W911KF-22-Q-0024 Solicitation.pdf
PDF 521 KB Posted
- Attached to
- Laser Welder Repair Federal contract opportunity
- Solicitation number
- W911KF-22-Q-0034
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 0002.pdf | ||
| Amendment 0001.pdf | ||
| W911KF-22-Q-0034 Solicitation.pdf | ||
| 2. Evidence of Authority To Sign Offers.pdf | ||
| 3. SIOAN Form 380-2 Personnel Data Questionnaire.pdf | ||
| 1. Statement of Work.pdf | ||
| 4. Wage Determination 2015-4587.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W911KF22Q0024 29-Mar-2022
b. TELEPHONE NUMBER
256-235-6763
8. OFFER DUE DATE/LOCAL TIME
05:00 PM 12 Apr 2022
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W911KF9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
ELLEN R. BETHEA
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
SEE SCHEDULE
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED ORX
SMALL BUSINESS
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
ACC-ANAD
ANNISTON ARMY DEPOT
7 FRANKFORD AVENUE, BLDG 35
ANNISTON AL 36201-4199
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE W31G1Y 16. ADMINISTERED BY
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
ANNISTON ARMY DEPOT (DPE)
7 FRANKFORD AVENUE BLDG 31
ANNISTON AL 36201
TEL: 256-235-6084 FAX:
256 235-6353FAX:
TEL: 256 235-6231 SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$8,000,000
NAICS:
811310
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF73
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
W911KF22Q0024
Section SF 1449 - CONTINUATION SHEET
NARRATIVES
Narrative 1: ATTACHMENTS. The following documents are incorporated as a part of this solicitation:
1. Statement of Work
2. Evidence of Authority to Sign Offers
3. SIOAN Form 380-2 Personnel Data Questionnaire
4. Wage Determination 2015-4587
Narrative 2: SYSTEM FOR AWARD MANAGEMENT (SAM).
Contractors shall complete the electronic annual representations and certifications within SAM and must be registered in the System for Award Management (SAM) database before responding to a solicitation. After award, companies must ensure that their SAM registration remains valid and current to avoid problems with invoicing and payment. For SAM access and navigation issues, follow the instructions provided at “User Guides and Helpful Hints” on SAM Home page.
Narrative 3: ELECTRONIC SUBMISSION OF OFFERORS.
All responses to this solicitation must be submitted in digitized/electronic format. Paper copy responses shall not be accepted. All solicitation responses must be submitted by email to:
ellen.r.bethea.civ@army.mil.
It is the responsibility of the offeror to confirm receipt and ensure its offer, in its entirety, reaches the Army Contracting Command-Detroit, Anniston Army Depot (ANAD), before the time set for closing of the solicitation. Attachments may be rejected once scanned by our email system and the Contract Specialist does not receive a notification.
Offers submitted using any other means shall not be accepted, unless stated otherwise in the solicitation.
SAM.gov provides industry with a single point of access to all U.S. Army contracting opportunities. The Contracting Opportunities Search feature allows vendors to easily locate opportunities. Vendors must be registered before being able to respond to a solicitation. Before registering, a Data Universal Numbering System (DUNS) Number is required and registration in the SAMS System (www.sam.gov) is required.
This procurement is sole sourced to Heat Treating Services Unlimited, Inc. 1100 Thousand Oaks Blvd, Greenville, SC 29607-5643
“ANY ORGANIZATION WHICH BELIEVES ITSELF TO BE IN POSSESSION OF THESE
CAPABILITIES CAN PROVIDE TO THE CONTRACTING OFFICER WRITTEN EVIDENCE
INCLUDING PERMISSION FROM AFC-HOLCROFT TO PERFORM THESE SERVICES AND MAY
BE CONSIDERED FOR FUTURE PROCUREMENT ACTIONS."
Any clauses or provisions of this solicitation which mention writing, returning, or submission of offer will mean electronic submission as stated in the paragraph above.
Electronic offers must identify the solicitation and the opening/closing date, and include, as a minimum, the following:
a. The applicable SF Form (SF33/SF1449/SF18/SF1442) filled out and signed.
b. All applicable fill-in provisions from the solicitation must be completed.
c. Any other information required by the solicitation.
It is your responsibility to furnish all information requested. We will not confirm information by telephone. If you do not fully respond (such as price, delivery date) to the Request for Quotation, you shall be determined non-responsive.
If you choose to password-protect access to your offer, you must provide the password to ANAD before the opening or closing date. Contact the buyer identified on the cover page of this solicitation to arrange a means of providing the password. Passwords used only for the purpose of write protecting files need not be provided.
Offerors shall make every effort to ensure that their offer is virus-free. Offers (or portions thereof) submitted which DO reflect the presence of a virus, or which are otherwise rendered unreadable by damage in either physical or electronic transit, shall be treated as “unreadable.”
See Federal Acquisition Regulation 14.406 or 15.207(c) for a description of the steps the Government shall take with regard to unreadable offers.
Any bid bond required by this solicitation must be submitted with the offer. Also, the properly completed original bid bond must be furnished to the Army Contracting Command-Detroit, Anniston Army Depot (ANAD), 7 Frankford Ave, Anniston, AL 36201-4199, prior to the opening or closing of the solicitation.
Narrative 4: ADDENDUM TO FAR CLAUSE 52.212-1 The offeror agrees to hold the prices in its offer firm for 90 calendar days from the date specified for receipt of offers.
Narrative 5: PAYMENT.
