This document outlines a pre-solicitation notice for a stand-alone contract to provide soil washing treatment services at Eielson Air Force Base in Alaska. The contract will require the treatment and disposal of approximately 130,000 cubic yards of stockpiled Per- and Polyfluoroalkyl Substances contaminated soil from eight separate F-35 construction projects. Soil treatment will utilize on-site soil washing, and the contractor will be responsible for ensuring all awarded soil volumes are treated to meet target cleanup levels or disposed of. Significant uncertainty exists around achieving cleanup levels for finer soil fractions, which may require disposal. Treated soil will be placed on the installation, while soil not meeting cleanup levels after washing may be disposed at a permitted landfill or approved underground injection facility. The solicitation is scheduled for release on or around June 24, 2022 through the Procurement Integrated Enterprise Environment and System for Award Management websites. The contract is an 8(a) small business set-aside estimated between $30-50 million.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Air Force Civil Engineer Center I n t e g r i t y - S e r v i c e - E x c e l l e n c e
July 2017
Contaminated Soil Stockpile SOP Supplemental revised october 12, 2021
Air Force Civil Engineer Center
Cross section view of a stockpile
• Note sandbags are securing the top liner
• Do not use items that can puncture and/or tear the liner
• Wattles are inside the bottom liner next to the stockpile
• Top liner extends three to five feet beyond the bottom linerDO NOT CONSTRUCT A STOCKPILE
UNLESS ALL MATERIALS ARE ON
HAND
Figure 1
General example of stockpile cross section
Large scale long term storage for 3,125 CY 1: Ropes used to hold down stockpile cover 2: Wattles used for runoff control 3: Use of 60 pound sand bags only 4: 20 mil cover
Stockpile constructed to standard or 10 mil, 6 mil is too thin
• Do NOT use logs, cables, rocks, or other items with jagged or sharp edges
• You WILL end up with rips and tears in the top cover
Figure 2
Improper weights to secure liners
• 1: Candlestick bollards are used to bring attention to the hazardous site
• 2: Sandbags are used to secure top cover
• 3: The stockpile is in an area which is regularly mowed.
• Note the use of heavy lumber to protect top cover from mowers and weed eaters
• 4: Stockpile sign is on a freestand
• Bottom liner has been lapped back over soil
• Wattles are under the top liner
Figure 3
Example of a proper stockpile
• 1: Wattles are under the top liner next to soil
• 2: Sandbags are used to secure top liner
• 3: Note placement using fences as protection
• Stockpile is away from vehicle and foot traffic
• Minimize possibility of damage
Figure 4
Example of a proper stockpile
Clear covers are not approved, covers should be opaque so plants do not grow
• Content and contamination of soil is listed
• Status is listed
• Installation and contractor POCs are listed with phone numbers
• Start date is listed
• Sign is laminated and
“secured” to sandbag
• Poor adhesion as tape weakens due to weather
• Best to use a freestanding sign
• Contrasting colors were used
Note: Name of contracting company, contractor, and full phone number were edited out for this example
Figure 5
Example of proper marking
Note: Generators may state “Hazardous,” “Contaminated,” “Toxic,” or any other such wording to express the underlying hazard of exposure, unless otherwise required by local, state, or federal regulations.
Figure 5
Example of proper marking
PFOS/PFOA
HAZARDOUS WASTE
DO NOT DISTURB MATERIAL
PROJECT POC
CLARK KENT
DAILY PLANENT
907-555-1234
EIELSON AFB POC
JOSEPH PRICE
AFCEC/CZOP
907-377-3578
HANGAR CONSTRUCTION
EIE123
GENERATION DATE: 4JUN18
POL
CONTAMINATED SOIL
DO NOT DISTURB MATERIAL
PROJECT POC
LEX LUTHOR
LEX CORP
907-555-5678
EIELSON AFB POC
JOSEPH PRICE
AFCEC/CZOP
907-377-3578
UTILIDOR EXTENSION
EIE456
GENERATION DATE: 17JUL18
• Start date is missing
• Spray paint was used
• Bled and faded over time
• Difficult to read
• Poor contrast
• Contractor had to remark stockpile
• Content and contamination of soil is listed
• Installation and contractor POCs are listed with phone numbers
Note: Name of contracting company, contractor, and full phone number were edited out for this example
Figure 6
Example of ineffective marking
• Sign is faded
• Sign was adhered using packing tape
Figure 6
Example of ineffective marking
• 1: Candlestick bollards are used to bring attention to the hazardous site
• 2: HBOs are used to tie down hazardous warning tape
• 3: Sandbags are used to secure top cover
• 4: The stockpile is in an area which is regularly mowed.
• Note the use of heavy lumber to protect top cover from mowers and weed eaters
Opposite sides of same stockpile
• Wattles are used to “seal” the stock pile
• Note the use under the top liner and outside of the stockpile liners
Figure 7
• 1: Candlestick bollards are used to bring attention to the hazardous site
• 2: Sandbags are used to secure top cover
• 3: Wattles are used outside of liners
• Serving as secondary containment
• Each sandbag has a contaminated soil stockpile sign attached
Figure 8
2 2
• Laminated
• Attached to securely driven metal post
• All required information listed
Figure 9
Contaminated Stockpile Entrance Sign
• Laminated
• Attached to locally constructed stand
• Used 2x4 lumber
• All required information listed
Figure 10
Contaminated Soil Stockpile Sign
• Either locally constructed or commercial stands
• Note: Sandbags weighing down locally constructed sign
• Commercial stand has a wide base
• Withstands strong winds
• Structurally durable
• Multipurpose/Reusable
Figure 11
Contaminated Stockpile Sign Stands
• Earth berms were used as secondary containment
• Note use of liners extending from stockpile to cover berms
• Liner is weighed down with sandbags
Figure 12
Earthen Berms
20 mil reinforced polyethylene bottom liner
General example large scale (1,000 cubic yards and above), long term stockpile
Extend top cover 3’-5’ beyond wattle
Wattle must be in contact with soil to serve as an absorbent
10 mil top cover
Secure perimeter every 5’
60 lb. sandbags
Large stockpiles can be tiered
| Slide Number 1 |
| Slide Number 2 |
| Slide Number 3 |
| Slide Number 4 |
| Slide Number 5 |
| Slide Number 6 |
| Slide Number 7 |
| Slide Number 8 |
| Slide Number 9 |
| Slide Number 10 |
| Slide Number 11 |
| Slide Number 12 |
| Slide Number 13 |
| Slide Number 14 |
| Slide Number 15 |
| Slide Number 16 |
| Slide Number 17 |
File details come from the government source that posted it. Updated .