SOL_W911N218Q0029.pdf
PDF 1 MB Posted
- Attached to
- Crane Maintenance
- Solicitation number
- W911N218Q0029
About this file
Crane Maintenance
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Conformed_Copy_Amended_SOL_0002_W911N218Q0029.pdf | ||
| Amended_SOL_0002_W911N218Q0029.pdf | ||
| Amended_SOL_0001_W911N218Q0029.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W911N218Q0029 15-Aug-2018
b. TELEPHONE NUMBER
717-267-8036
8. OFFER DUE DATE/LOCAL TIME
04:00 PM 31 Aug 2018
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W911N29. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
HAWA JANNEH
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
SEE SCHEDULE
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESSX
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
LETTERKENNY ARMY DEPOT
LETTERKENNY CONTRACTING OFFICE - ACC
1 OVERCASH AVENUE, ATTN: CCAM-ALK, BLDG 2S
CHAMBERSBURG PA 17201-4150
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE W800AF 16. ADMINISTERED BY
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
DIRECTORATE OF PUBLIC WORKS
KARA STITELY
BUILDING 14,
1 OVERCASH AVE.
CHAMBERSBURG PA 17201-4152
TEL: 267-8334 FAX:
717-2679834FAX:
TEL: SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$7,500,000
NAICS:
811310
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF67
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
W911N218Q0029
Section SF 1449 - CONTINUATION SHEET
NOTES
1) System for Award Management (SAM): In accordance with FAR 4.1102, Offerors must be registered in the SAM database in order to be eligible for contract award. No award will be made to an Offeror not registered.
Registration can be accomplished at https://www.sam.gov/portal/public/SAM/. Registration in this database must be kept current.
2) Annual Representations and Certifications: In accordance with FAR 4.1201, Offerors shall complete electronic annual representations and certifications within SAM as part of required registration. Registration in this database must be kept current and can be accessed at https://www.sam.gov/portal/public/SAM/.
3) Payment: Payment for this action will be made by Electronic Funds Transfer (EFT) through the Defense Finance and Accounting Services (DFAS) utilizing Wide Area Work Flow (WAWF). See 252.232-7006 for more information. http://farsite.hill.af.mil/vfdfara.htm
4) Quotes must be valid for a period of 60 days.
5) Wage Determination 2015-4253, Revision 8, dated 07/16/2018 is hereby incorporated. Wage Determination can be viewed at http://www.wdol.gov.
6) Do not submit an amount for the following CLINs;
0011,1011, 2011, 3011, 4011Cost for Restorative Maintenance Not To Exceed $18750.00 per year, this amount will be added to each quote.
0012, 1012, 2012, 3012, 4012 Cost for Repair Parts, Not To Exceed $26,250.00 per year, this amount will be added to each quote.
PWS
PERFORMANCE WORK STATEMENT (PWS)
FOR
Mobile Crane Fleet Preventative Maintenance (PM), Safety Inspection, and Restorative Maintenance
1.0 General:
1.1 Scope: The Contractor shall provide all personnel, equipment, tools, materials, supervision, quality control and other items and non-personal services necessary to perform Preventative Maintenance (PM) and restorative maintenance on the mobile crane fleet defined in paragraph 1.2 of this PWS, except as specified in Paragraph 3.0 as Government Furnished. The Contractor shall perform to the standards in this contract.
1.2 Background: Inspect and perform preventative maintenance on four (4) government owned mobile cranes listed in Paragraph 5.1 twice per year in accordance with (IAW) this PWS and Federal safety regulations. Provide restorative maintenance services for five (5) government owned mobile cranes listed in Paragraph 5.4. For each item of work listed in Paragraph 5.0 of this PWS, the Contractor will provide a unit cost and total cost for the effort for the base year and each option year of the performance under this requirement. Unit costs will include all labor, materials (with the exception of items specified in Paragraph 3.0 as Government Furnished), equipment, and facilities required to perform tasks indicated in Paragraph 5.0.
1.3 Period of Performance (PoP): The Period of Performance shall be one Base Year of 12 months and four (4) 12-month option years. The Period of Performance reads as follows:
1.3.1 Base Year: 1 Nov 2018 to 31 Oct 2019
1.3.2 Option Year One: 1 Nov 2019 to 31 Oct 2020
1.3.3 Option Year Two: 1 Nov 2020 to 31 Oct 2021
1.3.4 Option Year Three: 1 Nov 2021 to 31 Oct 2022
1.3.5 Option Year Four: 1 Nov 2022 to 31 Oct 2023
1.4 General Information:
1.4.1 Quality Assurance (QA): The Government shall evaluate the Contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government must do to ensure that the Contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and acceptable quality level(s) (defect rate(s)).
1.4.2 Recognized Holidays: The following are recognized US holidays. The Contractor shall not perform scheduled services on these days:
1.4.2.1 New Year’s Day: January 1st (Observed the next business day after the first if it falls on a Saturday or Sunday)
1.4.2.2 Martin Luther King, Jr.’s Birthday: Third Monday in January
1.4.2.3 President’s Day: Third Monday in February
1.4.2.4 Memorial Day: Last Monday in May
1.4.2.5 Independence Day: July 4th (Observed the next business day after the fourth if it falls on a Saturday or Sunday)
1.4.2.6 Labor Day: First Monday in September
1.4.2.7 Columbus Day: Second Monday in October
1.4.2.8 Veteran’s Day: November 11th (Observed the next business day after the eleventh if it falls on a Saturday or Sunday)
1.4.2.9 Thanksgiving Day: Fourth Thursday in November
1.4.2.10 Christmas Day: December 25th (Observed the next business day after the twenty fifth if it falls on a Saturday or Sunday)
1.4.3 Place and Performance of Services: The Contractor shall provide services between the hours of 0600 through 1530 on Monday through Thursday and 0600 through 1430 every other Friday, except on recognized US holidays or when the Government facility/installation is closed due to local or national emergencies, administrative closings, or similar Government-directed facility/installation closings. Performance shall be at Dock 2 within Letterkenny Army Depot. The Contractor shall at all times maintain an adequate work force for the uninterrupted performance of all tasks defined within this PWS when the Government facility/installation is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the work force are essential.
