SOL_W911N2-17-R-0018.pdf

PDF 676 KB Posted

Attached to
BLAST BOOTH MAINTENANCE
Solicitation number
W911N2-17-R-0018
Issued by

About this file

Solicitation

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUM

(No Collect Calls)

W911N2-17-R-0018 27-Jan-2017

b. TELEPHONE NUMBER

717-267-5536

8. OFFER DUE DATE/LOCAL TIME

10:00 AM 27 Feb 2017

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA X ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W911N29. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

SHAUN R. LEATHERMAN

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

1 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.X

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

A5M20051980066

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED OR X

SMALL BUSINESSX

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

LETTERKENNY ARMY DEPOT

LETTERKENNY CONTRACTING OFFICE - ACC

1 OVERCASH AVENUE, ATTN: CCAM-ALK, BLDG 2S

CHAMBERSBURG PA 17201-4150

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE W91FVA 16. ADMINISTERED BY

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

DIRECTORATE OF INDUSTRIAL OPERATIONS

JAMES MANJONE

LETTERKENNY ARMY DEPOT, BUILDING 389

CHAMBERSBURG PA 17201

TEL: 717-267-9534 FAX:

717-2679834FAX:

TEL: SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

$7,500,000

NAICS:

811310

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF187

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

W911N2-17-R-0018

Section SF 1449 - CONTINUATION SHEET

ITEM NO SUPPLIES/SERVICES ESTIMATED

QUANTITY

UNIT UNIT PRICE ESTIMATED AMOUNT

0001 Each

ROUTINE PREVENTIVE MAINTENANCE (PM)

FFP

PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON BLAST

BOOTHS LISTED IN APPENDIX A IN ACCORDANCE WITH PARAGRAPH

5.1.1 OF THE PERFORMANCE WORK STATEMENT (PWS)

FOB: Destination

PURCHASE REQUEST NUMBER: A5M20051980066

ESTIMATED

NET AMT

UNIT UNIT PRICE ESTIMATED AMOUNT

0001AA 3 Each

ROUTINE PM PANGBORN 44 (ASSET#D4833)

FFP

PROVIDE ALL LABOR, MATERIALS, PARTS TOOLS, SERVICES AND

EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE

PANGBORN 44 BLAST BOOTH AND DUST COLLECTOR (ASSET # D4833)

IN ACCORDANCE WITH APPENDIX B OF THE PERFORMANCE WORK

STATEMENT

UNIT UNIT PRICE ESTIMATED AMOUNT

0001AB 3 Each

ROUTINE PM PANGBORN 50 (ASSET#D4834)

FFP

PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE

PANGBORN 50 BLAST BOOTH AND DUST COLLECTOR (ASSET # D4834)

IN ACCORDANCE WITH APPENDIX C OF THE PERFORMANCE WORK

STATEMENT

UNIT UNIT PRICE ESTIMATED AMOUNT

0001AC 3 Each

ROUTINE PM ROTOBLAST (ASSET#R4249)

FFP

PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE

ROTOBLAST BARREL (ASSET # R4249) IN ACCORDANCE WITH

APPENDIX D OF THE PERFORMANCE WORK STATEMENT

UNIT UNIT PRICE ESTIMATED AMOUNT

0001AD 3 Each

ROUTINE PM PANGBORN SPIN. (ASSET#S0446)

FFP

PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE

PANGBORN SPINNER BLAST AND DUST COLLECTOR (ASSET # S0446)

IN ACCORDANCE WITH APPENDIX E OF THE PERFORMANCE WORK

STATEMENT

UNIT UNIT PRICE ESTIMATED AMOUNT

0001AE 3 Each

ROUTINE PM PANGBORN ROTO. (ASSET #D4819)

FFP

PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE

PANGBORN ROTOARY BLAST BOOTH AND DUST COLLECTOR (ASSET

#D4819 ) IN ACCORDANCE WITH APPENDIX F OF THE PERFORMANCE

WORK STATEMENT

UNIT UNIT PRICE ESTIMATED AMOUNT

0001AF 3 Each

ROUTINE PM GOFF 60 TUM. (ASSET#S0770)

FFP

PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE GOFF 60

TUMBLE BLAST AND DUST COLLECTOR (ASSET # S0770) IN

ACCORDANCE WITH APPENDIX G OF THE PERFORMANCE WORK

STATEMENT

UNIT UNIT PRICE ESTIMATED AMOUNT

0001AG 3 Each

ROUTINE PM EMPIRE (ASSET#S3239)

FFP

PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE EMPIRE

BLAST BOOTH AND DUST COLLECTOR (ASSET # S3239) IN

ACCORDANCE WITH APPENDIX H OF THE PERFORMANCE WORK

STATEMENT

UNIT UNIT PRICE ESTIMATED AMOUNT

0001AH 3 Each

ROUTINE PM CLEMCO (ASSET#S2455)

FFP

PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE CLEMCO

BLAST BOOTH AND DUST COLLECTOR (ASSET # S2455) IN

ACCORDANCE WITH APPENDIX I OF THE PERFORMANCE WORK

STATEMENT

UNIT UNIT PRICE ESTIMATED AMOUNT

0001AJ 3 Each

ROUTINE PM WHEELABRATOR (ASSET #S0233)

FFP

PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE

WHEELABRATOR BLAST BOOTH AND DUST COLLECTOR (ASSET #

S0233) IN ACCORDANCE WITH APPENDIX J OF THE PERFORMANCE

WORK STATEMENT

UNIT UNIT PRICE ESTIMATED AMOUNT

0001AK 3 Each

ROUTINE PM WHEELABRATOR (ASSET#S1944)

FFP

PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE

WHEELABRATOR BLAST BOOTH AND DUST COLLECTOR (ASSET #

S1944) IN ACCORDANCE WITH APPENDIX K OF THE PERFORMANCE

WORK STATEMENT

UNIT UNIT PRICE ESTIMATED AMOUNT

0001AL 3 Each

ROUTINE PM CLEMCO (ASSET#R6094)

FFP

PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE CLEMCO

BLAST BOOTH AND DUST COLLECTOR (ASSET # R6094) IN

ACCORDANCE WITH APPENDIX L OF THE PERFORMANCE WORK

STATEMENT

UNIT UNIT PRICE ESTIMATED AMOUNT

0001AM 3 Each

ROUTINE PM CLEMCO (ASSET#R6185)

FFP

PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE CLEMCO

BLAST BOOTH AND DUST COLLECTOR (ASSET # R6185) IN

ACCORDANCE WITH APPENDIX M OF THE PERFORMANCE WORK

STATEMENT

UNIT UNIT PRICE ESTIMATED AMOUNT

0001AN 3 Each

ROUTINE PM VIKING TUNNEL (ASSET#T3165)

