SOL_W911N2-17-R-0018.pdf
PDF 676 KB Posted
- Attached to
- BLAST BOOTH MAINTENANCE
- Solicitation number
- W911N2-17-R-0018
About this file
Solicitation
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SOL_AMENDMENT_W911N2-17-R-0018-0003.pdf | ||
| SOL_AMENDMENT_W911N2-17-R-0018-0002.pdf | ||
| SOL_AMENDMENT_W911N2-17-R-0018-0001.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W911N2-17-R-0018 27-Jan-2017
b. TELEPHONE NUMBER
717-267-5536
8. OFFER DUE DATE/LOCAL TIME
10:00 AM 27 Feb 2017
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA X ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W911N29. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
SHAUN R. LEATHERMAN
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
1 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.X
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
A5M20051980066
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESSX
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
LETTERKENNY ARMY DEPOT
LETTERKENNY CONTRACTING OFFICE - ACC
1 OVERCASH AVENUE, ATTN: CCAM-ALK, BLDG 2S
CHAMBERSBURG PA 17201-4150
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE W91FVA 16. ADMINISTERED BY
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
DIRECTORATE OF INDUSTRIAL OPERATIONS
JAMES MANJONE
LETTERKENNY ARMY DEPOT, BUILDING 389
CHAMBERSBURG PA 17201
TEL: 717-267-9534 FAX:
717-2679834FAX:
TEL: SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$7,500,000
NAICS:
811310
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF187
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
W911N2-17-R-0018
Section SF 1449 - CONTINUATION SHEET
ITEM NO SUPPLIES/SERVICES ESTIMATED
QUANTITY
UNIT UNIT PRICE ESTIMATED AMOUNT
0001 Each
ROUTINE PREVENTIVE MAINTENANCE (PM)
FFP
PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON BLAST
BOOTHS LISTED IN APPENDIX A IN ACCORDANCE WITH PARAGRAPH
5.1.1 OF THE PERFORMANCE WORK STATEMENT (PWS)
FOB: Destination
PURCHASE REQUEST NUMBER: A5M20051980066
ESTIMATED
NET AMT
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AA 3 Each
ROUTINE PM PANGBORN 44 (ASSET#D4833)
FFP
PROVIDE ALL LABOR, MATERIALS, PARTS TOOLS, SERVICES AND
EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE
PANGBORN 44 BLAST BOOTH AND DUST COLLECTOR (ASSET # D4833)
IN ACCORDANCE WITH APPENDIX B OF THE PERFORMANCE WORK
STATEMENT
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AB 3 Each
ROUTINE PM PANGBORN 50 (ASSET#D4834)
FFP
PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE
PANGBORN 50 BLAST BOOTH AND DUST COLLECTOR (ASSET # D4834)
IN ACCORDANCE WITH APPENDIX C OF THE PERFORMANCE WORK
STATEMENT
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AC 3 Each
ROUTINE PM ROTOBLAST (ASSET#R4249)
FFP
PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE
ROTOBLAST BARREL (ASSET # R4249) IN ACCORDANCE WITH
APPENDIX D OF THE PERFORMANCE WORK STATEMENT
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AD 3 Each
ROUTINE PM PANGBORN SPIN. (ASSET#S0446)
FFP
PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE
PANGBORN SPINNER BLAST AND DUST COLLECTOR (ASSET # S0446)
IN ACCORDANCE WITH APPENDIX E OF THE PERFORMANCE WORK
STATEMENT
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AE 3 Each
ROUTINE PM PANGBORN ROTO. (ASSET #D4819)
FFP
PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE
PANGBORN ROTOARY BLAST BOOTH AND DUST COLLECTOR (ASSET
#D4819 ) IN ACCORDANCE WITH APPENDIX F OF THE PERFORMANCE
WORK STATEMENT
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AF 3 Each
ROUTINE PM GOFF 60 TUM. (ASSET#S0770)
FFP
PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE GOFF 60
TUMBLE BLAST AND DUST COLLECTOR (ASSET # S0770) IN
ACCORDANCE WITH APPENDIX G OF THE PERFORMANCE WORK
STATEMENT
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AG 3 Each
ROUTINE PM EMPIRE (ASSET#S3239)
FFP
PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE EMPIRE
BLAST BOOTH AND DUST COLLECTOR (ASSET # S3239) IN
ACCORDANCE WITH APPENDIX H OF THE PERFORMANCE WORK
STATEMENT
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AH 3 Each
ROUTINE PM CLEMCO (ASSET#S2455)
FFP
PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE CLEMCO
BLAST BOOTH AND DUST COLLECTOR (ASSET # S2455) IN
ACCORDANCE WITH APPENDIX I OF THE PERFORMANCE WORK
STATEMENT
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AJ 3 Each
ROUTINE PM WHEELABRATOR (ASSET #S0233)
FFP
PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE
WHEELABRATOR BLAST BOOTH AND DUST COLLECTOR (ASSET #
S0233) IN ACCORDANCE WITH APPENDIX J OF THE PERFORMANCE
WORK STATEMENT
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AK 3 Each
ROUTINE PM WHEELABRATOR (ASSET#S1944)
FFP
PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE
WHEELABRATOR BLAST BOOTH AND DUST COLLECTOR (ASSET #
S1944) IN ACCORDANCE WITH APPENDIX K OF THE PERFORMANCE
WORK STATEMENT
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AL 3 Each
ROUTINE PM CLEMCO (ASSET#R6094)
FFP
PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE CLEMCO
BLAST BOOTH AND DUST COLLECTOR (ASSET # R6094) IN
ACCORDANCE WITH APPENDIX L OF THE PERFORMANCE WORK
STATEMENT
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AM 3 Each
ROUTINE PM CLEMCO (ASSET#R6185)
FFP
PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE CLEMCO
BLAST BOOTH AND DUST COLLECTOR (ASSET # R6185) IN
ACCORDANCE WITH APPENDIX M OF THE PERFORMANCE WORK
STATEMENT
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AN 3 Each
ROUTINE PM VIKING TUNNEL (ASSET#T3165)
FFP
PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE VIKING
TUNNEL BLAST AND DUST COLLECTOR (ASSET # T3165) IN
ACCORDANCE WITH APPENDIX N OF THE PERFORMANCE WORK
STATEMENT
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AP 3 Each
ROUTINE PM GIBSON TUMBLE (ASSET#U0093)
FFP
PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE GIBSON
TUMBLE BLAST AND DUST COLLECTOR (ASSET # U0093) IN
ACCORDANCE WITH APPENDIX O OF THE PERFORMANCE WORK
STATEMENT
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AQ 3 Each
ROUTINE PM GOFF ROTARY (ASSET#S2242)
FFP
PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE GOFF
ROTARY BLAST AND DUST COLLECTOR (ASSET # S2242) IN
ACCORDANCE WITH APPENDIX P OF THE PERFORMANCE WORK
STATEMENT
UNIT UNIT PRICE ESTIMATED AMOUNT
0002 Each
ANNUAL PREVENTIVE MAINTENANCE (PM)
FFP
PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON BLAST
BOOTHS LISTED IN APPENDIX A IN ACCORDANCE WITH PARAGRAPH
5.1.2 OF THE PERFORMANCE WORK STATEMENT
UNIT UNIT PRICE ESTIMATED AMOUNT
0002AA 1 Each
ANNUAL PM PANGBORN 44 (ASSET#D4833)
FFP
PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE
PANGBORN 44 BLAST BOOTH AND DUST COLLECTOR (ASSET # D4833)
IN ACCORDANCE WITH APPENDIX B OF THE PERFORMANCE WORK
STATEMENT
UNIT UNIT PRICE ESTIMATED AMOUNT
0002AB 1 Each
ANNUAL PM 50 (ASSET#D4834)
FFP
PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE
PANGBORN 50 BLAST BOOTH AND DUST COLLECTOR (ASSET # D4834)
IN ACCORDANCE WITH APPENDIX C OF THE PERFORMANCE WORK
STATEMENT.
UNIT UNIT PRICE ESTIMATED AMOUNT
0002AC 1 Each
ANNUAL PM ROTOBLAST (ASSET#R4249)
FFP
PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE
ROTOBLAST BARREL (ASSET # R4249) IN ACCORDANCE WITH
APPENDIX D OF THE PERFORMANCE WORK STATEMENT
UNIT UNIT PRICE ESTIMATED AMOUNT
0002AD 1 Each
ANNUAL PM PANGBORN SPIN. (ASSET#S0446)
FFP
PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE
PANGBORN SPINNER BLAST AND DUST COLLECTOR (ASSET # S0446)
IN ACCORDANCE WITH APPENDIX E OF THE PERFORMANCE WORK
STATEMENT
UNIT UNIT PRICE ESTIMATED AMOUNT
0002AE 1 Each
ANNUAL PM PANGBORN ROTO. (ASSET #D4819)
FFP
PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE
PANGBORN ROTOARY BLAST BOOTH AND DUST COLLECTOR (ASSET
#D4819 ) IN ACCORDANCE WITH APPENDIX F OF THE PERFORMANCE
WORK.
UNIT UNIT PRICE ESTIMATED AMOUNT
0002AF 1 Each
ANNUAL PM 60 TUM. (ASSET#S0770)
FFP
PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE GOFF 60
TUMBLE BLAST AND DUST COLLECTOR (ASSET # S0770) IN
ACCORDANCE WITH APPENDIX G OF THE PERFORMANCE WORK
STATEMENT
UNIT UNIT PRICE ESTIMATED AMOUNT
0002AG 1 Each
ANNUAL PM EMPIRE (ASSET#S3239)
FFP
PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE EMPIRE
BLAST BOOTH AND DUST COLLECTOR (ASSET # S3239) IN
ACCORDANCE WITH APPENDIX H OF THE PERFORMANCE WORK
STATEMENT.
UNIT UNIT PRICE ESTIMATED AMOUNT
0002AH 1 Each
ANNUAL PM CLEMCO (ASSET#S2455)
FFP
PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE CLEMCO
BLAST BOOTH AND DUST COLLECTOR (ASSET # S2455) IN
ACCORDANCE WITH APPENDIX I OF THE PERFORMANCE WORK
STATEMENT.
UNIT UNIT PRICE ESTIMATED AMOUNT
0002AJ 1 Each
ANNUAL PM WHEELABRATOR (ASSET #S0233)
FFP
PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE
WHEELABRATOR BLAST BOOTH AND DUST COLLECTOR (ASSET #
S0233) IN ACCORDANCE WITH APPENDIX J OF THE PERFORMANCE
WORK.
UNIT UNIT PRICE ESTIMATED AMOUNT
0002AK 1 Each
ANNUAL PM WHEELABRATOR (ASSET#S1944)
FFP
PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE
WHEELABRATOR BLAST BOOTH AND DUST COLLECTOR (ASSET #
S1944) IN ACCORDANCE WITH APPENDIX K OF THE PERFORMANCE
WORK. STATEMENT
UNIT UNIT PRICE ESTIMATED AMOUNT
0002AL 1 Each
ANNUAL PM CLEMCO (ASSET#R6094)
FFP
PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE CLEMCO
BLAST BOOTH AND DUST COLLECTOR (ASSET # R6094) IN
ACCORDANCE WITH APPENDIX L OF THE PERFORMANCE WORK
STATEMENT.
UNIT UNIT PRICE ESTIMATED AMOUNT
0002AM 1 Each
ANNUAL PM CLEMCO (ASSET#R6185)
FFP
ROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE CLEMCO
BLAST BOOTH AND DUST COLLECTOR (ASSET # R6185) IN
ACCORDANCE WITH APPENDIX M OF THE PERFORMANCE WORK
STATEMENT.
UNIT UNIT PRICE ESTIMATED AMOUNT
0002AN 1 Each
ANNUAL PM VIKING TUNNEL (ASSET#T3165)
FFP
PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE VIKING
TUNNEL BLAST AND DUST COLLECTOR (ASSET # T3165) IN
ACCORDANCE WITH APPENDIX N OF THE PERFORMANCE WORK
STATEMENT
UNIT UNIT PRICE ESTIMATED AMOUNT
0002AP 1 Each
ANNUAL PM GIBSON TUMBLE (ASSET#U0093)
FFP
PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE GIBSON
TUMBLE BLAST AND DUST COLLECTOR (ASSET # U0093) IN
ACCORDANCE WITH APPENDIX O OF THE PERFORMANCE WORK
STATEMENT.
UNIT UNIT PRICE ESTIMATED AMOUNT
0002AQ 1 Each
ANNUAL PM GOFF ROTARY (ASSET#S2242)
FFP
PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE GOFF
ROTARY BLAST AND DUST COLLECTOR (ASSET # S2242) IN
ACCORDANCE WITH APPENDIX P OF THE PERFORMANCE WORK
STATEMENT
ITEM NO SUPPLIES/SERVICES EST.
UNIT UNIT PRICE EST. AMOUNT
0003 600 Hours
NON-EMERGENCY REPAIR
T&M
PROVIDE ALL LABOR, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM NON-EMERGENCY UNSCHEDULED
SERVICE
ON ALL BLAST EQUIPMENT LISTED IN APPENDIX A IN ACCORDANCE
WITH PARAGRAPH 5.2 OF THE PERFORMANCE WORK STATEMENT.
TOT ESTIMATED PRICE
CEILING PRICE
UNIT UNIT PRICE EST. AMOUNT
0004 360 Hours
EMERGENCY REPAIR
T&M
PROVIDE ALL LABOR, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM NON-EMERGENCY UNSCHEDULED
SERVICE
ON ALL BLAST EQUIPMENT LISTED IN APPENDIX A IN ACCORDANCE
WITH PARAGRAPH 5.3 OF THE PERFORMANCE WORK STATEMENT.
UNIT UNIT PRICE EST. AMOUNT
0005 1 Lot
REPAIR RESOLUTION
T&M
OEM TECHNICIAN LABOR, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM UNRESOLVED UNSCHEDULED SERVICE ON
ALL BLAST EQUIPMENT LISTED IN APPENDIX A IN ACCORDANCE
WITH PARAGRAPH 5.4 OF THE PERFORMANCE WORK STATEMENT.
OEM SERVICE RATES SHALL BE BILLED AT ACTUAL COST.
UNIT UNIT PRICE EST. AMOUNT
0006 1 Lot
PARTS
T&M
PROVIDE ALL MATERIALS AND PARTS NECESSARY TO PERFORM
EMERGENCY, NON-EMERGENCY, OR REPAIRS UNDER REPAIR
RESOLUTION UNSCHEDULED SERVICE ON ALL MACHINES LISTED IN
APPENDIX A IN ACCORDANCE WITH PARAGRAPH 5.5 OF THE
PERFORMANCE WORK STATEMENT
UNIT UNIT PRICE ESTIMATED AMOUNT
0007 1 Each
CONTRACTOR MANPOWER REPORTING (CMR)
FFP
CONTRACTOR MANPOWER REPORTING IN ACCORDANCE WITH
PARAGRAPH 5.9 OF THE PERFORMANCE WORK STATEMENT
UNIT UNIT PRICE ESTIMATED AMOUNT
1001 Each
OPTION ROUTINE PREVENTIVE MAINTENANCE (PM)
FFP
PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON BLAST
BOOTHS LISTED IN APPENDIX A IN ACCORDANCE WITH PARAGRAPH
5.1.1 OF THE PERFORMANCE WORK STATEMENT (PWS)
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AA 3 Each
OPTION ROUTINE PM PANGBORN 44 (ASSET#D4833)
FFP
PROVIDE ALL LABOR, MATERIALS, PARTS TOOLS, SERVICES AND
EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE
PANGBORN 44 BLAST BOOTH AND DUST COLLECTOR (ASSET # D4833)
IN ACCORDANCE WITH APPENDIX B OF THE PERFORMANCE WORK
STATEMENT
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AB 3 Each
OPTION ROUTINE PM PANGBORN 50 (ASSET#D4834)
FFP
PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE
PANGBORN 50 BLAST BOOTH AND DUST COLLECTOR (ASSET # D4834)
IN ACCORDANCE WITH APPENDIX C OF THE PERFORMANCE WORK
STATEMENT
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AC 3 Each
OPTION ROUTINE PM ROTOBLAST (ASSET#R4249)
FFP
PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE
ROTOBLAST BARREL (ASSET # R4249) IN ACCORDANCE WITH
APPENDIX D OF THE PERFORMANCE WORK STATEMENT
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AD 3 Each
OPTION ROUTINE PM PANGBORN SPIN. (ASSET#S0446)
FFP
PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE
PANGBORN SPINNER BLAST AND DUST COLLECTOR (ASSET # S0446)
IN ACCORDANCE WITH APPENDIX E OF THE PERFORMANCE WORK
STATEMENT
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AE 3 Each
OPTION ROUTINE PM PANGBORN ROTO. (ASSET #D4819)
FFP
PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE
PANGBORN ROTOARY BLAST BOOTH AND DUST COLLECTOR (ASSET
#D4819 ) IN ACCORDANCE WITH APPENDIX F OF THE PERFORMANCE
WORK STATEMENT
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AF 3 Each
OPTION ROUTINE PM 60 TUM. (ASSET#S0770)
FFP
PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE GOFF 60
TUMBLE BLAST AND DUST COLLECTOR (ASSET # S0770) IN
ACCORDANCE WITH APPENDIX G OF THE PERFORMANCE WORK
STATEMENT
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AG 3 Each
OPTION ROUTINE PM EMPIRE (ASSET#S3239)
FFP
PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE EMPIRE
BLAST BOOTH AND DUST COLLECTOR (ASSET # S3239) IN
ACCORDANCE WITH APPENDIX H OF THE PERFORMANCE WORK
STATEMENT
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AH 3 Each
OPTION ROUTINE PM CLEMCO (ASSET#S2455)
FFP
PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE CLEMCO
BLAST BOOTH AND DUST COLLECTOR (ASSET # S2455) IN
ACCORDANCE WITH APPENDIX I OF THE PERFORMANCE WORK
STATEMENT
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AJ 3 Each
OPTION ROUTINE PM WHEELABRATOR (ASSET #S0233)
FFP
PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE
WHEELABRATOR BLAST BOOTH AND DUST COLLECTOR (ASSET #
S0233) IN ACCORDANCE WITH APPENDIX J OF THE PERFORMANCE
WORK STATEMENT
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AK 3 Each
OPTION ROUTINE PM WHEELABRATOR (ASSET#S1944)
FFP
PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE
WHEELABRATOR BLAST BOOTH AND DUST COLLECTOR (ASSET #
S1944) IN ACCORDANCE WITH APPENDIX K OF THE PERFORMANCE
WORK STATEMENT
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AL 3 Each
OPTION ROUTINE PM CLEMCO (ASSET#R6094)
FFP
PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE CLEMCO
BLAST BOOTH AND DUST COLLECTOR (ASSET # R6094) IN
ACCORDANCE WITH APPENDIX L OF THE PERFORMANCE WORK
STATEMENT
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AM 3 Each
OPTION ROUTINE PM CLEMCO (ASSET#R6185)
FFP
PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE CLEMCO
BLAST BOOTH AND DUST COLLECTOR (ASSET # R6185) IN
ACCORDANCE WITH APPENDIX M OF THE PERFORMANCE WORK
STATEMENT
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AN 3 Each
OPTION ROUTINE PM VIKING TUNNEL (ASSET#T3165)
FFP
PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE VIKING
TUNNEL BLAST AND DUST COLLECTOR (ASSET # T3165) IN
ACCORDANCE WITH APPENDIX N OF THE PERFORMANCE WORK
STATEMENT
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AP 3 Each
OPTION ROUTINE PM GIBSON TUMBLE (ASSET#U0093)
FFP
PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE GIBSON
TUMBLE BLAST AND DUST COLLECTOR (ASSET # U0093) IN
ACCORDANCE WITH APPENDIX O OF THE PERFORMANCE WORK
STATEMENT
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AQ 3 Each
OPTION ROUTINE PM GOFF ROTARY (ASSET#S2242)
FFP
PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE GOFF
ROTARY BLAST AND DUST COLLECTOR (ASSET # S2242) IN
ACCORDANCE WITH APPENDIX P OF THE PERFORMANCE WORK
STATEMENT
UNIT UNIT PRICE ESTIMATED AMOUNT
1002 Each
OPTION ANNUAL PREVENTIVE MAINTENANCE (PM)
FFP
PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON BLAST
BOOTHS LISTED IN APPENDIX A IN ACCORDANCE WITH PARAGRAPH
5.1.2 OF THE PERFORMANCE WORK STATEMENT
UNIT UNIT PRICE ESTIMATED AMOUNT
1002AA 1 Each
OPTION ANNUAL PM PANGBORN 44 (ASSET#D4833)
FFP
PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE
PANGBORN 44 BLAST BOOTH AND DUST COLLECTOR (ASSET # D4833)
IN ACCORDANCE WITH APPENDIX B OF THE PERFORMANCE WORK
STATEMENT
UNIT UNIT PRICE ESTIMATED AMOUNT
1002AB 1 Each
OPTION ANNUAL PM 50 (ASSET#D4834)
FFP
PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE
PANGBORN 50 BLAST BOOTH AND DUST COLLECTOR (ASSET # D4834)
IN ACCORDANCE WITH APPENDIX C OF THE PERFORMANCE WORK
STATEMENT.