1.4.4 The Government, depending on workload will adjust the work hours. Any work that is performed on the weekend will be approved by the KO before the work is done. Please allow up to three (3) business days for the decision to be made.
1.4.5 Security Requirements: Contractor and all associated sub-Contractor’s employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The Contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce shall comply with all personal identity verification requirements as directed by DOD, HQDA and/or local policy. Should the Force Protection Condition (FPCON) change, the Government may require changes in Contractor security matters or processes.
1.4.5.1 Physical Security: The Contractor shall safeguard all Government property provided for Contractor use. At the close of each work period, Government facilities, equipment and materials shall be secured.
1.4.5.2 AT Level 1 Awareness Training: All Contractor employees, to included subcontractor employees, requiring access to Army Installations, facilities, and controlled access areas shall complete AT Level 1 awareness training within 30 calendar days after contract start date and within 30 calendar days of new employees commencing performance. The Contractor shall submit certificates of completion for each affected Contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within 15 calendar days after completion of training. AT level 1 awareness training is available on the Letterkenny Army Depot homepage – www.lead.army.mil.
1.4.5.3 iWATCH Training: The Contractor and all associated sub-Contractors with an area of performance within an Army-controlled installation, facilities or area shall brief all employees on the local iWATCH program. This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR or contracting officer. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance. The Contractor shall report completion for each affected Contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within 15 calendar days after completion of training.
iWATCH training is available on the Letterkenny Army Depot homepage – www.lead.army.mil.
1.4.5.4 OPSEC Training: Per AR 530-1, Operations Security, new Contractor employees and associated sub- Contractor employees shall complete Level I OPSEC training within 30 calendar days of their reporting for duty and Yearlyly thereafter. The Contractor shall submit certificates of completion for each affected Contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within 15 calendar days after completion of training. Level 1 OPSEC training is available on the Letterkenny Army Depot homepage – www.lead.army.mil.
1.4.6 Conservation of Utilities: The Contractor shall instruct employees in utilities conservation practices. The Contractor shall operate under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount.
1.4.7 Special Qualifications: The Contractor shall ensure all employees possess all required licenses for operating all equipment used in the performance of this contract. (NOTE: The Government does not provide training to Contractors. Contractors must ensure that any personnel performing under a contract are fully trained, licensed, certified and qualified for the position in which they will be serving.)
1.4.8 Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the KO in accordance with Federal Acquisition Regulations Subpart 42.5. The KO, Contracting Officer’s Representative (COR), and other Government personnel, as appropriate, may meet periodically with the Contractor to review the contactor’s performance. At these meetings, the Contacting Officer will apprise the Contractor of how the Government views the Contractor’s performance and the Contractor shall apprise the Government of problems, if any, being experienced The Contractor shall resolve outstanding issues raised by the Government. Contractor attendance at these meetings shall be at no additional cost to the Government.
1.4.10 Identification of Contractor Employees: All contact personnel attending meetings, answering Government telephones and working in other situations where their Contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. The Contractor shall also ensure that all documents or reports produced by Contractor personnel are suitably marked as Contractor products or that Contractor participation is appropriately disclosed.
(Indicate if all Contractor personnel will be required to obtain and wear badges, wear specific uniforms, etc., in the performance of this contract.)
1.4.10.1 Identification Badges: Identification badges will be issued for admittance of personnel before performing work on this contract. The identification badge is the property of the U.S. Government and must be returned upon termination or demand. The Contractor agrees to insure all badges issued to employees are returned to the Directorate of Emergency Services, Letterkenny Army Depot, promptly upon termination of need for access or on expiration, whichever occurs first. In order to be permitted to access Letterkenny Army Depot, personnel must pass a National Criminal Information Center (MCIC) background check. Persons not passing the background check will not be permitted to access the installation for any purpose.
1.4.10.2 Badge Room is located in Building 2. Hours of operation are 0700 – 1500 Monday through Friday, but closed every other Friday. These hours are effective except when closed for holidays. If the Contractor’s hours of work are different than those stated above, the Contractor will be required to obtain badges when the badge room is open.
1.4.11 Organizational Conflicts of Interest (OCI): The Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent OCIs, as defined in FAR Subpart 9.5.
The Contractor shall notify the KO immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the KO to avoid or mitigate any such OCI.
The Contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the KO and in the event the KO unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the KO may affect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.
2.0 Definitions and Acronyms:
2.1 Definitions:
2.1.1 CONTRACTOR. A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.
2.1.2 CONTRACTING OFFICER (KO). A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.
2.1.3 CONTRACTING OFFICER'S REPRESENTATIVE (COR). An employee of the U.S. Government designated by the KO to monitor Contractor performance. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
2.1.4 DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the Performance Work Statement.
2.1.5 DELIVERABLE. Anything that can be physically delivered and includes non-manufactured things such as meeting minutes or reports.
2.1.6 KEY PERSONNEL. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.
2.1.7 PHYSICAL SECURITY. Actions that prevent the loss or damage of Government property.
2.1.8 QUALITY ASSURANCE. The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.
2.1.9 QUALITY ASSURANCE SURVEILLANCE PLAN (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of Contractor performance.
2.1.10 QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.
2.1.11 SUBCONTRACTOR. One that enters into a contract with a prime Contractor. The Government does not have privity of contract with the subcontractor.
2.1.12 WORK DAY. The number of hours per day the Contractor provides services in accordance with the contract.
2.1.13 WORK WEEK. Monday through Friday, unless specified otherwise.
2.2 ACRONYMS:
AFARS Army Federal Acquisition Regulation Supplement AR Army Regulation CFR Code of Federal Regulations CONUS Continental United States (excludes Alaska and Hawaii) COR Contracting Officer Representative COTS Commercial-Off-the-Shelf DA Department of the Army DD250 Department of Defense Form 250 (Receiving Report) DD254 Department of Defense Contract Security Requirement List DFARS Defense Federal Acquisition Regulation Supplement DOD Department of Defense FAR Federal Acquisition Regulation IAW In Accordance With KO Contracting Officer OCI Organizational Conflict of Interest ODC Other Direct Costs OEM Original Equipment Manufacturer OSHA Occupational Safety and Health Administration POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QAP Quality Assurance Program QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program TE Technical Exhibit
3.0 Government Furnished Property, Material, Equipment and Services (GFP/M/E/S): The Government will not provide the facilities, equipment, materials, and/or services listed below:
3.1 Utilities: All utilities in the facility will be available for the contactor’s use in the performance of this contract.
4.0 Contractor Furnished Property, Materials, Equipment (CFP/M/E):
4.1 General: Except for those items specifically stated to be Government-Furnished in Paragraph 3.0, the Contractor shall furnish everything required to perform these services as indicated in Paragraph 5.0.
5.0 Requirements: The Contractor shall:
5.1 Conduct scheduled Mid-Year and Yearly preventative maintenance (PM) according to the manufacturer’s specified warranty to the following list of mobile cranes:
5.1.1 Mobile Cranes
Grove Wheel Mounted RT875CC 70641 40 Ton E1143 1989
5.1.2 Yearly PM to be completed once per year IAW the Original Equipment Manufacturers (OEM) recommendations
Maintenance Work on Carrier
Vehicle Brakes Check the brake-lining thickness
Suspension Check the function of the forced lever
Hydraulic system Clean the magnetic rods of the hydraulic oil filer
Electrical system Check the acid concentration of the batteries
Tow bar coupling Check the bearing, Cotter pin, lower bushing, support ring, initial tension of the springs
Vehicle engine Observe the maintenance intervals in the vehicle engine operator instructions. Record any maintenance work carried out in the enclosed maintenance log
Transfer Case Change the oil
Axle lines Lubricating the longitudinal cardan shafts between the gear units
Wheels Rotate the wheels
Steering
-Check that the screw connections are tight and that the cotter pin has been fitted -Check all track rods and drag links for slack -Check rubber sleeves for damage
Air Conditioning system Check hoses and refrigerant compressor
Maintenance on the Superstructure
Crane Engine
-Observe the maintenance intervals in the crane engine operator instructions and record any maintenance work carried out in the enclosed maintenance log -Clean fuel Pre-Filter screen -Replace Filter Cartridge for fuel Pre-Filter
Hydraulic system Clean the magnetic rods of the return flow filter
Electrical system Check the acid concentration of the batteries
Ball bearing slewing Check the tightness of retaining bolts
Main Boom Lubricate locking pins and telescope slide faces
Slewing gears Lubricate slewing gear pinion and gear rim
Air conditioning system -Check hoses -Check Refrigerant Collector -Check Refrigerant Compressor
SLI Service the slip ring assembly in the cable drums
Description Model Serial
Number Capacity Local ID Year Mfg
Crane Crawler LS518 UD02WA 150 Ton E1183 1987 Link-Belt RTC-8080 N4J91261 80 Ton E1184 2009 Grove Rough Terrain Crane RT600E 45 Ton E1145 2006 Gove All Terrain GMK6250L 62209165 250 Ton E1146 2011
5.1.3 Mid-Year PM Services shall be completed once per year IAW OEM recommendations:
Maintenance Work on Carrier
Vehicle engine
-Observe the maintenance intervals in the vehicle engine operator instructions. Record any maintenance work carried out in the enclosed maintenance log -Change the fuel filter cartridge
Axle Lines -Change the oil in the axle center drive -Final drives oil change
Compressed air system Replace the granulate cartridge of the compresses air drier
Hydraulic system -Have the suspension system pressure accumulators checked by Crane CARE or by an authorized workshop -Replace the venting filter for the hydraulic oil tank -Oil Sample
Air conditioning system Check the entire air conditioning system
Maintenance on the Superstructure
Crane Engine -Observe the maintenance intervals in the crane engine operator instructions. Record any maintenance work carried out in the enclosed maintenance log -Change the fuel filter cartridge
Main Hoist -Oil Change in transmission -Oil change in the break unit -Check the old oil
Slewing gears Change the oil
Hydraulic system Oil Sample
Main Boom Check the locking system
5.1.4 Perform Yearly safety inspection and load/lift test as required per US Department of Labor Occupational Safety and Health Administration’s (OSHA) most current standard for the five (5) cranes listed below.
5.1.5 The Mid-Year PM, Yearly PM, and the Department of Labor, OSHA inspection with load/lift test for each crane will be scheduled after award of this contract and before any work begins by the Contractor. All parties including; the Contractor, interested government personnel, and the KO must agree on the schedule of work.
5.1.6 The contractor shall correct deficiencies created while the contractor is executing maintenance in paragraphs 5.1.3-5.1.5 identified by the COR at no cost to the government.
5.2 Restorative Maintenance Services includes unscheduled and scheduled maintenance to repair equipment to proper working order according to OEM specifications on the following cranes:
Description Model Serial Number
Capacity Local ID Year Mfg
Link-Belt Crane Crawler LS518 UD02WA 150 Ton E1183 1987
Link-Belt Rough Terrain RTC-8080 N4J91261 80 Ton E1184 2009
Grove Wheel Mounted RT875CC 70641 40 Ton E1143 1989
5.2.1 Scheduled Restorative Maintenance: Any conditions or issues requiring repair identified by the contractor during inspection or testing procedures shall be provided to the KO in writing within three (3) business days.
5.2.1.1 The written cost estimate shall include all materials and labor costs associated with the repair. The COR shall approve or deny the repairs.
5.2.1.2 Repairs approved by the COR will be scheduled in coordination with the Contractor, and other interested government parties.
5.2.2 Unscheduled Restorative Maintenance: The Contractor shall begin diagnosing the crane failure within two (2) hours of being notified by the COR.
5.2.2.1 Emergencies may occur at any location on the installation. Contractor shall respond at the breakdown site.
5.2.2.2 The Contractor shall create and provide a written cost estimate to complete restoration maintenance (labor and parts, to be provided by the Contractor) to the COR for approval. The COR must approve all restorative efforts prior to performing any services.
