Performance Work Statement W911N2-18-Q-0004

View the file

Other files

File Type Posted
SOL_W911N2-18-Q-0004-0001.pdf PDF
SOL_W911N2-18-Q-0004.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT (PWS)

FOR

CALIBRATION AND EMERGENCY REPAIR OF

COORDINATE MEASURING MACHINES (CMM)

1.0 General:

1.1 Scope: The contractor shall provide all personnel, equipment, tools, materials, supervision, quality control and other items and non-personal services necessary to perform calibration and emergency repair of coordinate measuring machines located in Building 350 Annex as defined in this PWS, except as specified in Section 3.0 as Government Furnished Property or Services. The contractor shall perform to the standards in this contract.

1.2 Background: Calibration and emergency repair is necessary to utilize the CMM effectively. The current contract is ending and an additional contract needs to be in place to continue annual calibration and emergency repairs.

1.3 Period of Performance (PoP): The Period of Performance shall be one Base Year of 12 months and four 12-month option years. The Period of Performance reads as follows:

1.3.1 Base Year: 22 December 2017 to 21 December 2018

1.3.2 Option Year One: 22 December 2018 to 21 December 2019

1.3.3 Option Year Two: 22 December 2019 to 21 December 2020

1.3.4 Option Year Three: 22 December 2020 to 21 December 2021

1.3.3 Option Year Four: 22 December 2021 to 21 December 2022

1.4 General Information:

1.4.1 Quality Control (QC): The contractor shall develop and maintain an effective QC program to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s QC program is the means by which it assures itself that its work complies with the requirements of the contract. As a minimum, the contractor shall develop QC procedures that address the areas identified in Technical Exhibit 1, Performance Requirements Summary. After acceptance of the QC Plan, the contractor shall obtain the KO’s (KO) acceptance in writing of any proposed changes to its QC system.

1.4.2 Quality Assurance (QA): The Government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and acceptable quality level(s) (defect rate(s)).

1.4.3 Recognized Holidays: The following are recognized US holidays. The contractor shall not perform services on these days:

1.4.3.1 New Year’s Day: January 1st

1.4.3.2 Martin Luther King, Jr.’s Birthday: Third Monday in January

1.4.3.3 President’s Day: Third Monday in February

1.4.3.4 Memorial Day: Last Monday in May

1.4.3.5 Independence Day: July 4th

1.4.3.6 Labor Day: First Monday in September

1.4.3.7 Columbus Day: First Monday in October

1.4.3.8 Veteran’s Day: November 11th

1.4.3.9 Thanksgiving Day: Third Thursday in November

1.4.3.10 Christmas Day: Third Thursday in December

1.4.4 Place and Performance of Services: The contractor shall provide services between the hours of 06:30 - 15:45, Monday – Thursday, and 06:30 - 14:45 on our scheduled Friday, except on recognized US holidays or when the Government facility/installation is closed due to local or national emergencies, administrative closings, or similar Government-directed facility/installation closings. The contractor will be expected to provide on-site annual calibration services at Building 350 Annex, Letterkenny Army Depot. The contractor shall at all times maintain an adequate work force for the uninterrupted performance of all tasks defined within this PWS when the Government facility/installation is not closed for the above reasons. When hiring personnel, the contractor shall keep in mind that the stability and continuity of the work force are essential.

1.4.5 Security Requirements: Contractor and all associated sub-contractor’s employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office.

Contractor workforce shall comply with all personal identity verification requirements as directed by DOD, HQDA and/or local policy. Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes. Performance of work will require limited access to classified information or equipment. DD 254, DoD Contractor Security Classification Specification, is not required.

1.4.5.1 Physical Security: The contractor shall safeguard all Government property provided for contractor use. At the close of each work period, Government facilities, equipment and materials shall be secured.

1.4.5.2 Key Control: The contractor shall establish and implement methods of ensuring all keys/key cards issued by the Government are not lost or misplaced and are not used by unauthorized persons. NOTE: All references to keys include key cards. No keys issued by the Government shall be duplicated. The contractor shall develop procedures covering key control that shall be included in the QC Plan. Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas. The contractor shall immediately report any occurrences of lost or duplicated keys/key cards to the Contracting Officer’s Representative (COR).

1.4.5.2.1 In the event keys, other than master keys, are lost or duplicated the contractor shall, upon direction by the KO, re-key or replace the affected lock or locks; however, the Government, at its option, may replace the affected lock or locks or perform re-keying. When the replacement of locks or re-keying is performed by the Government, the total cost of re-keying or the replacement of the lock or locks shall be deducted from the monthly payment due the contractor. In the event a master key is lost or duplicated, all locks and keys for that system shall be replaced by the Government and the total cost deducted from the monthly payment due the contractor.

1.4.5.2.2 The contactor shall prohibit the use of the Government issued keys/key cards by any persons other than the contractor’s employees. The contractor shall prohibit the opening of locked areas by contractor employees to permit entrance of persons other than contactor employees engaged in the performance of services in those areas, or personnel authorized entrance by the KO.

1.4.5.2.3 Lock Combinations: The contractor shall establish and implement methods of ensuring all lock combinations are not revealed to unauthorized persons. The contractor shall ensure that lock combinations are changed when personnel having access to the combinations no longer have a need to know such combinations. These procedures shall be included in the Contractor’s QC Plan.

1.4.5.3 AT Level 1 Awareness Training: All contractor employees, to included subcontractor employees, requiring access to Army Installations, facilities, and controlled access areas shall complete AT Level 1 awareness training within 30 calendar days after contract start date and within 30 calendar days of new employees commencing performance. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within 15 calendar days after completion of training. AT level 1 awareness training is available on the Letterkenny Army Depot homepage – www.lead.army.mil.

1.4.5.4 iWATCH Training: The contractor and all associated sub-contractors with an area of performance within an Army-controlled installation, facilities or area shall brief all employees on the local iWATCH program. This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR or contracting officer. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance. The contractor shall report completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within 15 calendar days after completion of training. iWATCH training is available on the Letterkenny Army Depot homepage – www.lead.army.mil.

1.4.5.6 OPSEC Training: Per AR 530-1, Operations Security, new contractor employees and associated sub-contractor employees shall complete Level I OPSEC training within 30 calendar days of their reporting for duty and annually thereafter. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within 15 calendar days after completion of training. Level 1 OPSEC training is available on the Letterkenny Army Depot homepage – www.lead.army.mil.

1.4.6 Conservation of Utilities: The contractor shall instruct employees in utilities conservation practices. The contractor shall operate under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount.

1.4.7 Special Qualifications: None.

1.4.8 Post Award Conference/Periodic Progress Meetings: The contractor agrees to attend any post award conference convened by the KO in accordance with Federal Acquisition Regulations Subpart 42.5. The KO, Contracting Officer’s Representative (COR), and other Government personnel, as appropriate, may meet periodically with the contractor to review the contactor’s performance. At these meetings, the Contacting Officer will apprise the contractor of how the Government views the contractor’s performance and the contractor shall apprise the Government of problems, if any, being experienced The contractor shall resolve outstanding issues raised by the Government.

Contractor attendance at these meetings shall be at no additional cost to the Government.

1.4.9 Contract Manager (CM): The contactor shall provide a CM who shall ensure performance under this contract. The name of this person, and an alternate who shall act for the contractor when the CM is absent, shall be designated in writing to the KO.

The CM or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract.

1.4.10 Identification of Contractor Employees: All contact personnel attending meetings, answering Government telephones and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. The contractor shall also ensure that all documents or reports produced by contractor personnel are suitably marked as contractor products or that contractor participation is appropriately disclosed.

1.4.11 Organizational Conflicts of Interest (OCI): The contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent OCIs, as defined in FAR Subpart 9.5. The contractor shall notify the KO immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the KO to avoid or mitigate any such OCI. The contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the KO and in the event the KO unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the KO may affect other remedies as he or she deems necessary, including prohibiting the contractor from participation in subsequent contracted requirements which may be affected by the OCI.

2.0 Definitions and Acronyms:

2.1.1 CONTRACTOR. A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.

2.1.2 CONTRACTING OFFICER (KO). A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.

2.1.3 CONTRACTING OFFICER'S REPRESENTATIVE (COR). An employee of the U.S. Government designated by the KO to monitor contractor performance. Such appointment shall be in writing and shall state the scope of authority and limitations.

This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.

2.1.4 DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the Performance Work Statement.

2.1.5 DELIVERABLE. Anything that can be physically delivered and includes non-manufactured things such as meeting minutes or reports.

2.1.6 KEY PERSONNEL. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.

2.1.7 PHYSICAL SECURITY. Actions that prevent the loss or damage of Government property.

2.1.8 QUALITY ASSURANCE. The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.

2.1.9 QUALITY ASSURANCE SURVEILLANCE PLAN (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.

2.1.10 QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.

2.1.11 SUBCONTRACTOR. One that enters into a contract with a prime contractor.

The Government does not have privity of contract with the subcontractor.

2.1.12 WORK DAY. The number of hours per day the Contractor provides services in accordance with the contract.

2.1.13 WORK WEEK. Biweekly a total of 80 hours, Monday thru Friday the first week and Monday thru Thursday the second week, complying to the Government’s work schedule unless specified otherwise.

2.2 ACRONYMS:

AFARS Army Federal Acquisition Regulation Supplement AR Army Regulation CFR Code of Federal Regulations CONUS Continental United States (excludes Alaska and Hawaii) COR Contracting Officer Representative COTS Commercial-Off-the-Shelf DA Department of the Army DD250 Department of Defense Form 250 (Receiving Report) DD254 Department of Defense Contract Security Requirement List DFARS Defense Federal Acquisition Regulation Supplement DOD Department of Defense FAR Federal Acquisition Regulation KO Contracting Officer OCI Organizational Conflict of Interest

ODC Other Direct Costs PIPO Phase In/Phase Out POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QAP Quality Assurance Program QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program TE Technical Exhibit

3.0 Government Furnished Property, Material, Equipment and Services (GFP/M/E/S):

The Government will provide the following utilities listed below:

3.1 Utilities: All utilities in the facility, such as electrical power for the use of hands tools, will be available for the contactor’s use in the performance of this contract.

3.2 Facilities: LEAD will provide clear access to the equipment to be serviced.

4.0 Contractor Furnished Property, Materials, Equipment (CFP/M/E):

4.1 General: Except for those items specifically stated to be Government-Furnished in Paragraph 3.0, the contractor shall furnish everything required to perform these services as indicated in Paragraph 1.1.

5.0 Requirements: The contractor shall provide all labor, material, parts, tools, services and equipment to perform the following:

5.1 ON-SITE, ANNUAL CALIBRATION: Contractor shall provide all labor, materials, and equipment required for the annual calibration of two (2) Hexagon Metrology – manufactured Coordinate Measuring Machines. Contractor shall provide an updated calibration sticker upon accurate completion of calibration. The CMM’s shall be calibrated to ASME B89.4.1 2001 standards. Any parts required for calibration shall be invoiced under the parts CLIN. (see paragraph 5.3)

5.1.1 CALIBRATION REPORT: Contractor shall provide a calibration report for the annual calibration of both CMM’s within 10 business days after calibration completion.

The report shall include all applicable readings, measurements, data points and/or recommendations for maintenance in their notification to the COR. The Contractor shall notify the COR of a completed calibration immediately after completion via e-mail and/or telecommunications.

5.2 EMERGENCY REPAIR SUPPORT: Contractor shall provide emergency repair support for the CMMs located on Letterkenny Army Depot. The Contractor shall schedule and deploy a service technician within one week upon request (whether by email or phone) by the COR. The CMM(s) shall operate as specified to calibration standards upon conclusion of the emergency repair. Any parts required for repairs shall be invoice under the parts CLIN (see paragraph 5.3)

5.2.1 Model # Global Performance 7-10-7, S/N 0816-1478

5.2.2 Model # Global Performance 12-22-10, S/N 0116-6501

5.3 SUPPLY REPAIR PARTS: Contractor shall provide new OEM repair parts as required for emergency repair and calibration for the CMMs listed in paragraph 5.2. The COR shall approve all parts costing more than fifty dollars ($50) each that are parts required by services performed under paragraph 5.1 and 5.2. Repair parts shall be billed as actuals.

