SOL_AMENDMENT_W911N2-17-R-0028-0001.pdf
PDF 21 KB Posted
- Attached to
- Turnkey Ventilation System Federal contract opportunity
- Solicitation number
- W911N2-17-R-0028
About this file
Amendment 1 Questions & Answers
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SOL_AMENDMENT_W911N2-17-R-0028-0003.pdf | ||
| SOL_AMENDMENT_W911N2-17-R-0028-0002.pdf | ||
| Drawing_BUILDING_57,_FORCE_PROVIDER_MICROGRID_TEST_CELL.pdf | ||
| SOL_W911N2-17-R-0028.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
THOMAS C. HALL
LETTERKENNY CONTRACTING OFFICE
1 OVERCASH AVENUE, CCAM-DPD
717-267-5583
CHAMBERSBURG PA 17201-4150
W25G1Q7018001O
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to answ er questions.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 13-Mar-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911N2-17-R-0028
X 9B. DATED (SEE ITEM 11)
14-Feb-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
13-Mar-2017
CODE
LETTERKENNY ARMY DEPOT
LETTERKENNY CONTRACTING OFFICE - ACC
1 OVERCASH AVENUE, ATTN: CCAM-ALK, BLDG 2S
CHAMBERSBURG PA 17201-4150
W911N2 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE W911N2
FACILITY CODECODE
EMAIL:TEL:
W911N2-17-R-0028
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
The following have been added by full text:
QUESTION AND ANSWERS
SOLICITATION W911N2-17-R-0028 QUESTIONS AND ANSWERS
Q.1) I have found what I believe are airflow design issues with the system. Should we bid the system as described in the solicitation or should I consider a redesign the system and bid it so that it will work?
A.1) Bid as specified. Request the design error be noted if possible.
Q.2) How many generators will run at one time?
A.2) The generator system, which includes six generators, will run one and sequentially increase the number up to 6 running at one time.
Q.3) Is the control panel to be located near the west wall steel columns?
A.3) Any location on the west wall is acceptable.
Q.4) The Makeup Air unit comes with controls in a pre-packaged enclosure. Would you like the components from this enclosure removed and installed in the motor starter control panel? Or can we just have a start stop button for the MUA unit in the motor starter control panel and run conduit and wire to the MUA control panel?
A.4) The start/stop button for the MUA should be included in the motor starter panel.
Q.5) How much movement (vertically) will be required in the generator hoods? Expand on Section 4.2.3.2 please.
A.5) The generator is 59 inches in height. The hoods will need to be moved so the generators can be placed for testing using a forklift. The hoods will need to move from 59” to 96” at a minimum measured from the floor.
Q.6) What material if the roof of building 57? Is it a built-up roof?
A.6) It is a built-up roof.
Q.7) How far and where is the closest natural gas connection point to where the MUA unit will be located?
A.7) We are to provide the natural gas to within 10’ of the MAU (para 2.0) Q.8) The exhaust fan is specified as having a 300°F minimum temperature rating. What is the maximum temperature the fan is to be rated at? Is the fan volume of 5000CFM an SCFM or ACFM rating?
A.8) The exhaust fan must be minimally rated at 300°F – anything greater than that is acceptable. Fan volume is ACFM.
Q.9) Should the process exhaust fan be tied into the building joists? Or what sort of connection is required?
A.9) Any air handling equipment needs to be supported by the structural steel roof girders
(End of Summary of Changes)