Contractor must accept Government Smart Pay Credit Card or payment by Defense Finance Accounting Service (DFAS). COMPLETE THE FOLLOWING INFORMATION AND
INCLUDE WITH ANY OFFER.
Payment Method: MasterCard_____ DFAS_____
Vendor Contact Information: POC: __________________________ Telephone: _____________________
FAX: __________________________
Email: _________________________
Narrative 6: WAWF PROCEDURES.
If your order WILL BE PAID BY DFAS (not by credit card) and contains DFARS Clause 252.232-7003, Electronic Submission of Payment Requests, you must submit your invoice through Wide Area Workflow (WAWF). This clause requires invoices for supplies and services purchased by the DoD be submitted via electronic means. The Wide Area Workflow system satisfies this mandatory requirement. WAWF can be accessed on the internet at https://piee.eb.mil/piee-landing/.
Ensure the Electronic Business POCs listed in the System for Award Management (SAM) for your company are the same individuals that will submit invoices through WAWF before using WAWF. SAM is accessible at www.sam.gov. For SAM access and navigation issues, follow the instructions provided at “User Guides and Helpful Hints” on SAM Home page.
If your Electronic Business (EB) POCs are correct, contact the WAWF helpdesk at 1-866-618- 5988 and ask them to establish a group for your CAGE code. The group administrator will also have to call the WAWF helpdesk to request account activation. Once the group is established and the account is activated, you will be able to create a Combination Invoice/Receiving report (SUPPLIES/MATERIALS) or a 2 in 1 Invoice (SERVICES/EQUIPMENT) using the codes below and instructions available from our contract administrator/buyer.
Questions concerning payment should be directed to the responsible Defense Finance Accounting Services (DFAS). Please have the order number and invoice number ready when calling about payment status.
The accounts payable mailing address can be located in Block 18a of your order. You can easily access payment information using the DFAS web site at http://www.dfas.mil. Your purchase order/contract number or invoice will be required to inquire status of your payment.
Go to DFAS on the web at: www/dfas.mil/money/vendor. THE FOLLOWING CODES
WILL BE REQUIRED TO ROUTE YOUR INVOICES AND ADDITIONAL EMAILS
CORRECTLY THROUGH WAWF:
WAWF
Data/CODES needed for
Invoice
SUPPLIES/
MATERIALS
(PRs that start with W31G1Y)
SERVICES/
EQUIPMENT
SUPPLIES/
MATERIALS
(PRs DO NOT that start with W31G1Y)
CONSTRUCTION
CAGE CODE
SAM Cage code listed in Contractor/
Offeror field of contract
SAM Cage code listed in Contractor/
Offeror field of contract
SAM Cage code listed in
Contractor/ Offeror field of contract
SAM Cage code listed in
Contractor/Offeror field of contract
ISSUE/ADMIN BY
DODAAC
W911KF W911KF W911KF W911KF
INSPECT BY
DODAAC (If needed)
W31G1Y (Must have inspector code)
W911KF
W911KF
(Unless
Inspected by
DCMA)
W911KF
SHIP TO
(Supplies/Material s
Only)
W911KF
NOT
AVAILABLE
W911KF W911KF
ACCEPTOR
(Services/Equipment
Only)
NOT
AVAILABLE
W911KF
NOT
AVAILABLE
NOT AVAILABLE
Type of Invoice COMBO 2 IN 1 COMBO CONSTRUCTION
Pay DODAAC HQ0303 HQ0303 HQ0303 HQ0303
CONTRACT NUMBER:
EMAIL POINT OF CONTACT LISTING:
CONTRACT ADMINISTRATOR:
CONTRACTING OFFICER:
USER AND/OR INSPECTOR:
Narrative 7: WAGE DETERMINATION
(a) U. S. Department of Labor Wage Determination Number(s) _2015-4587_dated _12/27/2021_ is/are attached and made a part of this Solicitation. The Wage Determination(s) will be made a part of any resulting contract. However, if this solicitation includes the FAR Clause 52.222-48 entitled EXEMPTION FROM APPLICATION OF THE SERVICE CONTRACT LABOR
STANDARDS TO CONTRACTS FOR MAINTENANCE, CALIBRATION, OR REPAIR OF
CERTAIN EQUIPMENT-CERTIFICATION (MAY 2014), and the contractor provides an affirmative certification therein, the Wage Determination(s) will not be made a part of any resulting contract.
(b) Any class of service employees which is not listed therein, but which is to be employed under this contract, shall be classified by the Contractor so as to provide a reasonable relationship between such classifications and those listed in the attachment, and shall be paid such monetary wages and furnished such fringe benefits as are determined by agreement of the interested parties, who shall be deemed to be the contracting agency, the Contractor, and the employees who will perform on the contract or their representatives. If the interested parties do not agree on a classification or reclassification which is, in fact, conformable, the contracting officer shall submit the question, together with his recommendation, to the Office of Government Contract Wage Standards, Wage and Hour Division, ESA, of the Department of Labor for final determination. Failure to pay such employees the compensation agreed upon by the interested parties or finally determined by the Administrator or his authorized representative shall be a violation of this contract. No employees engaged in performing work on this contract shall in any event be paid less than the minimum wage specified shall be in Section b (a)(1) of the Fair Labor Standards Act of 1938, as amended.
Narrative 8: Services will be performed at:
Anniston Army Depot 7 Frankford Ave, Building 108 Anniston, AL 36201
WORK HOURS RECEIVING HOURS DAY(S) OF WEEK
7:00 AM - 4:30 PM 7:00 AM - 2:00 PM Monday - Thursday 7:00 AM - 3:30 PM 7:00 AM - 2:00 PM Every other Friday CLOSED 7:00 AM - 2:00 PM Every other Friday CLOSED CLOSED Saturdays, Sundays, and
Federal Holidays
(1) Federal Holidays. Federal holidays may cause the Depot to be closed for one or more of the work days identified. The contract performance period has taken this possibility into consideration.