FFP

PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE VIKING

TUNNEL BLAST AND DUST COLLECTOR (ASSET # T3165) IN

ACCORDANCE WITH APPENDIX N OF THE PERFORMANCE WORK

STATEMENT

UNIT UNIT PRICE ESTIMATED AMOUNT

0001AP 3 Each

ROUTINE PM GIBSON TUMBLE (ASSET#U0093)

FFP

PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE GIBSON

TUMBLE BLAST AND DUST COLLECTOR (ASSET # U0093) IN

ACCORDANCE WITH APPENDIX O OF THE PERFORMANCE WORK

STATEMENT

UNIT UNIT PRICE ESTIMATED AMOUNT

0001AQ 3 Each

ROUTINE PM GOFF ROTARY (ASSET#S2242)

FFP

PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE GOFF

ROTARY BLAST AND DUST COLLECTOR (ASSET # S2242) IN

ACCORDANCE WITH APPENDIX P OF THE PERFORMANCE WORK

STATEMENT

UNIT UNIT PRICE ESTIMATED AMOUNT

0002 Each

ANNUAL PREVENTIVE MAINTENANCE (PM)

FFP

PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON BLAST

BOOTHS LISTED IN APPENDIX A IN ACCORDANCE WITH PARAGRAPH

5.1.2 OF THE PERFORMANCE WORK STATEMENT

UNIT UNIT PRICE ESTIMATED AMOUNT

0002AA 1 Each

ANNUAL PM PANGBORN 44 (ASSET#D4833)

FFP

PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE

PANGBORN 44 BLAST BOOTH AND DUST COLLECTOR (ASSET # D4833)

IN ACCORDANCE WITH APPENDIX B OF THE PERFORMANCE WORK

STATEMENT

UNIT UNIT PRICE ESTIMATED AMOUNT

0002AB 1 Each

ANNUAL PM 50 (ASSET#D4834)

FFP

PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE

PANGBORN 50 BLAST BOOTH AND DUST COLLECTOR (ASSET # D4834)

IN ACCORDANCE WITH APPENDIX C OF THE PERFORMANCE WORK

STATEMENT.

UNIT UNIT PRICE ESTIMATED AMOUNT

0002AC 1 Each

ANNUAL PM ROTOBLAST (ASSET#R4249)

FFP

PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE

ROTOBLAST BARREL (ASSET # R4249) IN ACCORDANCE WITH

APPENDIX D OF THE PERFORMANCE WORK STATEMENT

UNIT UNIT PRICE ESTIMATED AMOUNT

0002AD 1 Each

ANNUAL PM PANGBORN SPIN. (ASSET#S0446)

FFP

PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE

PANGBORN SPINNER BLAST AND DUST COLLECTOR (ASSET # S0446)

IN ACCORDANCE WITH APPENDIX E OF THE PERFORMANCE WORK

STATEMENT

UNIT UNIT PRICE ESTIMATED AMOUNT

0002AE 1 Each

ANNUAL PM PANGBORN ROTO. (ASSET #D4819)

FFP

PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE

PANGBORN ROTOARY BLAST BOOTH AND DUST COLLECTOR (ASSET

#D4819 ) IN ACCORDANCE WITH APPENDIX F OF THE PERFORMANCE

WORK.

UNIT UNIT PRICE ESTIMATED AMOUNT

0002AF 1 Each

ANNUAL PM 60 TUM. (ASSET#S0770)

FFP

PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE GOFF 60

TUMBLE BLAST AND DUST COLLECTOR (ASSET # S0770) IN

ACCORDANCE WITH APPENDIX G OF THE PERFORMANCE WORK

STATEMENT

UNIT UNIT PRICE ESTIMATED AMOUNT

0002AG 1 Each

ANNUAL PM EMPIRE (ASSET#S3239)

FFP

PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE EMPIRE

BLAST BOOTH AND DUST COLLECTOR (ASSET # S3239) IN

ACCORDANCE WITH APPENDIX H OF THE PERFORMANCE WORK

STATEMENT.

UNIT UNIT PRICE ESTIMATED AMOUNT

0002AH 1 Each

ANNUAL PM CLEMCO (ASSET#S2455)

FFP

PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE CLEMCO

BLAST BOOTH AND DUST COLLECTOR (ASSET # S2455) IN

ACCORDANCE WITH APPENDIX I OF THE PERFORMANCE WORK

STATEMENT.

UNIT UNIT PRICE ESTIMATED AMOUNT

0002AJ 1 Each

ANNUAL PM WHEELABRATOR (ASSET #S0233)

FFP

PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE

WHEELABRATOR BLAST BOOTH AND DUST COLLECTOR (ASSET #

S0233) IN ACCORDANCE WITH APPENDIX J OF THE PERFORMANCE

WORK.

UNIT UNIT PRICE ESTIMATED AMOUNT

0002AK 1 Each

ANNUAL PM WHEELABRATOR (ASSET#S1944)

FFP

PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE

WHEELABRATOR BLAST BOOTH AND DUST COLLECTOR (ASSET #

S1944) IN ACCORDANCE WITH APPENDIX K OF THE PERFORMANCE

WORK. STATEMENT

UNIT UNIT PRICE ESTIMATED AMOUNT

0002AL 1 Each

ANNUAL PM CLEMCO (ASSET#R6094)

FFP

PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE CLEMCO

BLAST BOOTH AND DUST COLLECTOR (ASSET # R6094) IN

ACCORDANCE WITH APPENDIX L OF THE PERFORMANCE WORK

STATEMENT.

UNIT UNIT PRICE ESTIMATED AMOUNT

0002AM 1 Each

ANNUAL PM CLEMCO (ASSET#R6185)

FFP

ROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE CLEMCO

BLAST BOOTH AND DUST COLLECTOR (ASSET # R6185) IN

ACCORDANCE WITH APPENDIX M OF THE PERFORMANCE WORK

STATEMENT.

UNIT UNIT PRICE ESTIMATED AMOUNT

0002AN 1 Each

ANNUAL PM VIKING TUNNEL (ASSET#T3165)

FFP

PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE VIKING

TUNNEL BLAST AND DUST COLLECTOR (ASSET # T3165) IN

ACCORDANCE WITH APPENDIX N OF THE PERFORMANCE WORK

STATEMENT

UNIT UNIT PRICE ESTIMATED AMOUNT

0002AP 1 Each

ANNUAL PM GIBSON TUMBLE (ASSET#U0093)

FFP

PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE GIBSON

TUMBLE BLAST AND DUST COLLECTOR (ASSET # U0093) IN

ACCORDANCE WITH APPENDIX O OF THE PERFORMANCE WORK

STATEMENT.

UNIT UNIT PRICE ESTIMATED AMOUNT

0002AQ 1 Each

ANNUAL PM GOFF ROTARY (ASSET#S2242)

FFP

PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE GOFF

ROTARY BLAST AND DUST COLLECTOR (ASSET # S2242) IN

ACCORDANCE WITH APPENDIX P OF THE PERFORMANCE WORK

STATEMENT

ITEM NO SUPPLIES/SERVICES EST.

