACT TESTER AND ACCESSORIES
1.0. GENERAL
1.1. SCOPE
Furnish one each Charpy V pendulum impact tester with striker, tongs, cooling bath, and rack that meet the following specifications. Installation and training shall also be provided. Specifications are based upon commercially available products and shall meet or exceed the following minimum required specifications.
1.2. GENERAL INFORMATION
1.2.1. Hours of Work: All work shall be performed during Letterkenny’s tour of duty which is a compressed work schedule with eight days that are nine hours in duration, one day that is eight hours in duration and one standard day off within a two week pay period (80 hours). Monday through Thursday shall be nine hour days scheduled from 0600 through 1530. The first Friday of the pay period shall be an eight hour day scheduled from 0600 through 1430.
The second Friday of the pay period shall be the standard day off. Other hours, weekend, and holiday work shall be considered separately as requested by the contractor and approved by the Contracting Officer.
1.2.2. Safety, and Fire Protection: All work shall comply with LEAD 385-1 and LEAD Safety Bulletin 18-01 for contractors working on the depot. The contractor is reminded that LEAD maintains a Safety Management System (SMS) and is either OHSAS 18001 or ISO 45001 certified. It is the contractor’s responsibility to be familiar with these documents and to comply with their contents. Any and all on site work at LEAD shall be completed in accordance with applicable OSHA, DOD, Army, and LEAD Safety requirements. As a federal installation, additional requirements other than OSHA apply to contractors performing work at LEAD. Examples include full conformance to all applicable NFPA standards, ANSI standards, and other consensus standards for the industry covered by the subject contract. It is the responsibility of the contractor to be familiar with all applicable standards prior to starting work. The equipment and installation shall meet all of the safety criteria set forth in ANSI Z9.4 and OSHA 29 CFR 1910.94. Any and all safety messages or recalls related to the safe use of the products provided by the contractor will be provided to the COR for the contract within 5 days of the contractor’s awareness of the message or notice.
1.2.3. Security Requirements: The contractor shall be responsible to ensure that all employees and subcontractor employees that shall visit the depot shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office.
Contractor workforce shall comply with all personal identity verification requirements as directed by DOD, HQDA and/or local policy. Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.
1.2.4. OPSEC Training: Per AR 530-1, Operations Security. Contractor employees and associated sub-contractor employees shall complete Level I OPSEC training within 30 calendar days of their reporting for duty and annually thereafter. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer if a COR is not assigned, within 15 calendar days after completion of training. Level 1 OPSEC training is available on the Letterkenny Army Depot homepage – www.lead.army.mil
1.2.5. iWATCH Training: The contractor and all associated sub-contractors with an area of performance within an Army-controlled installation, facilities or area shall brief all employees on the local iWATCH program. This local developed training shall be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the TPOC or contracting officer. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance. The contractor shall report completion for each affected contractor employee and subcontractor employee, to the TPOC and contracting officer within 15 calendar days after completion of training. iWATCH training is available on the Letterkenny Army Depot homepage – www.lead.army.mil
1.2.6. AT Level I Training: All contractor employees, to include subcontractor employees, requiring access to Army installations, facilities, and controlled access areas shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee to the COR or to the contracting officer, if a COR is not assigned, within 15 calendar days after completion of training by all employees and subcontractor personnel. AT Level I awareness training is available at the following website: http://jko.jten.mil/courses/atl1/launch.html
1.2.7. Badges: Identification badges shall be issued for admittance of personnel before performing work or service on this contract. The identification badge is the property of the US Government and must be returned upon termination or demand. The contractor/vendor agrees that he shall ensure all badges issued to employees are returned to the Badge and Identification Section, Security Division, Letterkenny Army Depot promptly on termination of need or on expiration, which occurs first. The badge room is located in Bldg 2, phone # 717-267- 5301. Hours of operation are 7:30 AM to 3:30 PM, Monday thru Friday, exclusive of Federal Holidays
2.0. GOVERNMENT RESPONSIBILITIES: LEAD will be responsible for the following:
2.1. Facilities: The government will provide clear access to all working areas necessary for the contractor to perform the installation outlined, during the hours listed in section 1.2.1 above.
2.2. Materials/Services:
2.2.1. Provide electricity and compressed air for vendor hand tools.
2.2.2. Provide space to layout out supplies, tools, etc. needed to complete the project.
3.0. CONTRACTOR RESPONSIBILITIES: the contractor will be responsible for the following:
3.1. Upon award of the contract, the contractor will perform an in depth inspection of the installation site to familiarize themselves with the site conditions. Any required facilities modifications will be made known to the LEAD POC at this time.