5.4 CONTRACTOR MANPOWER REPORTING (CMR): The Office of the Assistant Secretary of the Army (Manpower & Reserve Affairs) operates and maintains a secure Army data collection site where the Contractor shall report ALL Contractor manpower (including subcontractor manpower) required for performance of this contract. The contractor shall completely fill in all the information in the format using the following web address https://www.ecmra.mil/Login.aspx. The required information includes: (1) Contracting Office, KO, Contracting Officer’s Technical Representative (COTR) or also known as the Contracting Officer’s Representative (COR); (2) Contract number, including task and delivery order number; (3) Beginning and ending dates covered by reporting period; (4) Contractor's name, address, phone number, e-mail address, identity of Contractor employee entering data; (5) Estimated direct labor hours (including sub-Contractors); (6) Estimated direct labor dollars paid this reporting period (including sub-Contractors); (7) Total payments (including sub-Contractors); (8) Predominant Federal Service Code (FSC) reflecting services provided by Contractor (and separate predominant FSC for each sub-Contractor if different); (9) Estimated data collection cost; (10) Organizational title associated with the Unit Identification Code (UIC) for the Army Requiring Activity (the Army Requiring Activity is responsible for providing the Contractor with its UIC for the purposes of reporting this information);

(11) Locations where Contractor and sub-Contractors perform the work (specified by zip code in the United States and nearest city, country, when in an overseas location, using standardized nomenclature provided on website); (12) Presence of deployment or contingency contract language; and (13) Number of Contractor and sub-Contractor employees deployed in theater this reporting period (by country). As part of its submission, the Contractor shall provide the estimated total cost (if any) incurred to comply with this reporting requirement. Reporting period shall be the period of performance not to exceed 12 months ending September 30 of each government fiscal year and must be reported by 31 October of each calendar year. Contractors may use a direct XML data transfer to the database server or fill in the fields on the website. The XML direct transfer is a format for transferring files from a Contractor’s system to the secure website without the need for separate data entries for each required data element at the website. The specific formats for the XML direct transfer may be downloaded from the website.

6.0 Applicable Publications: Publications applicable to this PWS are listed below:

OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA)

29 CFR 1925 Safety and Health Standards for Federal Service Contracts 29 CFR 1910 Occupational Safety and Health Standards (Copies may be obtained at www.osha.gov)

LETTERKENNY ARMY DEPOT (LEAD)

LEAD-R 385-1 Safety and Occupational Health Program (Copies may be obtained from LEAD Directorate of Contracting, Bldg. 2)

LEAD-P 385-4

Requirements for Security, Safety, and Fire Prevention for Contractors Performing Work on LEAD

AR 385-10

The Army Safety Program

American Society of Mechanical Engineers (ASME) ASME B89.4.1 – Acceptance Test and Reverification Test for CMMs Part 2: CMMs Used for Measuring Linear Dimensions (Technical Report)

TECHNICAL EXHIBIT 1

Performance Requirements Summary

This Performance Requirements Summary includes performance standards. The Government will use these standards to determine contractor performance and shall compare contractor performance to the Acceptable Quality Level (AQL).

PWS

Paragraph Task Performance Standard

Acceptable Quality Levels

(AQL)

Surveillance Method / By

Whom

5.1

ON-SITE, ANNUAL

CALIBRATION OF

COORDINATE

MEASURING

MACHINES

Calibration completed as scheduled with the

COR, by certified/trained personnel, and a notification of the

100% of all equipment

Inspection and record-keeping by COR http://www.osha.gov/ calibration issued to the

COR.

5.2 EMERGENCY REPAIR

SUPPORT

Contractor dispatches service technician within one week upon notification by the COR.

100% of all requests

Record-keeping by COR

5.3 SUPPLY REPAIR

PARTS

Contractor supplies parts as approved to make repairs and calibration.

95% of all parts requests

Record-keeping and inspection by COR

TECHNICAL EXHIBIT 2

Deliverables Schedule

Deliverable Frequency

Number of Copies

Medium/ Format Submit To

1.4.5.2 AT

LEVEL 1

Awareness Training

Complete within 30 calendar days of contract start date and within 30 days of new employee start date

Electronic or hard copy of completion statement

Submit proof of training to

COR

1.4.5.3 iWATCH Training

Complete within 30 calendar days of contract start date and within 30 days

Electronic or hard copy of completion statement

Submit proof of training to

COR

1.4.5.4 OPSEC

Training

Complete within 30 calendar days of contract start date and within 30 days

Electronic or hard copy of completion statement

Submit proof of training to

COR

5.1.1 Calibration

Report

Within 10 business days after calibration completion

1 Electronic Submit to COR

5.5 Contractor

Manpower Reporting (CMR)

Annually 1 Electronic CMR Website (see 5.4)