This document contains specifications for a construction project to build a river baling deck for the Chena River Lakes Flood Control Project in North Pole, Alaska. The specifications require the contractor to provide temporary signage including a bulletin board for posting legal notices, temporary traffic control including haul roads, barricades, and fencing around the construction site. The contractor must also follow NFPA standards for temporary wiring and equipment grounding. The solicitation number for this opportunity is W911KB20B0004 and it was issued by the Department of the Army Corps of Engineers Engineering District Alaska to receive bids for constructing the river baling deck.

View the file

Other files for this federal contract opportunity

Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R0004 RIVER BALING DECK CHL020

other staging area is desired. Show locations of safety and construction fences, site trailers, construction entrances, trash dumpsters, temporary sanitary facilities, and worker parking areas.

PART 2 PRODUCTS

2.1 TEMPORARY SIGNAGE

2.1.1 Bulletin Board

Immediately upon beginning of work, provide a weatherproof glass-covered bulletin board not less than 36 by 48 inches in size for displaying the Equal Employment Opportunity poster, a copy of the wage decision contained in the contract, Wage Rate Information poster, and other information approved by the Contracting Officer. Locate the bulletin board at the project site in a conspicuous place easily accessible to all employees, as approved by the Contracting Officer.

2.2 TEMPORARY TRAFFIC CONTROL

2.2.1 Haul Roads

At contractors expense construct access and haul roads necessary for proper prosecution of the work under this contract. Construct with suitable grades and widths; sharp curves, blind corners, and dangerous cross traffic are to be avoided. Provide necessary lighting, signs, barricades, and distinctive markings for the safe movement of traffic.

The method of dust control must be adequate to ensure safe operation at all times. Location, grade, width, and alignment of construction and hauling roads are subject to approval by the Contracting Officer.

Lighting must be adequate to assure full and clear visibility for full width of haul road and work areas during any night work operations. Any temporary access and haul roads constructed by the Contractor shall be removed prior to project completion and the site returned to its original existing condition.

2.2.2 Barricades

Erect and maintain temporary barricades to limit public access to hazardous areas. Whenever safe public access to paved areas such as roads, parking areas or sidewalks is prevented by construction activities or as otherwise necessary to ensure the safety of both pedestrian and vehicular traffic barricades will be required. Securely place barricades clearly visible with adequate illumination to provide sufficient visual warning of the hazard during both day and night.

2.2.3 Fencing

AM#4... Provide construction safety fencing along the construction site to control access by unauthorized people. ...AM#4

2.2.4 Temporary Wiring

Provide temporary wiring in accordance with NFPA 241 and NFPA 70 , Article 305-6(b), Assured Equipment Grounding Conductor Program. Include frequent inspection of all equipment and apparatus.

SECTION 01 50 00 Page 3AM#06 AM#06