RFI Questions and Responses
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid_Opening_W91151-19-B-0014_Sign_in.pdf | ||
| Bid_Abstract_W91151-19-B-0014_Renovate_BLDG_9591.pdf | ||
| FollowUp_RFIs_-_AD105978P.DOCX | DOCX document | |
| Amendment_04_W91151-19-B-0014.pdf | ||
| W91151-19-B-0014_Amendment_0003.pdf | ||
| REVISED_DRAWINGS_-_AD105978P.PDF | ||
| Amend-02_W9115119B0014_26Jul19.pdf | ||
| Amended_Solicitation_W91151-19-B-0014_Renovate_BLDG_9591.pdf | ||
| Solicitation_W91151-19-B-0014_Renovate_BLDG_9591.pdf | ||
| Technical_Exhibit_B_-_Drawings_(1).pdf | ||
| Technical_Exhibit_C_-_As_Builts_(1).pdf | ||
| Technical_Exhibit_A_-_Specifications_1-11-16_(1).pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUESTIONS FROM INDUSTRY
W91151-19-B-0014
Renovate Bldg. 9591 on Fort Hood, TX, DPW Project AD105978P
Please see below Contractor Question is response of Site Visit
1. On the existing cabinets there were hasps for pad locks. Do you want the new cabinets to have this?
No
2. Do you want the Ice Machine water line insulted?
No
3. On the plans it doesn’t say what type of texture you want. The existing is vinyl wallpaper.
Orange peel texture on all new GWB.
4. On the plans it doesn’t mention what color you want the paint.
Paint shall match gray wallpaper
5. Do you want cove base on the new walls?
Yes, new GWB walls shall have 4” vinyl wall base.
6. When the old Floor vinyl gets demo’d the old cove base may be damaged. Do you want to replace the cove base in all the areas where we are installing new vinyl?
Yes
7. What do you want done with existing cubes that are being replaced?
Turn existing equipment over to the government.
8. Who is responsible for moving the file cabinets Assume contractor will move all existing furniture.
9. Will the building be occupied during construction?
Yes
10. At the job walk they mentioned the roof will be replaced. Will you update the plans.
Yes, see updated plans.
11. At the job walk they mentioned the 2 wall mounted HVAC units will be replaced. Will the plans be updated?
Yes, see updated plans.
12. Will we need to access under this building? If so will this be considered confined space?
Yes, and it will be considered confined space.
13. On page A-101 note 4. It says to remove all paint from the landing stairs and ramp. Do you want it removed to the metal? Do you want the hand rails done as well?
Yes, all the way to the metal. Hand rails also.
Additional Changes to the Plans per the users’ request:
· Added a door into the kitchenette area, see revised plans.
· Added ceiling ducted transfers from 3 offices into open bay area, see revised plans.