5.2.2.3 Once restorative maintenance services have been approved by the COR, the Contractor shall work in a continuous effort to repair the crane to full 100% operational use.
5.3 Parts/Materials: Parts and materials for preventative maintenance and restorative maintenance described in paragraphs 5.1 and 5.2 shall be provided by the contractor. The parts/materials shall be standard parts in new or equivalent to new condition. The materials/parts replaced under this contract shall be subject to the commercial warranty associated with individual materials/parts.
5.4 Work shall be performed on site unless otherwise authorized by the KO.
5.5 Contractor shall dispose of any Hazardous waste in accordance with applicable Pennsylvania Department of Environmental Protection (PADEP) laws and regulations off depot.
5.6 Proper care must be taken to prevent damage to all Government assets including but not limited to the cranes being serviced.
5.7 CONTRACTOR MANPOWER REPORTING (CMR): The Office of the Assistant Secretary of the Army (Manpower & Reserve Affairs) operates and maintains a secure Army data collection site where the Contractor shall report ALL Contractor manpower (including subcontractor manpower) required for performance of this contract.
The Contractor shall completely fill in all the information in the format using the following web address https://Contractormanpower.army.pentagon.mil. The required information includes: (1) Contracting Office, KO, Contracting Officer’s Technical Representative (COTR) or also known as the Contracting Officer’s Representative (COR); (2) Contract number, including task and delivery order number; (3) Beginning and ending dates covered by reporting period; (4) Contractor's name, address, phone number, e-mail address, identity of Contractor employee entering data; (5) Estimated direct labor hours (including sub-Contractors); (6) Estimated direct labor dollars paid this reporting period (including sub-Contractors); (7) Total payments (including sub-Contractors); (8) Predominant Federal Service Code (FSC) reflecting services provided by Contractor (and separate predominant FSC for each sub-
Description Model Serial Number
Capacity Local ID Year Mfg
Link-Belt Crane Crawler LS518 UD02WA 150 Ton E1183 1987
Link-Belt Rough Terrain RTC-8080 N4J91261 80 Ton E1184 2009
Grove Wheel Mounted RT875CC 70641 40 Ton E1143 1989
Contractor if different); (9) Estimated data collection cost; (10) Organizational title associated with the Unit Identification Code (UIC) for the Army Requiring Activity (the Army Requiring Activity is responsible for providing the Contractor with its UIC for the purposes of reporting this information); (11) Locations where Contractor and sub-Contractors perform the work (specified by zip code in the United States and nearest city, country, when in an overseas location, using standardized nomenclature provided on website); (12) Presence of deployment or contingency contract language; and (13) Number of Contractor and sub-Contractor employees deployed in theater this reporting period (by country). As part of its submission, the Contractor shall provide the estimated total cost (if any) incurred to comply with this reporting requirement. Reporting period shall be the period of performance not to exceed 12 months ending September 30 of each government fiscal year and must be reported by 31 October of each calendar year. Contractors may use a direct XML data transfer to the database server or fill in the fields on the website. The XML direct transfer is a format for transferring files from a Contractor’s system to the secure website without the need for separate data entries for each required data element at the website. The specific formats for the XML direct transfer may be downloaded from the website.
6.0 Applicable Publications: Publications applicable to this PWS are listed below
TECHNICAL EXHIBIT 1
Performance Requirements Summary
This Performance Requirements Summary includes performance standards. The Government will use these standards to determine Contractor performance and shall compare Contractor performance to the Acceptable Quality Level (AQL).
Publication (ChapterIPage)
Date of Publication
Mandatory or Advisory
Website
AR 190-5 Motor Vehicle Traffic Supervision
22-May-06 Mandatory https://armypubs.army.mil/epubs/DR_pubs/DR_a/pdf/web/r190_5.pdf
AR 190-16 Physical Security 31-May-91 Mandatory https://armypubs.army.mil/epubs/DR_pubs/DR_a/pdf/web/r190_16.pdf
AR 190-45 Law Enforcement Reporting
27-Sep-16 Mandatory https://armypubs.army.mil/epubs/DR_pubs/DR_a/pdf/web/ARN6734_r190 _45_Web_FINAL.pdf
AR 200-1 Environmental Protection and Enhancement
13-Dec-07 Mandatory https://armypubs.army.mil/epubs/DR_pubs/DR_a/pdf/web/r200_1.pdf
AR 385-10 Army Safety Program 24-Feb-17 Mandatory https://armypubs.army.mil/epubs/DR_pubs/DR_a/pdf/web/ARN2099_AR3 85-10_Web_FINAL.pdf
AR 530-1 Operations Security
(OPSEC)
26-Sep-14 Mandatory https://armypubs.army.mil/epubs/DR_pubs/DR_a/pdf/web/r530_1.pdf
AR 600-85, The Army Substance Abuse Program
28-Nov-16 Mandatory https://armypubs.army.mil/epubs/DR_pubs/DR_a/pdf/web/AR600- 85_WEB_Final.pdf
LE
A
D LEAD Regulation 385-1 LEAD Safety and Occupational Health
Program 5-May-17 Mandatory None, Copy provided upon request
OSHA Part 1910-Occupational Safety and Health Standards
By Standard Mandatory https://www.osha.gov/html/a-z-index.html
Federal Acquisition Regulations (FAR) Subpart 9.5
Organizational and Consultant Conflicts
1-Mar-05 Mandatory https://www.acquisition.gov/sites/default/files/current/far/pdf/FAR.pdf
Vehicle Code of the Commonwealth of
Pennsylvania By Code Mandatory http://www.dmv.pa.gov/Pages/default.aspx/vehiclecode/index.html
Standards of Conduct 14-Nov-11 Mandatory https://www.federalregister.gov/documents/2011/11/14/2011- 29090/standards-of-conduct
A rm y Re gu la ti on s A pp lic ab le f ed er al
, s ta te a nd lo ca l l aw s
Performance Requirement Summary (PRS)
TECHNICAL EXHIBIT 2
Deliverables Schedule
Schedule of Deliverables
Section
Deliverable
Frequency Number of Copies per
Crane
Submission
Format
Submit To
5.1.2- 5.1.3
Yearly and Mid-Year PM Reports
One each per year
1 Electronic COR
5.1.4 OSHA inspection and Load /
Lift Test
Yearlyly 1 Electronic / Paper
COR
5.2 Restorative Maintenance
Services Diagnostics and
Cost Estimate
Per Occurrence 1 Electronic COR
5.7 Contract Manpower
Reporting (CMR
Yearlyly 1 Electronic https://www.ecmra.mil
Required Service
Applicable PWS Paragraph
Performance Standard
Acceptable Quality Level
(AQL)
Surveillance Method/By
Whom
Outcome to be Achieved
Perform Preventative Maintenance
5.1.1-5.1.3 Perform PM for each of the four
(5) cranes
97% Compliance Periodic Surveillance
Customer Feedback
Preventative Maintenance is conducted, documentation created and equipment remains operational.