3.2. Provide expected arrival date of equipment 60 days prior to equipment delivery. At this time the contractor will also provide a firm installation start date.
3.3. Supply all equipment, parts, labor and materials necessary for the shipping, off-loading, storage, positioning, installation, and proper operation of the provided equipment.
3.4. Installation of the equipment in its entirety
3.5. Remove all excess equipment, shipping crates, scrap and consumable materials used by the contractor for shipment and installation of the equipment.
4.0. SPECIFICATIONS:
4.1. Pendulum type tester of rigid construction for Charpy V-Notch impact testing:
4.1.1. Designed and built in conformance with Annex A1 of ASTM E23 – 2018:
4.1.1.1. Machine frame equipped with a bubble level or a machined surface suitable for establishing levelness of the axis of pendulum bearings or, alternatively, axis of rotation of the pendulum shall be accessible for direct measurement.
4.1.1.2. Analog scales on which energy readings can be estimated in increments of 0.25 % of the range capacity or less.
4.1.1.3. Analog scales may be compensated for total frictional losses. Error in the indicating device at any point shall not exceed 0.2 % of the range capacity or 0.4 % of the reading, whichever is larger.
4.1.1.4. Total frictional losses of the machine during the swing in the striking direction shall not exceed 0.75 % of the range capacity, and pendulum energy loss from friction in an analog scale pointer mechanism shall not exceed 0.25 % of range capacity.
4.1.1.5. Position of the pendulum, hanging freely, shall be such that the striker is within 2.5 mm from the test specimen. When the indicating device has been positioned to read zero energy in a free swing, it shall read within 0.2 % of the range capacity when the striker of the pendulum is held against the test specimen.
4.1.1.6. The plane of swing of the pendulum shall be perpendicular to the transverse axis of the Charpy specimen anvils within 3:1000.
4.1.1.7. Transverse play of the pendulum at the striker shall not exceed 0.75 mm under a transverse force of 4 % of the effective weight of the pendulum applied at the center of strike. Radial play of the pendulum bearings shall not exceed 0.075 mm.
4.1.1.8. The height of the center of strike in the latched position, above its free hanging position, shall be within
0.4 % of the range capacity divided by the supporting force, measured as described in ASTM E23 - 2018, A2.3.5.1. If total frictional losses are compensated for by increasing the height of drop, the height of drop may be increased by not more than 1 %.
4.1.1.9. The mechanism for releasing the pendulum from its initial position shall operate freely and permit release of the pendulum without initial impulse, retardation, or side vibration.
4.1.1.10. The test specimen shall exit the machine with a minimum of interference.
- Pendulums shall be Compound Type, C-Type, or U-Type.
- With C-Type or Compound-Type pendulums, the broken specimen will not rebound into the pendulum.
Clearance at the end of the specimen must be at least 13 mm, or there shall be a specific design feature to deflect the specimen out of the machine.
- With a U-Type pendulum, means shall be provided to prevent the broken specimen from rebounding against the pendulum. Steel shrouds or another design feature are installed for this purpose unless specimen ends have at least 13mm clearance.
4.1.1.11. Means shall be provided to locate and support the test specimen against two anvil blocks such that the center of the notch is located within 0.25 mm of the midpoint between the anvils. The machine will be designed for use with ASTM E23 - 2018 centering tongs.
4.1.1.12. Anvils and supports shall comply with forms and dimensions shown in ASTM E23 - 2018, Fig. A1.2.
Other dimensions should minimize interference between the pendulum and broken specimens.
4.1.1.13. The center line of the striker shall advance in the plane that is within 0.40 mm of the midpoint between the supporting edges of the anvils. The striker shall be perpendicular to the longitudinal axis of the specimen within 5:1000. The striker shall be parallel within 1:1000 to the face of a perfectly square test specimen held against the anvils.
4.1.2. Support a test specimen as a simple beam at a precise location so that the notched face of the specimen is vertical, and the pendulum strikes the other vertical face directly opposite the notch.
4.1.3. Capable of testing specimens of standard size 10 x 10 x 55 mm down to sub-size 10 x 2.5 x 55 mm.
4.1.4. Provide an indicating device for measuring the absorbed energy of the broken specimen.
4.1.5. Minimum energy capacity of 400J (300 ft-lbs). Maximum energy for the tester should be as close to 400J (300 ft-lbs) as achievable, but not under.
4.1.6. Linear velocity of striker at impact point is 4.9 – 5.8 m/s (16 – 19 ft/s).
4.1.7. overall dimensions of 83” +/- 2” x 20” +/- 2” x 73” +/- 2”.
4.1.8. The scale will be in ft-lb.
4.1.9. Calibrate IAW ASTM E23 - 2018, to include direct and indirect verifications IAW Annex A2 of ASTM E23.
Calibration/verifications required after final installation.
4.1.10. Capable of operating as a stand-alone unit. No PC, laptop, external software, network, wi-fi, blue-tooth, or similar connection shall be required for machine start-up, operation, test result display, or maintenance.
4.1.11. If a specimen centering device is integral to the tester, it shall not be located within 13mm of the specimen ends during testing. This requirement is to prevent broken specimens from rebounding into the pendulum. An integral specimen centering device is not a requirement.
4.2. Specimen Cooler:
4.2.1. Liquid bath type with mechanical refrigeration.
4.2.2. Use a suitable container with a specimen positioning fixture to cover the specimens, when immersed, with at least 25 mm (1 in.) of the liquid, and position so that the notch area is not closer than 25 mm to the sides or bottom of the container, and no part of the specimen is in contact with the container.
4.2.3. Minimum capacity of 30 specimens.
4.2.4. Provide liquid agitation/stirring.
4.2.5. Provide temperature indication with minimum increments of 1 degC.
4.2.6. Control specimen temperature within +/- 1 degC (+/- 2 degF) as required by ASTM E23 – 2018.
4.2.7. Minimum temperature control range of -80 deg C to 30 degC.
4.2.8. Capable of operating as a stand-alone unit. No network, wi-fi, blue-tooth, or similar connection shall be required for start-up, operation, or maintenance.
4.2.9.. No consumables such as dry ice or liquid nitrogen may be used to provide refrigeration.
4.3. Centering Tongs:
4.3.1. Self-centering tongs designed to fit the notch in the impact specimen are required for removing the specimens from the temperature control medium and placing them in a centered position on the tester anvil.
4.3.2. Meet the dimensional requirements of ASTM E23 – 2018.
4.3.3. Metallic construction.
4.4. Pendulum striker in 8mm nominal size IAW Annex A1 of ASTM E23 – 2018. All required specimen supports, shrouds, and Charpy anvils will be provided.
4.5. Charpy rack with 4 liter chamber to hold 65 specimens minimum.
5.0. INSTALLATION:
Installation shall comply with Annex A1 of ASTM E23 – 2018.
The machine shall be level to within 3:1000 and securely bolted to the existing 10” thk. concrete floor.
The bolts shall be tightened as specified by the machine manufacturer.
6.0. TRAINING: Operator training shall be provided for 2 – 4 individuals on-site at LEAD.
7.0. DOCUMENTATION: Two sets of installation drawings shall be submitted for approval. Two sets of operator instruction manuals, maintenance service manuals, and parts listing manuals shall be provided for the furnished systems. These manuals shall be written in the English language.
8.0. WARRANTY: Supplier shall provide a minimum of one year warranty on all components and workmanship, commencing with the date of final acceptance by LEAD.
9.0. PRESERVATION, PACKAGING AND DELIVERY: The contractor shall utilize standard commercial methods for preservation and packaging appropriate for each unit and acceptable to commercial carriers. As a minimum, all areas susceptible to damage from exposure to the elements shall be preserved and/or packed to prevent damage. The contractor shall be responsible for ensuring the equipment is delivered to LEAD in good condition.
10.0. INSPECTION AND ACCEPTANCE: The equipment shall be examined for design, construction, materials, components, and workmanship to determine compliance with the contract and this specification. Any deviation from these requirements shall be cause for rejection.
11.0. INFORMATION ASSURANCE REQUIREMENTS: These systems shall operate in stand-alone mode only (no network connection of any kind). If there becomes such a time where these systems require the use of another PC (laptop, tablet, etc.) or network connection it shall conform to all requisite DoD and Army cybersecurity requirements. Additionally, since these systems operate in stand-alone mode there shall be no ability to connect via either wireless (e.g Bluetooth) or wired (e.g. Ethernet cable), to a network. If these parameters change then the systems shall be subject to Change Configuration Board (CCB) approval for operation
12.0. APPLICABLE DOCUMENTS:
LETTERKENNY ARMY DEPOT (LEAD)
LEAD reg. 385-1 - Safety and Occupational Health Program Copies may be obtained from LEAD Directorate of Contracting
AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM)
ASTM E23-2018 – Standard Test Methods for Notched Bar Impact Testing of Metallic Materials
(End of Summary of Changes)