UNIT UNIT PRICE ESTIMATED AMOUNT
1002AC 1 Each
OPTION ANNUAL PM ROTOBLAST (ASSET#R4249)
FFP
PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE
ROTOBLAST BARREL (ASSET # R4249) IN ACCORDANCE WITH
APPENDIX D OF THE PERFORMANCE WORK STATEMENT
UNIT UNIT PRICE ESTIMATED AMOUNT
1002AD 1 Each
OPTION ANNUAL PM PANGBORN SPIN. (ASSET#S0446)
FFP
PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE
PANGBORN SPINNER BLAST AND DUST COLLECTOR (ASSET # S0446)
IN ACCORDANCE WITH APPENDIX E OF THE PERFORMANCE WORK
STATEMENT
UNIT UNIT PRICE ESTIMATED AMOUNT
1002AE 1 Each
OPTION ANNUAL PM PANGBORN ROTO. (ASSET #D4819)
FFP
PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE
PANGBORN ROTOARY BLAST BOOTH AND DUST COLLECTOR (ASSET
#D4819 ) IN ACCORDANCE WITH APPENDIX F OF THE PERFORMANCE
WORK.
UNIT UNIT PRICE ESTIMATED AMOUNT
1002AF 1 Each
OPTION ANNUAL PM 60 TUM. (ASSET#S0770)
FFP
PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE GOFF 60
TUMBLE BLAST AND DUST COLLECTOR (ASSET # S0770) IN
ACCORDANCE WITH APPENDIX G OF THE PERFORMANCE WORK
STATEMENT
UNIT UNIT PRICE ESTIMATED AMOUNT
1002AG 1 Each
OPTION ANNUAL PM EMPIRE (ASSET#S3239)
FFP
PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE EMPIRE
BLAST BOOTH AND DUST COLLECTOR (ASSET # S3239) IN
ACCORDANCE WITH APPENDIX H OF THE PERFORMANCE WORK
STATEMENT.
UNIT UNIT PRICE ESTIMATED AMOUNT
1002AH 1 Each
OPTION ANNUAL PM CLEMCO (ASSET#S2455)
FFP
PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE CLEMCO
BLAST BOOTH AND DUST COLLECTOR (ASSET # S2455) IN
ACCORDANCE WITH APPENDIX I OF THE PERFORMANCE WORK
STATEMENT.
UNIT UNIT PRICE ESTIMATED AMOUNT
1002AJ 1 Each
OPTION ANNUAL PM WHEELABRATOR (ASSET #S0233)
FFP
PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE
WHEELABRATOR BLAST BOOTH AND DUST COLLECTOR (ASSET #
S0233) IN ACCORDANCE WITH APPENDIX J OF THE PERFORMANCE
WORK.
UNIT UNIT PRICE ESTIMATED AMOUNT
1002AK 1 Each
OPTION ANNUAL PM WHEELABRATOR (ASSET#S1944)
FFP
PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE
WHEELABRATOR BLAST BOOTH AND DUST COLLECTOR (ASSET #
S1944) IN ACCORDANCE WITH APPENDIX K OF THE PERFORMANCE
WORK. STATEMENT
UNIT UNIT PRICE ESTIMATED AMOUNT
1002AL 1 Each
OPTION ANNUAL PM CLEMCO (ASSET#R6094)
FFP
PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE CLEMCO
BLAST BOOTH AND DUST COLLECTOR (ASSET # R6094) IN
ACCORDANCE WITH APPENDIX L OF THE PERFORMANCE WORK
STATEMENT.
UNIT UNIT PRICE ESTIMATED AMOUNT
1002AM 1 Each
OPTION ANNUAL PM CLEMCO (ASSET#R6185)
FFP
ROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE CLEMCO
BLAST BOOTH AND DUST COLLECTOR (ASSET # R6185) IN
ACCORDANCE WITH APPENDIX M OF THE PERFORMANCE WORK
STATEMENT.
UNIT UNIT PRICE ESTIMATED AMOUNT
1002AN 1 Each
OPTION ANNUAL PM VIKING TUNNEL (ASSET#T3165)
FFP
PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE VIKING
TUNNEL BLAST AND DUST COLLECTOR (ASSET # T3165) IN
ACCORDANCE WITH APPENDIX N OF THE PERFORMANCE WORK
STATEMENT
UNIT UNIT PRICE ESTIMATED AMOUNT
1002AP 1 Each
OPTION ANNUAL PM GIBSON TUMBLE (ASSET#U0093)
FFP
PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE GIBSON
TUMBLE BLAST AND DUST COLLECTOR (ASSET # U0093) IN
ACCORDANCE WITH APPENDIX O OF THE PERFORMANCE WORK
STATEMENT.
UNIT UNIT PRICE ESTIMATED AMOUNT
1002AQ 1 Each
OPTION ANNUAL PM GOFF ROTARY (ASSET#S2242)
FFP
PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE GOFF
ROTARY BLAST AND DUST COLLECTOR (ASSET # S2242) IN
ACCORDANCE WITH APPENDIX P OF THE PERFORMANCE WORK
STATEMENT
UNIT UNIT PRICE EST. AMOUNT
1003 600 Hours
OPTION NON-EMERGENCY REPAIR
T&M
PROVIDE ALL LABOR, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM NON-EMERGENCY UNSCHEDULED
SERVICE
ON ALL BLAST EQUIPMENT LISTED IN APPENDIX A IN ACCORDANCE
WITH PARAGRAPH 5.2 OF THE PERFORMANCE WORK STATEMENT.
UNIT UNIT PRICE EST. AMOUNT
1004 360 Hours
OPTION EMERGENCY REPAIR
T&M
PROVIDE ALL LABOR, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM NON-EMERGENCY UNSCHEDULED
SERVICE
ON ALL BLAST EQUIPMENT LISTED IN APPENDIX A IN ACCORDANCE
WITH PARAGRAPH 5.3 OF THE PERFORMANCE WORK STATEMENT.
UNIT UNIT PRICE EST. AMOUNT
1005 1 Lot
OPTION REPAIR RESOLUTION
T&M
OEM TECHNICIAN LABOR, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM UNRESOLVED UNSCHEDULED SERVICE ON
ALL BLAST EQUIPMENT LISTED IN APPENDIX A IN ACCORDANCE
WITH PARAGRAPH 5.4 OF THE PERFORMANCE WORK STATEMENT.
OEM SERVICE RATES SHALL BE BILLED AT ACTUAL COST.
UNIT UNIT PRICE EST. AMOUNT
1006 1 Lot
OPTION PARTS
T&M
PROVIDE ALL MATERIALS AND PARTS NECESSARY TO PERFORM
EMERGENCY, NON-EMERGENCY, OR REPAIRS UNDER REPAIR
RESOLUTION UNSCHEDULED SERVICE ON ALL MACHINES LISTED IN
APPENDIX A IN ACCORDANCE WITH PARAGRAPH 5.5 OF THE
PERFORMANCE WORK STATEMENT
UNIT UNIT PRICE ESTIMATED AMOUNT
1007 1 Each
OPTION CONTRACTOR MANPOWER REPORTING (CMR)
FFP
CONTRACTOR MANPOWER REPORTING IN ACCORDANCE WITH
PARAGRAPH 5.9 OF THE PERFORMANCE WORK STATEMENT
UNIT UNIT PRICE ESTIMATED AMOUNT
2001 Each
OPTION ROUTINE PREVENTIVE MAINTENANCE (PM)
FFP
PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON BLAST
BOOTHS LISTED IN APPENDIX A IN ACCORDANCE WITH PARAGRAPH
5.1.1 OF THE PERFORMANCE WORK STATEMENT (PWS)
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AA 3 Each
OPTION ROUTINE PM PANGBORN 44 (ASSET#D4833)
FFP
PROVIDE ALL LABOR, MATERIALS, PARTS TOOLS, SERVICES AND
EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE
PANGBORN 44 BLAST BOOTH AND DUST COLLECTOR (ASSET # D4833)
IN ACCORDANCE WITH APPENDIX B OF THE PERFORMANCE WORK
STATEMENT
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AB 3 Each
OPTION ROUTINE PM PANGBORN 50 (ASSET#D4834)
FFP
PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE
PANGBORN 50 BLAST BOOTH AND DUST COLLECTOR (ASSET # D4834)
IN ACCORDANCE WITH APPENDIX C OF THE PERFORMANCE WORK
STATEMENT
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AC 3 Each
OPTION ROUTINE PM ROTOBLAST (ASSET#R4249)
FFP
PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE
ROTOBLAST BARREL (ASSET # R4249) IN ACCORDANCE WITH
APPENDIX D OF THE PERFORMANCE WORK STATEMENT
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AD 3 Each
OPTION ROUTINE PM PANGBORN SPIN. (ASSET#S0446)
FFP
PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE
PANGBORN SPINNER BLAST AND DUST COLLECTOR (ASSET # S0446)
IN ACCORDANCE WITH APPENDIX E OF THE PERFORMANCE WORK
STATEMENT
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AE 3 Each
OPTION ROUTINE PM PANGBORN ROTO. (ASSET #D4819)
FFP
PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE
PANGBORN ROTOARY BLAST BOOTH AND DUST COLLECTOR (ASSET
#D4819 ) IN ACCORDANCE WITH APPENDIX F OF THE PERFORMANCE
WORK STATEMENT
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AF 3 Each
OPTION ROUTINE PM 60 TUM. (ASSET#S0770)
FFP
PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE GOFF 60
TUMBLE BLAST AND DUST COLLECTOR (ASSET # S0770) IN
ACCORDANCE WITH APPENDIX G OF THE PERFORMANCE WORK
STATEMENT
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AG 3 Each
OPTION ROUTINE PM EMPIRE (ASSET#S3239)
FFP
PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE EMPIRE
BLAST BOOTH AND DUST COLLECTOR (ASSET # S3239) IN
ACCORDANCE WITH APPENDIX H OF THE PERFORMANCE WORK
STATEMENT
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AH 3 Each
OPTION ROUTINE PM CLEMCO (ASSET#S2455)
FFP
PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE CLEMCO
BLAST BOOTH AND DUST COLLECTOR (ASSET # S2455) IN
ACCORDANCE WITH APPENDIX I OF THE PERFORMANCE WORK
STATEMENT
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AJ 3 Each
OPTION ROUTINE PM WHEELABRATOR (ASSET #S0233)
FFP
PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE
WHEELABRATOR BLAST BOOTH AND DUST COLLECTOR (ASSET #
S0233) IN ACCORDANCE WITH APPENDIX J OF THE PERFORMANCE
WORK STATEMENT
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AK 3 Each
OPTION ROUTINE PM WHEELABRATOR (ASSET#S1944)
FFP
PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE
WHEELABRATOR BLAST BOOTH AND DUST COLLECTOR (ASSET #
S1944) IN ACCORDANCE WITH APPENDIX K OF THE PERFORMANCE
WORK STATEMENT
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AL 3 Each
OPTION ROUTINE PM CLEMCO (ASSET#R6094)
FFP
PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE CLEMCO
BLAST BOOTH AND DUST COLLECTOR (ASSET # R6094) IN
ACCORDANCE WITH APPENDIX L OF THE PERFORMANCE WORK
STATEMENT
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AM 3 Each
OPTION ROUTINE PM CLEMCO (ASSET#R6185)
FFP
PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE CLEMCO
BLAST BOOTH AND DUST COLLECTOR (ASSET # R6185) IN
ACCORDANCE WITH APPENDIX M OF THE PERFORMANCE WORK
STATEMENT
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AN 3 Each
OPTION ROUTINE PM VIKING TUNNEL (ASSET#T3165)
FFP
PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE VIKING
TUNNEL BLAST AND DUST COLLECTOR (ASSET # T3165) IN
ACCORDANCE WITH APPENDIX N OF THE PERFORMANCE WORK
STATEMENT
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AP 3 Each
OPTION ROUTINE PM GIBSON TUMBLE (ASSET#U0093)
FFP
PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE GIBSON
TUMBLE BLAST AND DUST COLLECTOR (ASSET # U0093) IN
ACCORDANCE WITH APPENDIX O OF THE PERFORMANCE WORK
STATEMENT
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AQ 3 Each
OPTION ROUTINE PM GOFF ROTARY (ASSET#S2242)
FFP
PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE GOFF
ROTARY BLAST AND DUST COLLECTOR (ASSET # S2242) IN
ACCORDANCE WITH APPENDIX P OF THE PERFORMANCE WORK
STATEMENT
UNIT UNIT PRICE ESTIMATED AMOUNT
2002 Each
OPTION ANNUAL PREVENTIVE MAINTENANCE (PM)
FFP
PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON BLAST
BOOTHS LISTED IN APPENDIX A IN ACCORDANCE WITH PARAGRAPH
5.1.2 OF THE PERFORMANCE WORK STATEMENT
UNIT UNIT PRICE ESTIMATED AMOUNT
2002AA 1 Each
OPTION ANNUAL PM PANGBORN 44 (ASSET#D4833)
FFP
PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE
PANGBORN 44 BLAST BOOTH AND DUST COLLECTOR (ASSET # D4833)
IN ACCORDANCE WITH APPENDIX B OF THE PERFORMANCE WORK
STATEMENT
UNIT UNIT PRICE ESTIMATED AMOUNT
2002AB 1 Each
OPTION ANNUAL PM 50 (ASSET#D4834)
FFP
PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE
PANGBORN 50 BLAST BOOTH AND DUST COLLECTOR (ASSET # D4834)
IN ACCORDANCE WITH APPENDIX C OF THE PERFORMANCE WORK
STATEMENT.
UNIT UNIT PRICE ESTIMATED AMOUNT
2002AC 1 Each
OPTION ANNUAL PM ROTOBLAST (ASSET#R4249)
FFP
PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE
ROTOBLAST BARREL (ASSET # R4249) IN ACCORDANCE WITH
APPENDIX D OF THE PERFORMANCE WORK STATEMENT
UNIT UNIT PRICE ESTIMATED AMOUNT
2002AD 1 Each
OPTION ANNUAL PM PANGBORN SPIN. (ASSET#S0446)
FFP
PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE
PANGBORN SPINNER BLAST AND DUST COLLECTOR (ASSET # S0446)
IN ACCORDANCE WITH APPENDIX E OF THE PERFORMANCE WORK
STATEMENT
UNIT UNIT PRICE ESTIMATED AMOUNT
2002AE 1 Each
OPTION ANNUAL PM PANGBORN ROTO. (ASSET #D4819)
FFP
PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE
PANGBORN ROTOARY BLAST BOOTH AND DUST COLLECTOR (ASSET
#D4819 ) IN ACCORDANCE WITH APPENDIX F OF THE PERFORMANCE
WORK.
UNIT UNIT PRICE ESTIMATED AMOUNT
2002AF 1 Each
OPTION ANNUAL PM 60 TUM. (ASSET#S0770)
FFP
PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE GOFF 60
TUMBLE BLAST AND DUST COLLECTOR (ASSET # S0770) IN
ACCORDANCE WITH APPENDIX G OF THE PERFORMANCE WORK
STATEMENT
UNIT UNIT PRICE ESTIMATED AMOUNT
2002AG 1 Each
OPTION ANNUAL PM EMPIRE (ASSET#S3239)
FFP
PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE EMPIRE
BLAST BOOTH AND DUST COLLECTOR (ASSET # S3239) IN
ACCORDANCE WITH APPENDIX H OF THE PERFORMANCE WORK
STATEMENT.
UNIT UNIT PRICE ESTIMATED AMOUNT
2002AH 1 Each
OPTION ANNUAL PM CLEMCO (ASSET#S2455)
FFP
PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE CLEMCO
BLAST BOOTH AND DUST COLLECTOR (ASSET # S2455) IN
ACCORDANCE WITH APPENDIX I OF THE PERFORMANCE WORK
STATEMENT.
UNIT UNIT PRICE ESTIMATED AMOUNT
2002AJ 1 Each
OPTION ANNUAL PM WHEELABRATOR (ASSET #S0233)
FFP
PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE
WHEELABRATOR BLAST BOOTH AND DUST COLLECTOR (ASSET #
S0233) IN ACCORDANCE WITH APPENDIX J OF THE PERFORMANCE
WORK.
UNIT UNIT PRICE ESTIMATED AMOUNT
2002AK 1 Each
OPTION ANNUAL PM WHEELABRATOR (ASSET#S1944)
FFP
PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE
WHEELABRATOR BLAST BOOTH AND DUST COLLECTOR (ASSET #
S1944) IN ACCORDANCE WITH APPENDIX K OF THE PERFORMANCE
WORK. STATEMENT
UNIT UNIT PRICE ESTIMATED AMOUNT
2002AL 1 Each
OPTION ANNUAL PM CLEMCO (ASSET#R6094)
FFP
PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE CLEMCO
BLAST BOOTH AND DUST COLLECTOR (ASSET # R6094) IN
ACCORDANCE WITH APPENDIX L OF THE PERFORMANCE WORK
STATEMENT.
UNIT UNIT PRICE ESTIMATED AMOUNT
2002AM 1 Each
OPTION ANNUAL PM CLEMCO (ASSET#R6185)
FFP
ROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE CLEMCO
BLAST BOOTH AND DUST COLLECTOR (ASSET # R6185) IN
ACCORDANCE WITH APPENDIX M OF THE PERFORMANCE WORK
STATEMENT.
UNIT UNIT PRICE ESTIMATED AMOUNT
2002AN 1 Each
OPTION ANNUAL PM VIKING TUNNEL (ASSET#T3165)
FFP
PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE VIKING
TUNNEL BLAST AND DUST COLLECTOR (ASSET # T3165) IN
ACCORDANCE WITH APPENDIX N OF THE PERFORMANCE WORK
STATEMENT
UNIT UNIT PRICE ESTIMATED AMOUNT
2002AP 1 Each
OPTION ANNUAL PM GIBSON TUMBLE (ASSET#U0093)
FFP
PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE GIBSON
TUMBLE BLAST AND DUST COLLECTOR (ASSET # U0093) IN
ACCORDANCE WITH APPENDIX O OF THE PERFORMANCE WORK
STATEMENT.
UNIT UNIT PRICE ESTIMATED AMOUNT
2002AQ 1 Each
OPTION ANNUAL PM GOFF ROTARY (ASSET#S2242)
FFP
PROVIDE ALL LABOR, MATERIAL, PARTS, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM ROUTINE MAINTENANCE ON THE GOFF
ROTARY BLAST AND DUST COLLECTOR (ASSET # S2242) IN
ACCORDANCE WITH APPENDIX P OF THE PERFORMANCE WORK
STATEMENT
UNIT UNIT PRICE EST. AMOUNT
2003 600 Hours
OPTION NON-EMERGENCY REPAIR
T&M
PROVIDE ALL LABOR, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM NON-EMERGENCY UNSCHEDULED
SERVICE
ON ALL BLAST EQUIPMENT LISTED IN APPENDIX A IN ACCORDANCE
WITH PARAGRAPH 5.2 OF THE PERFORMANCE WORK STATEMENT.
UNIT UNIT PRICE EST. AMOUNT
2004 360 Hours
OPTION EMERGENCY REPAIR
T&M
PROVIDE ALL LABOR, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM NON-EMERGENCY UNSCHEDULED
SERVICE
ON ALL BLAST EQUIPMENT LISTED IN APPENDIX A IN ACCORDANCE
WITH PARAGRAPH 5.3 OF THE PERFORMANCE WORK STATEMENT.
UNIT UNIT PRICE EST. AMOUNT
2005 1 Lot
OPTION REPAIR RESOLUTION
T&M
OEM TECHNICIAN LABOR, TOOLS, SERVICES AND
EQUIPMENT TO PERFORM UNRESOLVED UNSCHEDULED SERVICE ON
ALL BLAST EQUIPMENT LISTED IN APPENDIX A IN ACCORDANCE
WITH PARAGRAPH 5.4 OF THE PERFORMANCE WORK STATEMENT.
OEM SERVICE RATES SHALL BE BILLED AT ACTUAL COST.
UNIT UNIT PRICE EST. AMOUNT
2006 1 Lot
OPTION PARTS
T&M
PROVIDE ALL MATERIALS AND PARTS NECESSARY TO PERFORM
EMERGENCY, NON-EMERGENCY, OR REPAIRS UNDER REPAIR
RESOLUTION UNSCHEDULED SERVICE ON ALL MACHINES LISTED IN
APPENDIX A IN ACCORDANCE WITH PARAGRAPH 5.5 OF THE
PERFORMANCE WORK STATEMENT
UNIT UNIT PRICE ESTIMATED AMOUNT
2007 1 Each
OPTION CONTRACTOR MANPOWER REPORTING (CMR)
FFP
CONTRACTOR MANPOWER REPORTING IN ACCORDANCE WITH
PARAGRAPH 5.9 OF THE PERFORMANCE WORK STATEMENT
SOLICITATION NOTES
1. System for Award Management (SAM): In accordance with FAR 4.1102, Offerors must be registered in the SAM database in order to be eligible for contract award. No award will be made to an Offeror not registered.
Registration can be accomplished at https://www.sam.gov/portal/public/SAM/. Registration in this database must be kept current.
2. Annual Representations and Certifications: In accordance with FAR 4.1201, Offerors shall complete electronic annual representations and certifications within SAM as part of required registration. Registration in this database must be kept current and can be accessed at https://www.sam.gov/portal/public/SAM/.
3. Questions: Questions regarding this solicitation shall be submitted to the Contracting Officer, in writing, at least 5 calendar days prior to the closing date. Questions submitted after this time will be answered at the discretion of the Contracting Officer. The Contracting Officer for this action is Kristin Robson, email:
Kristin.e.robson.civ@mail.mil. Copy Contract Specialist Shaun Leatherman, email:
shaun.r.leatherman.civ@mail.mil
4. Award without Discussions: The Government intends to award without discussions; therefore Offerors should submit their best prices in their initial offer. If FAR Provision 52.212-2, Evaluation-Commercial Items, is included, Offerors must submit all information requested therein in order for the Government to determine technical acceptability.
5. Amendments: The Offeror shall submit to the Contracting Officer signed copies of all amendments issued to this solicitation. Failure to comply may cause your proposal to be rejected.
6. Payment: Payment for this action will be made by Electronic Funds Transfer (EFT) through the Defense Finance and Accounting Services (DFAS) utilizing Wide Area Work Flow (WAWF). See 252.232-7006 for more information.
7. Period for Acceptance of Offers. The Offeror agrees to hold the prices in its offer firm for 60 calendar days from the date specified for receipt of offers.
8. Type of Contract: The type of contract resulting from this solicitation is specified in FAR Provision 52.216-1, Type of Contract. For Indefinite Delivery/Indefinite Quantity (IDIQ) or Requirements contracts all quantities are estimated and individual task orders shall be issued citing specific quantities and delivery dates. Payment will be made on actual services performed.
9. Proposals: Proposals shall be signed by an authorized individual in accordance with FAR 4.102, Contractor’s Signature. Failure to comply may cause your proposal to be rejected. Offerors should mark each page of their proposal as "Proprietary Information" if they want it treated as Proprietary Information under the Procurement Integrity Act.
10. FOB Destination: Unless otherwise stated in the solicitation, Offerors shall provide FOB Destination prices.
11. Contact Information : A Contracting Officer’s Representative will be appointed at the time of award. The successful Offeror will be furnished the COR name and contact information at the time of contract award.
12. Wage Determination: Wage Determination number 2015-2249 Revision 2 dated 22 December 2015 and is hereby incorporated. Wage Determination can be viewed at http://www.wdol.gov.
13. Period of Performance: The period of performance indicated in the PWS and solicitation are estimated and will be adjusted to coincide with the actual award date.
14. Site Visit: A site visit is scheduled for Thursday, February 9, 2017 at 9:00 AM Eastern Daylight Time. Site visit attendance is urged but is not mandatory; however, failure to attend a site visit shall not be a reason for price increases to the contract after contract award. Submit the names of all attendees to Shaun R. Leatherman at shaun.r.leatherman.civ@mail.mil no later than Friday, February 3, 2017 at 12:00 PM Eastern Daylight Time. All attendees will meet at Building 2S, Directorate of Contracting, 1 Overcash Ave., Letterkenny Army Depot, Chambersburg, PA. Offerors are required to obtain a visitor’s pass from the Badge Office (Bldg. 2 South, located beside the Contracting Office) prior to arriving at the Contracting Office. Please allow at least 45 minutes for this process. You must provide a current picture identification, vehicle registration and proof of insurance to obtain a pass. The documentation you receive with your vistor pass must remain with you during the site visit and returned to the gate guards after release of the site visit, prior to departure of the depot. **NOTE: FOR THIS SITE VISIT, PLEASE WEAR STEEL TOED SHOES, HEARING PROTECTION AND SAFETY GLASSES, as you will be in an industrial area the entire time of the site visit.
PERFORMANCE WORK STATEMENT
PERFORMANCE WORK STATEMENT (PWS)
FOR
Blast Equipment Maintenance Services
1.0 General:
1.1 Scope: The contractor shall provide all personnel, equipment, tools, materials, supervision, quality control and other items and non-personal services necessary to perform emergency repairs, non-emergency repairs, calibrations, and Preventive Maintenance (PM) services as defined in this PWS, except as specified in Paragraph 3.0 as Government Furnished. The contractor shall perform to the standards in this contract.
1.2 Background: The industrial blast equipment (listed in Appendix A) support all of the programs at Letterkenny Army Depot (LEAD). When these machines breakdown, long downtimes impact the ability of LEAD to meet production and delivery schedules of these programs. LEAD is requesting a service contract to ensure this equipment is repaired and operational in the shortest amount of time to reduce the impact on production and delivery schedule.
1.3 Period of Performance (PoP): The Period of Performance shall be one Base Year of 12 months and two 12-month option years. The Period of Performance reads as follows:
1.3.1 Base Year: 21 March 2017 to 20 March 2018
1.3.2 Option Year One: 21 March 2018 to 20 March 2019
1.3.3 Option Year Two: 21 March 2019 to 20 March 2020
1.4 General Information:
1.4.1 Quality Assurance (QA): The Government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and acceptable quality level(s) (defect rate(s)).
1.4.2 Recognized Holidays: The following are recognized US holidays. The contractor shall not perform services on these days:
1.4.2.1 New Year’s Day: January 1st
1.4.2.2 Martin Luther King, Jr.’s Birthday: Third Monday in January
1.4.2.3 President’s Day: Third Monday in February
1.4.2.4 Memorial Day: Last Monday in May
1.4.2.5 Independence Day: July 4th
1.4.2.6 Labor Day: First Monday in September
1.4.2.7 Columbus Day: First Monday in October
1.4.2.8 Veteran’s Day: November 11th
1.4.2.9 Thanksgiving Day: Third Thursday in November
1.4.2.10 Christmas Day: Third Thursday in December
1.4.3 Place and Performance of Services: The contractor shall provide services between the hours of 0600 and 1630 on Monday through Friday), except on recognized US holidays or when the Government facility/installation is closed due to local or national emergencies, administrative closings, or similar Government-directed facility/installation closings. Performance shall be at building 370, 350, 57, 37, or any other facility where blast equipment listed in Appendix A is installed at LEAD. The contractor shall at all times maintain an adequate work force for the uninterrupted performance of all tasks defined within this PWS when the Government facility/installation is not closed for the above reasons. When hiring personnel, the contractor shall keep in mind that the stability and continuity of the work force are essential.
1.4.4 Security Requirements: Contractor and all associated sub-contractor’s employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce shall comply with all personal identity verification requirements as directed by DOD, HQDA and/or local policy. Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.
1.4.4.1 Physical Security: The contractor shall safeguard all Government property provided for contractor use. At the close of each work period, Government facilities, equipment and materials shall be secured.
1.4.4.2 AT Level 1 Awareness Training: All contractor employees, to included subcontractor employees, requiring access to Army Installations, facilities, and controlled access areas shall complete AT Level 1 awareness training within 30 calendar days after contract start date and within 30 calendar days of new employees commencing performance. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within 15 calendar days after completion of training. AT level 1 awareness training is available on the Letterkenny Army Depot homepage – www.lead.army.mil.
1.4.4.3 iWATCH Training: The contractor and all associated sub-contractors with an area of performance within an Army-controlled installation, facilities or area shall brief all employees on the local iWATCH program. This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR or contracting officer. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance. The contractor shall report completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within 15 calendar days after completion of training. iWATCH training is available on the Letterkenny Army Depot homepage – www.lead.army.mil.
1.4.4.4 OPSEC Training: Per AR 530-1, Operations Security, new contractor employees and associated sub-contractor employees shall complete Level I OPSEC training within 30 calendar days of their reporting for duty and annually thereafter. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within 15 calendar days after completion of training. Level 1 OPSEC training is available on the Letterkenny Army Depot homepage – www.lead.army.mil.
1.4.5 Special Qualifications: The contractor shall ensure that all personnel and sub-contractor personnel performing under this contract are fully trained, licensed, and qualified to perform maintenance on the equipment listed in this contract. The contractor shall be responsible for obtaining any and all permits, certifications and/or licensures required to perform the services listed in this PWS.
1.4.6 Safety: The Contractor shall be comply with all applicable federal (OSHA), state, local and Letterkenny rules, regulations, and standards that pertain to safety. Contractor personnel shall be equipped with the appropriate protective safety equipment (e.g. respirator, clothing, foot protection, hearing and eye protection, etc.) before conducting maintenance on any blast equipment. Safety equipment and procedures shall adhere to LEAD Safety Specifications as well as OSHA, NIOSH and ANSI recommendations/standards (See Section 6.0: Applicable Documents). All blast equipment shall be considered by the Contractor as contaminated with cadmium, lead, chromium or other hazardous materials. Contractor personnel shall use proper hygiene practices when in hazardous areas and wear protective equipment at all times and shall be responsible for the supply, cleaning, and maintenance of their own protective equipment. The contractor shall be responsible for training their employees on all safety regulations and procedures which are applicable to the maintenance of blast equipment as well as providing a pre-work brief to all Contractor personnel prior to them performing any work on Letterkenny Army Depot. The pre-work brief must cover both OSHA and Letterkenny regulations, particularly those listed under Chapter 26, LEAD Reg. 385-1 (see Section 6.2).
1.4.6.1 Job Safety Analysis and Safety Plan: The contractor shall…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .