Amend_0001.pdf

PDF 279 KB Posted

Attached to
Brake Rod, Bearings, Traction Motor
Solicitation number
W911KF-17-Q-0062
Issued by

About this file

Extend Date and Time.

View the file

Other files

File Type Posted
17-Q-0062.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE SCHEDULE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

See Page 2.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 8

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 04-Oct-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911KF-17-Q-0062

X 9B. DATED (SEE ITEM 11)

28-Aug-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

04-Oct-2017

CODE

ARMY CONTRACTING COMMAND - WARREN (ANAD)

ANNISTON ARMY DEPOT

7 FRANKFORD AVENUE, BLDG 35

ANNISTON AL 36201-4199

W911KF 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W911KF-17-Q-0062

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

EXTEND DATE AND TIME

1. The purpose of this amendment is to extend the date and time due to no bids received.

2. The date and time will be changed FROM 28 September 2017, 10:00a.m. TO 18 October 2017, 10:00a.m. CST.

3. All of the terms and conditions will remain unchanged.

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

SOLICITATION/CONTRACT FORM

The required response date/time has changed from 28-Sep-2017 10:00 AM to 18-Oct-2017 10:00 AM.

The following have been modified:

SPECIAL PROVISIONS

SPECIAL NOTE: Definition of “small business concern” eligible for award under a small business set-aside, in accordance with 13 CFR 121 as referenced in this solicitation, page___, FAR Clause 52.212- 3(a) Definitions: “How does SBA define ``business concern or concern''? (a) A business concern eligible for assistance from SBA as a small business is a business entity organized for profit, with a place of business located in the United States, and which operates primarily within the United States or which makes a significant contribution to the U.S. economy through payment of taxes or use of American products, materials or labor. (b) A business concern may be in the legal form of an individual proprietorship, partnership, limited liability company, corporation, joint venture, association, trust or cooperative, except that where the form is a joint venture there can be no more than 49 percent participation by foreign business entities in the joint venture. (c) A firm will not be treated as a separate business concern if a substantial portion of its assets and/or liabilities are the same as those of a predecessor entity. In such a case, the annual receipts and employees of the predecessor will be taken into account in determining size.” Offerors must comply with the nonmanufacturer rule as stated in FAR Parts 19.102(f) and 19.502-2(c), and must also comply with FAR Clause 52.219-14, Limitations on Subcontracting (Nov 2011), as follows: “(a) This clause does not apply to the unrestricted portion of a partial set-aside. (b) Applicability. This clause applies only to -- (1) Contracts that have been set aside or reserved for small business concerns or 8(a) concerns; (2) Part or parts of a multiple-award contract that have been set aside for small business concerns or 8(a) concerns; and (3) Orders set aside for small business or 8(a) concerns under multiple-award contracts as described in 8.405-5 and 16.505(b)(2)(i)(F).

(c) By submission of an offer and execution of a contract, the Offeror/ Contractor agrees that in performance of the contract in the case of a contract for- (1) Services (except construction). At least 50 percent of the cost of contract performance incurred for personnel shall be expended for employees of the concern. (2) Supplies (other than procurement from a nonmanufacturer of such supplies). The concern shall perform work for at least 50 percent of the cost of manufacturing the supplies, not including http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/far/08.htm#P273_45070 http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/far/16.htm#P464_78757 the cost of materials. (3) General construction. The concern will perform at least 15 percent of the cost of the contract, not including the cost of materials, with its own employees. (4) Construction by special trade contractors. The concern will perform at least 25 percent of the cost of the contract, not including the cost of materials, with its own employees.” Size standards apply as stated in this solicitation.

SPECIAL NOTE: This procurement is 100% set-aside for competition in accordance with FAR Clause 52.219-14, subcontracting limitations do not apply to procurement from a nonmanufacturer. However, Contractor must comply with FAR Part 19.001, which states, ”Nonmanufacturer Rule” means that a contractor under a small business set-aside or 8(a) contract shall be a small business under the applicable size standard and shall provide either its own product or that of another domestic small business manufacturing or processing concern.”

Note # 1: Please read the statement of work carefully to be sure all materials and documentation are submitted to the contracting officer as required.

Note # 2: As of 10 August 2015, Army Contracting Command – Warren (ACC-WRN) has decommissioned use of the Army Single Face to Industry for the publication of ACC-WRN contracting opportunities.

Federal Business Opportunities, FedBizOpps or FBO, will be the replacement system to provide and facilitate eCommerce capability for ACC-WRN contracting community and industry partners.

Please go to FedBizOpps, www.fbo.gov, to view this solicitation and any related attachments in its entirety.

Unless directed to do otherwise in the solicitation, vendors are required to submit offers, bids, or quotes electronically for this solicitation via the Federal Business Opportunities (FBO) system.

Vendors who continue to submit offers, bids, or quotes electronically via the ASFI Bid Response System on solicitations issued after 10 August 2015, may be deemed non-responsive.

For additional information on FBO Electronic Bid Submissions reference the FBO Vendor Guide - Section

4.3.1 Submitting an Electronic Response.

Note # 3: Contractor must accept Government Smart Pay Visa Credit Card or provide their electronic funds transfer address. Contractors must be registered in the System for Award Management (SAM) database before an award will be issued. Companies should verify their SAM registration to ensure it is valid and current. COMPLETE THE FOLLOWING INFORMATION AND INCLUDE WITH ANY OFFER.

Accept VISA? Yes_____ No_____

If no, EFT address: ________________________

Federal Tax Identification Number: __________________ Dun & Bradstreet Number (DUNS):__________________ CAGE Code: _____________ System for Award Management (SAM) Registration: Yes______ No_______ Expiration Date:__________

Vendor Contact Information: POC____________________________ https://www.fbo.gov/downloads/FBO_Vendor_Guide.pdf

Telephone:_______________________

FAX: ___________________________

Email:___________________________

NOTE # 4: The Contracting Officer will evaluate bids on based on Lowest Price Technically Accepted.

This may result from the Government in making more than one award (multiple awards).

Note # 5: SHIP TO ADDRESS (DGRC):

Defense Nontactical Generator and Rail Equipment Center (DGRC) Attn: Kregg Knight or Rob Rozick 6233 Aspen Avenue, Building 1722 Hill Air Force Base, UT 84056

Note # 6: In addition to other factors, the Contracting Officer will evaluate bids on the basis of advantages or disadvantages to the Government that might result from making more than one award (multiple awards).

Note # 7: Prospective contractors shall complete electronic annual representations and certifications at http://www.sam.gov after registration in the System for Award Management (SAM) database (see DFAR 204.1105). Prospective contractors shall update the representations and certifications submitted to SAM as necessary, but at least annually, to ensure they are kept current, accurate, and complete. The representations and certifications are effective until one year from date of submission or update to SAM.

Note # 8: Safety Practices and Guidelines. The Contractor shall conform to all federal OSHA standards applicable to the work performed and all safety practices and guidelines contained within this Statement of Work. Contractor shall strictly adhere to the contract clause entitled "Accident Prevention", Army Material Command (AMC) Regulation (R) 385-100, Safety and Occupational Health Regulation ANADR 385-1, Engineering Manual (EM) 385-1-1, 29 Code of Federal Regulations (CFR) 1926/1910, other related Department of Transportation (DOT) Regulations (49 CFR), and all local policies. If a contractor employee is observed performing an activity in a manner inconsistent with any of the above cited regulations or is engaged in any activity that is dangerous to life, limb, or government property, the ANAD Safety Representative shall have the authority to notify the employee and/or the contractor’s on-site supervisor of the hazardous activity and require correction of the hazardous activity. This authority does not preclude the Safety Representative from notifying the Contracting Officer’s Representative of the hazardous condition or safety violation in appropriate situations.

If necessary, the ANAD Safety Representative shall have the authority on behalf of the Contracting Officer to require the contractor and/or its employee to stop the hazardous activity until corrective action is taken to eliminate a hazardous condition or safety violation. Said action shall not be considered to be the basis of a claim and shall be at no cost to the Government.

Contractor will notify ANAD Safety Office immediately of Reports of Inspections and/or Notices of Violation or other enforcement actions (including warning letters) received from by local, State, and Federal Regulators in which the violation is attributed to the action of the contractor or its subcontractors while working or providing services on ANAD’s installation. Contractor will provide ANAD with a copy of the Inspection Report, Notice of Violation or other enforcement action, and all supporting documentation.

http://www.sam.gov/

WAWF PROCEDURES

If your order WILL BE PAID BY DFAS (not by credit card) and contains DFARS Clause 252.232-7003, Electronic Submission of Payment Requests, you must submit your invoice through Wide Area Workflow (WAWF). This clause requires invoices for supplies and services purchased by the DoD be submitted via electronic means. The Wide Area Workflow system satisfies this mandatory requirement. WAWF can be accessed on the internet at https://wawf.eb.mil/

Ensure the Electronic Business POCs listed in the System for Award Management (SAM) for your company are the same individuals that will submit invoices through WAWF before using WAWF. The previous ‘Central Contractor Registration (CCR)’ system has been migrated to the System for Award Management (SAM) and accessible at www.sam.gov. For SAM access and navigation issues, follow the instruction provided at “User Guides and Helpful Hints” on SAM Home page.

If your Electronic Business (EB) POCs are correct, contact the WAWF helpdesk at 1-866-618-5988 or by e-mail at cscassig@ogden.disa.mil and ask them to establish a group for your CAGE code. The group administrator will also have to call the WAWF helpdesk to request account activation. Once the group is established and the account is activated, you will be able to create a Combination Invoice/Receiving report (SUPPLIES/MATERIALS) or a 2 in 1 Invoice (SERVICES/EQUIPMENT) using the codes below and instructions available from our contract administrator/buyer.

Questions concerning payment should be directed to the responsible Defense Finance Accounting Services (DFAS). Please have the order number and invoice number ready when calling about payment status.

The accounts payable mailing address can be located in Block 18a of your order. You can easily access payment information using the DFAS web site at http://www.dfas.mil/http://www.dfas.mil. Your purchase order/contract number or invoice will be required to inquire status of your payment. Go to DFAS on the web at: www/dfas.mil/money/vendor.

https://wawf.eb.mil/ http://www.sam.gov/ mailto:cscassig@ogden.disa.mil http://www.dfas.mil/ http://www.dfas.mil/ http://farsite.hill.af.mil/Application%20Data/krems/Local%20Settings/Temporary%20Internet%20Files/OLK563/dfas

THE FOLLOWING CODES WILL BE REQUIRED TO ROUTE YOUR INVOICES AND ADDITIONAL

EMAILS CORRECTLY THROUGH WAWF:

WAWF

Data/CODES needed for Invoice

SUPPLIES/

MATERIALS

(PRs that start with W31G1Y)

SERVICES/

EQUIPMENT

SUPPLIES/

MATERIALS

(PRs DO NOT that start with W31G1Y)

CONSTRUCTION

CAGE CODE SAM Cage code listed in Contractor/Offe ror field of contract

SAM Cage code listed in Contractor/Offe ror field of contract

SAM Cage code listed in Contractor/Offe ror field of contract

SAM Cage code listed in Contractor/Offeror field of contract

ISSUE/ADMIN BY

DODAAC

W911KF W911KF W911KF W911KF

INSPECT BY

DODAAC (If needed)

W31G1Y (Must have inspector code)

W911KF W911KF

(Unless Inspected by

DCMA)

W911KF

SHIP TO

(Supplies/Materials Only)

W911KF NOT

AVAILABLE

W911KF W911KF

ACCEPTOR

(Services/Equipment Only)

NOT

AVAILABLE

W911KF NOT

AVAILABLE

NOT AVAILABLE

Type of Invoice COMBO 2 IN 1 COMBO CONSTRUCTION

Pay DODAAC HQ0303 HQ0303 HQ0303 HQ0303

CONTRACT NUMBER:

DELIVERY ORDER NUMBER (IF APPLICABLE):

EMAIL POINT OF CONTACT LISTING: (Please insert following email addresses for additional email distribution)

CONTRACT ADMINISTRATOR:

CONTRACTING OFFICER:

USER AND/OR INSPECTOR:

ADDITIONAL CONTACTS:

52.0000-4000 DISCLOSURE OF UNIT PRICE INFORMATION

This constitutes notification pursuant to Executive Order 12600, Pre-Disclosure Notification Procedures for Confidential Commercial Information (June 23, 1987), of our intention to release unit prices in response to any request under the Freedom of Information Act, 5 USC 552. Unit price is defined as the contract price per unit or item purchased. We consider any objection to be waived unless the contracting officer is notified of your objection to such posting prior to submission of initial proposals.

52.0000-4204 COVERAGE OF OPEN DELIVERY TRUCKS

All open delivery trucks or other delivery vehicles shall be covered with a tarp or other means to preclude paper or other materials from blowing out along the roadways.

52.0000-4408a INSTALLATION SECURITY FOR DGRC

No unauthorized materials of any type may be brought onto or left unattended on the installation. For this reason the Contractor must have a process in place to receive and store materials and have visibility of the location of those materials at all times while on DGRC-Hill AFB. This includes construction materials, equipment, and miscellaneous items. This visibility/accountability of materials applies to the Contractor, subcontractors, and material suppliers.

Furthermore, all Contractor, subcontractor, and material supplier employees are prohibited from bringing personal belongings of any nature onto the installation if such items are to be left unattended at any time.

The Contractor is also required to have a plan of action for implementing these procedures and must submit that plan to the Contracting Officer upon request. This plan of action must include a provision for informing all employees and subcontractors of these procedures. The plan of action must also address monitoring and procedures the Contractor has in place to ensure compliance with this contractual provision.

Should the Contractor fail to comply with this mandatory contractual provision, the Contractor may be held responsible for all direct and indirect costs incurred by the Government in identifying, securing, segregating, removing, and otherwise properly disposing of improper or abandoned materials/equipment.

52.0000-4905a RECEIVING HOURS—DEFENSE NTG RAIL EQUIPMENT CENTER (DGRC)

a. Receiving hours for deliveries to Building 1701 at Hill Air Force Base:

DAYS PER WEEK HOURS

Monday – Thursday 6:30 a.m. – 4:30 p.m.

b. DGRC will be closed Fridays, Saturdays, Sundays, and Federal Holidays.

c. Details of this order/contract should not be discussed with anyone other than the Contract Administrator whose name and telephone number are shown in the ADMINISTERED BY block of the order/contract. Should you receive any inquiry(ies) from any source other than as indicated above, we would appreciate you contacting us in writing or by telephoning the appropriate administrator at Anniston Army Depot.

d. If the purchase/contract/delivery order number is not noted on the shipping document or marked clearly on the box/package, it will be REJECTED.

52.0000-4922 FOREIGN SUPPLIES

This contract is subject to the Buy American Act (41 U.S.C. 10a-d) and implements Parts 25 of the FAR and DFARS and any restrictions in appropriation acts on the procurement of foreign supplies. The quotation must identify any foreign items to be furnished.

52.0000-4924 COMMERCIAL WARRANTY

The Contractor agrees that the supplies or services furnished under this contract shall be covered by the most favorable commercial warranties the Contractor gives to any customer for such supplies or services and that the rights and remedies provided herein are in addition to and do not limit any rights afforded to the Government by any other clause of this contract.

52.0214-4804 EVALUATION CRITERIA (OCT 1993)

Award will be made to the responsible offeror whose offer, conforming to the solicitation, will be most advantageous to the Government, considering price and price related factors.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .