About this file

This document is an amendment to a solicitation for overhead cranes. The amendment changes the acquisition set aside to a total small business set aside. It extends the response date from June 11 to June 18, 2021. The amendment provides answers to vendor questions to clarify requirements such as periods of performance, design standards, and testing procedures. The solicitation, as amended, is for the procurement and installation of one 70-ton overhead crane and three 30-ton overhead cranes at Anniston Army Depot in Alabama. The North American Industry Classification code is 333923 and the size standard is 1250 employees.

View the file

Other files for this federal contract opportunity

Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

See page 2 for details.

1. CONTRACT ID CODE PAGE OF PAGES

1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 08-Jun-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W911KF21Q0036

X 9B. DATED (SEE ITEM 11)

12-May-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

08-Jun-2021

CODE

ACC-ANAD

ANNISTON ARMY DEPOT

7 FRANKFORD AVENUE, BLDG 35

ANNISTON AL 36201-4199

W911KF 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W911KF21Q0036

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

AMENDMENT NOTES

The following are applicable to this amendment:

1. The Acquisition Set Aside has changed from No Preference / Not Listed to Small Business. The set aside percentage 100.00% has been added.

2. The required response date/time has changed from 11-Jun-2021 04:00 PM to 18-Jun-

2021 04:00 PM.

3. Answers to questions submitted by interested vendors are included in this amendment.

4. An error in the Request for Technical Literature has been revised to reflect to correct anticipated delivery timeframe: Reasonable delivery for this item is 365 days. (The corrected Request for Technical Literature document will be attached with this amendment).

5. All other terms and conditions remain unchanged.

QUESTIONS AND ANSWERS:

Question: 1. Period of performance. The current statement of work states that the cranes should be delivered and installed by 365 after award but the request for technical literature states the items should be delivered in 600 days. What is the required period of performance on this contract?

Answer: 1. This is a typographical error in the technical literature it should be 365 days (Corrected Request for Technical Literature is attached with this amendment).

Question 2. 6.4 and 9.4 Bridge Girders: The paragraph references that the “Bridge shall be designed for all dead and live loads plus a safety factor of 5.” This is a might higher safety factor than CMAA regulations call for and will result in a much heavier and more expensive crane. The design requirement should follow CMAA design guidance for a Class D crane. Which is the correct design requirement for the bridge crane. There is a good change that the building structure is not designed to handle the additional weight of the crane that would be required under the current description.

Answer2. CMAA requirements will supersede.

Question 3. 7.1 references that the wire rope shall be in the English unit of measure and shall not be in the metric unit of measure. The Specified hoist Detroit DFR6053-15 comes with METRIC sized wire rope on it and is not available with English unit of measure wire rope.

Answer 3. The hoist requested is what should be supplied.

Question 4. What are the existing conductor rails and are we supposed to supply the new collector assemblies?

Answer 4. Requiring activity does not have the information on the conductor rails. (They are enclosed). The contractor are to supply the new collector assemblies.

Question 5. 12.2.4 Hoist loss of power references that “both brakes will set”. The specified hoist only has one brake on it. Is there supposed to be an additional brake on this hoist?

Answer 5. The hoist specified it will be tested. The load test is one requiring activity has used many times but may be outdated for this hoist.

Question 6. Who will provide the load test weights for the crane? If the government will not provide steel weights and the contractor is to provide weights is water available?

Answer 6. The contractor will have to provide steel test weights for test. No water is available.

Question 7. 9.2 references 200 ft/min and .5 ft/min low speed. The usual speed different between high and low speed is 10 times the high speed so the low speed would be 20 ft/min. Is this acceptable?

Answer 7. All motions are to be VFD controlled to allow infinite adjustable.

Question 8. Is a backup pushbutton or radio required on these cranes?

Answer 8. No backup required.

Question 9.Are any horns or lights required on these cranes? Are any flood lights required on these cranes?

Answer 9. No flood lights are required but horns and flashing lights are required as CMAA.

Question 10. Can we get a copy of the sign-in sheet from the walk through?

Question 10. The sign-in sheet from the site visit will be provided upon request.

Question 11. 17.0 Are the existing cranes to be disposed of by the government or the contractor?

If it is the contractor are they considered property of the contractor for scrap purposes?

Answer 11. The contractor is only responsible for placing the cranes outside the building.

Question 12. Does the Buy America Act apply to these cranes?

Answer 12. Yes, the Buy America Act applies.

Question 13: Why wasn’t this posted as a small business set aside as there are dozens of qualified small crane manufacturers in the United States?

Answer 13: This decision was based on an erroneous analysis of market research. This amendment changes the procurement type to total small business set-aside.

Question 14: Are there any drawings available on the existing cranes?

Answer 14: No

Question 15: Do you know the rail size the cranes will be running on in each bay?

Answer 15: The rail was replaced approximately 20 years ago. To the requiring activity’s recollection, there is 90-lb. rail in all high bays.

Question 16: What brand and size runway electrification is existing?

Answer 16: It was replaced approximately 15 years ago, but the requiring activity is unsure of the brand and size.

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

SOLICITATION/CONTRACT FORM

The set aside percentage 100.00% has been added.

The required response date/time has changed from 11-Jun-2021 04:00 PM to 18-Jun-2021 04:00 PM.

The Acquisition Set Aside has changed from No Preference / Not Listed to Small Business.

(End of Summary of Changes)