Annual OSHA Inspection and Lift/Load Test
5.1.4 Perform OSHA
Inspection and
Lift/Load Test of the five (5) cranes
100% Compliance
100% Inspection of the OSHA reports
Inspection and Test IAW OSHA and Certificate to operate the crane or repairs required to meet requirements
Perform Restorative
Maintenance
5.2 Performa
restorative maintenance to return to OEM standards
97% Compliance Periodic Surveillance
Customer Feedback
Repairs conducted and equipment is operational.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Lot Mid-Year Inspection 150 Ton
FFP
ANNUAL INSPECTION- Crane Crawler 1987, Capacity 150 TON, Model LS518, Serial Number UD02WA. See Performance Work Statement 5.1.3, 5.1.5, 5.1.6.
FOB: Destination
NSN: AASSVC815701GA
MILSTRIP: W25G1Q815701GA
PURCHASE REQUEST NUMBER: W25G1Q815701GA
PSC CD: J039
NET AMT
0002 1 Lot Yearly Inspection 150 Ton
FFP
ANNUAL INSPECTION- Crane Crawler 1987, Capacity 150 TON, Model LS518, Serial Number UD02WA. See Performance Work Statement 5.1.2, 5.1.4, 5.1.5, 5.1.6.
FOB: Destination
NSN: AASSVC815701GB
MILSTRIP: W25G1Q815701GB
PURCHASE REQUEST NUMBER: W25G1Q815701GB
0003 1 Lot Mid-Year Inspection 80 Ton
FFP
ANNUAL INSPECTION-LINK BELT 2009, Capacity 80 TON, Model RTC- 8080, Serial Number N4J91261, See Performance Work Statement 5.1.3, 5.1.5, 5.1.6.
FOB: Destination
NSN: AASSVC815701GC
MILSTRIP: W25G1Q815701GC
PURCHASE REQUEST NUMBER: W25G1Q815701GC
0004 1 Lot Yearly Inspection 80 Ton
FFP
ANNUAL INSPECTION-LINK BELT 2009, Capacity 80 TON, Model RTC- 8080, Serial Number N4J91261, See Performance Work Statement 5.1.2, 5.1.4, 5.1.5, 5.1.6.
FOB: Destination
NSN: AASSVC815701GD
MILSTRIP: W25G1Q815701GD
PURCHASE REQUEST NUMBER: W25G1Q815701GD
0005 1 Lot Mid-Year Inspection 45 Ton
FFP
ANNUAL INSPECTION-GROVE Rough Terrain Crane 2006, Capacity 45 TON, Model RT600E, Serial Number 226237, See Performance Work Statement 5.1.3, 5.1.5, 5.1.6.
FOB: Destination
NSN: AASSVC815701GE
MILSTRIP: W25G1Q815701GE
PURCHASE REQUEST NUMBER: W25G1Q815701GE
0006 1 Lot Yearly Inspection 45 Ton
FFP
ANNUAL INSPECTION-GROVE Rough Terrain Crane 2006, Capacity 45 TON, Model RT600E, Serial Number 226237, See Performance Work Statement 5.1.2, 5.1.4, 5.1.5, 5.1.6.
FOB: Destination
NSN: AASSVC815701GF
MILSTRIP: W25G1Q815701GF
PURCHASE REQUEST NUMBER: W25G1Q815701GF
0007 1 Lot Mid-Year Inspection 250 Ton
FFP
ANNUAL INSPECTION-GROVE All Terrain 2011, Capacity 250 TON, Model GM6250L, Serial Number 62209165, See Performance Work Statement 5.1.3, 5.1.5, 5.1.6.
FOB: Destination
NSN: AASSVC815701GG
MILSTRIP: W25G1Q815701GG
PURCHASE REQUEST NUMBER: W25G1Q815701GG
0008 1 Lot Yearly Inspection 250 Ton
FFP
ANNUAL INSPECTION-GROVE All Terrain 2011, Capacity 250 TON, Model GM6250L, Serial Number 62209165, See Performance Work Statement 5.1.2, 5.1.4, 5.1.5, 5.1.6.
FOB: Destination
NSN: AASSVC815701GP
MILSTRIP: W25G1Q815701GP
PURCHASE REQUEST NUMBER: W25G1Q815701GP
0009 1 Lot Mid-Year Inspection 40 Ton
FFP
ANNUAL INSPECTION-GROVE Wheel Mounted 1989, Capacity 40 TON, Model RT875CC, Serial Number 70641, See Performance Work Statement 5.1.3, 5.1.5, 5.1.6.
FOB: Destination
NSN: AASSVC815701GJ
MILSTRIP: W25G1Q815701GJ
PURCHASE REQUEST NUMBER: W25G1Q815701GJ
0010 1 Lot Yearly Inspection 40 Ton
FFP
ANNUAL INSPECTION-GROVE Wheel Mounted 1989, Capacity 40 TON, Model RT875CC, Serial Number 70641, See Performance Work Statement 5.1.2, 5.1.4, 5.1.5, 5.1.6.
FOB: Destination
NSN: AASSVC815701GK
MILSTRIP: W25G1Q815701GK
PURCHASE REQUEST NUMBER: W25G1Q815701GK
0011 1 Lot
EMERGENCY RESTORATIVE MAINTENANCE
FFP
EMERGENCY RESTORATIVE MAINTENANCE, Performance Work Statement 5.2, 1 Lot= 1 Hour (Do not quote on this CLIN, amount Not to Exceed $18,750) FOB: Destination
NSN: AASSVC815701GL
MILSTRIP: W25G1Q815701GL
PURCHASE REQUEST NUMBER: W25G1Q815701GL
0012 1 Lot
REPAIR PARTS
FFP
REPAIR PARTS, Performance Work Statment 5.3. (Do not quote on this CLIN, amount will not exceed $26,250) FOB: Destination
NSN: AASSVC818000QF
MILSTRIP: W25G1Q818000QF
PURCHASE REQUEST NUMBER: W25G1Q818000QF
0013 1 Lot
MANPOWER REPORTING
FFP
MANPOWER REPORTING, Performance Work Statement 5.7.
FOB: Destination
NSN: AASSVC815701GM
MILSTRIP: W25G1Q815701GM
PURCHASE REQUEST NUMBER: W25G1Q815701GM
1001 1 Lot OPTION Mid-Year Inspection 150 Ton
FFP
ANNUAL INSPECTION- Crane Crawler 1987, Capacity 150 TON, Model LS518, Serial Number UD02WA. See Performance Work Statement 5.1.3, 5.1.5, 5.1.6.
FOB: Destination
NSN: AASSVC815701GA
MILSTRIP: W25G1Q815701GA
1002 1 Lot OPTION Yearly Inspection 150 Ton
FFP
ANNUAL INSPECTION- Crane Crawler 1987, Capacity 150 TON, Model LS518, Serial Number UD02WA. See Performance Work Statement 5.1.2, 5.1.4, 5.1.5, 5.1.6.
FOB: Destination
NSN: AASSVC815701GB
1003 1 Lot OPTION Mid-Year Inspection 80 Ton
FFP
ANNUAL INSPECTION-LINK BELT 2009, Capacity 80 TON, Model RTC- 8080, Serial Number N4J91261, See Performance Work Statement 5.1.3, 5.1.5, 5.1.6.
FOB: Destination
NSN: AASSVC815701GC
1004 1 Lot OPTION Yearly Inspection 80 Ton
FFP
ANNUAL INSPECTION-LINK BELT 2009, Capacity 80 TON, Model RTC- 8080, Serial Number N4J91261, See Performance Work Statement 5.1.2, 5.1.4, 5.1.5, 5.1.6.
FOB: Destination
NSN: AASSVC815701GD
1005 1 Lot OPTION Mid-Year Inspection 45 Ton
FFP
ANNUAL INSPECTION-GROVE Rough Terrain Crane 2006, Capacity 45 TON, Model RT600E, Serial Number 226237, See Performance Work Statement 5.1.3, 5.1.5, 5.1.6.
FOB: Destination
NSN: AASSVC815701GE
1006 1 Lot OPTION Yearly Inspection 45 Ton
FFP
ANNUAL INSPECTION-GROVE Rough Terrain Crane 2006, Capacity 45 TON, Model RT600E, Serial Number 226237, See Performance Work Statement 5.1.2, 5.1.4, 5.1.5, 5.1.6.
FOB: Destination
NSN: AASSVC815701GF
1007 1 Lot OPTION Mid-Year Inspection 250 Ton
FFP
ANNUAL INSPECTION-GROVE All Terrain 2011, Capacity 250 TON, Model GM6250L, Serial Number 62209165, See Performance Work Statement 5.1.3, 5.1.5, 5.1.6.
FOB: Destination
NSN: AASSVC815701GG
1008 1 Lot OPTION Yearly Inspection 250 Ton
FFP
ANNUAL INSPECTION-GROVE All Terrain 2011, Capacity 250 TON, Model GM6250L, Serial Number 62209165, See Performance Work Statement 5.1.2, 5.1.4, 5.1.5, 5.1.6.
FOB: Destination
NSN: AASSVC815701GP
1009 1 Lot OPTION Mid-Year Inspection 40 Ton
FFP
ANNUAL INSPECTION-GROVE Wheel Mounted 1989, Capacity 40 TON, Model RT875CC, Serial Number 70641, See Performance Work Statement 5.1.3, 5.1.5, 5.1.6.
FOB: Destination
NSN: AASSVC815701GJ
1010 1 Lot OPTION Yearly Inspection 40 Ton
FFP
ANNUAL INSPECTION-GROVE Wheel Mounted 1989, Capacity 40 TON, Model RT875CC, Serial Number 70641, See Performance Work Statement 5.1.2, 5.1.4, 5.1.5, 5.1.6.
FOB: Destination
NSN: AASSVC815701GK
1011 1 Lot
OPTION EMERGENCY RESTORATIVE MAINTENANCE
FFP
EMERGENCY RESTORATIVE MAINTENANCE, Performance Work Statement 5.2, 1 Lot= 1 Hour (Do not quote on this CLIN, amount Not to Exceed $18,750) FOB: Destination
NSN: AASSVC815701GL
1012 1 Lot
OPTION REPAIR PARTS
FFP
REPAIR PARTS, Performance Work Statment 5.3. (Do not quote on this CLIN, amount will not exceed $26,250) FOB: Destination
NSN: AASSVC818000QF
1013 1 Lot
OPTION MANPOWER REPORTING
FFP
MANPOWER REPORTING, Performance Work Statement 5.7.
FOB: Destination
NSN: AASSVC815701GM
2001 1 Lot OPTION Mid-Year Inspection 150 Ton
FFP
ANNUAL INSPECTION- Crane Crawler 1987, Capacity 150 TON, Model LS518, Serial Number UD02WA. See Performance Work Statement 5.1.3, 5.1.5, 5.1.6.
FOB: Destination
2002 1 Lot OPTION Yearly Inspection 150 Ton
FFP
ANNUAL INSPECTION- Crane Crawler 1987, Capacity 150 TON, Model LS518, Serial Number UD02WA. See Performance Work Statement 5.1.2, 5.1.4, 5.1.5, 5.1.6.
FOB: Destination
2003 1 Lot OPTION Mid-Year Inspection 80 Ton
FFP
ANNUAL INSPECTION-LINK BELT 2009, Capacity 80 TON, Model RTC- 8080, Serial Number N4J91261, See Performance Work Statement 5.1.3, 5.1.5, 5.1.6.
FOB: Destination
2004 1 Lot OPTION Yearly Inspection 80 Ton
FFP
ANNUAL INSPECTION-LINK BELT 2009, Capacity 80 TON, Model RTC- 8080, Serial Number N4J91261, See Performance Work Statement 5.1.2, 5.1.4, 5.1.5, 5.1.6.
FOB: Destination
2005 1 Lot OPTION Mid-Year Inspection 45 Ton
FFP
ANNUAL INSPECTION-GROVE Rough Terrain Crane 2006, Capacity 45 TON, Model RT600E, Serial Number 226237, See Performance Work Statement 5.1.3, 5.1.5, 5.1.6.
FOB: Destination
2006 1 Lot OPTION Yearly Inspection 45 Ton
FFP
ANNUAL INSPECTION-GROVE Rough Terrain Crane 2006, Capacity 45 TON, Model RT600E, Serial Number 226237, See Performance Work Statement 5.1.2, 5.1.4, 5.1.5, 5.1.6.
FOB: Destination
2007 1 Lot OPTION Mid-Year Inspection 250 Ton
FFP
ANNUAL INSPECTION-GROVE All Terrain 2011, Capacity 250 TON, Model GM6250L, Serial Number 62209165, See Performance Work Statement 5.1.3, 5.1.5, 5.1.6.
FOB: Destination
2008 1 Lot OPTION Yearly Inspection 250 Ton
FFP
ANNUAL INSPECTION-GROVE All Terrain 2011, Capacity 250 TON, Model GM6250L, Serial Number 62209165, See Performance Work Statement 5.1.2, 5.1.4, 5.1.5, 5.1.6.
FOB: Destination
2009 1 Lot OPTION Mid-Year Inspection 40 Ton
FFP
ANNUAL INSPECTION-GROVE Wheel Mounted 1989, Capacity 40 TON, Model RT875CC, Serial Number 70641, See Performance Work Statement 5.1.3, 5.1.5, 5.1.6.
FOB: Destination
2010 1 Lot OPTION Yearly Inspection 40 Ton
FFP
ANNUAL INSPECTION-GROVE Wheel Mounted 1989, Capacity 40 TON, Model RT875CC, Serial Number 70641, See Performance Work Statement 5.1.2, 5.1.4, 5.1.5, 5.1.6.
FOB: Destination
2011 1 Lot
OPTION EMERGENCY RESTORATIVE MAINTENANCE
FFP
EMERGENCY RESTORATIVE MAINTENANCE, Performance Work Statement 5.2, 1 Lot= 1 Hour (Do not quote on this CLIN, amount Not to Exceed $18,750) FOB: Destination
2012 1 Lot
OPTION REPAIR PARTS
FFP
REPAIR PARTS, Performance Work Statment 5.3. (Do not quote on this CLIN, amount will not exceed $26,250) FOB: Destination
2013 1 Lot
OPTION MANPOWER REPORTING
FFP
MANPOWER REPORTING, Performance Work Statement 5.7.
FOB: Destination
3001 1 Lot OPTION Mid-Year Inspection 150 Ton
FFP
ANNUAL INSPECTION- Crane Crawler 1987, Capacity 150 TON, Model LS518, Serial Number UD02WA. See Performance Work Statement 5.1.3, 5.1.5, 5.1.6.
FOB: Destination
3002 1 Lot OPTION Yearly Inspection 150 Ton
FFP
ANNUAL INSPECTION- Crane Crawler 1987, Capacity 150 TON, Model LS518, Serial Number UD02WA. See Performance Work Statement 5.1.2, 5.1.4, 5.1.5, 5.1.6.
FOB: Destination
3003 1 Lot OPTION Mid-Year Inspection 80 Ton
FFP
ANNUAL INSPECTION-LINK BELT 2009, Capacity 80 TON, Model RTC- 8080, Serial Number N4J91261, See Performance Work Statement 5.1.3, 5.1.5, 5.1.6.
FOB: Destination
3004 1 Lot OPTION Yearly Inspection 80 Ton
FFP
ANNUAL INSPECTION-LINK BELT 2009, Capacity 80 TON, Model RTC- 8080, Serial Number N4J91261, See Performance Work Statement 5.1.2, 5.1.4, 5.1.5, 5.1.6.
FOB: Destination
3005 1 Lot OPTION Mid-Year Inspection 45 Ton
FFP
ANNUAL INSPECTION-GROVE Rough Terrain Crane 2006, Capacity 45 TON, Model RT600E, Serial Number 226237, See Performance Work Statement 5.1.3, 5.1.5, 5.1.6.
FOB: Destination
3006 1 Lot OPTION Yearly Inspection 45 Ton
FFP
ANNUAL INSPECTION-GROVE Rough Terrain Crane 2006, Capacity 45 TON, Model RT600E, Serial Number 226237, See Performance Work Statement 5.1.2, 5.1.4, 5.1.5, 5.1.6.
FOB: Destination
3007 1 Lot OPTION Mid-Year Inspection 250 Ton
FFP
ANNUAL INSPECTION-GROVE All Terrain 2011, Capacity 250 TON, Model GM6250L, Serial Number 62209165, See Performance Work Statement 5.1.3, 5.1.5, 5.1.6.
FOB: Destination
3008 1 Lot OPTION Yearly Inspection 250 Ton
FFP
ANNUAL INSPECTION-GROVE All Terrain 2011, Capacity 250 TON, Model GM6250L, Serial Number 62209165, See Performance Work Statement 5.1.2, 5.1.4, 5.1.5, 5.1.6.
FOB: Destination
3009 1 Lot OPTION Mid-Year Inspection 40 Ton
FFP
ANNUAL INSPECTION-GROVE Wheel Mounted 1989, Capacity 40 TON, Model RT875CC, Serial Number 70641, See Performance Work Statement 5.1.3, 5.1.5, 5.1.6.
FOB: Destination
3010 1 Lot OPTION Yearly Inspection 40 Ton
FFP
ANNUAL INSPECTION-GROVE Wheel Mounted 1989, Capacity 40 TON, Model RT875CC, Serial Number 70641, See Performance Work Statement 5.1.2, 5.1.4, 5.1.5, 5.1.6.
FOB: Destination
3011 1 Lot
OPTION EMERGENCY RESTORATIVE MAINTENANCE
FFP
EMERGENCY RESTORATIVE MAINTENANCE, Performance Work Statement 5.2, 1 Lot= 1 Hour (Do not quote on this CLIN, amount Not to Exceed $18,750) FOB: Destination
3012 1 Lot
OPTION REPAIR PARTS
FFP
REPAIR PARTS, Performance Work Statment 5.3. (Do not quote on this CLIN, amount will not exceed $26,250) FOB: Destination
3013 1 Lot
OPTION MANPOWER REPORTING
FFP
MANPOWER REPORTING, Performance Work Statement 5.7.
FOB: Destination
4001 1 Lot OPTION Mid-Year Inspection 150 Ton
FFP
ANNUAL INSPECTION- Crane Crawler 1987, Capacity 150 TON, Model LS518, Serial Number UD02WA. See Performance Work Statement 5.1.3, 5.1.5, 5.1.6.
FOB: Destination
4002 1 Lot OPTION Yearly Inspection 150 Ton
FFP
ANNUAL INSPECTION- Crane Crawler 1987, Capacity 150 TON, Model LS518, Serial Number UD02WA. See Performance Work Statement 5.1.2, 5.1.4, 5.1.5, 5.1.6.
FOB: Destination
4003 1 Lot OPTION Mid-Year Inspection 80 Ton
FFP
ANNUAL INSPECTION-LINK BELT 2009, Capacity 80 TON, Model RTC- 8080, Serial Number N4J91261, See Performance Work Statement 5.1.3, 5.1.5, 5.1.6.
FOB: Destination
4004 1 Lot OPTION Yearly Inspection 80 Ton
FFP
ANNUAL INSPECTION-LINK BELT 2009, Capacity 80 TON, Model RTC- 8080, Serial Number N4J91261, See Performance Work Statement 5.1.2, 5.1.4, 5.1.5, 5.1.6.
FOB: Destination
4005 1 Lot OPTION Mid-Year Inspection 45 Ton
FFP
ANNUAL INSPECTION-GROVE Rough Terrain Crane 2006, Capacity 45 TON, Model RT600E, Serial Number 226237, See Performance Work Statement 5.1.3, 5.1.5, 5.1.6.
FOB: Destination
4006 1 Lot OPTION Yearly Inspection 45 Ton
FFP
ANNUAL INSPECTION-GROVE Rough Terrain Crane 2006, Capacity 45 TON, Model RT600E, Serial Number 226237, See Performance Work Statement 5.1.2, 5.1.4, 5.1.5, 5.1.6.
FOB: Destination
4007 1 Lot OPTION Mid-Year Inspection 250 Ton
FFP
ANNUAL INSPECTION-GROVE All Terrain 2011, Capacity 250 TON, Model GM6250L, Serial Number 62209165, See Performance Work Statement 5.1.3, 5.1.5, 5.1.6.
FOB: Destination
4008 1 Lot OPTION Yearly Inspection 250 Ton
FFP
ANNUAL INSPECTION-GROVE All Terrain 2011, Capacity 250 TON, Model GM6250L, Serial Number 62209165, See Performance Work Statement 5.1.2, 5.1.4, 5.1.5, 5.1.6.
FOB: Destination
4009 1 Lot OPTION Mid-Year Inspection 40 Ton
FFP
ANNUAL INSPECTION-GROVE Wheel Mounted 1989, Capacity 40 TON, Model RT875CC, Serial Number 70641, See Performance Work Statement 5.1.3, 5.1.5, 5.1.6.
FOB: Destination
4010 1 Lot OPTION Yearly Inspection 40 Ton
FFP
ANNUAL INSPECTION-GROVE Wheel Mounted 1989, Capacity 40 TON, Model RT875CC, Serial Number 70641, See Performance Work Statement 5.1.2, 5.1.4, 5.1.5, 5.1.6.
FOB: Destination
4011 1 Lot
OPTION EMERGENCY RESTORATIVE MAINTENANCE
FFP
EMERGENCY RESTORATIVE MAINTENANCE, Performance Work Statement 5.2, 1 Lot= 1 Hour (Do not quote on this CLIN, amount Not to Exceed $18,750) FOB: Destination
4012 1 Lot
OPTION REPAIR PARTS
FFP
REPAIR PARTS, Performance Work Statment 5.3. (Do not quote on this CLIN, amount will not exceed $26,250) FOB: Destination
4013 1 Lot
OPTION MANPOWER REPORTING
FFP
MANPOWER REPORTING, Performance Work Statement 5.7.
FOB: Destination
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government 0002 Destination Government Destination Government 0003 Destination Government Destination Government 0004 Destination Government Destination Government 0005 Destination Government Destination Government 0006 Destination Government Destination Government 0007 Destination Government Destination Government 0008 Destination Government Destination Government 0009 Destination Government Destination Government 0010 Destination Government Destination Government 0011 Destination Government Destination Government 0012 Destination Government Destination Government 0013 Destination Government Destination Government 1001 Destination Government Destination Government 1002 Destination Government Destination Government 1003 Destination Government Destination Government 1004 Destination Government Destination Government 1005 Destination Government Destination Government 1006 Destination Government Destination Government 1007 Destination Government Destination Government 1008 Destination Government Destination Government 1009 Destination Government Destination Government 1010 Destination Government Destination Government 1011 Destination Government Destination Government 1012 Destination Government Destination Government 1013 Destination Government Destination Government 2001 Destination Government Destination Government 2002 Destination Government Destination Government 2003 Destination Government Destination Government
2004 Destination Government Destination Government 2005 Destination Government Destination Government 2006 Destination Government Destination Government 2007 Destination Government Destination Government 2008 Destination Government Destination Government 2009 Destination Government Destination Government 2010 Destination Government Destination Government 2011 Destination…