(2) Shutdown Periods. The Government may choose to shut down for a week or portions of a week as stated below. During this shutdown, and unless otherwise stated, only those Government personnel essential for equipment/facility maintenance will be permitted work.
4th of July Holiday Safety Stand-Down Day* Christmas Holiday Employee Appreciation Day*
*Safety Stand-Down Day and Employee Appreciation Day generally occur on a Friday (8-hour day). Safety Stand-Down Day consists of either two half-days occurring at six-month intervals or one full workday per year. Employee Appreciation Day generally occurs on a Friday (half of an 8-hour day) and is usually held in the afternoon. The Contractor’s services may not be required during these periods. In such cases, the Contractor will be notified in writing by the Government. These interruptions will be at no cost to the Government.
(3) Schedule Changes. When situations warrant, the Government may change the hours of operation to adjust for certain conditions, i.e., weather conditions (extreme heat or cold). For example, during summer production, shops may begin work at 6:00 am and leave work at 3:30 pm to avoid the afternoon heat. The Contractor shall be provided as much advance written notice as possible when these situations occur and will be expected to support any schedule change provided by the Contracting Officer.
(4) Vehicle Searches: All vehicles entering, moving throughout, and exiting ANAD are subject to random searches as directed by the Depot Commander.
Narrative 9: OPTION YEARS: Contractor shall be notified at least sixty (60) days prior to expiration date of the contract if the Government intends to exercise its option to extend the contract for an additional year. In the event the Government fails to notify the contractor within the said sixty (60) days, but at a time less than sixty (60) days prior to the expiration date does notify the contractor that it intends to exercise the option to extend the contract for an additional year, the contractor will have the right to waive the sixty (60) day notice requirement and to perform under the option year contract.
Narrative 10: AUTOMATED INSTALLATION ENTRY (AIE) BADGE.
Contractors accessing Anniston Army Depot shall be required to obtain an AIE badge. To do so, contractors must submit a completed SIOAN 380-2 (sent to contractor at time of award) to the Contract Specialist with all required signatures. A background check will be completed and approved/disapproved within 7-10 days. Once approved, the contractor can schedule an appointment for an AIE badge to be issued.
Narrative 11: IDENTIFICATION BADGES.
The following requirements apply to all contractors working inside the Controlled Area of Anniston Army Depot.
(1) Contractors are required to secure, and wear at all times, employee identification badges for all employees who must enter the Anniston Army Depot (ANAD) to engage in contract work.
Badges must be secured before an employee will be allowed entry onto the depot. Contractors that are non-US citizens must be escorted by depot personnel with the proper security clearance.
Emergency badges will be issued on a case-by-case basis. Badges may be obtained from the Badge Office (BO), Building 367, located at the main entrance to ANAD. No charge is made for badges if they are returned. Contractors will be charged twenty-five dollars ($25.00) for each badge issued to replace lost badges or badges damaged through carelessness, negligence, or misuse. All persons to be badged shall present a PHOTO identification from one of the following sources:
a. - State driver's license
b. - State identification card
c. - Federal, municipal, or school identification card bearing a seal and the following information: photo, name, social security number, date of birth, and physical description
NOTE: A social security card is not a photo identification and will not be accepted as proper identification. Employee identification cards issued by the Contractor will not be accepted. The Directorate of Emergency Services (DES) will reject any identification presented which is altered, not issued by one of the above identified agencies, or otherwise questioned regarding validity.
(2) Contractors shall submit the name of a point of contact responsible for security requirements through the Contracting Officer to the Installation Security Management Office upon notification of contract award.
(3) Ten working days prior to the date Contractor employee will begin work in the controlled area of ANAD (within the gates), a Personal Data Questionnaire/Privacy Act Statement (SIOAN Form 380-2) must be completed and signed for each employee. The form authorizes ANAD to conduct a local background check for any criminal record or questionable reliability. No contractors or employees will be issued a badge without a favorable local background check.
SIOAN Forms 380-2 may only be submitted for persons who are current employees of the Contractor or who hold a letter of intent to hire issued by the Contractor. Forms will be submitted to the Badge Office (BO), Building 367, located at the main entrance to ANAD. NO
PRE-EMPLOYMENT LOCAL BACKGROUND CHECKS WILL BE CONDUCTED BY
ANNISTON ARMY DEPOT. The prime contractor is responsible for checking with the Badge
Office (BO), Building 367, phone number 256 235-6820, to ensure that employees have been cleared for entrance to ANAD.
(4) Also, at least ten working days before the Contractor expects to begin work on the installation, prime Contractor shall submit, on company letterhead, the name, social security number, date/place of birth, and citizenship of all persons entering ANAD to perform contract work for the prime and any subcontractors. Letter shall be submitted through the Contracting Officer to the Badge Office (BO).
(5) Violation of any security or safety requirements will be grounds for immediate suspension of the individual's badge. DES will notify the Contracting Officer when suspension actions are taken. The Contractor can appeal the suspension to DES, who is the final adjudication authority of the individual's reinstatement or revocation of badge privileges.
(6) See clause entitled Identification of Contractor Employees for Contractor employees working on Anniston Army Depot.
Narrative 12: TRAFFIC.
The Contractor shall be required to conform to Depot regulations concerning:
(1) Designated routes
(2) Parking regulations
(3) Insurance--See clause entitled "Insurance Requirements." The Contractor shall also ensure that all POVs brought on the installation are fully insured for minimum amount of personal injury and personal damage liability required by Federal Acquisition Regulation 28.307-2.
(4) Highway Barricades, Warning Signs, and Parking: The Contractor shall comply with Depot Regulation ANADR 190-5 and Manual on Uniform Traffic Control Devices, ANSI D6.1, Part VI, Latest Edition. Contractors are permitted to drive their vehicles inside buildings to load and unload supplies and equipment. However, when finished loading and unloading, the Contractor should move the vehicle outside to a designated parking space.
Narrative 13: CELLULAR TELEPHONE USE. Use of any cellular telephone camera is prohibited on this installation. If a cellular telephone is illegally used on this installation, that cellular telephone is subject to confiscation, and any violation may be punishable by fine or imprisonment or both. Use of cameras without ANAD-issued permit is strictly prohibited. Non-permitted cameras are subject to confiscation.
Narrative 14: FIRE PROVENTION AND PROTECTION. The Contractor shall comply with all fire prevention measures prescribed in the installation fire prevention and protection regulation, a copy of which is on file in the office of the Contracting Officer. A written hot work permit shall be obtained from the installation fire department for use of any heat producing devices such as blowtorches, portable furnaces, tar kettles, or gas and electric welding and cutting equipment. The Contractor shall be liable for any fire loss to Government property attributable to negligence on the part of the Contractor, including failure to comply with fire prevention measures prescribed by the terms of this contract.
Narrative 15: UTILITIES. Government-owned and operated utilities are adequate for the needs and use of the Contractor as well as the Government. All reasonably required amounts of water and electricity are available to the Contractor without charge.
Narrative 16: AIR EMMISSIONS. The contractor is responsible for early coordination with the Directorate of Risk Management on any action that might result in air emissions (dust, volatile substances, etc). ANAD's Title V Air Permit requires the installation to obtain construction permits for new or modified air sources. The Alabama Department of Environmental Management (ADEM) must issue a construction permit before ANAD purchases and installs any equipment which shall produce air emissions. Installation and/or start-up of this equipment without the proper permit and coordination with ADEM is a violation of State and federal environmental law. The violation could result in a possible civil penalty or fine of $32,500 per day per violation from the Federal Environmental Protection Agency. Contractors considering a new process or device, or a modification to an existing unit, must first coordinate with the Environmental Compliance Division, Directorate of Risk Management.
Narrative 17: ENVIRONMENTAL MANAGEMENT SYSTEM, ISO 14001. The contractor and its subcontractors shall conform to Anniston Army Depot's Environmental Management System (EMS) including all policies and procedures required by the EMS. All activities conducted within the installation are subject to the EMS and any plans, goals, objectives, targets, etc. established through the EMS. It is the contractor's responsibility to ensure that any work performed under this contract is accomplished in accordance with the Anniston Army Depot's Environmental Policy (Commander's Policy #72). Information about the EMS can be obtained from the Directorate of Risk Management by calling (256) 235-7746. The contractor or subcontractors shall be responsible for stopping work (or stopping the work of subcontractors) and reporting any operation or condition on ANAD that could adversely affect the environment or the health and safety of employees or the public. In such situations, the contractor should immediately advise the COR or an appropriate authority. Emergencies should be reported by dialing "911" from any Anniston Army Depot base telephone.
Narrative 18: SAFETY AND ACCIDENT PREVENTION. Contractors shall adhere to all safety rules and regulation of corrective actions, which shall be taken into consideration:
General:
Applicable Publication: The publications listed below form a part of this specification to extent referenced. The publications are referred to in the text by basic designation only.
Code of Federal Regulation (CFR): OSHA General Industry Safety and Health Standards (29 CFR 1910), Publication V2206; OSHA Construction Industry Standards (29 CFR 1926). One source of these regulations is OSHA Publication 2207, which includes a combination of both parts 1910 and 1926 as they relate to construction safety and health. It is for sale by the Superintendent of Documents, U.S. Government Printing Office, Washington, DC 20402.
National Emission Standards for Hazardous Air Pollutants (40 CFR, Part 61).
Title 29 of the Code of Federal Regulations, Subtitle B, Part 1926 provides the safety and health regulations for construction. Under the general provisions, it gives each contractor responsibility to “…initiate and maintain such programs as may be necessary to comply with this part (29CFR1926).” The general company safety plan should address the how the company shall comply with the basic requirements of the standard.
For 29 CFR 1926 and other OSHA standards and interpretations plus other resources are available from the Occupational Safety and Health web site, www.osha.gov.
In addition to contract clause entitled "ACCIDENT PREVENTION," FAR 52.236-13, the contractor shall comply with all regulations, publications and manuals current at the time the Task Order is being performed to include but are not limited to Army Material Command (AMC) Regulation 385-100, Safety and Occupational Health Regulation ANADR 385-1, Engineering Manual (EM) 385-1-1, 29 Code of Federal Regulations (CFR) 1926/1910, other related Department of Transportation (DOT) Regulations (49 CFR), Federal Standard (Fed Std): 313A Material Safety Data Sheets, ANSI BHMA A156, National Electric Safety Code ANSI C2, NFPA Codes and Standards, National Electric Code Handbook, UFGS (Unified Facilities Guide Specification) and all local policies. Definition of Hazardous Materials: Refer to hazardous and toxic materials/substances included in Subparts H and Z of 29 CFR 1910 and to others as additionally defined in Fed. Std 313. Those most commonly encountered include asbestos, polychlorinated biphenyl’s (PCB’s) explosives and radioactive material, but may include others. The most likely products to contain asbestos are sprayed-on fireproofing, insulation, boiler lagging and pipe covering. Engineering Manual 385-1-1 outlines safety requirements for construction. A copy of it is available for review in the Anniston Army Depot safety office, or from the Army Corp of Engineers web site, www.usace.mil/publications.
The Contractor shall assume full responsibility and liability for compliance with all applicable regulations pertaining to the health and safety of personnel during the execution of work, and shall hold the Government harmless for any action on his/her part or that of his/her employees or subcontractors, which results in illness, injury, or death. Contractors prior year OSHA logs (form 300A) and a site specific safety plan for work to be performed on Anniston Army Depot must be provided for approval by the Anniston Army Depot Safety Office no more than 10 days after award of contract. Contractor shall maintain an accurate record of accidents resulting in traumatic injury or death and accidents resulting in damage to Government property, supplies, and equipment. The Contractor shall report incidents causing disruption of contract services, or any accidents in connection with performance of this contract, to the Contracting Officer Representative within two (2) hours of occurrence. Contractor shall notify ANAD Safety Office immediately of Reports of Inspections and/or Notices of Violation or other enforcement actions (including warning letters) received from/by local, State, and Federal Regulators in which the violation or alleged violation is attributed to the action of the contractor or its subcontractors.
Contractor shall provide ANAD with a copy of the Inspection Report, Notice of Violation or other enforcement action, and all supporting documentation.
Contractor shall safeguard and maintain all Government property, as well as, provide for the safety and well-being of personnel employed in the administration of this contract. Local PPE requirements are at minimum long pants, long sleeved shirts, protective footwear, protective eyewear and hearing protection shall be used and provided by contractor.
The Government reserves the right to conduct unannounced safety inspection at any time, all OSHA required records to include OSHA form 300 and 300A shall be made available to COR or ANAD Safety Office Staff upon request or during unannounced safety inspections. OSHA logs must be produced for review within 3 working days of initial request. Contractor shall notify ANAD Safety Office immediately of Reports of Inspections and/or Notices of Violation or other enforcement actions (including warning letters) received from/ by local, State, and Federal Regulators in which the violation is attributed to the action of the contractor or its subcontractors.
Contractor shall provide ANAD with a copy of the Inspection Report, Notice of Violation or other enforcement action, and all supporting documentation within 1 day of receipt of documentation.
If a contractor employee is observed performing an activity in a manner inconsistent with any of the above cited regulations or is engaged in any activity that is dangerous to life, limb, or government property, the ANAD Safety Representative shall have the authority to notify the employee and/or the contractor’s on-site supervisor of the hazardous activity and require correction of the hazardous activity. If necessary, the ANAD Safety Representative shall have the authority on behalf of the Contracting Officer to require the contractor and/or its employee to stop the hazardous activity until corrective action is taken to eliminate a hazardous condition or safety violation. Said action shall not be considered to be the basis of a claim against the government and shall be at no cost to the Government.
The contractor must have a Drug Free Workplace plan that includes post-accident testing. This shall be part of their Safety Plan.
Narrative 19: CONTRACTOR SAFETY PROGRAMS AND ACCIDENT PREVENTION
PLANS.
For each specific job or contract, an accident prevention plan (or job safety plan) must be submitted. This plan is specific for the current project, and must address the particular hazards which shall be inherent in the project and how they shall control them. This plan must be submitted to the ANAD Safety Office not more than 10 days after contract award. Contractor must have approved plan in place prior to any work being performed on ANAD. Listed below are some of the items that must be covered in the plan, the plan must also meet current standards listed above.
(1.) SIGNATURE SHEET. Title, signature, and phone number of the following:
a. Plan preparer
b. Plan approval, e.g., owner, company president, etc.
c. Plan concurrence (concurrence of other applicable corporate and project personnel
(contractor) such as their safety officer, project manager, or superintendent) (2.) BACKGROUND INFORMATION. List the following:
a. Contractor
b. Contract number
c. Project name
d. Brief description of the work to be performed and location
e. Contractor accident experience (provide information such as OSHA 200 logs, company safety trend analysis)
f. Listing of phases of work and hazardous activities requiring activity hazards analyses.
(3.) STATEMENT OF SAFETY AND HEALTH POLICY.
(4.) RESPONSIBILITIES AND LINES OF AUTHORITIES.
a. Identification and accountability of personnel responsible for safety - at both corporate and project level if applicable.
b. Lines of authority.
(5.) SUBCONTRACTORS AND SUPPLIERS.
a. Identification of subcontractors and suppliers (if known).
b. Means for controlling and coordinating subcontractors and suppliers.
c. Safety responsibilities of subcontractors and suppliers.
(6.) TRAINING.
a. List subjects to be discussed with employees in safety indoctrination.
b. List mandatory training and certifications, which are applicable to this project (e.g., explosive actuated tools, confined space entry, crane operator, vehicle operator, HAZWOPER training and certification, personal protective equipment, electrical hazards, elevated surfaces.).
c. Identify requirements for emergency response training.
d. Outline requirements (who attends, when given, who shall conduct etc.) for supervisory and employee safety meetings.
(7.) SAFETY AND HEALTH INSPECTIONS. Provide details on:
a. Who shall conduct safety inspections (e.g. project manager, safety professional, QC, supervisor, employees, etc.)
b. Any external inspections/certifications that may be required.
