W9115118B0007

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00010 - SOLICITATION CONTRACT FORM

The following have been added by full text:

ANSWERS TO RFI'S FROM INDUS TR

1. Will this project require a Storm Water Pollution Prevention Plan (SWPPP)

Yes.

2. How long can we shut down the taxiway to install each culvert?

See phasing plans and notes on contracting drawings. There are not set durations of each phase, but each phase needs to be complete before moving onto the next phase of work. All work needs to be completed within the overall duration of the project.

3. Is this contract required to have a standalone QC Manager?

The contract does not require a dedicated QC Manager however the QC Manager can have no other duties than QC on the contract as specified under sections 01 5 01.00 20.

4. Is this contract required to have a standalone Superintendent?

The contract requires a Superintendent to be on site at all times work is being performed in accordance with specification 01 45 01.00 20. a full-time dedicated Superintendent (IAW 52.236-6, Superintendence by the Contractor).

5. Is this contract required to have a standalone SSHO?

The superintended may be the SSHO or can be a standalone person.

6. Can any of these positions have a dual role? Ex: Can the QC Manager also fulfill the SSHO Duties?

Per spec 01 45 01.0020: "The QCM shall have no other duties than quality control and shall provide adequate oversight of the project to ensure compliance with the quality provisions of the contract. The QCM will implement a Quality Control Plan in accordance with the specifications in the contract."

SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS

The following have been modified:

52.252-3 ALTERATIONS IN SOLICITATION (APR 1984)

Amendment 01 – Change RFI due date.

Amendment 02 – Answers to RFI

(End of Summary of Changes) image1.wmf