Follow up RFI's

View the file

Other files for this federal contract opportunity

Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AD105978P – RENOVATE BLDG 9591

FOLLOW-UP RFI’S 8/9/19

1. What type of door do we install in the kitchen? The existing door is a mobile home door.

Install a hollow-metal door to match the style of the existing “mobile home door”.

2. What type of stair landing do we install?

Steel landing, stair, and roof.

3. Is the roof attached to the new stair landing or on its own 4 post?

Canopy/roof shall be attached to the stair landing.

4. What type of roof is on the new stair landing?

Steel R-panel.

5. If we remove 2 panels under the building on opposite sides of the building will this remove the confined space definition? By definition you must have a means of entry and ingress to not be considered confined space.

Under the OSHA standard, this area is a confined space.

6. Is the intent to sand the metal enough to apply new paint on without stripping it completely down to bare metal?

Intent is to strip/sand down to bare metal and refinish ramp/stairs/handrails/posts to like-new condition.

7. Can equipment pad be placed directly on top of the asphalt versus cutting 6 inch grade beams all around?

No, install pads per drawings.

8. Is there any HVAC duct details?

Please see the provided Technical Exhibit C for existing ductwork sizing and layout. New supply and return ductwork shall be 18" X 18" and be connected to the existing supply plenums and return grilles, respectively. All new ductwork shall be installed and insulated per specs.

9. Is there any HVAC electrical details?

Please see the attached Technical Exhibit C and photos for existing HVAC power requirements and disconnect locations.

10. Will handwash station be required along with porta potty?

Yes

11. Will the newly constructed canopy at the rear entrance need to be attached to the roofing system in place or is it to be free standing?

Free standing.

12. Are we to incorporate the new dura-last roofing system over the canopies as well as the existing roof structure?

No.

13. Since the HVAC was not something we needed to look at on the original site visit, what is the electrical information, amperage, phase, voltage, etc., of each HVAC unit that needs to be replaced?

Please see the attached Technical Exhibit C and photos for existing HVAC power requirements and disconnect locations.

14. Will we need to remove and replace the existing HVAC units inside & outside means of disconnect?

Contractor shall demolish all disconnects for existing units and install a new, outdoor disconnect in a NEMA 3R enclosure for each.