(8.) SAFETY AND HEALTH EXPECTATIONS, INCENTIVE PROGRAMS, AND
COMPLIANCE.
a. The company's written safety program goals, objectives, and accident experience.
b. A brief description of the company's safety incentive programs (if any)
c. Policies and procedures for holding managers and supervisors accountable for safety.
(9.) ACCIDENT REPORTING. The contractor shall identify who shall complete the following, how, and when:
a. Exposure data (man hours worked)
b. Accident investigations, reports and logs
c. Immediate notification of accidents
(10.) PLANS (PROGRAMS, PROCEDURES) AS APPLICABLE TO THE WORK TO BE
CONDUCTED. This list is not all-inclusive, nor shall all topics apply to all contractors.
a. Hazard communication
b. Emergency response plans (spills, posting of emergency telephone numbers, fire prevention, etc.)
c. Layout plans
d. Respiratory protection plan
e. Health hazard control program
f. Lead abatement plan
g. Asbestos abatement plan
h. Abrasive blasting
i. Confined space
j. Hazardous energy control plan
k. Critical lift procedures
l. Contingency plan for severe weather
m. Access and haul road plan
n. Demolition plan (engineering and asbestos survey)
o. Material handling equipment licensing
p. Plan for prevention of alcohol and drug abuse
q. Fall protection
(11.) Detailed site-specific hazards and controls shall be provided in the activity hazard analysis for each phase of the operation.
Narrative 20: SEXUAL ASSUALT AND HARASSMENT IN THE WORKPLACE.
Contractor employees working in areas with Federal employees must be aware of the workplace rules and requirements prohibiting and responding to sexual harassment and sexual assault incidents and claims. Sexual assault is an involuntary sexual act in which a person is threatened, coerced, or forced to engage against their shall, or any sexual touching of a person who has not consented. Sexual assault and sexual harassment are strictly forbidden and the Depot Commander has mandated that everyone on the premises of ANAD has a responsibility to prevent assault and harassment and report it if discovered. The COR shall provide a Fact Sheet defining sexual harassment to be distributed to contractor employees working in government facilities.
As with any workforce, there is opportunity for inappropriate behavior between Contractor and Government employees. Prevention and prompt reporting and resolution of any such incidents are Top Priorities at Anniston Army Depot. Offending employees are subject to barment from ANAD. Contract performance requirements shall not be adjusted for reasons related to an incident involving an offense by contractor employees.
In order to prevent problems from arising, Contractor supervisors must provide the following information to each employee working on ANAD premises:
If you believe you are a victim of sexual harassment:
It is important that you take action. Ignoring sexual harassment seldom makes it stop; in most cases, sexual harassment continues or becomes worse when it is tolerated. While removing yourself from the uncomfortable situation may seem to be a solution, it is probably not in your best interest or the interests of other potential victims around you.
Tell the harasser that the behavior is unwelcome and must stop. Any way of telling them to stop is acceptable, including directly telling him or her, calling, e-mailing or sending a memo.
Tell someone; do not keep it to yourself. There are things that other people can do to help you Document the incident. Write down dates, places, names of witnesses and what happened.
Keep e-mails, text messages, instant messages, voice mails, and all history of the incidents.
Report harassment to your supervisor, director, EEO staff, Victim Advocate, or union representative.
Follow whatever complaint procedures apply with your employer
If you witness sexual harassment or it is reported to you:
Report it to your supervisor
Report it to the Depot Sexual Harassment/Assault Response and Prevention (SHARP) Coordinator, Mrs. Wendy Suttles, at (256) 240-3447.
Cooperate with any investigative agencies.
Narrative 21: CONTRACTOR OWNED PROPERTY.
When contractors bring in equipment onto Anniston Army Depot for use in performing contracted work to repair, replace or install, all contractor-owned equipment must have ‘company name’ stenciled, laser marked, or marked in some other permanent way on the equipment.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Lot Preventive Maint.-Furnace Units (base)
FFP
Perform bi-annual onsite preventive maintenance for Atmosphere Furnace Company (AFC)-Holcroft Furnace Units at the Anniston Army Depot facility in accordance with (IAW) the Statement of Work (SOW, Attachment 1).
Base Year Period of Perfomance: 12 months after date of award.
FOB: Destination
NSN: AASSVC203200UF
MILSTRIP: W31G1Y203200UF
PURCHASE REQUEST NUMBER: W31G1Y203200UF
PSC CD: J044
NET AMT
0002 1 Lot Emergency Repair-Furnace Units (base)
FFP
Provide unlimited technical support and perform emergency repairs for Atmosphere Furnace Company (AFC)-Holcroft Furnace Units at the Anniston Army Depot facility in accordance with (IAW) the Statement of Work (SOW, Attachment 1).
Principal Period of Maintenance (PPM) IAW SOW $_________ per _______.
Outside Principal Period of Maintenance (PPM) IAW SOW $________ per hour.
Travel $________ per hour.
All associated costs including labor, travel, lodging, equipment, repair parts, etc.
must be submitted to the Government on an itemized invoice.
Travel expenses shall include hourly travel rate plus per diem, airfare and rental vehicle. Airfare and rental vehicle will be reimbursed at actual costs. Anniston Army Depot will not pay more than the per diem for lodging and meals. All other travel expenses (mileage, parking, and per diem) will be reimbursed in accordance with Joint Travel Regulations (JTR) and receipts submitted to the Contracting Officer for actual travel expenses.
A Not to Exceed (NTE) amount will be added to this CLIN. Any unused funds will be removed from this CLIN at completion of the period of performance.
Base Year Period of Perfomance: 12 months after date of award.
FOB: Destination
NSN: AASSVC203200UG
MILSTRIP: W31G1Y203200UG
PURCHASE REQUEST NUMBER: W31G1Y203200UG
0003 1 Lot OPTION Preventive Maint.-Furnace Units (Opt 1)
FFP
Perform bi-annual onsite preventive maintenance for Atmosphere Furnace Company (AFC)-Holcroft Furnace Units at the Anniston Army Depot facility in accordance with (IAW) the Statement of Work (SOW, Attachment 1).
Option 1 Period of Perfomance: 12 months after expiration of base year.
FOB: Destination
0004 1 Lot OPTION Emergency Repair-Furnace Units (Opt 1)
FFP
Provide unlimited technical support and perform emergency repairs for Atmosphere Furnace Company (AFC)-Holcroft Furnace Units at the Anniston Army Depot facility in accordance with (IAW) the Statement of Work (SOW, Attachment 1).
Principal Period of Maintenance (PPM) IAW SOW $_________ per _______.
Outside Principal Period of Maintenance (PPM) IAW SOW $________ per hour.
Travel $________ per hour.
All associated costs including labor, travel, lodging, equipment, repair parts, etc.
must be submitted to the Government on an itemized invoice.
Travel expenses shall include hourly travel rate plus per diem, airfare and rental vehicle. Airfare and rental vehicle will be reimbursed at actual costs. Anniston Army Depot will not pay more than the per diem for lodging and meals. All other travel expenses (mileage, parking, and per diem) will be reimbursed in accordance with Joint Travel Regulations (JTR) and receipts submitted to the Contracting Officer for actual travel expenses.
A Not to Exceed (NTE) amount will be added to this CLIN. Any unused funds will be removed from this CLIN at completion of the period of performance.
Option 1 Period of Perfomance: 12 months after expiration of base year.
0005 1 Lot OPTION Preventive Maint.-Furnace Units (Opt 2)
FFP
Perform bi-annual onsite preventive maintenance for Atmosphere Furnace Company (AFC)-Holcroft Furnace Units at the Anniston Army Depot facility in accordance with (IAW) the Statement of Work (SOW, Attachment 1).
Option 2 Period of Perfomance: 12 months after expiration of option period 1.
0006 1 Lot OPTION Emergency Repair-Furnace Units (Opt 2)
FFP
Provide unlimited technical support and perform emergency repairs for Atmosphere Furnace Company (AFC)-Holcroft Furnace Units at the Anniston Army Depot facility in accordance with (IAW) the Statement of Work (SOW, Attachment 1).
Principal Period of Maintenance (PPM) IAW SOW $_________ per _______.
Outside Principal Period of Maintenance (PPM) IAW SOW $________ per hour.
Travel $________ per hour.
All associated costs including labor, travel, lodging, equipment, repair parts, etc.
must be submitted to the Government on an itemized invoice.
Travel expenses shall include hourly travel rate plus per diem, airfare and rental vehicle. Airfare and rental vehicle will be reimbursed at actual costs. Anniston Army Depot will not pay more than the per diem for lodging and meals. All other travel expenses (mileage, parking, and per diem) will be reimbursed in accordance with Joint Travel Regulations (JTR) and receipts submitted to the Contracting Officer for actual travel expenses.
A Not to Exceed (NTE) amount will be added to this CLIN. Any unused funds will be removed from this CLIN at completion of the period of performance.
Option 2 Period of Perfomance: 12 months after expiration of option period 1.
0007 1 Lot OPTION Preventive Maint.-Furnace Units (Opt 3)
FFP
Perform bi-annual onsite preventive maintenance for Atmosphere Furnace Company (AFC)-Holcroft Furnace Units at the Anniston Army Depot facility in accordance with (IAW) the Statement of Work (SOW, Attachment 1).
Option 3 Period of Perfomance: 12 months after expiration of option period 2.
0008 1 Lot OPTION Emergency Repair-Furnace Units (Opt 3)
FFP
Provide unlimited technical support and perform emergency repairs for Atmosphere Furnace Company (AFC)-Holcroft Furnace Units at the Anniston Army Depot facility in accordance with (IAW) the Statement of Work (SOW, Attachment 1).
Principal Period of Maintenance (PPM) IAW SOW $_________ per _______.
Outside Principal Period of Maintenance (PPM) IAW SOW $________ per hour.
Travel $________ per hour.
All associated costs including labor, travel, lodging, equipment, repair parts, etc.
must be submitted to the Government on an itemized invoice.
Travel expenses shall include hourly travel rate plus per diem, airfare and rental vehicle. Airfare and rental vehicle will be reimbursed at actual costs. Anniston Army Depot will not pay more than the per diem for lodging and meals. All other travel expenses (mileage, parking, and per diem) will be reimbursed in accordance with Joint Travel Regulations (JTR) and receipts submitted to the Contracting Officer for actual travel expenses.
A Not to Exceed (NTE) amount will be added to this CLIN. Any unused funds will be removed from this CLIN at completion of the period of performance.
Option 3 Period of Perfomance: 12 months after expiration of option period 2.
0009 1 Lot OPTION Preventive Maint.-Furnace Units (Opt 4)
FFP
Perform bi-annual onsite preventive maintenance for Atmosphere Furnace Company (AFC)-Holcroft Furnace Units at the Anniston Army Depot facility in accordance with (IAW) the Statement of Work (SOW, Attachment 1).
Option 4 Period of Perfomance: 12 months after expiration of option period 3.
0010 1 Lot OPTION Emergency Repair-Furnace Units (Opt 4)
FFP
Provide unlimited technical support and perform emergency repairs for Atmosphere Furnace Company (AFC)-Holcroft Furnace Units at the Anniston Army Depot facility in accordance with (IAW) the Statement of Work (SOW, Attachment 1).
Principal Period of Maintenance (PPM) IAW SOW $_________ per _______.
Outside Principal Period of Maintenance (PPM) IAW SOW $________ per hour.
Travel $________ per hour.
All associated costs including labor, travel, lodging, equipment, repair parts, etc.
must be submitted to the Government on an itemized invoice.
Travel expenses shall include hourly travel rate plus per diem, airfare and rental vehicle. Airfare and rental vehicle will be reimbursed at actual costs. Anniston Army Depot will not pay more than the per diem for lodging and meals. All other travel expenses (mileage, parking, and per diem) will be reimbursed in accordance with Joint Travel Regulations (JTR) and receipts submitted to the Contracting Officer for actual travel expenses.
A Not to Exceed (NTE) amount will be added to this CLIN. Any unused funds will be removed from this CLIN at completion of the period of performance.
Option 4 Period of Perfomance: 12 months after expiration of option period 3.
CLAUSES INCORPORATED BY REFERENCE
52.203-18 Prohibition on Contracting With Entities That Require Certain
Internal Confidentiality Agreements or Statements-- Representation
JAN 2017
52.204-7 System for Award Management OCT 2018 52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011 52.204-10 Reporting Executive Compensation and First-Tier
Subcontract Awards
JUN 2020
52.204-13 System for Award Management Maintenance OCT 2018 52.204-16 Commercial and Government Entity Code Reporting AUG 2020 52.204-18 Commercial and Government Entity Code Maintenance AUG 2020 52.204-19 Incorporation by Reference of Representations and
Certifications.
DEC 2014
52.204-22 Alternative Line Item Proposal JAN 2017 52.209-6 Protecting the Government's Interest When Subcontracting
With Contractors Debarred, Suspended, or Proposed for Debarment
DEC 2021
52.209-10 Prohibition on Contracting With Inverted Domestic Corporations
NOV 2015
52.222-3 Convict Labor JUN 2003 52.222-43 Fair Labor Standards Act And Service Contract Labor
Standards - Price Adjustment (Multiple Year And Option Contracts)
AUG 2018
52.222-44 Fair Labor Standards And Service Contract Labor Standards- Price Adjustment
MAY 2014
52.222-50 Combating Trafficking in Persons DEC 2021 52.223-5 Pollution Prevention and Right-to-Know Information MAY 2011 52.223-18 Encouraging Contractor Policies To Ban Text Messaging
While Driving
JUN 2020
52.225-13 Restrictions on Certain Foreign Purchases FEB 2021 52.232-33 Payment by Electronic Funds Transfer--System for Award
Management
OCT 2018
52.232-36 Payment by Third Party MAY 2014 52.232-39 Unenforceability of Unauthorized Obligations JUN 2013 52.232-40 Providing Accelerated Payments to Small Business
Subcontractors
DEC 2021
52.233-1 Alt I Disputes (May 2014) - Alternate I DEC 1991 52.233-3 Protest After Award AUG 1996 52.233-4 Applicable Law for Breach of Contract Claim OCT 2004 52.237-2 Protection Of Government Buildings, Equipment, And
Vegetation
APR 1984
252.203-7000 Requirements Relating to Compensation of Former DoD Officials
SEP 2011
252.203-7005 Representation Relating to Compensation of Former DoD Officials
NOV 2011
252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7006 Billing Instructions OCT 2005 252.204-7008 Compliance With Safeguarding Covered Defense Information
Controls
OCT 2016
252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting
DEC 2019
252.204-7015 Notice of Authorized Disclosure of Information for Litigation Support
MAY 2016
252.204-7018 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services
JAN 2021
252.215-7013 Supplies and Services Provided by Nontraditional Defense Contractors.
JAN 2018
252.223-7006 Prohibition On Storage, Treatment, and Disposal of Toxic or Hazardous Materials
SEP 2014
252.225-7001 Buy American And Balance Of Payments Program-- Basic DEC 2017 252.225-7002 Qualifying Country Sources As Subcontractors DEC 2017 252.225-7012 Preference For Certain Domestic Commodities DEC 2017 252.225-7048 Export-Controlled Items JUN 2013 252.232-7003 Electronic Submission of Payment Requests and Receiving
Reports
DEC 2018
252.232-7010 Levies on Contract Payments DEC 2006 252.237-7010 Prohibition on Interrogation of Detainees by Contractor
Personnel
JUN 2013
252.243-7001 Pricing Of Contract Modifications DEC 1991 252.244-7000 Subcontracts for Commercial Items JAN 2021 252.244-7001 Alt I Contractor Purchasing System Administration (May 2014) --
Alternate I
MAY 2014
252.246-7007 Contractor Counterfeit Electronic Part Detection and Avoidance System
AUG 2016
252.246-7008 Sources of Electronic Parts MAY 2018
CLAUSES INCORPORATED BY FULL TEXT
52.204-1 APPROVAL OF CONTRACT (DEC 1989)
This contract is subject to the written approval of the contracting officer and shall not be binding until so approved.
(End of clause)
52.204-17 OWNERSHIP OR CONTROL OF OFFEROR (AUG 2020)
(a) Definitions. As used in this provision--
Commercial and Government Entity (CAGE) code means—
(1) An…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .