Dam_44_Spillway_Approach_MarkupPg_6_to_10.pdf

PDF 3 MB Posted

Attached to
Maintenance of DAMS 44, 48, and 50
Solicitation number
W91151-19-B-0020
Issued by

About this file

Pg. 6 to 10

View the file

Other files

File Type Posted
W91151-19-B-0020.docx DOCX document
Dam_44_Spillway_Approach_MarkupPg_11_to_14.pdf PDF
Dam_44_Spillway_Approach_MarkupPg_3_to_5.pdf PDF
Dam_44_Spillway_Approach_MarkupPg1_to_2.pdf PDF
Bid_Abstract_19B0020__FBO.GOV_09-9-2019.pdf PDF
Dam_44_-Spillway_Markup_Pg._11__to_14__8-30-2019.pdf PDF
Dam_44_-Spillway_Markup_Pg._6__to_10__8-30-2019.pdf PDF
Dam_44_-Spillway_Markup_Pg._1_to_2_8-30-2019.pdf PDF
Dam_44_-Spillway_Markup_Pg._3_to_5__8-30-2019.pdf PDF
Dam_44_Spillway_Approach_Markup_pg._5_to_6_.pdf PDF
Dam_44_Spillway_Approach_Markup_pg._12_to_14_final_.pdf PDF
Dam_44_Spillway_Approach_Markup_pg._7_to_8_.pdf PDF
Dam_44_Spillway_Approach_Markup_pg._9_to__11_.pdf PDF
Dam_44_Spillway_Approach_Markup_pg._1_to_2_.pdf PDF
Dam_44_Spillway_Approach_Markup_pg._3_to_4_.pdf PDF
Amendment-03_W9115119B0020_8-28-2019.pdf PDF
Released-_W91151-19-B-0020_Amend-02_8-20-2019.pdf PDF
Amend-01_8-15-2019.pdf PDF
AD007067P_-_Rehab_Dam_44_Tech_Exh_B-_Drawings_-Pg._12-14_.pdf PDF
AD002635P_-_Rehab_Dam_50__Tech_Exh_B-_Drawings_5_-8.pdf PDF
AD002625P_-_Rehab_Dam_48_Tech_Exh_B-_Drawings_Pg._5-7.pdf PDF
AD007067P_-_Rehab_Dam_44_Tech_Exh_B-_Drawings_-Pg._1-4_.pdf PDF
AD002625P_-_Rehab_Dam_48_Tech_Exh_B-_Drawings_Pg._1-4.pdf PDF
W9115119B0020_7-26-2019.pdf PDF
AD002635P_-_Rehab_Dam_50_Specifications_(Tech_Exh._A)_rev.pdf PDF
AD007067P_-_Rehab_Dam_44_Tech_Exh_B-_Drawings_-Pg._9-11_.pdf PDF
AD002625P_-_Rehab_Dam_48_Tech_Exh_B-_Drawings_Pg._8-_11.pdf PDF
AD002625P_-_Rehab_Dam_48_Tech_Exh_B-_Drawings_Pg._12-_14.pdf PDF
AD002625P_-_Rehab_Dam_48_Specifications_(Tech_Exh._A)_rev.pdf PDF
AD002635P_-_Rehab_Dam_50__Tech_Exh_B-_Drawings_13-_TXDOT_1(3).pdf PDF
AD007067P_-_Rehab_Dam_44_Tech_Exh_B-_Drawings_-Pg._5-8_.pdf PDF
AD002635P_-_Rehab_Dam_50__Tech_Exh_B-_Drawings_1-_4.pdf PDF
AD007067P_-_Rehab_Dam_44_Specifications_(Tech_Ex._A)_rev.pdf PDF
AD002635P_-_Rehab_Dam_50__Tech_Exh_B-_Drawings_9-_12.pdf PDF
Rehab_Dam_50__Tech_Exh_B-_Drawings__(1)_TXDOT_1(4)_to_(1)_Layout_1_(2).pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Spillway approach channel

REMOVE SEDIMENT AND

VEGETATION FROM

SPILLWAY APPROACH

CHANNEL. SEE NOTE 2.

Hatch the approach channel sediment removal area. Use a hatch that has a lot of white space so the contours are clearly visible below the hatch.

CONSTRUCTION

Adjust construction limits to include the new sediment removal area

Update limits

2. Remove cattails, vegetation, accumulated sediment and debris within the spillway approach channel. For bidding purposes, assume that the sediment is 2-ft thick.

REMOVE SEDIMENT

AND VEGETATION

FROM SPILLWAY

APPROACH

CHANNEL. SEE NOTE

3.

Hatch the approach channel sediment removal area. Use a hatch that has a lot of white space so the contours are clearly visible below the hatch.

3. Remove cattails, vegetation, accumulated sediment and debris within the spillway approach channel. For bidding purposes, assume that the sediment is 2-ft thick.

File details come from the government source that posted it.