AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Project titled 2018-2020 Nome Harbor Maintenance Dredging, Nome, Alaska has been amended to update the w age rate infomation located in Section 00 73 46 and sharing the Pre-Bid Teleconference minutes located in the section titled SF 30 - Block 14 Modification Continuation Page.
See the Summary of Changes for all details.
All other terms and conditions of W911KB18B0001 remain the same.
CONTRACTORS ARE REQUIRED TO ACKNOWLEDGE RECEIPT OF THIS AMENDMENT ON THE REVERSE SIDE OF THE SF1442.
1. CONTRACT ID CODE PAGE OF PAGES
1 20
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 16-Nov-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911KB18B0001
X 9B. DATED (SEE ITEM 11)
03-Nov-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
16-Nov-2017
CODE
U.S. ARMY ENGINEER DISTRICT, AK
CEPOA-CT (W911KB)
PO BOX 6898
JBER AK 99506-0898
W911KB 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W911KB18B0001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 11 00 - STANDARD FORM (SF) 1442
The Issued By organization below has been added:
U.S. ARMY ENGINEER DISTRICT, AK
CEPOA-CT (W911KB)
PO BOX 6898
JBER AK 99506-0898
SECTION 00 73 46 - WAGE DETERMINATIONS SCHEDULES
The following have been modified:
General Decision Number: AK170001 11/10/2017 AK1
Superseded General Decision Number: AK20160001
State: Alaska
Construction Types: Building and Heavy
Counties: Alaska Statewide.
BUILDING AND HEAVY CONSTRUCTION PROJECTS (does not include residential construction consisting of single family homes and apartments up to and including 4 stories)
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.20 for calendar year 2017 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.20 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2017.
The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/06/2017 1 01/20/2017 2 01/27/2017 3 02/17/2017 4 03/17/2017 5 03/31/2017 6 04/07/2017
7 04/21/2017 8 05/12/2017 9 05/19/2017 10 05/26/2017 11 07/21/2017 12 07/28/2017 13 09/15/2017 14 11/10/2017
ASBE0097-001 01/01/2017
Rates Fringes
Asbestos Workers/Insulator (includes application of all insulating materials protective coverings, coatings and finishings to all types of mechanical systems).........................$ 38.68 20.07
HAZARDOUS MATERIAL HANDLER
(includes preparation, wetting, stripping, removal scrapping, vacuming, bagging, and disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems).........$ 37.38 19.55
BOIL0502-002 08/01/2016
Rates Fringes
BOILERMAKER......................$ 44.26 28.41
BRAK0001-002 07/01/2016
Rates Fringes
Bricklayer, Blocklayer, Stonemason, Marble Mason, Tile Setter, Terrazzo Worker.....$ 40.81 19.15 Tile & Terrazzo Finisher.........$ 34.79 19.15
CARP1501-001 09/01/2016
Rates Fringes
MILLWRIGHT.......................$ 36.74 22.99
CARP2520-003 09/01/2016
Rates Fringes
Diver Stand-by....................$ 42.65 25.04
Tender......................$ 41.65 25.04 Working.....................$ 82.45 25.04 Piledriver Carpenter...................$ 38.34 25.04 Piledriver; Skiff Operator and Rigger..................$ 38.34 25.04 Sheet Stabber...............$ 38.34 25.04 Welder......................$ 43.90 25.04
DEPTH PAY PREMIUM FOR DIVERS BELOW WATER SURFACE:
50-100 feet $1.00 per foot 101 feet and deeper $2.00 per foot
ENCLOSURE PAY PREMIUM WITH NO VERTICAL ASCENT:
5-50 FEET $1.00 PER FOOT/DAY
51-100 FEET $2.00 PER FOOT/DAY
101 FEET AND ABOVE $3.00 PER FOOT/DAY
SATURATION DIVING:
The standby rate applies until saturation starts. The saturation diving rate applies when divers are under pressure continuously until work task and decompression are complete. the diver rate shall be paid for all saturation hours.
WORK IN COMBINATION OF CLASSIFICATIONS:
Employees working in any combination of classifications within the diving crew (except dive supervisor) in a shift are paid in the classification with the highest rate for that shift.