UNIT UNIT PRICE EST. AMOUNT

0003 600 Hours

NON-EMERGENCY REPAIR

T&M

PROVIDE ALL LABOR, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM NON-EMERGENCY UNSCHEDULED

SERVICE

ON ALL BLAST EQUIPMENT LISTED IN APPENDIX A IN ACCORDANCE

WITH PARAGRAPH 5.2 OF THE PERFORMANCE WORK STATEMENT.

TOT ESTIMATED PRICE

CEILING PRICE

UNIT UNIT PRICE EST. AMOUNT

0004 360 Hours

EMERGENCY REPAIR

T&M

PROVIDE ALL LABOR, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM NON-EMERGENCY UNSCHEDULED

SERVICE

ON ALL BLAST EQUIPMENT LISTED IN APPENDIX A IN ACCORDANCE

WITH PARAGRAPH 5.3 OF THE PERFORMANCE WORK STATEMENT.

UNIT UNIT PRICE EST. AMOUNT

0005 1 Lot

REPAIR RESOLUTION

T&M

OEM TECHNICIAN LABOR, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM UNRESOLVED UNSCHEDULED SERVICE ON

ALL BLAST EQUIPMENT LISTED IN APPENDIX A IN ACCORDANCE

WITH PARAGRAPH 5.4 OF THE PERFORMANCE WORK STATEMENT.

OEM SERVICE RATES SHALL BE BILLED AT ACTUAL COST.

UNIT UNIT PRICE EST. AMOUNT

0006 1 Lot

PARTS

T&M

PROVIDE ALL MATERIALS AND PARTS NECESSARY TO PERFORM

EMERGENCY, NON-EMERGENCY, OR REPAIRS UNDER REPAIR

RESOLUTION UNSCHEDULED SERVICE ON ALL MACHINES LISTED IN

APPENDIX A IN ACCORDANCE WITH PARAGRAPH 5.5 OF THE

PERFORMANCE WORK STATEMENT

UNIT UNIT PRICE ESTIMATED AMOUNT

0007 1 Each

CONTRACTOR MANPOWER REPORTING (CMR)

FFP

CONTRACTOR MANPOWER REPORTING IN ACCORDANCE WITH

PARAGRAPH 5.9 OF THE PERFORMANCE WORK STATEMENT

UNIT UNIT PRICE ESTIMATED AMOUNT

1001 Each

OPTION ROUTINE PREVENTIVE MAINTENANCE (PM)

FFP

PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON BLAST

BOOTHS LISTED IN APPENDIX A IN ACCORDANCE WITH PARAGRAPH

5.1.1 OF THE PERFORMANCE WORK STATEMENT (PWS)

UNIT UNIT PRICE ESTIMATED AMOUNT

1001AA 3 Each

OPTION ROUTINE PM PANGBORN 44 (ASSET#D4833)

FFP

PROVIDE ALL LABOR, MATERIALS, PARTS TOOLS, SERVICES AND

EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE

PANGBORN 44 BLAST BOOTH AND DUST COLLECTOR (ASSET # D4833)

IN ACCORDANCE WITH APPENDIX B OF THE PERFORMANCE WORK

STATEMENT

UNIT UNIT PRICE ESTIMATED AMOUNT

1001AB 3 Each

OPTION ROUTINE PM PANGBORN 50 (ASSET#D4834)

FFP

PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE

PANGBORN 50 BLAST BOOTH AND DUST COLLECTOR (ASSET # D4834)

IN ACCORDANCE WITH APPENDIX C OF THE PERFORMANCE WORK

STATEMENT

UNIT UNIT PRICE ESTIMATED AMOUNT

1001AC 3 Each

OPTION ROUTINE PM ROTOBLAST (ASSET#R4249)

FFP

PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE

ROTOBLAST BARREL (ASSET # R4249) IN ACCORDANCE WITH

APPENDIX D OF THE PERFORMANCE WORK STATEMENT

UNIT UNIT PRICE ESTIMATED AMOUNT

1001AD 3 Each

OPTION ROUTINE PM PANGBORN SPIN. (ASSET#S0446)

FFP

PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE

PANGBORN SPINNER BLAST AND DUST COLLECTOR (ASSET # S0446)

IN ACCORDANCE WITH APPENDIX E OF THE PERFORMANCE WORK

STATEMENT

UNIT UNIT PRICE ESTIMATED AMOUNT

1001AE 3 Each

OPTION ROUTINE PM PANGBORN ROTO. (ASSET #D4819)

FFP

PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE

PANGBORN ROTOARY BLAST BOOTH AND DUST COLLECTOR (ASSET

#D4819 ) IN ACCORDANCE WITH APPENDIX F OF THE PERFORMANCE

WORK STATEMENT

UNIT UNIT PRICE ESTIMATED AMOUNT

1001AF 3 Each

OPTION ROUTINE PM 60 TUM. (ASSET#S0770)

FFP

PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE GOFF 60

TUMBLE BLAST AND DUST COLLECTOR (ASSET # S0770) IN

ACCORDANCE WITH APPENDIX G OF THE PERFORMANCE WORK

STATEMENT

UNIT UNIT PRICE ESTIMATED AMOUNT

1001AG 3 Each

OPTION ROUTINE PM EMPIRE (ASSET#S3239)

FFP

PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE EMPIRE

BLAST BOOTH AND DUST COLLECTOR (ASSET # S3239) IN

ACCORDANCE WITH APPENDIX H OF THE PERFORMANCE WORK

STATEMENT

UNIT UNIT PRICE ESTIMATED AMOUNT

1001AH 3 Each

OPTION ROUTINE PM CLEMCO (ASSET#S2455)

FFP

PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE CLEMCO

BLAST BOOTH AND DUST COLLECTOR (ASSET # S2455) IN

ACCORDANCE WITH APPENDIX I OF THE PERFORMANCE WORK

STATEMENT

UNIT UNIT PRICE ESTIMATED AMOUNT

1001AJ 3 Each

OPTION ROUTINE PM WHEELABRATOR (ASSET #S0233)

FFP

PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE

WHEELABRATOR BLAST BOOTH AND DUST COLLECTOR (ASSET #

S0233) IN ACCORDANCE WITH APPENDIX J OF THE PERFORMANCE

WORK STATEMENT

UNIT UNIT PRICE ESTIMATED AMOUNT

1001AK 3 Each

OPTION ROUTINE PM WHEELABRATOR (ASSET#S1944)

FFP

PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE

WHEELABRATOR BLAST BOOTH AND DUST COLLECTOR (ASSET #

S1944) IN ACCORDANCE WITH APPENDIX K OF THE PERFORMANCE

WORK STATEMENT

UNIT UNIT PRICE ESTIMATED AMOUNT

1001AL 3 Each

OPTION ROUTINE PM CLEMCO (ASSET#R6094)

FFP

PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE CLEMCO

BLAST BOOTH AND DUST COLLECTOR (ASSET # R6094) IN

ACCORDANCE WITH APPENDIX L OF THE PERFORMANCE WORK

STATEMENT

UNIT UNIT PRICE ESTIMATED AMOUNT

1001AM 3 Each

OPTION ROUTINE PM CLEMCO (ASSET#R6185)

FFP

PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE CLEMCO

BLAST BOOTH AND DUST COLLECTOR (ASSET # R6185) IN

ACCORDANCE WITH APPENDIX M OF THE PERFORMANCE WORK

STATEMENT

UNIT UNIT PRICE ESTIMATED AMOUNT

1001AN 3 Each

OPTION ROUTINE PM VIKING TUNNEL (ASSET#T3165)

FFP

PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE VIKING

TUNNEL BLAST AND DUST COLLECTOR (ASSET # T3165) IN

ACCORDANCE WITH APPENDIX N OF THE PERFORMANCE WORK

STATEMENT

UNIT UNIT PRICE ESTIMATED AMOUNT

1001AP 3 Each

OPTION ROUTINE PM GIBSON TUMBLE (ASSET#U0093)

FFP

PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE GIBSON

TUMBLE BLAST AND DUST COLLECTOR (ASSET # U0093) IN

ACCORDANCE WITH APPENDIX O OF THE PERFORMANCE WORK

STATEMENT

UNIT UNIT PRICE ESTIMATED AMOUNT

1001AQ 3 Each

OPTION ROUTINE PM GOFF ROTARY (ASSET#S2242)

FFP

PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE GOFF

ROTARY BLAST AND DUST COLLECTOR (ASSET # S2242) IN

ACCORDANCE WITH APPENDIX P OF THE PERFORMANCE WORK

STATEMENT

UNIT UNIT PRICE ESTIMATED AMOUNT

1002 Each

OPTION ANNUAL PREVENTIVE MAINTENANCE (PM)

FFP

PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON BLAST

BOOTHS LISTED IN APPENDIX A IN ACCORDANCE WITH PARAGRAPH

5.1.2 OF THE PERFORMANCE WORK STATEMENT

UNIT UNIT PRICE ESTIMATED AMOUNT

1002AA 1 Each

OPTION ANNUAL PM PANGBORN 44 (ASSET#D4833)

FFP

PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE

PANGBORN 44 BLAST BOOTH AND DUST COLLECTOR (ASSET # D4833)

IN ACCORDANCE WITH APPENDIX B OF THE PERFORMANCE WORK

STATEMENT

UNIT UNIT PRICE ESTIMATED AMOUNT

1002AB 1 Each

OPTION ANNUAL PM 50 (ASSET#D4834)

FFP

PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE

PANGBORN 50 BLAST BOOTH AND DUST COLLECTOR (ASSET # D4834)

IN ACCORDANCE WITH APPENDIX C OF THE PERFORMANCE WORK

STATEMENT.

UNIT UNIT PRICE ESTIMATED AMOUNT

1002AC 1 Each

OPTION ANNUAL PM ROTOBLAST (ASSET#R4249)

FFP

PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE

ROTOBLAST BARREL (ASSET # R4249) IN ACCORDANCE WITH

APPENDIX D OF THE PERFORMANCE WORK STATEMENT

UNIT UNIT PRICE ESTIMATED AMOUNT

1002AD 1 Each

OPTION ANNUAL PM PANGBORN SPIN. (ASSET#S0446)

FFP

PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE

PANGBORN SPINNER BLAST AND DUST COLLECTOR (ASSET # S0446)

IN ACCORDANCE WITH APPENDIX E OF THE PERFORMANCE WORK

STATEMENT

UNIT UNIT PRICE ESTIMATED AMOUNT

1002AE 1 Each

OPTION ANNUAL PM PANGBORN ROTO. (ASSET #D4819)

FFP

PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE

PANGBORN ROTOARY BLAST BOOTH AND DUST COLLECTOR (ASSET

#D4819 ) IN ACCORDANCE WITH APPENDIX F OF THE PERFORMANCE

WORK.

UNIT UNIT PRICE ESTIMATED AMOUNT

1002AF 1 Each

OPTION ANNUAL PM 60 TUM. (ASSET#S0770)

FFP

PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE GOFF 60

TUMBLE BLAST AND DUST COLLECTOR (ASSET # S0770) IN

ACCORDANCE WITH APPENDIX G OF THE PERFORMANCE WORK

STATEMENT

UNIT UNIT PRICE ESTIMATED AMOUNT

1002AG 1 Each

OPTION ANNUAL PM EMPIRE (ASSET#S3239)

FFP

PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE EMPIRE

BLAST BOOTH AND DUST COLLECTOR (ASSET # S3239) IN

ACCORDANCE WITH APPENDIX H OF THE PERFORMANCE WORK

STATEMENT.

UNIT UNIT PRICE ESTIMATED AMOUNT

1002AH 1 Each

OPTION ANNUAL PM CLEMCO (ASSET#S2455)

FFP

PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE CLEMCO

BLAST BOOTH AND DUST COLLECTOR (ASSET # S2455) IN

ACCORDANCE WITH APPENDIX I OF THE PERFORMANCE WORK

STATEMENT.

UNIT UNIT PRICE ESTIMATED AMOUNT

1002AJ 1 Each

OPTION ANNUAL PM WHEELABRATOR (ASSET #S0233)

FFP

PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE

WHEELABRATOR BLAST BOOTH AND DUST COLLECTOR (ASSET #

S0233) IN ACCORDANCE WITH APPENDIX J OF THE PERFORMANCE

WORK.

UNIT UNIT PRICE ESTIMATED AMOUNT

1002AK 1 Each

OPTION ANNUAL PM WHEELABRATOR (ASSET#S1944)

FFP

PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE

WHEELABRATOR BLAST BOOTH AND DUST COLLECTOR (ASSET #

S1944) IN ACCORDANCE WITH APPENDIX K OF THE PERFORMANCE

WORK. STATEMENT

UNIT UNIT PRICE ESTIMATED AMOUNT

1002AL 1 Each

OPTION ANNUAL PM CLEMCO (ASSET#R6094)

FFP

PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE CLEMCO

BLAST BOOTH AND DUST COLLECTOR (ASSET # R6094) IN

ACCORDANCE WITH APPENDIX L OF THE PERFORMANCE WORK

STATEMENT.

UNIT UNIT PRICE ESTIMATED AMOUNT

1002AM 1 Each

OPTION ANNUAL PM CLEMCO (ASSET#R6185)

FFP

ROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE CLEMCO

BLAST BOOTH AND DUST COLLECTOR (ASSET # R6185) IN

ACCORDANCE WITH APPENDIX M OF THE PERFORMANCE WORK

STATEMENT.

UNIT UNIT PRICE ESTIMATED AMOUNT

1002AN 1 Each

OPTION ANNUAL PM VIKING TUNNEL (ASSET#T3165)

FFP

PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE VIKING

TUNNEL BLAST AND DUST COLLECTOR (ASSET # T3165) IN

ACCORDANCE WITH APPENDIX N OF THE PERFORMANCE WORK

STATEMENT

UNIT UNIT PRICE ESTIMATED AMOUNT

1002AP 1 Each

OPTION ANNUAL PM GIBSON TUMBLE (ASSET#U0093)

FFP

PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE GIBSON

TUMBLE BLAST AND DUST COLLECTOR (ASSET # U0093) IN

ACCORDANCE WITH APPENDIX O OF THE PERFORMANCE WORK

STATEMENT.

UNIT UNIT PRICE ESTIMATED AMOUNT

1002AQ 1 Each

OPTION ANNUAL PM GOFF ROTARY (ASSET#S2242)

FFP

PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE GOFF

ROTARY BLAST AND DUST COLLECTOR (ASSET # S2242) IN

ACCORDANCE WITH APPENDIX P OF THE PERFORMANCE WORK

STATEMENT

UNIT UNIT PRICE EST. AMOUNT

1003 600 Hours

OPTION NON-EMERGENCY REPAIR

T&M

PROVIDE ALL LABOR, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM NON-EMERGENCY UNSCHEDULED

SERVICE

ON ALL BLAST EQUIPMENT LISTED IN APPENDIX A IN ACCORDANCE

WITH PARAGRAPH 5.2 OF THE PERFORMANCE WORK STATEMENT.

UNIT UNIT PRICE EST. AMOUNT

1004 360 Hours

OPTION EMERGENCY REPAIR

T&M

PROVIDE ALL LABOR, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM NON-EMERGENCY UNSCHEDULED

SERVICE

ON ALL BLAST EQUIPMENT LISTED IN APPENDIX A IN ACCORDANCE

WITH PARAGRAPH 5.3 OF THE PERFORMANCE WORK STATEMENT.

UNIT UNIT PRICE EST. AMOUNT

1005 1 Lot

OPTION REPAIR RESOLUTION

T&M

OEM TECHNICIAN LABOR, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM UNRESOLVED UNSCHEDULED SERVICE ON

ALL BLAST EQUIPMENT LISTED IN APPENDIX A IN ACCORDANCE

WITH PARAGRAPH 5.4 OF THE PERFORMANCE WORK STATEMENT.

OEM SERVICE RATES SHALL BE BILLED AT ACTUAL COST.

UNIT UNIT PRICE EST. AMOUNT

1006 1 Lot

OPTION PARTS

T&M

PROVIDE ALL MATERIALS AND PARTS NECESSARY TO PERFORM

EMERGENCY, NON-EMERGENCY, OR REPAIRS UNDER REPAIR

RESOLUTION UNSCHEDULED SERVICE ON ALL MACHINES LISTED IN

APPENDIX A IN ACCORDANCE WITH PARAGRAPH 5.5 OF THE

PERFORMANCE WORK STATEMENT

UNIT UNIT PRICE ESTIMATED AMOUNT

1007 1 Each

OPTION CONTRACTOR MANPOWER REPORTING (CMR)

FFP

CONTRACTOR MANPOWER REPORTING IN ACCORDANCE WITH

PARAGRAPH 5.9 OF THE PERFORMANCE WORK STATEMENT

UNIT UNIT PRICE ESTIMATED AMOUNT

2001 Each

OPTION ROUTINE PREVENTIVE MAINTENANCE (PM)

FFP

PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON BLAST

BOOTHS LISTED IN APPENDIX A IN ACCORDANCE WITH PARAGRAPH

5.1.1 OF THE PERFORMANCE WORK STATEMENT (PWS)

UNIT UNIT PRICE ESTIMATED AMOUNT

2001AA 3 Each

OPTION ROUTINE PM PANGBORN 44 (ASSET#D4833)

FFP

PROVIDE ALL LABOR, MATERIALS, PARTS TOOLS, SERVICES AND

EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE

PANGBORN 44 BLAST BOOTH AND DUST COLLECTOR (ASSET # D4833)

IN ACCORDANCE WITH APPENDIX B OF THE PERFORMANCE WORK

STATEMENT

UNIT UNIT PRICE ESTIMATED AMOUNT

2001AB 3 Each

OPTION ROUTINE PM PANGBORN 50 (ASSET#D4834)

FFP

PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE

PANGBORN 50 BLAST BOOTH AND DUST COLLECTOR (ASSET # D4834)

IN ACCORDANCE WITH APPENDIX C OF THE PERFORMANCE WORK

STATEMENT

UNIT UNIT PRICE ESTIMATED AMOUNT

2001AC 3 Each

OPTION ROUTINE PM ROTOBLAST (ASSET#R4249)

FFP

PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE

ROTOBLAST BARREL (ASSET # R4249) IN ACCORDANCE WITH

APPENDIX D OF THE PERFORMANCE WORK STATEMENT

UNIT UNIT PRICE ESTIMATED AMOUNT

2001AD 3 Each

OPTION ROUTINE PM PANGBORN SPIN. (ASSET#S0446)

FFP

PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE

PANGBORN SPINNER BLAST AND DUST COLLECTOR (ASSET # S0446)

IN ACCORDANCE WITH APPENDIX E OF THE PERFORMANCE WORK

STATEMENT

UNIT UNIT PRICE ESTIMATED AMOUNT

2001AE 3 Each

OPTION ROUTINE PM PANGBORN ROTO. (ASSET #D4819)

FFP

PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE

PANGBORN ROTOARY BLAST BOOTH AND DUST COLLECTOR (ASSET

#D4819 ) IN ACCORDANCE WITH APPENDIX F OF THE PERFORMANCE

WORK STATEMENT

UNIT UNIT PRICE ESTIMATED AMOUNT

2001AF 3 Each

OPTION ROUTINE PM 60 TUM. (ASSET#S0770)

FFP

PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE GOFF 60

TUMBLE BLAST AND DUST COLLECTOR (ASSET # S0770) IN

ACCORDANCE WITH APPENDIX G OF THE PERFORMANCE WORK

STATEMENT

UNIT UNIT PRICE ESTIMATED AMOUNT

2001AG 3 Each

OPTION ROUTINE PM EMPIRE (ASSET#S3239)

FFP

PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE EMPIRE

BLAST BOOTH AND DUST COLLECTOR (ASSET # S3239) IN

ACCORDANCE WITH APPENDIX H OF THE PERFORMANCE WORK

STATEMENT

UNIT UNIT PRICE ESTIMATED AMOUNT

2001AH 3 Each

OPTION ROUTINE PM CLEMCO (ASSET#S2455)

FFP

PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE CLEMCO

BLAST BOOTH AND DUST COLLECTOR (ASSET # S2455) IN

ACCORDANCE WITH APPENDIX I OF THE PERFORMANCE WORK

STATEMENT

UNIT UNIT PRICE ESTIMATED AMOUNT

2001AJ 3 Each

OPTION ROUTINE PM WHEELABRATOR (ASSET #S0233)

FFP

PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE

WHEELABRATOR BLAST BOOTH AND DUST COLLECTOR (ASSET #

S0233) IN ACCORDANCE WITH APPENDIX J OF THE PERFORMANCE

WORK STATEMENT

UNIT UNIT PRICE ESTIMATED AMOUNT

2001AK 3 Each

OPTION ROUTINE PM WHEELABRATOR (ASSET#S1944)

FFP

PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE

WHEELABRATOR BLAST BOOTH AND DUST COLLECTOR (ASSET #

S1944) IN ACCORDANCE WITH APPENDIX K OF THE PERFORMANCE

WORK STATEMENT

UNIT UNIT PRICE ESTIMATED AMOUNT

2001AL 3 Each

OPTION ROUTINE PM CLEMCO (ASSET#R6094)

FFP

PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE CLEMCO

BLAST BOOTH AND DUST COLLECTOR (ASSET # R6094) IN

ACCORDANCE WITH APPENDIX L OF THE PERFORMANCE WORK

STATEMENT

UNIT UNIT PRICE ESTIMATED AMOUNT

2001AM 3 Each

OPTION ROUTINE PM CLEMCO (ASSET#R6185)

FFP

PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE CLEMCO

BLAST BOOTH AND DUST COLLECTOR (ASSET # R6185) IN

ACCORDANCE WITH APPENDIX M OF THE PERFORMANCE WORK

STATEMENT

UNIT UNIT PRICE ESTIMATED AMOUNT

2001AN 3 Each

OPTION ROUTINE PM VIKING TUNNEL (ASSET#T3165)

FFP

PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE VIKING

TUNNEL BLAST AND DUST COLLECTOR (ASSET # T3165) IN

ACCORDANCE WITH APPENDIX N OF THE PERFORMANCE WORK

STATEMENT

UNIT UNIT PRICE ESTIMATED AMOUNT

2001AP 3 Each

OPTION ROUTINE PM GIBSON TUMBLE (ASSET#U0093)

FFP

PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE GIBSON

TUMBLE BLAST AND DUST COLLECTOR (ASSET # U0093) IN

ACCORDANCE WITH APPENDIX O OF THE PERFORMANCE WORK

STATEMENT

UNIT UNIT PRICE ESTIMATED AMOUNT

2001AQ 3 Each

OPTION ROUTINE PM GOFF ROTARY (ASSET#S2242)

FFP

PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE GOFF

ROTARY BLAST AND DUST COLLECTOR (ASSET # S2242) IN

ACCORDANCE WITH APPENDIX P OF THE PERFORMANCE WORK

STATEMENT

UNIT UNIT PRICE ESTIMATED AMOUNT

2002 Each

OPTION ANNUAL PREVENTIVE MAINTENANCE (PM)

FFP

PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON BLAST

BOOTHS LISTED IN APPENDIX A IN ACCORDANCE WITH PARAGRAPH

5.1.2 OF THE PERFORMANCE WORK STATEMENT

UNIT UNIT PRICE ESTIMATED AMOUNT

2002AA 1 Each

OPTION ANNUAL PM PANGBORN 44 (ASSET#D4833)

FFP

PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE

PANGBORN 44 BLAST BOOTH AND DUST COLLECTOR (ASSET # D4833)

IN ACCORDANCE WITH APPENDIX B OF THE PERFORMANCE WORK

STATEMENT

UNIT UNIT PRICE ESTIMATED AMOUNT

2002AB 1 Each

OPTION ANNUAL PM 50 (ASSET#D4834)

FFP

PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE

PANGBORN 50 BLAST BOOTH AND DUST COLLECTOR (ASSET # D4834)

IN ACCORDANCE WITH APPENDIX C OF THE PERFORMANCE WORK

STATEMENT.

UNIT UNIT PRICE ESTIMATED AMOUNT

2002AC 1 Each

OPTION ANNUAL PM ROTOBLAST (ASSET#R4249)

FFP

PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE

ROTOBLAST BARREL (ASSET # R4249) IN ACCORDANCE WITH

APPENDIX D OF THE PERFORMANCE WORK STATEMENT

UNIT UNIT PRICE ESTIMATED AMOUNT

2002AD 1 Each

OPTION ANNUAL PM PANGBORN SPIN. (ASSET#S0446)

FFP

PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE

PANGBORN SPINNER BLAST AND DUST COLLECTOR (ASSET # S0446)

IN ACCORDANCE WITH APPENDIX E OF THE PERFORMANCE WORK

STATEMENT

UNIT UNIT PRICE ESTIMATED AMOUNT

2002AE 1 Each

OPTION ANNUAL PM PANGBORN ROTO. (ASSET #D4819)

FFP

PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE

PANGBORN ROTOARY BLAST BOOTH AND DUST COLLECTOR (ASSET

#D4819 ) IN ACCORDANCE WITH APPENDIX F OF THE PERFORMANCE

WORK.

UNIT UNIT PRICE ESTIMATED AMOUNT

2002AF 1 Each

OPTION ANNUAL PM 60 TUM. (ASSET#S0770)

FFP

PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE GOFF 60

TUMBLE BLAST AND DUST COLLECTOR (ASSET # S0770) IN

ACCORDANCE WITH APPENDIX G OF THE PERFORMANCE WORK

STATEMENT

UNIT UNIT PRICE ESTIMATED AMOUNT

2002AG 1 Each

OPTION ANNUAL PM EMPIRE (ASSET#S3239)

FFP

PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE EMPIRE

BLAST BOOTH AND DUST COLLECTOR (ASSET # S3239) IN

ACCORDANCE WITH APPENDIX H OF THE PERFORMANCE WORK

STATEMENT.

UNIT UNIT PRICE ESTIMATED AMOUNT

2002AH 1 Each

OPTION ANNUAL PM CLEMCO (ASSET#S2455)

FFP

PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE CLEMCO

BLAST BOOTH AND DUST COLLECTOR (ASSET # S2455) IN

ACCORDANCE WITH APPENDIX I OF THE PERFORMANCE WORK

STATEMENT.

UNIT UNIT PRICE ESTIMATED AMOUNT

2002AJ 1 Each

OPTION ANNUAL PM WHEELABRATOR (ASSET #S0233)

FFP

PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE

WHEELABRATOR BLAST BOOTH AND DUST COLLECTOR (ASSET #

S0233) IN ACCORDANCE WITH APPENDIX J OF THE PERFORMANCE

WORK.

UNIT UNIT PRICE ESTIMATED AMOUNT

2002AK 1 Each

OPTION ANNUAL PM WHEELABRATOR (ASSET#S1944)

FFP

PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE

WHEELABRATOR BLAST BOOTH AND DUST COLLECTOR (ASSET #

S1944) IN ACCORDANCE WITH APPENDIX K OF THE PERFORMANCE

WORK. STATEMENT

UNIT UNIT PRICE ESTIMATED AMOUNT

2002AL 1 Each

OPTION ANNUAL PM CLEMCO (ASSET#R6094)

FFP

PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE CLEMCO

BLAST BOOTH AND DUST COLLECTOR (ASSET # R6094) IN

ACCORDANCE WITH APPENDIX L OF THE PERFORMANCE WORK

STATEMENT.

UNIT UNIT PRICE ESTIMATED AMOUNT

2002AM 1 Each

OPTION ANNUAL PM CLEMCO (ASSET#R6185)

FFP

ROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE CLEMCO

BLAST BOOTH AND DUST COLLECTOR (ASSET # R6185) IN

ACCORDANCE WITH APPENDIX M OF THE PERFORMANCE WORK

STATEMENT.

UNIT UNIT PRICE ESTIMATED AMOUNT

2002AN 1 Each

OPTION ANNUAL PM VIKING TUNNEL (ASSET#T3165)

FFP

PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE VIKING

TUNNEL BLAST AND DUST COLLECTOR (ASSET # T3165) IN

ACCORDANCE WITH APPENDIX N OF THE PERFORMANCE WORK

STATEMENT

UNIT UNIT PRICE ESTIMATED AMOUNT

2002AP 1 Each

OPTION ANNUAL PM GIBSON TUMBLE (ASSET#U0093)

FFP

PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE GIBSON

TUMBLE BLAST AND DUST COLLECTOR (ASSET # U0093) IN

ACCORDANCE WITH APPENDIX O OF THE PERFORMANCE WORK

STATEMENT.

UNIT UNIT PRICE ESTIMATED AMOUNT

2002AQ 1 Each

OPTION ANNUAL PM GOFF ROTARY (ASSET#S2242)

FFP

PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE GOFF

ROTARY BLAST AND DUST COLLECTOR (ASSET # S2242) IN

ACCORDANCE WITH APPENDIX P OF THE PERFORMANCE WORK

STATEMENT

UNIT UNIT PRICE EST. AMOUNT

2003 600 Hours

OPTION NON-EMERGENCY REPAIR

T&M

PROVIDE ALL LABOR, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM NON-EMERGENCY UNSCHEDULED

SERVICE

ON ALL BLAST EQUIPMENT LISTED IN APPENDIX A IN ACCORDANCE

WITH PARAGRAPH 5.2 OF THE PERFORMANCE WORK STATEMENT.

UNIT UNIT PRICE EST. AMOUNT

2004 360 Hours

OPTION EMERGENCY REPAIR

T&M

PROVIDE ALL LABOR, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM NON-EMERGENCY UNSCHEDULED

SERVICE

ON ALL BLAST EQUIPMENT LISTED IN APPENDIX A IN ACCORDANCE

WITH PARAGRAPH 5.3 OF THE PERFORMANCE WORK STATEMENT.

UNIT UNIT PRICE EST. AMOUNT

2005 1 Lot

OPTION REPAIR RESOLUTION

T&M

OEM TECHNICIAN LABOR, TOOLS, SERVICES AND

EQUIPMENT TO PERFORM UNRESOLVED UNSCHEDULED SERVICE ON

ALL BLAST EQUIPMENT LISTED IN APPENDIX A IN ACCORDANCE

WITH PARAGRAPH 5.4 OF THE PERFORMANCE WORK STATEMENT.

OEM SERVICE RATES SHALL BE BILLED AT ACTUAL COST.

UNIT UNIT PRICE EST. AMOUNT

2006 1 Lot

OPTION PARTS

T&M

PROVIDE ALL MATERIALS AND PARTS NECESSARY TO PERFORM

EMERGENCY, NON-EMERGENCY, OR REPAIRS UNDER REPAIR

RESOLUTION UNSCHEDULED SERVICE ON ALL MACHINES LISTED IN

APPENDIX A IN ACCORDANCE WITH PARAGRAPH 5.5 OF THE

PERFORMANCE WORK STATEMENT

UNIT UNIT PRICE ESTIMATED AMOUNT

2007 1 Each

OPTION CONTRACTOR MANPOWER REPORTING (CMR)

FFP

CONTRACTOR MANPOWER REPORTING IN ACCORDANCE WITH

PARAGRAPH 5.9 OF THE PERFORMANCE WORK STATEMENT

SOLICITATION NOTES

1. System for Award Management (SAM): In accordance with FAR 4.1102, Offerors must be registered in the SAM database in order to be eligible for contract award. No award will be made to an Offeror not registered.

Registration can be accomplished at https://www.sam.gov/portal/public/SAM/. Registration in this database must be kept current.

2. Annual Representations and Certifications: In accordance with FAR 4.1201, Offerors shall complete electronic annual representations and certifications within SAM as part of required registration. Registration in this database must be kept current and can be accessed at https://www.sam.gov/portal/public/SAM/.

3. Questions: Questions regarding this solicitation shall be submitted to the Contracting Officer, in writing, at least 5 calendar days prior to the closing date. Questions submitted after this time will be answered at the discretion of the Contracting Officer. The Contracting Officer for this action is Kristin Robson, email:

Kristin.e.robson.civ@mail.mil. Copy Contract Specialist Shaun Leatherman, email:

shaun.r.leatherman.civ@mail.mil

4. Award without Discussions: The Government intends to award without discussions; therefore Offerors should submit their best prices in their initial offer. If FAR Provision 52.212-2, Evaluation-Commercial Items, is included, Offerors must submit all information requested therein in order for the Government to determine technical acceptability.

5. Amendments: The Offeror shall submit to the Contracting Officer signed copies of all amendments issued to this solicitation. Failure to comply may cause your proposal to be rejected.

6. Payment: Payment for this action will be made by Electronic Funds Transfer (EFT) through the Defense Finance and Accounting Services (DFAS) utilizing Wide Area Work Flow (WAWF). See 252.232-7006 for more information.

7. Period for Acceptance of Offers. The Offeror agrees to hold the prices in its offer firm for 60 calendar days from the date specified for receipt of offers.

8. Type of Contract: The type of contract resulting from this solicitation is specified in FAR Provision 52.216-1, Type of Contract. For Indefinite Delivery/Indefinite Quantity (IDIQ) or Requirements contracts all quantities are estimated and individual task orders shall be issued citing specific quantities and delivery dates. Payment will be made on actual services performed.

9. Proposals: Proposals shall be signed by an authorized individual in accordance with FAR 4.102, Contractor’s Signature. Failure to comply may cause your proposal to be rejected. Offerors should mark each page of their proposal as "Proprietary Information" if they want it treated as Proprietary Information under the Procurement Integrity Act.

10. FOB Destination: Unless otherwise stated in the solicitation, Offerors shall provide FOB Destination prices.

11. Contact Information : A Contracting Officer’s Representative will be appointed at the time of award. The successful Offeror will be furnished the COR name and contact information at the time of contract award.

12. Wage Determination: Wage Determination number 2015-2249 Revision 2 dated 22 December 2015 and is hereby incorporated. Wage Determination can be viewed at http://www.wdol.gov.

