LETTERKENNY ARMY DEPOT
PRODUCTION ENGINEERING DIVISION SPECIFICATION
370 ASRS UNIT-LOAD SRM CRANE REPLACEMENT
6/26/18
1. SCOPE: This specification establishes the minimum requirements for the purchase of the ASRS unit-load cranes, or Storage and Retrieval Machines (SRMs) replacement.
The project shall be contractor installed in Building 370 at Letterkenny Army Depot. The contractor shall provide all professional architectural, engineering and construction services for the preparation of all necessary drawings, specifications, calculations, cost estimates and related design, permits, fabrication, construction, installation and testing services for the completion of this project.
1.1 DESIGN: The equipment furnished for the replacement project shall be new and the latest proven model and design. Any equipment incorporating untried methods shall be subject to rejection at the discretion of the Contracting officer. The ASRS crane subsystem replacement project shall be designed, fabricated, and installed by a manufacturer regularly engaged in the design, development, and installation of this type modification. The equipment installed for this project shall be in stock or producible within a reasonable period of time. The supplier of this equipment shall have previously successfully installed this type of equipment for similar upgrades for industry, other than for his own use. All parts and materials used in the manufacture of the upgrade components shall be new and unused. All components subject to periodic adjustment, replacement, or servicing shall be readily accessible.
1.2 SYSTEM DESIGN DEVIATIONS: The following requirements are presented to serve, as a guideline to the prospective contractor and are not intended to discourage creativity.
However, deviations from the prescribed guidelines shall be accompanied with a justification of the varying approach.
2. APPLICABLE DOCUMENTS: The following documents are mandatory and all components of the ASRS crane subsystem replacement shall meet all applicable requirements at the date of manufacture. Supplements or amendments to these publications may be issued during the construction of the equipment and shall be considered to be effective immediately upon receipt by the Contractor.
2.1 GOVERNMENT DOCUMENTS
U.S. Department of Labor:
General Industry, OSHA Safety Health Standards (21 CFR Subpart J) CFR Title 29, Chapter XVII, Part 1910 – Occupational Safety and Health
Regulations CFR Title 21, Chapter VIII, Part 1040 – Performance Standards for Light
Emitting Products (copies may be obtained from http://www.osha.gov/)
2.2 NATIONAL FIRE PROTECTION ASSOCIATION
NFPA Standard 70 – National Electric Code NFPA Standard 79 – Electrical Standard for Industrial Machinery NFPA Standard 115 – Laser Fire Protection
(copies may be obtained from http://www.nfpa.org/)
370 ASRS UNIT-LOAD CRANE REPLACEMENT
2.3 AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)
ASME B30.13 Storage/Retrieval (S/R) Machines and Associated Equipment ANSI Z136.1-1999 American National Standard for the Safe Use of Lasers (copies may be obtained from http://www.ansi.org/)
2.4 UNDERWRITERS LABORATORIES INC.
UL 508 Standard for Safety for Industrial Control Equipment (copies may be obtained from http://www.ul.com/)
2.5 LEAD REGULATIONS
LEAD Pamphlet No. 385-4 Requirements for Security, Safety, and Fire Prevention for Contractors Performing Work on Letterkenny Army Depot (copies may be obtained from Letterkenny Army Depot Contracting Office)
3. REQUIREMENTS:
3.1 ENERGY EFFICIENCY REQUIREMENTS: All equipment that directly consumes energy in normal operation shall be designed and constructed for the highest degree of energy efficiency as governed by the latest developments available within industry.
3.2 SAFETY AND ENVIRONMENTAL REQUIREMENTS
3.2.1 EQUIPMENT HAZARDS: Hazards inside the unit-load cranes and positioning systems shall be guarded against unauthorized access. Clearly visible signs and symbols shall warn personnel in the area, and interlocks, safety mats and redundant deactivation systems shall guard against accidental access to the hazards. Guards shall be easily removable to facilitate inspection, maintenance, or repair.
3.2.2 MERCURY RESTRICTION: The equipment shall not contain mercury compounds nor be exposed to free mercury during manufacture.
3.2.3 ASBESTOS RESTRICTION: Asbestos and materials containing asbestos shall not be used in or on the equipment.
3.2.4 PCB RESTRICTION: Equipment and materials containing Polychlorinated Biphenyl
(PCB) shall not be shipped to Letterkenny Army Depot.
4. SPECIFICATIONS: The following specifications cover the ASRS SRM subsystem upgrades.
4.1 STORAGE & RETRIEVAL MACHINE (SRM): The contractor shall replace the existing
SRMs (cranes) that are located in each of the two (2) unit-load aisles in the building 370 ASRS. The contractor’s crane replacement shall include the following additional equipment, at a minimum; 60 lb. continuous (welded) floor rail, power rail, bus duct, front and rear E-stop pushbuttons, hydraulic end of aisle buffers/stops, positioning targets, and aisle sweeps integrated into the e-stop chain. Each new crane shall be a RAPID STORE 1800 Unit-load SRM, or equivalent, used for a 2000 pound (including pallet) rated 40 in x 48 in loads. Each crane shall include all necessary AC servo drives, single deep shuttle, and onboard controls. Each crane shall have maximum speeds of at least, horizontal speed of 492 feet per minute (fpm), vertical speed of 120 fpm, and shuttle/extractor speed of 140 fpm. Each crane shall be integrated and work properly within the existing aisle way; and be able to retrieve and store each of the existing boxes in that aisle without major modification.
4.2 SRM ONBOARD CONTROLS: The RAPID STORE 1800 Unit-Load controls shall contain an Allen-Bradley CompactLogix PLC, or equivalent, for control logic, laser distance meters for horizontal and vertical positioning, and Control Techniques AC motor controls, or equivalent, for all three axes. The contractor shall furnish and completely integrate all hardware, software, and materials. All axes of the SRMs shall use AC motors with Siemens variable speed regenerative motor controllers (same models for horizontal and vertical). Operational and equipment performance shall be equal to the current SRMs original equipment manufacturer (OEM) standards and requirements, or better.
4.3 SRM PROTOCOL: The RAPID STORE 1800 Unit-Load SRM controls shall include the protocol required to communicate directly with the existing manager computer that is controlling the ASRS equipment in both building 350 & 370.
4.4 RAPID STORE 1800 UNIT-LOAD PENDANT: The contractor shall provide a manual control pendant with each SRM. The pendant shall also provide horizontal and vertical control of the SRM in maintenance speed.
4.5 MAINTENANCE & DIAGNOSTIC SOFTWARE: The contractor shall provide OpNet
Maintenance and Diagnostics Software, or equivalent, for the end of aisle maintenance and diagnostics functions. The following screens (functions) shall be provided at a minimum: main OpNet, rack mapping, fault codes, and I/O map.
4.6 MAINTENANCE HMI INTERFACE: The contractor shall provide an Allen-Bradley
PanelView Human Machine Interface (HMI), or equivalent, mounted in the door of each on-board enclosure. The PanelView HMI shall provide LEADs maintenance personnel a touch screen maintenance and troubleshooting interface for performing SRM setup, diagnostics and resolving SRM errors.
4.7 SAFETY FEATURES:
4.7.1 Integrated ladder on SRM mast with safety rail system for climber’s safety harness.
4.7.2 Person rideable carriage for maintenance with safety harness tie off point. Includes required safety rails with maintenance controls and over speed brake.
4.7.3 Gates and safety switches for two existing front end fences.
4.7.4 New gates, fencing, and switches at maintenance end of aisles.
4.7.5 New light curtains at input and output conveyors.
5. WARRANTY: The contractor shall furnish a standard commercial warranty or full one year warranty (parts, labor, and shipping, at minimum), whichever is greater, with the equipment hardware and software. The contractor shall provide commercial warranties for all subcontracted components. The warranty shall be effective beginning immediately after final acceptance of the project and not before that time.
6. PRESERVATION, PACKING, AND SHIPPING: The contractor shall utilize standard methods for preservation and packaging appropriate for the components and acceptable to commercial carriers. As a minimum, all areas susceptible to damage from exposure to the elements shall be preserved and/or packed to prevent damage. The contractor shall be responsible for ensuring that the equipment is delivered to Letterkenny Army Depot in good condition.
7. Information Technology (IT) Industrial System Requirements:
7.1 Operating System (OS) Specifications:
7.1.1 If applicable, the system’s OS must be Microsoft Windows 10, Windows Server 2012R2, or Red Hat Linux v6.X. Any OS supplied with the system must contain all service packs, updated patches, and hot fixes. All patching and fixes will be current as of a predefined date agreed upon by the vendor and the government.
7.1.2 Defense Information System Agency (DISA) Security Technical Implementation Guides
(STIGS) are configuration standards for the Department of Defense and contain technical guidance to lock down information systems and software applications that might otherwise be vulnerable to malicious attacks. The contractor shall be responsible for ensuring all appropriate STIGs are implemented and their software runs acceptably while secure.
7.1.3 The Army Golden Master (AGM) is a collection of security settings for Microsoft
Operating systems which must be applied to all Army computer systems. LEAD will supply the AGM to the contractor who shall ensure their software functions as intended, when installed on top of the AGM.
7.2 Programmable Logic Controllers (PLC): If a PLC is to be installed within the system, it shall be manufactured by a government approved source and shall provide an Ethernet adapter to allow for connection to the Industrial Network if required. If an Ethernet connection is used to interconnect the PLC to peripheral equipment, an additional Ethernet port shall be provided.
7.3 System Software Specifications:
7.3.1 Software Installations: If installing application code at LEAD, the contractor shall install the code within a standard container (E.g., Program Files) and located in a volume separate from the standard System Files. Interactive applications are required to run as services and daemons and any time WEB services are used, file types (E.g., XML and HTML) must be separated.
7.3.2 Software Licensing: When installed, the software licensing for computers, control units and other IT systems will be surrendered to the Information Technology Configuration Manager and will become the property of the Government upon acceptance of the system.
7.3.3 If software has been customized for LEAD’s use or is any software other than
Commercial Off The Shelf (COTS); the contractor shall provide copies of all source code, firmware and software used in the system, as well as one set of backup and configuration software for PLC’s, control and communication computers, and data acquisition. All programs shall be tested and fully operational before acceptance. All acceptance testing will adhere to common User Acceptance Testing (UAT) standards as defined by the government.
7.3.4 If any special programming software or programming software interface devices such as hardware "keys", dongles or "PIC" modules, are required to access software, these programs and devices shall be provided to LEAD along with the necessary registration information. If custom application software was written and provided, a copy of the required compiler and compiler license shall also be provided. At acceptance, all items shall become property of the government. Software and hardware purchased for this project shall be registered to Commander, Letterkenny Army Depot, Chambersburg, PA 17201.
7.4 System Environment Specifications:
7.4.1 All supplied software must be capable of operating in a multi-user environment and data which contains permissions information shall be hidden from view and inaccessible to those with less than administrator level access. Shared accounts shall not be used, and users shall only be authorized the minimum security rights to operate the application software. Users will not have access to system or software configuration items (e.g., Control Panel, software and hardware installation). Under no circumstances will the intended end user log in using the Administrator or Root account for routine operation of the equipment. The use of these accounts will be restricted to only administrative activities which will be carried out by LEAD Information Technology personnel. All software products shall employ a minimum of three permission based levels of access.
7.4.1.1 Administrator - Full control at root level, restricted to LEAD IT personnel and when required, the Contractor.
7.4.1.2 Maintenance - Mid-level control required to perform maintenance and alter control parameters as needed.
7.4.1.3 Operator - Minimum control necessary to perform the routine operation of software.
The Operator shall not be able to alter the programming of software, make changes to executable files, or modify control parameters.
7.4.2 Application Interoperability: If an application will interfere with the operation of the industrial system, E.g., (McAfee Anti-Virus), the Contractor shall provide a written statement to the LEAD IT Directorate explaining the technical restrictions placed upon them.
7.4.3 Auditing: If applicable, the contractor shall enable audit files and data logs for access by
LEAD Cybersecurity personnel to audit access and actions on the equipment.
7.4.4 User Acceptance Testing (UAT): LEAD Cyber Security Personnel will have the ability to conduct validation testing with approved security tools prior to equipment being introduced to the shop floor. This testing will also satisfy any UAT requirements. A UAT Plan will be furnished prior to testing and all equipment documentation will be made available for review during the test. If discrepancies are discovered the contractor shall remediate identified issues prior to government acceptance.
7.5 Documentation Requirements:
7.5.1 A complete set of instruction manuals containing all of the information necessary to operate, maintain, and reinstall all software and hardware contained within the system shall be provided by the Contractor. These manuals shall include step-by-step instructions which facilitate the rebuilding of the system in the event of a fatal system crash.
7.5.2 If networked, the Contractor shall provide the system’s network design drawings to the
Information Technology Directorate. These drawings should include complete directional data flow diagrams that include all ports and protocols in use.
7.5.3 The Contractor shall provide to Industrial Automation at least two electronic copies of all control unit programs. These copies should include description files of the ladder logic and any cabling required to connect to the control systems. No control units will be password protected and no other form of lockout measure shall be implemented by anyone other than LEAD IT employees. The Contractor shall also provide electrical wiring diagrams for all installed control systems to this LEAD Industrial Automation group.
7.5.4 Certificate of Networthiness: Certificate of Networthiness (CoN) certification ensures
Automated Information Systems (AIS) utilizing the Army Network are developed in compliance with the Clinger Cohen Act and are secure, supportable, sustainable, and compatible with the Army Enterprise Infrastructure (AEI) (as defined in AR 25-1). All new
AIS capabilities and all capability modifications and upgrades must be assessed to validate their Networthiness (network security, network impact, compatibility with the infrastructure, infrastructure requirements, spectrum support, security policy compliance, Joint Technical Architecture –Army (JTA-A) standards compliance, communications and information manpower, training, logistics support, schedule, and funding). If software is installed within the system, the Contractor shall work with LEAD Directorate of Information Management (DOIM) personnel to check for CoN availability and when not available, ensure a CoN is requested and all documentation is submitted.
7.6 Proposal Deviations:
7.6.1 Proposals or specifications that deviate from those described herein shall be coordinated for specific approval or rejection by the LEAD Information Technology representatives prior to shipment, installation, or acceptance of the equipment.
8. INSTALLATION REQUIREMENTS
8.1 DESIGN AND INSTALLATION:
The contractor shall provide all parts, labor, and services for the design, fabrication, and installation of all ASRS crane subsystem replaced components. The contractor shall provide competent English speaking personnel to perform the upgrades, place the system in operation and to conduct the acceptance tests and training of depot personnel. The contractor, through his service personnel, shall be fully responsible for the offloading, installation, activation, and testing of the system and the service personnel shall remain until system activation and testing has successfully been completed. Under no circumstances should the contractor plan on gratuitous Depot assistance for diagnosis, troubleshooting, or repair of the system during installation, activation, and testing.
All hardware, software, materials, and miscellaneous components shall be installed per industry standards. Although modifications require components to be replaced, the overall form, fit, size, and shape of the ASRS subsystems shall not be altered unless authorized by Letterkenny Army Depot personnel.
ROOF ACCESS: The contractor shall be responsible to design, remove, and install roof for access to remove and install cranes and any other equipment that needs access through the roof. The contractor is responsible to ensure structural integrity is not compromised while roof is removed for installation. The contractor is also responsible to return roof to proper structural and weather condition after installation has been completed.
8.2 SECURITY, SAFETY, AND FIRE PREVENTION: The contractor shall comply with
LEAD P 385-4, Requirements for Security, Safety, and Fire Prevention for Contractors Performing work on Letterkenny Army Depot.
8.3 BADGES: Identification badges will be issued for admittance of personnel before performing work or service on this contract. The identification badge is the property of the US Government and must be returned upon termination or demand. The contractor/vendor agrees that he will ensure all badges issued to employees are returned to the Badge and Identification Section, Security Division, Letterkenny Army Depot promptly on termination of need or on expiration, which occurs first. The badge room is located in Bldg 2, phone # 717-267-5301. Hours of operation are 7:30 AM to 4:40 PM, Monday thru Friday, exclusive of Federal Holidays.
8.4 HOURS OF WORK: All work shall be performed between the hours of 7:00 AM and
3:30 PM, Monday Thru Friday, exclusive of Federal Holidays. Other hours, weekend and holiday work will be considered separately as requested by the contractor and approved by the Contracting Officer.
8.5 FEDERAL HOLIDAYS: The following is a list of Federal Holidays:
Martin Luther King’s Birthday, Presidents Day, Memorial Day, July 4, Labor Day, Columbus Day, Veterans Day, Thanksgiving, Christmas Day, and New Years Day.
8.6 FIRE EXTINGUISHERS: The LEAD Fire Department will designate the proper type and number of fire extinguishers needed prior to beginning of the contracted work. The LEAD Fire Department will not provide any extinguisher support. The contractor can gain the above information through a pre-construction conference, visiting the fire department, or phone 717-267-8231.
8.7 USE OF PORTABLE GAS OR ARC EQUIPMENT: The contractor shall obtain a permit, from the LEAD Fire Department, to use portable gas or arc equipment for cutting, welding or open flame operations. The Fire Department will require one day advance notice to permit necessary inspection before actually starting work, and notification when work is finished to allow for re-inspection. The Fire Department can be notified by calling ext. 8231. The contractor shall take necessary precautions to prevent fires IAW NFPA Standard No. 51B and LEAD R 420-13.
8.8 SPILLS: Any spills or releases of materials or wastes must be reported immediately to the site supervisor, the LEAD Fire Department, and the LEAD Environmental Office per the LEAD Installation spill Contingency Plan (ISCP). Any such spills or releases generated by the contractor shall be contained, cleaned and disposed of by the contractor per the direction of the LEAD on-scene coordinator.
9. GOVERNMENT RESPONSIBILITIES:
9.1 SITE PREPARATION: Letterkenny Army Depot will provide a clear area for the ASRS
SRM replacement project.
9.2 UTILITIES: LEAD will make available temporary utilities for the installation and modification of the affected ASRS subsystems.
9.3 TESTING MATERIALS: LEAD will provide a supply of material for use during the performance tests and training. The material shall be the type that the unit-load cranes store and pick.
9.4 DELIVERY AND STORAGE: The Government will not be responsible for accepting, signing for, loading or unloading, or providing extended covered storage for materials or equipment as part of this contract.
10. CONTRACTOR RESPONSIBILITIES:
10.1 INSTALLATION SCHEDULE: A proposed construction and installation schedule shall be submitted by the contractor within 30 days after receipt of the purchase order.
10.2 UTILITY REQUIREMENTS: The contractor shall provide certified utility requirements within 15 days after receipt of the purchase order.
10.3 FIELD VERIFICATION:
It shall be the responsibility of the contractor to verify, in the field, all measurements, locations of structures and utilities, and any other physical conditions that would affect the progress, or quantity of work. Any errors by the contractor, due to omission of field verification, shall not be the basis for any increase in contract price. Where existing utilities or other obstructions interfere with the progress of the contract, the contractor shall provide all materials and labor to relocate all obstructions as required and approved by the Contracting Officer.
It shall be the responsibility of the contractor to verify the software code requirements and the accessibility of those programs that would affect the progress, quality, or quantity of work. Any errors or oversights by the contractor, due to omission of preliminary verification, shall not be the basis for any increase in contract price. Where existing unknown software code and programming have proprietary rights by the OEM that may interfere with the progress of the contract, the contractor shall provide all materials, labor, and OEM support to properly integrate software into the ASRS system as required and approved by the Contracting Officer.
10.4 CONTRACTOR PERSONNEL: All personnel performing work on this project including, but not limited to, the design, fabrication, programming, and integration of the new equipment shall be OEM qualified and certified.
10.5 PROTECTION OF EXISTING STRUCTURES AND EQUIPMENT: The contractor shall take all necessary precautions to insure against damage to existing structures and equipment to remain in place.
10.6 INSTALLATION OF NEW EQUIPMENT: The contractor shall be responsible for supplying all parts, equipment, tools, and labor required to install the equipment provided under this contract. This shall include off-loading equipment, moving it to the installation site, positioning and installing floor mountings if necessary. The contractor shall make all connections to existing utilities necessary for proper operation. The contractor shall remove and dispose all packaging and preservative material. Removed components shall not be taken from the Depot property. Removed components shall be placed in a location determined by Letterkenny Army Depot personnel at a later date.
10.7 WIRING: All electrical work shall be performed by a certified electrician and in compliance with the National Electrical Code and National Electrical Manufacturers Association. All work shall be subject to inspection by LEAD electricians.
10.8 PIPE: All compressed air piping work shall be in compliance with all applicable codes and shall be subject to inspection by LEAD personnel.
10.9 LUBRICANTS AND FLUIDS: The contractor shall submit to LEAD Material Safety Data Sheets (MSDS) for all lubricants and fluids used in the equipment. The MSDSs shall be submitted to LEAD within 30 (thirty) days after award of contract. The contractor shall supply all lubricants and fluids required for proper operation of the equipment.
10.10 RADIO FREQUENCY AUTHORIZATION: If any frequency authorization is required, the contractor shall be responsible to submit the proper documentation and request the authorization from the proper government agency for the use of non-military government frequency bandwidth.
11. QUALITY ASSURANCE PROVISIONS:
11.1 SYSTEM DATA: The contractor shall furnish two (2) copies of the following commercial and system unique data with new modifications. The data shall be available for use during installation and training of Depot personnel.
A. Operator Manual B. Maintenance Manual (including all applicable schematics in electronic and hard copy form) (as builts) C. Repair Parts Catalog for both unique and commercial parts
D. Software code in electronic form, either floppy disk or CD E. Diagnostic (troubleshooting) software if available
11.2 QUALITY CONFORMANCE INSPECTION: The ASRS unit-load SRMs shall be subject to a quality conformance inspection, performed by a designated Depot representative, to determine compliance with this specification.
11.3 TESTS: The contractor shall be responsible for developing test procedures to demonstrate compliance with the requirements of this specification. All testing procedures shall be approved by Depot Technical Point of Contact (TPOC) prior to the start of testing.
11.4 TRAINING: The contractor shall be responsible for providing training of three (3) Depot personnel in the operation of the upgraded ASRS system, and three (3) Depot personnel in the maintenance of the equipment supplied under this contract. All instructions, oral and written, shall be in the English language. Depot personnel to be trained shall be made available when requested, providing the installation and testing requirements of this specification have been successfully completed.
12. FINAL ACCEPTANCE: Final acceptance shall be within 14 days after successful completion of all provisions of this contract.
13. AT Level 1 Awareness Training: All contractor employees, to included subcontractor employees, requiring access to Army Installations, facilities, and controlled access areas shall complete AT Level 1 awareness training within 30 calendar days after contract start date and within 30 calendar days of new employees commencing performance. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within 15 calendar days after completion of training. AT level 1 awareness training is available at https://jkodirect.jten.mil/Atlas2/page/login/Login.jsf.
14. Physical Security: The contractor shall safeguard all Government property provided for contractor use. At the close of each work period, Government facilities, equipment and materials shall be secured.
15. iWATCH Training: The contractor and all associated sub-contractors with an area of performance within an Army-controlled installation, facilities or area shall brief all employees on the local iWATCH program. This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR or contracting officer. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance. The contractor shall report completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within 15 calendar days after completion of training. iWATCH training is available on the Letterkenny Army Depot homepage – http://www.letterkenny.army.mil/iwatch.html; select "Contractor AT/OPSEC Resource."
16. OPSEC Training: Per AR 530-1, Operations Security, new contractor employees and associated sub-contractor employees shall complete Level I OPSEC training within 30 calendar days of their reporting for duty and annually thereafter. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within 15 calendar days after completion of training. Level 1 OPSEC training is available on the Letterkenny Army Depot homepage – www.lead.army.mil.
17. Threat Awareness and Reporting Program (TARP) Training: For all contractors with security clearances. Per AR 381-12, contractor employees shall receive annual TARP training by a CI agent or other trainer as specified in 2-4b. TARP training is available on the Letterkenny Army Depot homepage – www.lead.army.mil.
18. Badges: Identification badges will be issued for admittance of personnel before performing work or service on this contract. The identification badge is the property of the US Government and shall be returned upon termination or demand. The contractor/vendor shall ensure all badges issued to employees are returned to the Badge and Identification Section, Security Division, Letterkenny Army Depot promptly on termination of need or on expiration, which occurs first. The badge room is located in Bldg 2, phone # 717-267-5301. Hours of operation are 7:30 AM to 3:30 PM, Monday thru Thursday, exclusive of Federal Holidays.