CARP4059-001 09/01/2016
Rates Fringes
CARPENTER
Carpenter...................$ 38.34 25.04 Lather/Drywall Applicator...$ 36.59 22.59
ELEC1547-004 04/01/2017
Rates Fringes
CABLE SPLICER....................$ 39.82 3%+25.44
ELECTRICIAN......................$ 39.49 3%+25.69
ELEC1547-005 04/01/2017
Line Construction
Rates Fringes
CABLE SPLICER....................$ 52.57 3%+30.81
Linemen (Including Equipment Operators, Technician)...........$ 50.52 3%+30.81
Powderman........................$ 48.52 3%+30.81
TREE TRIMMER.....................$ 35.84 3%+23.56
ELEV0019-002 01/01/2017
Rates Fringes
ELEVATOR MECHANIC................$ 53.76 31.585+a+b
FOOTNOTE: a. Employer contributes 8% of the basic hourly rate for over 5 year's service and 6% of the basic hourly rate for 6 months to 5 years' of service as vacation paid credit. b. Eight paid holidays:
New Year's Day; Memorial Day; Independence Day;
Labor Day; Veteran's Day; Thanksgiving Day; Friday after Thanksgiving, and Christmas Day
ENGI0302-002 01/01/2017
Rates Fringes
POWER EQUIPMENT OPERATOR
GROUP 1.....................$ 40.28 22.65
GROUP 1A....................$ 42.04 22.65
GROUP 2.....................$ 39.51 22.65
GROUP 3.....................$ 38.79 22.65
GROUP 4.....................$ 32.58 22.65
TUNNEL WORK
GROUP 1....................$ 44.31 22.65
GROUP 1A...................$ 46.24 22.65
GROUP 2....................$ 43.46 22.65
GROUP 3....................$ 42.67 22.65
GROUP 4....................$ 35.84 22.65
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 1: Asphalt Roller: Breakdown, Intermediate, and Finish; Back Filler; Barrier Machine (Zipper); Beltcrete with power pack and similar conveyors; Bending Machine;
Boat Coxwains; Bulldozers; Cableways, Highlines and Cablecars; Cleaning Machine; Coating Machine; Concrete Hydro Blaster; Cranes-45 tons and under or 150 foot boom and under (including jib and attachments): (a) Hydralifts or Transporters, all track or truck type,(b) Derricks;
Crushers; Deck Winches-Double Drum; Ditching or Trenching Machine (16 inch or over); Drilling Machines, core, cable, rotary and exploration; Finishing Machine Operator, Concrete Paving, Laser Screed, Sidewalk, Curb and Gutter Machine; Helicopters; Hover Craft, Flex Craft, Loadmaster, Air Cushion, All Terrain Vehicle, Rollagon, Bargecable, Nodwell, and Snow Cat; Hydro Ax: Feller Buncher and similar; Loaders (2 1/2 yards through 5 yards, including all attachments): Forklifts with telescopic boom and swing attachment, Overhead and front end, 2 1/2 yards through 5 yards, Loaders with forks or pipe clamps; Loaders, elevating belt type, Euclid and similar types; Mechanics, Bodyman; Micro Tunneling Machine; Mixers: Mobile type w/hoist combination; Motor Patrol Grader; Mucking Machines:
Mole, Tunnel Drill, Horizontal/Directional Drill Operator, and/or Shield; Operator on Dredges; Piledriver Engineers, L. B. Foster, Puller or similar Paving Breaker; Power Plant, Turbine Operator, 200 k.w. and over (power plants or combination of power units over 300 k.w.); Scrapers-through 40 yards; Service Oiler/Service Engineer; Sidebooms-under 45 tons; Shot Blast Machine; Shovels, Backhoes, Excavators with all attachments, and Gradealls (3 yards and under), Spreaders, Blaw Knox, Cedarapids, Barber Greene, Slurry Machine; Sub-grader (Gurries, Reclaimer, and similar types); Tack tractor; Truck mounted Concrete Pumps, Conveyor, Creter; Water Kote Machine; Unlicensed off road hauler
GROUP 1A: Camera/Tool/Video Operator (Slipline), Cranes-over 45 tons or 150 foot (including jib and attachments): (a) Clamshells and Draglines (over 3 yards),
(b) Tower cranes; Licensed Water/Waste Water Treatment Operator; Loaders over 5 yds.; Certified Welder, Electrical Mechanic, Camp Maintenance Engineer, Mechanic (over 10,000 hours); Motor Patrol Grader, Dozer, Grade Tractor, Roto-mill/Profiler (finish: when finishing to final grade and/or to hubs, or for asphalt); Power Plants: 1000 k.w.
and over; Quad; Screed; Shovels, Backhoes, Excavators with all attachments (over 3 yards), Sidebooms over 45 tons;
Slip Form Paver, C.M.I. and similar types; Scrapers over 40 yards;
GROUP 2: Boiler-fireman; Cement Hog and Concrete Pump Operator; Conveyors (except as listed in group 1); Hoist on steel erection; Towermobiles and Air Tuggers;
Horizontal/Directional Drill Locator;Licensed Grade Technician; Loaders, (i.e., Elevating Grader and Material Transfer Vehicle); Locomotives: rod and geared engines;
Mixers; Screening, Washing Plant; Sideboom (cradling rock drill regardless of size); Skidder; Trencing Machine under 16 inches; Waste/ Waste Water Treatment Operator.
GROUP 3: "A" Frame Trucks, Deck Winches: single power drum;
Bombardier (tack or tow rig); Boring Machine; Brooms-power;
Bump Cutter; Compressor; Farm tractor; Forklift, industrial type; Gin Truck or Winch Truck with poles when used for hoisting; Grade Checker and Stake Hopper; Hoist, Air Tuggers, Elevators; Loaders: (a) Elevating-Athey, Barber Green and similar types (b) Forklifts or Lumber Carrier (on construction job site) (c) Forklifts with Tower (d) Overhead and Front-end, under 2 1/2 yds. Locomotives:Dinkey (air, steam, gas and electric) Speeders; Mechanics (light duty); Oil, Blower Distribution; Post Hole Diggers, mechanical; Pot Fireman (power agitated); Power Plant, Turbine Operator, under 200 k.w.; Pumps-water; Roller-other than Plantmix; Saws, concrete; Skid Steer with all attachments; Straightening Machine; Tow Tractor
GROUP 4: Rig Oiler/Crane Assistant Engineer;Parts and Equipment Coordinator; Swamper (on trenching machines or shovel type equipment); Spotter; Steam Cleaner; Drill Helper.
FOOTNOTE: Groups 1-4 receive 10% premium while performing tunnel or underground work. Rig Oiler/Crane Assistant Engineer shall be required on cranes over 85 tons or over 100 feet of boom.
IRON0751-003 07/01/2017
Rates Fringes
Ironworkers:
BRIDGE, STRUCTURAL,
ORNAMENTAL, REINFORCING
MACHINERY MOVER, RIGGER,
SHEETER, STAGE RIGGER,
BENDER OPERATOR.............$ 37.25 30.43
FENCE, BARRIER INSTALLER....$ 33.75 30.08
GUARDRAIL INSTALLERS........$ 34.75 30.08
GUARDRAIL LAYOUT MAN........$ 34.49 30.08
HELICOPTER, TOWER...........$ 38.25 30.43
LABO0341-005 04/01/2017
Rates Fringes
Laborers: South of the 63rd Parallel & West of Longitude 138 Degrees
GROUP 1.....................$ 30.55 26.72
GROUP 2.....................$ 31.55 26.72
GROUP 3.....................$ 32.45 26.72
GROUP 3A....................$ 35.73 26.72
GROUP 3B....................$ 39.27 24.01
GROUP 4.....................$ 20.12 26.72
TUNNELS, SHAFTS, AND RAISES
GROUP 1....................$ 33.61 26.72
GROUP 2....................$ 34.71 26.72
GROUP 3....................$ 35.70 26.72
GROUP 3A...................$ 39.30 26.72
GROUP 3B...................$ 43.20 24.01
LABORERS CLASSIFICATIONS
GROUP 1: Asphalt Workers (shovelman, plant crew); Brush Cutters; Camp Maintenance Laborer; Carpenter Tenders; Choke Setters, Hook Tender, Rigger, Signalman; Concrete Laborer(curb and gutter, chute handler, grouting, curing, screeding); Crusher Plant Laborer; Demolition Laborer;
Ditch Diggers; Dump Man; Environmental Laborer (asbestos (limited to nonmechanical systems), hazardous and toxic waste, oil spill); Fence Installer; Fire Watch Laborer;
Flagman; Form Strippers; General Laborer; Guardrail Laborer, Bridge Rail Installers; Hydro-Seeder Nozzleman;
Laborers (building); Landscape or Planter; Laying of Decorative Block (retaining walls, flowered decorative block 4 feet and below); Material Handlers; Pneumatic or Power Tools; Portable or Chemical Toilet Serviceman; Pump Man or Mixer Man; Railroad Track Laborer; Sandblast, Pot Tender; Saw Tenders; Scaffold Building and Erecting; Slurry Work; Stake Hopper; Steam Point or Water Jet Operator;
Steam Cleaner Operator; Tank Cleaning; Utiliwalk, Utilidor Laborer and Conduit Installer; Watchman (construction projects); Window Cleaner
GROUP 2: Burning and Cutting Torch; Cement or Lime Dumper or Handler (sack or bulk); Choker Splicer; Chucktender (wagon, airtrack and hydraulic drills); Concrete Laborers (power buggy, concrete saws, pumpcrete nozzleman, vibratorman);
Culvert Pipe Laborer; Cured in place Pipelayer;
Environmental Laborer (marine work, oil spill skimmer operator, small boat operator); Foam Gun or Foam Machine Operator; Green Cutter (dam work); Gunnite Operator; Hod Carriers; Jackhammer or Pavement Breakers (more than 45 pounds);Laying of Decorative Block (retaining walls, flowered decorative block above 4 feet); Mason Tender and Mud Mixer (sewer work); Pilot Car; Plasterer, Bricklayer and Cement Finisher Tenders; Power Saw Operator; Railroad Switch Layout Laborer; Sandblaster; Sewer Caulkers; Sewer Plant Maintenance Man; Thermal Plastic Applicator; Timber Faller, chain saw operator, filer; Timberman
GROUP 3: Alarm Installer; Bit Grinder; Guardrail Machine Operator; High Rigger and tree topper; High Scaler;
Multiplate; Slurry Seal Squeegee Man
GROUP 3A: Asphalt Raker, Asphalt Belly dump lay down; Drill Doctor (in the field); Drillers (including, but not limited to, wagon drills, air track drills; hydraulic drills);
Powderman; Pioneer Drilling and Drilling Off Tugger (all type drills); Pipelayers
GROUP 3B: Grade checker (setting or transfering of grade marks, line and grade)
GROUP 4: Final Building Cleanup
TUNNELS, SHAFTS, AND RAISES CLASSIFICATIONS
GROUP 1: Brakeman; Muckers; Nippers; Topman and Bull Gang;
Tunnel Track Laborer
GROUP 2: Burning and Cutting Torch; Concrete Laborers;
Jackhammers; Nozzleman, Pumpcrete or Shotcrete.
GROUP 3: Miner; Retimberman
GROUP 3A: Asphalt Raker, Asphalt Belly dump lay down; Drill Doctor (in the field); Drillers (including, but not limited to, wagon drills, air track drills; hydraulic drills);
Powderman; Pioneer Drilling and Drilling Off Tugger (all type drills); Pipelayers.
GROUP 3B: Grade checker (setting or transfering of grade marks, line and grade)
Tunnel shaft and raise rates only apply to workers regularly employed inside a tunnel portal or shaft collar.
LABO0942-001 04/01/2017
Rates Fringes
Laborers: North of the 63rd Parallel & East of Longitude 138 Degrees
GROUP 1.....................$ 30.55 26.72
GROUP 2.....................$ 31.55 26.72
GROUP 3.....................$ 32.45 26.72
GROUP 3A....................$ 35.73 26.72
GROUP 3B....................$ 39.27 24.01
GROUP 4.....................$ 20.12 26.72
TUNNELS, SHAFTS, AND RAISES
GROUP 1....................$ 33.61 26.52
GROUP 2....................$ 34.71 26.52
GROUP 3....................$ 35.70 26.52
GROUP 3A...................$ 39.30 26.52
GROUP 3B...................$ 43.20 23.81
LABORERS CLASSIFICATIONS
GROUP 1: Asphalt Workers (shovelman, plant crew); Brush Cutters; Camp Maintenance Laborer; Carpenter Tenders; Choke Setters, Hook Tender, Rigger, Signalman; Concrete Laborer(curb and gutter, chute handler, grouting, curing, screeding); Crusher Plant Laborer; Demolition Laborer;
Ditch Diggers; Dump Man; Environmental Laborer (asbestos (limited to nonmechanical systems), hazardous and toxic waste, oil spill); Fence Installer; Fire Watch Laborer;
Flagman; Form Strippers; General Laborer; Guardrail Laborer, Bridge Rail Installers; Hydro-Seeder Nozzleman;
Laborers (building); Landscape or Planter; Laying of Decorative Block (retaining walls, flowered decorative block 4 feet and below); Material Handlers; Pneumatic or Power Tools; Portable or Chemical Toilet Serviceman; Pump Man or Mixer Man; Railroad Track Laborer; Sandblast, Pot Tender; Saw Tenders; Scaffold Building and Erecting; Slurry Work; Stake Hopper; Steam Point or Water Jet Operator;
Steam Cleaner Operator; Tank Cleaning; Utiliwalk, Utilidor Laborer and Conduit Installer; Watchman (construction projects); Window Cleaner
GROUP 2: Burning and Cutting Torch; Cement or Lime Dumper or Handler (sack or bulk); Choker Splicer; Chucktender (wagon, airtrack and hydraulic drills); Concrete Laborers (power buggy, concrete saws, pumpcrete nozzleman, vibratorman);
Culvert Pipe Laborer; Cured in place Pipelayer;
Environmental Laborer (marine work, oil spill skimmer operator, small boat operator); Foam Gun or Foam Machine Operator; Green Cutter (dam work); Gunnite Operator; Hod Carriers; Jackhammer or Pavement Breakers (more than 45 pounds);Laying of Decorative Block (retaining walls, flowered decorative block above 4 feet); Mason Tender and Mud Mixer (sewer work); Pilot Car; Plasterer, Bricklayer and Cement Finisher Tenders; Power Saw Operator; Railroad Switch Layout Laborer; Sandblaster; Sewer Caulkers; Sewer Plant Maintenance Man; Thermal Plastic Applicator; Timber Faller, chain saw operator, filer; Timberman
GROUP 3: Alarm Installer; Bit Grinder; Guardrail Machine Operator; High Rigger and tree topper; High Scaler;
Multiplate; Slurry Seal Squeegee Man
GROUP 3A: Asphalt Raker, Asphalt Belly dump lay down; Drill Doctor (in the field); Drillers (including, but not limited to, wagon drills, air track drills; hydraulic drills);
Powderman; Pioneer Drilling and Drilling Off Tugger (all type drills); Pipelayers
GROUP 3B: Grade checker (setting or transfering of grade marks, line and grade)
GROUP 4: Final Building Cleanup
TUNNELS, SHAFTS, AND RAISES CLASSIFICATIONS
GROUP 1: Brakeman; Muckers; Nippers; Topman and Bull Gang;
Tunnel Track Laborer
GROUP 2: Burning and Cutting Torch; Concrete Laborers;
Jackhammers; Nozzleman, Pumpcrete or Shotcrete.
GROUP 3: Miner; Retimberman
GROUP 3A: Asphalt Raker, Asphalt Belly dump lay down; Drill Doctor (in the field); Drillers (including, but not limited to, wagon drills, air track drills; hydraulic drills);
Powderman; Pioneer Drilling and Drilling Off Tugger (all type drills); Pipelayers.
GROUP 3B: Grade checker (setting or transfering of grade marks, line and grade)
Tunnel shaft and raise rates only apply to workers regularly employed inside a tunnel portal or shaft collar.
PAIN1959-001 07/01/2017
NORTH OF THE 63RD PARALLEL
Rates Fringes
PAINTER
BRUSH/ROLLER PAINT OR WALL
COVERER.....................$ 31.99 20.29
TAPING, TEXTURING,
STRUCTURAL PAINTING,
SANDBLASTING, POT TENDER,
FINISH METAL, SPRAY,
BUFFER OPERATOR, RADON
MITIGATION, LEAD BASED
PAINT ABATEMENT, HAZARDOUS
MATERIAL HANDLER............$ 32.51 20.29
PAIN1959-002 07/01/2017
SOUTH OF THE 63RD PARALLEL
Rates Fringes
PAINTER
Brush, Roller, Sign, Paper and Vinyl, Swing Stage, Hand Taper/Drywall, Structural Steel, and Commercial Spray............$ 30.23 20.04 Machine Taper/Drywall.......$ 31.48 20.04 Spray-Sand/Blast, Epoxy and Tar Applicator..........$ 31.58 20.04
PAIN1959-003 07/01/2017
NORTH OF THE 63RD PARALLEL
Rates Fringes
GLAZIER..........................$ 38.63 22.39
PAIN1959-004 07/01/2017
Rates Fringes
FLOOR LAYER: Carpet.............$ 29.23 13.96
PAIN1959-006 07/01/2017
SOUTH OF THE 63RD PARALLEL
Rates Fringes
GLAZIER..........................$ 38.63 21.67
PLAS0867-001 02/01/2016
PLASTERER
North of the 63rd parallel..$ 37.25 20.41 South of the 63rd parallel..$ 37.00 20.41
PLAS0867-004 02/01/2016
Rates Fringes
CEMENT MASON/CONCRETE FINISHER
North of the 63rd parallel..$ 37.25 20.41 South of the 63rd parallel..$ 37.00 20.41
PLUM0262-002 01/01/2017
East of the 141st Meridian
Rates Fringes
Plumber; Steamfitter.............$ 38.02 26.72
PLUM0367-002 07/01/2017
South of the 63rd Parallel
Rates Fringes
Plumber; Steamfitter.............$ 39.00 23.80
PLUM0375-002 07/01/2017
North of the 63rd Parallel
Rates Fringes
Plumber; Steamfitter.............$ 40.91 25.40
PLUM0669-002 04/01/2017
Rates Fringes
SPRINKLER FITTER.................$ 46.00 23.29
ROOF0189-006 04/01/2016
Rates Fringes
ROOFER...........................$ 42.62 15.50
SHEE0023-003 07/01/2017
South of the 63rd Parallel
SHEET METAL WORKER...............$ 42.00 24.82
SHEE0023-004 07/01/2017
North of the 63rd Parallel
Rates Fringes
SHEET METAL WORKER...............$ 47.74 23.48
* TEAM0959-003 09/01/2017
Rates Fringes
TRUCK DRIVER
GROUP 1.....................$ 39.59 21.97
GROUP 1A....................$ 40.86 21.97
GROUP 2.....................$ 38.33 21.97
GROUP 3.....................$ 37.51 21.97
GROUP 4.....................$ 36.93 21.97
GROUP 5.....................$ 36.17 21.97
GROUP 1: Semi with Double Box Mixer; Dump Trucks (including rockbuggy and trucks with pups) over 40 yards up to and including 60 yards; Deltas, Commanders, Rollogans and similar equipment when pulling sleds, trailers or similar equipment; Boat Coxswain; Lowboys including attached trailers and jeeps, up to and including 12 axles; Ready-mix over 12 yards up to and including 15 yards); Water Wagon (250 Bbls and above); Tireman, Heavy Duty/Fueler
GROUP 1A: Dump Trucks (including Rockbuggy and Trucks with pups) over 60 yards up to and including 100 yards; Jeeps (driver under load)
GROUP 2: Turn-O-Wagon or DW-10 not self-loading; All Deltas, Commanders, Rollogans, and similar equipment; Mechanics;
Dump Trucks (including Rockbuggy and Trucks with pups) over 20 yards up to and including 40 yards; Lowboys including attached trailers and jeeps up to and including 8 axles;
Super vac truck/cacasco truck/heat stress truck; Ready-mix over 7 yards up to and including 12 yards; Partsman;
Stringing Truck
GROUP 3: Dump Trucks (including Rockbuggy and Trucks with pups) over 10 yards up to and including 20 yards; batch trucks 8 yards and up; Oil distributor drivers; Oil Distributor Drivers; Trucks/Jeeps (push or pull); Traffic Control Technician
GROUP 4: Buggymobile; Semi or Truck and trailer; Dumpster;
Tireman (light duty); Dump Trucks (including Rockbuggy and Truck with pups) up to and including 10 yards; Track Truck Equipment; Grease Truck; Flat Beds, dual rear axle; Hyster Operators (handling bulk aggregate); Lumber Carrier; Water
Wagon, semi; Water Truck, dual axle; Gin Pole Truck, Winch Truck, Wrecker, Truck Mounted "A" Frame manufactured rating over 5 tons; Bull Lifts and Fork Lifts with Power Boom and Swing attachments, over 5 tons; Front End Loader with Forks; Bus Operator over 30 passengers; All Terrain Vehicles; Boom Truck/Knuckle Truck over 5 tons; Foam Distributor Truck/dual axle; Hydro-seeders, dual axle;
Vacuum Trucks, Truck Vacuum Sweepers; Loadmaster (air and water); Air Cushion or similar type vehicle; Fire Truck/Ambulance Driver; Combination Truck-fuel and grease;
Compactor (when pulled by rubber tired equipment); Rigger (air/water/oilfield); Ready Mix, up to and including 7 yards;
GROUP 5: Gravel Spreader Box Operator on Truck; Flat Beds, single rear axle; Boom Truck/Knuckle Truck up to and including 5 tons; Pickups (Pilot Cars and all light duty vehicles); Water Wagon (Below 250 Bbls); Gin Pole Truck, Winch Truck, Wrecker, Truck Mounted "A" Frame, manufactured rating 5 tons and under; Bull Lifts and Fork Lifts (fork lifts with power broom and swing attachments up to and including 5 tons); Buffer Truck; Tack Truck; Farm type Rubber Tired Tractor (when material handling or pulling wagons on a construction project); Foam Distributor, single axle; Hydro-Seeders, single axle; Team Drivers (horses, mules and similar equipment); Fuel Handler (station/bulk attendant); Batch Truck, up to and including 7 yards;
Gear/Supply Truck; Bus Operator, Up to 30 Passengers;
Rigger/Swamper
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
SECTION SF 30 - BLOCK 14 MODIFICATION CONTINUATION PAGE
The following have been added by full text:
PRE-BID TELECONFERENCE
W911KB-18-B-0001
NOM013
2018-2020 Maintenance Dredging Nome, Alaska Pre-Bid Teleconference 15-Nov-2017 10am Alaska Time
• Roll Call of Participants U.S. Army Corps of Engineers
Christine Dale Contracting Officer Kelly McGavran Civil Engineer Tech Eric Morey Contracting Officers Representative Michael Tencza Project Manager Al Arruda Cost Engineer Christopher Taylor Contract Specialist
Offerors
Cap Shafer Alaska Marine Excavation, LLC.
Others
Joy Baker City of Nome
• Contract Front End Type of Solicitation: Invitation for Bid (sealed bid) Magnitude of Construction: Between $5M and $10M Contract Period: Base year + two option years Process for Responding to Questions (Bidder Inquiry): See Section 00 21 00 Process for Bid Submittal: See Section 00 11 00 and Section 00 21 00 Bid Bond : can be electronic till the apparent winner is selected then must be furnished on paper Bids: arrangements will not be made by USACE contracting to bring contractors on base to deliver bids. Bids shall be delivered by courier service, electrically or in person without assistance from USACE contracting to get on JBER.
• Solicitation Schedule
Issued: 03-Nov-2017 Bids Due: 06-Dec-2017 at 2:00pm Alaska time Award: On or about 12-Jan-2018
• General Overview of Maintenance Dredging
Location: Nome is located in northwest Alaska along Norton Sound.
Harbor Description: Nome Harbor includes an entrance channel approximately
4,200 feet long with varying width. The outer entrance channel is dredged to -22 feet mean lower low water (MLLW). The channel then transitions to -12 feet MLLW in the inner entrance channel. The harbor approach channel and inner harbor are maintained to a depth of -10 feet MLLW. The east sediment trap, located adjacent to the Nome causeway bridge, is dredged to -22 feet MLLW.
Equipment: No equipment is specified for this contract. Historically, a cutterhead suction pipeline dredge has been used. The Contractor shall select equipment appropriately capable of dredging and restrict the placement of dredging equipment to only that required to accomplish the work.
Dredge Material: Long-shore transport, storm driven waves, and riverine sediment contribute to shoaling of the project. Materials to be dredged include, but are not limited to, silt, sand, gravel, cobbles, boulders, and miscellaneous debris. It is the Contractor’s responsibility to remove and properly dispose of any such miscellaneous debris at no additional cost to the Government. Obstructions shown on sheet C-102 of the drawings are not required to be removed in this contract.
Work Areas: Maintenance dredging is divided into work areas for three contract line items (CLINs) each dredge season. Dredging in the inner harbor, harbor approach channel, inner entrance channel, and transition are grouped under one CLIN with an estimated 24,000 cubic yards (CY) per dredge season. See the bid schedule for sub-divided items AA (12,000 CY) and AB (12,000 CY). Reference items 2, 3, and 6 in the NOTES TO BIDDERS. There are also optional CLINs for maintenance dredging the outer entrance channel with an estimated quantity of 20,000 CY per dredge season and the east sediment trap with an estimated quantity of 25,000 CY per dredge season. See the bid schedule for the sub-divided items.
Construction Schedule: Reference clause 52.211-10, Section 01 57 20.00 10, and Section 31 09 13.00 29. The timing of the dredge start date at Nome is dependent on ice out of the harbor and completion of the pre-dredge survey. Ice out of the harbor typically occurs June 1st through June 16th each year. An environmental fish window requires in-water maintenance dredging to be complete by June 30th each dredge season for the harbor approach channel and inner harbor. Dredging of the base items shall be complete by July 31st, 2018. If the optional items for the outer entrance channel and/or east sediment trap are exercised, then dredging shall be complete by August 31st, 2018. Optional items for maintenance dredging in 2019 and 2020 follow a similar schedule each season.
Fuel: CLINs in the bid schedule for fuel shall not be used to pay for mobilization, demobilization, or any support equipment such as survey vessels or land based equipment as described in Section 01 22 00.00 10. Following contract award the Contractor shall submit an estimated fuel consumption rate (gallons/CY) for their dredge equipment per Section 01 19 40.00 29. During construction the Contractor shall provide dated fuel receipts/invoices to the Contracting Officer and promptly notify the Government when 85% of the not to exceed fuel cost for dredging has been reached. Payment shall be made less the computed fuel cost associated with material dredged below/outside the dredge prism. Reference items 1, 4, and 5 in the NOTES TO BIDDERS.
Surveys: Pre-dredge, interim (if exercised), and post-dredge surveys shall be the basis of payment for the dredged quantity as described in Section 01 22 00.00 10 and conducted by an independent surveyor meeting the requirements of Section 31 09 13.00 29. Pre-dredge survey(s) shall be completed and approved before maintenance dredging begins each season unless approved otherwise by the Contracting Officer or their designated representative. Daily soundings as described in Section 31 09 13.00 29 are not required to be performed by an independent surveyor. Post-dredge survey(s) indicating that required depth was achieved shall be completed as described in Section 31 09 13.00 29 prior to demobilization. If required depths were not achieved in the post-dredge survey(s), then the Contractor shall remove required material and re-survey using their independent surveyor at no additional cost to the Government.
Changes from Previous Contract: The dredge limits in the outer entrance channel were extended seaward approximately 200 feet to address a shoal starting to build along the toe of the main breakwater. Survey limits were expanded to provide continuous coverage between the causeway and main breakwater while adjustments were also made to the location and collection frequency of beach profiles. Many updates were made throughout the survey requirements in Section 31 09 13.00 29. Note that this is not a complete summary of all changes. Offerors should thoroughly review this solicitation prior to submitting their bid.
(End of Summary of Changes)