13. Period of Performance: The period of performance indicated in the PWS and solicitation are estimated and will be adjusted to coincide with the actual award date.

14. Site Visit: A site visit is scheduled for Thursday, February 9, 2017 at 9:00 AM Eastern Daylight Time. Site visit attendance is urged but is not mandatory; however, failure to attend a site visit shall not be a reason for price increases to the contract after contract award. Submit the names of all attendees to Shaun R. Leatherman at shaun.r.leatherman.civ@mail.mil no later than Friday, February 3, 2017 at 12:00 PM Eastern Daylight Time. All attendees will meet at Building 2S, Directorate of Contracting, 1 Overcash Ave., Letterkenny Army Depot, Chambersburg, PA. Offerors are required to obtain a visitor’s pass from the Badge Office (Bldg. 2 South, located beside the Contracting Office) prior to arriving at the Contracting Office. Please allow at least 45 minutes for this process. You must provide a current picture identification, vehicle registration and proof of insurance to obtain a pass. The documentation you receive with your vistor pass must remain with you during the site visit and returned to the gate guards after release of the site visit, prior to departure of the depot. **NOTE: FOR THIS SITE VISIT, PLEASE WEAR STEEL TOED SHOES, HEARING PROTECTION AND SAFETY GLASSES, as you will be in an industrial area the entire time of the site visit.

PERFORMANCE WORK STATEMENT

PERFORMANCE WORK STATEMENT (PWS)

FOR

Blast Equipment Maintenance Services

1.0 General:

1.1 Scope: The contractor shall provide all personnel, equipment, tools, materials, supervision, quality control and other items and non-personal services necessary to perform emergency repairs, non-emergency repairs, calibrations, and Preventive Maintenance (PM) services as defined in this PWS, except as specified in Paragraph 3.0 as Government Furnished. The contractor shall perform to the standards in this contract.

1.2 Background: The industrial blast equipment (listed in Appendix A) support all of the programs at Letterkenny Army Depot (LEAD). When these machines breakdown, long downtimes impact the ability of LEAD to meet production and delivery schedules of these programs. LEAD is requesting a service contract to ensure this equipment is repaired and operational in the shortest amount of time to reduce the impact on production and delivery schedule.

1.3 Period of Performance (PoP): The Period of Performance shall be one Base Year of 12 months and two 12-month option years. The Period of Performance reads as follows:

1.3.1 Base Year: 21 March 2017 to 20 March 2018

1.3.2 Option Year One: 21 March 2018 to 20 March 2019

1.3.3 Option Year Two: 21 March 2019 to 20 March 2020

1.4 General Information:

1.4.1 Quality Assurance (QA): The Government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and acceptable quality level(s) (defect rate(s)).

1.4.2 Recognized Holidays: The following are recognized US holidays. The contractor shall not perform services on these days:

1.4.2.1 New Year’s Day: January 1st

1.4.2.2 Martin Luther King, Jr.’s Birthday: Third Monday in January

1.4.2.3 President’s Day: Third Monday in February

1.4.2.4 Memorial Day: Last Monday in May

1.4.2.5 Independence Day: July 4th

1.4.2.6 Labor Day: First Monday in September

1.4.2.7 Columbus Day: First Monday in October

1.4.2.8 Veteran’s Day: November 11th

1.4.2.9 Thanksgiving Day: Third Thursday in November

1.4.2.10 Christmas Day: Third Thursday in December

1.4.3 Place and Performance of Services: The contractor shall provide services between the hours of 0600 and 1630 on Monday through Friday), except on recognized US holidays or when the Government facility/installation is closed due to local or national emergencies, administrative closings, or similar Government-directed facility/installation closings. Performance shall be at building 370, 350, 57, 37, or any other facility where blast equipment listed in Appendix A is installed at LEAD. The contractor shall at all times maintain an adequate work force for the uninterrupted performance of all tasks defined within this PWS when the Government facility/installation is not closed for the above reasons. When hiring personnel, the contractor shall keep in mind that the stability and continuity of the work force are essential.

1.4.4 Security Requirements: Contractor and all associated sub-contractor’s employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce shall comply with all personal identity verification requirements as directed by DOD, HQDA and/or local policy. Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.

1.4.4.1 Physical Security: The contractor shall safeguard all Government property provided for contractor use. At the close of each work period, Government facilities, equipment and materials shall be secured.

1.4.4.2 AT Level 1 Awareness Training: All contractor employees, to included subcontractor employees, requiring access to Army Installations, facilities, and controlled access areas shall complete AT Level 1 awareness training within 30 calendar days after contract start date and within 30 calendar days of new employees commencing performance. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within 15 calendar days after completion of training. AT level 1 awareness training is available on the Letterkenny Army Depot homepage – www.lead.army.mil.

1.4.4.3 iWATCH Training: The contractor and all associated sub-contractors with an area of performance within an Army-controlled installation, facilities or area shall brief all employees on the local iWATCH program. This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR or contracting officer. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance. The contractor shall report completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within 15 calendar days after completion of training. iWATCH training is available on the Letterkenny Army Depot homepage – www.lead.army.mil.

1.4.4.4 OPSEC Training: Per AR 530-1, Operations Security, new contractor employees and associated sub-contractor employees shall complete Level I OPSEC training within 30 calendar days of their reporting for duty and annually thereafter. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within 15 calendar days after completion of training. Level 1 OPSEC training is available on the Letterkenny Army Depot homepage – www.lead.army.mil.

1.4.5 Special Qualifications: The contractor shall ensure that all personnel and sub-contractor personnel performing under this contract are fully trained, licensed, and qualified to perform maintenance on the equipment listed in this contract. The contractor shall be responsible for obtaining any and all permits, certifications and/or licensures required to perform the services listed in this PWS.

1.4.6 Safety: The Contractor shall be comply with all applicable federal (OSHA), state, local and Letterkenny rules, regulations, and standards that pertain to safety. Contractor personnel shall be equipped with the appropriate protective safety equipment (e.g. respirator, clothing, foot protection, hearing and eye protection, etc.) before conducting maintenance on any blast equipment. Safety equipment and procedures shall adhere to LEAD Safety Specifications as well as OSHA, NIOSH and ANSI recommendations/standards (See Section 6.0: Applicable Documents). All blast equipment shall be considered by the Contractor as contaminated with cadmium, lead, chromium or other hazardous materials. Contractor personnel shall use proper hygiene practices when in hazardous areas and wear protective equipment at all times and shall be responsible for the supply, cleaning, and maintenance of their own protective equipment. The contractor shall be responsible for training their employees on all safety regulations and procedures which are applicable to the maintenance of blast equipment as well as providing a pre-work brief to all Contractor personnel prior to them performing any work on Letterkenny Army Depot. The pre-work brief must cover both OSHA and Letterkenny regulations, particularly those listed under Chapter 26, LEAD Reg. 385-1 (see Section 6.2).

1.4.6.1 Job Safety Analysis and Safety Plan: The contractor shall…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .