Technical_Exhibit_A-Specs.pdf

PDF 2 MB Posted

Attached to
Replace Oil and Water Separator at Washrack
Solicitation number
W91151-17-B-0041
Issued by

About this file

Exhibit A, Technical Exhibit A-Specifications

View the file

Other files

File Type Posted
Appendix_A_Specifications.pdf PDF
Technical_Exhibit_B_Drawings.pdf PDF
W91151-17-B-0041_Final.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Headquarters III Corps, Fort Hood Directorate of Public Works (DPW)

Technical Exhibit “A”

REPLACE OIL WATER SEPARATOR

44015

SPECIFICATIONS

APRIL 29, 2017

Contract No. W91151-17-C-XXXX

Directorate of Public Works Engineering Division

US Army, III Corps 4612 Engineer Dr.

Fort Hood, TX 76544

DPW Specification Jan 11, 2016

DPWSPECS TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 32 01.00 10 1 JAN PROJECT SCHEDULE

01 33 00 1 JAN SUBMITTAL PROCEDURES

01 35 13 1 JAN SPECIAL PROJECT PROCEDURES

01 35 23.00 40 1 JAN OWNER SAFETY REQUIREMENTS

01 35 29 1 JAN SAFETY AND OCCUPATIONAL HEALTH REQUIREMENTS

01 45 01.00 20 1 JAN QUALITY CONTROL (QC)

01 57 20.00 10 1 JAN ENVIRONMENTAL PROTECTION

01 77 00 1 JAN CLOSEOUT PROCEDURES

01 78 23 1 JAN OPERATION AND MAINTENANCE DATA

01 80 00 1 JAN UTILITIES

DIVISION 02 - EXISTING CONDITIONS

02 41 00 10/14 DEMOLITION

DIVISION 03 - CONCRETE

03 30 00 09/14 CAST-IN-PLACE CONCRETE

DIVISION 05 - METALS

05 12 00 11/11

05 50 13 04/06

STRUCTURAL STEEL

METAL: MISCELLANEOUS AND FABRICATIONS

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 60 00 07/14 FLASHING AND SHEET METAL

MASTER TABLE OF CONTENTS Page 1

DIVISION 26 - ELECTRICAL

26 00 00.00 20 09/14 BASIC ELECTRICAL MATERIALS AND METHODS

INTERIOR DISTRIBUTION SYSTEMS26 20 00

DIVISION 31 - EARTHWORK

0031 00 08/14 EARTHWORK

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 01 19 32 11 23 32 13 13.06

FIELD MOLDED SEALANTS FOR PAVEMENT

AGGREGATE BASE COURSE

PORTLAND CEMENT CONTCRETE PAVEMENTS

DIVISION 33 - UTILITIES

33 34 00 33 40 00 33 71 02

FORCE MAINS AND INVERTED SIPHONS

STORM DRAINAGE UTILITIES

UNDERGROUND ELECTRICAL DISTRIBUTION

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 140 PAGES

01 32 01.00 10 SD-01 Preconstruction Submittals

3.4.2 GInitial Project Schedule

3.4.1 GProgram Project Schedule

3.4.3 GPeriodic Schedule Update

01 35 13 SD-01 Preconstruction Submittals

1.4.7 GSupport Subcontractor Awards

1.4.2 GDigging And Water Use Permits

1.5.3 GStorm Water Prevention Pollution

Plan (SWPPP)

1.5.6 GWater Use Permit

1.4.1 GFort Hood Airfield Access

1.5.4 GTraffic Control Plan

1.5.5 GArmy Radiation Permit

1.5.8 GUtility Metering Permit

GRange Passes

1.5.10.1 GAT Level I Training

1.4.9.4 GOPSEC Training

01 35 23.00 40 SD-01 Preconstruction Submittals

1.3.1 GContractor's Health and Safety

Plan SD-06 Test Reports

1.14Gas Protection SD-07 Certificates

1.3.2Protection Plan 1.11License Certificates

01 35 29 SD-01 Preconstruction Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 140 PAGES

01 35 29 GActivity Hazard Analysis

1.13 GCrane Critical Lift Plan

GCrane Operators GConfined Space Entry Permit

SD-06 Test Reports Accident Reports

1.11.1Regulatory Citations and Violations

01 45 01.00 20 SD-01 Preconstruction Submittals

3.1 G3-Key Personal

GQuality Control Plan (QCP) 01 57 20.00 10 SD-01 Preconstruction Submittals

3.4.1Air Permits

3.8.1 GEnvironmental Manager

SD-11 Closeout Submittals Contractor Hazardous Material Inventory and Consumption Log

3.4.1 GAir Permits

Refrigerant Equipment Service Log

Emissions Inventory Questionnaire for New Sources

3.4.2Emission Inventory 3.9.2Recycle Weight Tickets 3.9.3Construction Waste Tickets

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 140 PAGES

01 77 00 SD-10 Operation and Maintenance Data

GEquipment/Product Warranty List SD-11 Closeout Submittals

GCertification of EPA Designated Items

GForm DD1354 (and Appendix D where applicable)

GVideos GFinal Operation and Maintenance

Manuals GFinal Record Drawings GInventory of Contractor Furnished and Installed Equipment 02 41 00 SD-01 Preconstruction Submittals

GDemolition Plan GUtility Cut and Cap Plan

SD-07 Certificates Asbestos and Lead Based Paint Notification Forms submitted to Texas Department of State Health Services

FIO

SD-11 Closeout Submittals Receipts

FIO

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 140 PAGES

02 82 00 SD-03 Product Data 1.3.8Material Safety Data Sheets

(MSDS) for all materials proposed for transport to the project site

FIO

SD-06 Test Reports

1.5.5Air sampling results

FIO

3.3.3.2Asbestos disposal quantity report 3.2.7.3Clearance sampling

GAsbestos Survey Report showing quantities and locations

SD-07 Certificates 1.3.9Asbestos hazard abatement plan

FIO

1.3.10Testing laboratory

Private qualified person 1.5.4Contractor's license 1.5.2Competent person 1.5.3Worker's license 1.3.11Landfill approval 1.3.3Employee training

Medical certification requirements 1.3.11Waste shipment records 1.3.6Respiratory Protection Program

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 140 PAGES

02 82 00 1.3.11Delivery tickets 1.3.4Notifications

Notifications to Texas Department of State Health Services; G

SD-11 Closeout Submittals 1.3.4Notifications 1.3.4Permits and licenses

02 82 18.00 20 SD-06 Test Reports 1.5.4Air sampling results 3.2.8.2Clearance sampling

SD-07 Certificates 1.3.9Mold remediation plan

Private qualified person documentation (Mold assessors, remediators)

1.5.3Contractor's license Responsible person

1.3.4Notifications 1.3.4Notifications

SD-11 Closeout Submittals 1.3.4Notifications 1.3.4Notifications

02 82 33.13 20 SD-03 Product Data 1.6.4Vacuum Filters 1.6.1Respirators

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 140 PAGES

02 82 33.13 20 SD-06 Test Reports 1.5.2.3sampling results 1.5.2.3Occupational and Environmental

Assessment Data Report SD-07 Certificates

1.5.1.1 GQualifications of CP

1.5.1.3Testing Laboratory 3.1.1.1Occupant Notification

1.5.1.2 GTraining Certification

GNotification of the Commencement of LBP Hazard Abatement activities

1.5.1.4 GThird Party Consultant

Qualifications

1.5.3lead-based paint/paint with lead removal/control plan

1.5.2.6Respiratory Protection Program 1.5.2.7Hazard Communication Program approved hazardous waste treatment, storage, or disposal facility

1.5.2.8Lead Waste Management Plan 3.5.1.1Clearance Certification

SD-11 Closeout Submittals 3.5.2.1hazardous waste manifest

03 30 00 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 140 PAGES

03 30 00 1.4.2.1 GReinforcing steel SD-05 Design Data

2.3.1 Gmix design

SD-06 Test Reports

3.12.2.2Compressive strength tests

FIO

3.12.2.1Slump Tests SD-07 Certificates

2.5.1Reinforcing Bars

FIO

04 01 41 SD-03 Product Data Cleaning and Restoration Methods

04 20 00 SD-03 Product Data Shop Drawings Reinforcing Steel

1.5.1Local/Regional Materials Masonry Blends being used; to include each type of rock included in blend

Environmental Data Brick

2.2Concrete Masonry Units (CMU) 2.5Water-Repellant Admixture

SD-04 Samples 2.2Concrete Masonry Units (CMU)

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 140 PAGES

04 20 00 2.1Clay or Shale Brick SD-08 Manufacturer’s Instructions

2.4.2Masonry Cement 05 12 00 SD-02 Shop Drawings

Fabrication drawings; G SD-06 Test Reports

2.2Bolts, nuts, and washers SD-07 Certificates

2.1Steel 2.5Galvanizing 1.4AISC Quality Certification

AISC Fabrication Plant Quality Certification

05 40 00 SD-02 Shop Drawings 1.5.1Framing Components

SD-03 Product Data 2.1studs,joists

SD-05 Design Data 1.5.2Metal framing calculations 3.1.1Welds

05 50 00 SD-02 Shop Drawings 2.20steel stairs 2.22structural steel door frames 2.9Floor gratings and roof walkways 2.12Handrails 2.13Ladders

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 140 PAGES

05 50 00 3.14Roof hatch SD-03 Product Data

2.9Floor gratings and roof walkways 2.12Handrails 2.13Ladders 2.20Steel stairs 2.22Structural steel door frames 3.14Roof hatch

06 20 00 SD-03 Product Data Cabinetry hardware

SD-04 Samples Cabinetry and couter top Moldings

2.3Fascias and Trim 07 21 17 SD-03 Product Data

3.3.1Insulation Vapor retarder

SD-08 Manufacturer’s Instructions 3.3.1Insulation

07 24 00 SD-03 Product Data 2.2Sheathing board

Vapor Barrier 2.6Thermal insulation

Adhesive 2.5Mechanical Fasteners 2.12Accessories

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 140 PAGES

07 24 00 2.7Base coat 2.8Portland cement 2.9Reinforcing fabric 2.10Finish coat 2.13Joint Sealant

Sealant Primer 2.14Bond breaker 2.15Backer Rod

Insulation Board Warranty

FIO

SD-04 Samples Sample Boards

SD-07 Certificates 1.4.1Qualifications of EIFS

Manufacturer 1.4.2Qualification of EIFS Installer

Qualification of Sealant Applicator

SD-08 Manufacturer’s Instructions 3.3Installation

SD-10 Operation and Maintenance Data

EIFS

07 41 13 SD-02 Shop Drawings Flashing and Accessories

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 140 PAGES

07 41 13 Gutter/Downspout Assembly SD-03 Product Data Roof panels

FACTORY-APPLIED COLOR

FINISH

2.4Accessories Fasteners

SD-04 Samples GRoof Panels

SD-06 Test Reports 2.6.2Fire Rating Test Report 2.2Factory Finish and Color

Performance Requirements SD-08 Manufacturer’s Instructions

INSTALLATION MANUAL

07 55 00 SD-03 Product Data 2.2Insulation Board

Membrane Roofing Fasteners Sheet Metal Design Materials Caulking Contractors Qualifications 2-Roof Vents Scuppers and Curbs Designs Parapet Wall Flashing Designs Fascia Designs and Colors

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 140 PAGES

07 55 00 SD-04 Samples GMembrane Roofing

2.2Insulation Board Fasteners Fascia 2-Way Roof Vent

SD-08 Manufacturer’s Instructions Installation

SD-11 Closeout Submittals Manufacturers Final Inspection Quality Verification Report

07 57 14 SD-03 Product Data Polyurethane foam

SD-07 Certificates GQualification of Manufacturer GQualification of Applicator

07 60 00 SD-02 Shop Drawings

3.1.27 GFlashing at roof penetrations

07 84 00 SD-03 Product Data 2.1Firestopping Materials

07 92 00 SD-03 Product Data 2.1Sealants 2.4Backstops

08 11 13 SD-03 Product Data 2.1Doors

Frames

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 140 PAGES

08 11 13 2.2Accessories Weatherstripping

08 11 16 SD-02 Shop Drawings 2.1Doors and frames

SD-08 Manufacturer’s Instructions 2.1Doors and frames

08 14 00 SD-03 Product Data 2.1Doors 2.1.7Fire resistance rating

08 33 23 SD-02 Shop Drawings 2.1Overhead Coiling Doors 1.6Counterbalancing Mechanism 2.3Counterbalancing Mechanism 1.6Manual Door Operators 2.4Manual Door Operators 1.6Electric Door Operators 2.5Electric Door Operators 2.1.4Bottom Bar 1.5Guides 2.3.1Mounting Brackets 2.1.10Overhead Drum 1.6Hood 1.6Painting 1.5Installation Drawings

SD-03 Product Data 2.1Overhead Coiling Doors

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 140 PAGES

08 33 23 2.2Hardware 1.6Counterbalancing Mechanism 2.3Counterbalancing Mechanism 1.6Manual Door Operators 2.4Manual Door Operators 1.6Electric Door Operators 2.5Electric Door Operators 2.6Fire-Rated Door Assembly

SD-05 Design Data 2.1Overhead Coiling Doors 2.2Hardware 1.6Counterbalancing Mechanism 2.3Counterbalancing Mechanism 1.6Manual Door Operators 2.4Manual Door Operators 1.6Electric Door Operators 2.5Electric Door Operators 1.2Fire-Rated Door

SD-10 Operation and Maintenance Data

1.5Operation and Maintenance Manuals

1.6Overhead Coiling Door Assemblies

1.6Materials 1.6Devices

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 140 PAGES

08 33 23 1.6Procedures 1.6Manufacture's Brochures 1.6Parts Lists 3.3.2Cleaning

08 34 19.10 20 SD-02 Shop Drawings 2.1Rolling service doors

Rolling fire doors SD-03 Product Data

2.1Rolling service doors 2.4.2Motors 2.4.3Controls

SD-08 Manufacturer’s Instructions 2.1Rolling service doors

SD-10 Operation and Maintenance Data

2.1Rolling service doors 08 36 13 SD-02 Shop Drawings

2.2 GDoors

SD-03 Product Data

2.2 GDoors

2.6 GElectric operators

SD-08 Manufacturer’s Instructions 2.2Doors

SD-10 Operation and Maintenance Data

2.2 GDoors

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 140 PAGES

08 36 19 SD-02 Shop Drawings

2.2 GDoors

SD-03 Product Data

2.2 GDoors

2.4.1 GMotors

2.4.2 GControls

SD-08 Manufacturer’s Instructions 2.2Doors

SD-10 Operation and Maintenance Data

2.2 GDoors

08 51 13.00 20 SD-02 Shop Drawings

2.1Windows Fabrication Drawings

SD-03 Product Data 2.1Windows 2.2.5.1Hardware 2.2.2Weatherstripping 2.2.5Accessories

SD-05 Design Data Structural calculations for deflection

08 60 45 SD-02 Shop Drawings 3.2Shop Drawings

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 140 PAGES

08 60 45 2.1[SKYLIGHTS][ AND

][TRANSLUCENT PANELS]

1.6Warranty SD-06 Test Reports

2.1Test Reports SD-07 Certificates

2.5Systems 1.4Qualifications

08 71 00 SD-02 Shop Drawings 2.3.6Keying system

SD-03 Product Data 2.3Hardware items

SD-11 Closeout Submittals 1.3Key Bitting

08 81 00 SD-02 Shop Drawings Installation

SD-03 Product Data Insulating Glass

1.3Glazing Accessories SD-07 Certificates Insulating Glass Laminated Glass

08 91 00 SD-02 Shop Drawings 1.4Wall louvers 1.5Wall louvers

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 140 PAGES

08 91 00 2.2Metal Wall Louvers 09 29 00 SD-03 Product Data

Cementitious backer units 2.1.1Gypsum Board 2.1.7Accessories

SD-08 Manufacturer’s Instructions Material Safety Data Sheets

09 30 00 SD-03 Product Data 2.1Tile

Adhesive SD-04 Samples

2.1Tile 2.3Grout

09 51 00 SD-03 Product Data Acoustical Ceiling Systems

SD-07 Certificates Acoustic Ceiling Tiles and Suspension System

09 65 00 SD-03 Product Data Resilient Flooring and Accessories

2.4Adhesives SD-08 Manufacturer’s Instructions

3.2Surface Preparation Installation

09 68 00 SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 140 PAGES

09 68 00 2.1Carpet 3.4Installation

SD-04 Samples 2.1Carpet

SD-07 Certificates 2.1Carpet

09 90 00 SD-03 Product Data Coating

SD-08 Manufacturer’s Instructions 1.6.2Manufacturer's Material Safety

Data Sheets 10 14 02 SD-03 Product Data

1.3Interior Signage 10 21 13 SD-02 Shop Drawings

GInstallation Drawings Fabrication Drawings

SD-03 Product Data 2.6Colors And Finishes 2.2Partition Panels and Doors 2.1.3Anchoring Devices and

Fasteners 2.1.5Hardware and Fittings

10 22 13 SD-03 Product Data 1.4Wire mesh partitions

10 26 13 SD-03 Product Data 2.2Corner Guards

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 140 PAGES

10 28 13 SD-03 Product Data Finishes Accessory Items

10 44 16 SD-03 Product Data 2.1Fire Extinguishers

Accessories Cabinets Wall Brackets Replacement Parts

SD-07 Certificates 2.1Fire Extinguishers 2.1Manufacturer's Warranty with

Inspection Tag 11 68 13 SD-02 Shop Drawings

Configuration 1.5.5Shop Drawings

Fall Height SD-03 Product Data

2.2Equipment 1.3.4Equipment Identification 1.6Delivery, Storage and Handling 1.5.1Manufacturer Qualification 2.1Materials

SD-04 Samples 2.1.5Color

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 140 PAGES

11 68 13 2.1.3Recycled Plastic Wood Finishes

SD-07 Certificates 2.1Materials 1.5.1Manufacturer Qualification 1.5.2Installer Qualification 1.5.3Manufacturer's Representative

Substitution SD-10 Operation and Maintenance Data

1.8Maintenance Instructions 12 24 13 SD-03 Product Data

2.1Window Shades 1.3Hardware

SD-08 Manufacturer’s Instructions 2.1Window Shades

13 34 19 SD-01 Preconstruction Submittals 1.6.2Manufacturer's Qualifications

SD-02 Shop Drawings Shop and Detail Drawings

SD-05 Design Data descriptive and technical literature building design analysis 21 12 00 SD-02 Shop Drawings

1.4.4 GStandpipe system

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 140 PAGES

21 12 00 SD-03 Product Data

2.1.1 GPipe and fittings

2.1.1 GMechanical couplings

2.1.2 GPipe hangers and supports

2.1.3 GValves

2.1.9 GFire department connections

2.1.10 GAlarm valves

2.1.11 GWater motor alarms

2.1.12 GPressure switch

2.1.13 GWaterflow detector

2.1.14 GFire hose cabinets

2.1.15 GValve tamper switch

2.1.17 GBackflow preventer

2.2.1 GBuried Pipe and fittings

SD-06 Test Reports

3.8.1 GPreliminary tests

3.8.2 GAcceptance tests

SD-07 Certificates

1.6.1 GQualifications of installer

SD-10 Operation and Maintenance Data

2.1.10 GAlarm valves

2.1.17 GBackflow preventer

SD-11 Closeout Submittals

1.6.2 GSystem as-built drawings

21 13 00.00 20 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 140 PAGES

21 13 00.00 20 1.4Sprinkler heads and piping system layout

1.4.8Electrical wiring diagrams SD-03 Product Data

2.2Piping 2.2.4Alarm valves 2.2.8Valves 2.2.5Water motor alarms 2.2.2Sprinkler heads 2.2.7Pipe hangers and supports 2.2.6Flow switch 2.2.13Fire department connections 2.2.14Excess pressure pump 2.2.1Mechanical couplings 2.2.9Backflow Preventer

SD-05 Design Data 1.4Sprinkler system design

SD-06 Test Reports 3.2.1Preliminary tests

SD-07 Certificates 1.6.1Qualifications of installer

SD-10 Operation and Maintenance Data

2.2.4Alarm valves 2.2.14Excess pressure pump 2.2.9Backflow preventer

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 140 PAGES

21 13 00.00 20 SD-11 Closeout Submittals 1.4.9As-built drawings

21 13 00.00 40 SD-01 Preconstruction Submittals

1.2 GRecord of Existing Conditions

SD-02 Shop Drawings

2.2.3 GSupporting Elements

2.2.4 GFire-Department Connections

2.2.9.1 GFire Alarm System

2.2.8 GSprinkler Heads

2.2.9 GValves

SD-03 Product Data

2.2.1 GUnderground Piping Materials

2.2.2 GAboveground Piping Materials

2.2.9 GValves

2.2.4 GFire-Department Connections

2.2.5 GRiser Alarm Equipment

2.2.6.1 GAir Compressor

2.2.7 GStandpipe Equipment and Fire

Hose Cabinet Stations

2.2.8 GSprinkler Heads

2.3 GMaterials

2.2.3 GSupporting Elements

2.1 GEquipment and Performance

Data SD-05 Design Data

Part 2 GDesign Analysis and Calculations

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 140 PAGES

21 13 00.00 40 SD-06 Test Reports

3.3.6 GPressure Tests

3.3.3 GSystem Operating Tests

3.3.3 GAir Tests

3.3.3 GValve-Operating Tests

3.3.3 GDrainage Tests

21 13 16.00 20 SD-02 Shop Drawings 1.3.8Sprinkler heads and piping system layout 1.3.8Electrical wiring diagrams

SD-03 Product Data 2.1Piping 2.1.10Valves 2.1.5Water motor alarms 2.1.2Sprinkler heads 2.1.9Pipe hangers and supports 2.1.14Fire department connections 2.1.7Low air pressure supervisory switch 2.1.4Dry pipe valves 2.1.8Air compressor 2.1.1Mechanical couplings 2.1.10.1Backflow Preventers 2.1.6Pressure Switch

SD-05 Design Data 1.3Sprinkler system design

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 140 PAGES

21 13 16.00 20 SD-06 Test Reports 3.2.1Preliminary tests

SD-07 Certificates 1.5.1Qualifications of installer

SD-10 Operation and Maintenance Data

2.1.4Dry pipe valves 2.1.8Air compressor

SD-11 Closeout Submittals 1.3.9As-built drawings of each system

21 13 18.00 10 SD-02 Shop Drawings

1.4.3 GShop Drawings

3.8As-Built Drawings

SD-03 Product Data

1.4.1 GFire Protection Specialist

1.4.2Installer Qualifications 1.4.1List of Submittals

2.1 GMaterials and Equipment

1.6Spare Parts

3.9 GOnSite Training

SD-05 Design Data 3.3.1Sway Bracing

1.2.1.2 GHydraulic Calculations

2.13.4.1 GStorage Batteries

SD-06 Test Reports

3.7 GPreliminary Tests

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 140 PAGES

21 13 18.00 10 3.8Final Acceptance Tests SD-07 Certificates

3.2 GInspection by Fire Protection

Specialist

SD-10 Operation and Maintenance Data

3.9 GOperating and Maintenance

Instructions

21 13 20.00 20 SD-02 Shop Drawings

1.3.1.1 GFire extinguishing system

SD-03 Product Data

2.19.1 GPipe, fittings, and mechanical

couplings

2.1.3 G[Deluge] [Pre-action] valves

2.19.5 GValves

2.11.1 GWater motor alarms

2.1.1 GSprinkler heads

2.16 GMonitor nozzles

2.17 GHose and nozzles

2.19.4 GPipe hangers and supports

2.11.3.1 GPressure switch

2.19.11 GFire department inlet connections

2.12 GTank mounted air compressor

2.12 GAir pressure regulating device

2.3.1 GAir compressor

2.11.4 Gtrouble alarm

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 140 PAGES

21 13 20.00 20 2.2 GDetection devices

2.2.2.1 GStorage batteries

2.11.2 GAlarm bells

2.11.2 GAlarm horns

2.2.1.3 GAnnunciator panel

2.18 GFoam hydrants

2.15.3 GAFFF concentrate storage tanks

2.14 GProportioning equipment

2.13 GAFFF concentrate

2.19.3 GStrainers

2.5 GManual release stations

2.19.12 GBackflow preventers

2.2.1 GControl panel

2.2.2.2 GBattery charger

SD-05 Design Data

1.3.1.2 GHydraulic calculations

1.3.1.2 GPressure discharge graphs or

tables

1.3.1.2 GBattery standby power

requirements calculations

1.3.1.2 GSystem surge analysis

SD-06 Test Reports

2.7 G2-wire smoke detectors

3.8.1 GPreliminary tests

3.8.2 GAcceptance tests

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 140 PAGES

21 13 20.00 20 2.14.1 Gdiaphragm pressure proportioning tanks

SD-07 Certificates

1.5.1 GQualifications of installer

1.3.1.3 GAFFF containment and disposal

plan

2.19.12 GBackflow preventers

SD-10 Operation and Maintenance Data

2.1.3 G[Deluge] [Pre-action] valves

2.12 GTank mounted air compressor

2.14 GProportioning equipment

2.2.1 GControl panel

2.15.3 GAFFF concentrate storage tanks

2.16 GMonitor nozzles

1.3.1.1 Gfire extinguishing system

SD-11 Closeout Submittals

1.3.1.4 GAs-built drawings for the fire

extinguishing system 21 13 24.00 10 SD-02 Shop Drawings

1.4.3 GDetail Drawings

1.4.1As-built Drawings

SD-03 Product Data

2.1 GMaterials and Equipment

1.5Spare Parts

1.2 GAFFF System

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 140 PAGES

21 13 24.00 10 1.4.2 GInstaller's Qualifications

3.6.4 GPost-discharge Test

Requirements SD-06 Test Reports

3.6.4Test Reports SD-07 Certificates

2.1 GMaterials and Equipment

SD-10 Operation and Maintenance Data

3.8 GOperation and Maintenance

Manuals

21 13 26.00 40 SD-01 Preconstruction Submittals Part 2 GMaterial, Equipment, and Fixture

Lists

1.4 GRecord of Existing Conditions

SD-02 Shop Drawings Part 2 GConnection Diagrams Part 2 GControl Diagrams

1.4 GInstallation Drawings

SD-03 Product Data Part 2 GEquipment and Performance

Data Part 2 GEquipment Foundation Data Part 2 GPiping Materials

2.3.7 GAboveground Piping Systems

Part 2 GValves

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 140 PAGES

21 13 26.00 40 2.3.5 GDetection Systems Part 2 GAlarms Part 2 GSprinkler Heads Part 2 GSupporting Elements

SD-04 Samples

3.1.3 GManufacturer's Standard Color

Charts SD-05 Design Data

Part 2 GDesign Analysis and Calculations SD-06 Test Reports

3.2 GPressure Tests

3.2 GSystem Tests

3.2 GOperating Tests

SD-07 Certificates

1.3 GListing of Product Installations

Part 2 GPiping Materials

2.3.7 GAboveground Piping Systems

Part 2 GValves

2.3.5 GDetection Systems

Part 2 GAlarms Part 2 GAir Compressor Part 2 GSprinkler Heads Part 2 GSupporting Elements

SD-10 Operation and Maintenance Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 140 PAGES

21 13 26.00 40 3.4.1 GOperation and Maintenance Manuals

21 21 01.00 10 SD-02 Shop Drawings 1.3Piping layout 1.3.1Electrical wiring diagrams

SD-03 Product Data Storage cylinders Discharge head Manifolds

2.9Discharge alarm 2.3Pipe and fittings 2.4.3Pipe hangers and supports 2.6Actuating stations 2.6.3Pressure switch 2.6.5Control panel 2.7.1Smoke detectors 2.7.2Heat activated detectors 2.9.2Alarm horns 2.9.3Visual alarms 2.11Dampers

Main and reserve switch 2.9Warning signs 2.6.6.1Storage batteries 2.6.6.2Battery charger

SD-05 Design Data 1.3.2System calculations

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 140 PAGES

21 21 01.00 10 2.6.6.1Calculations substantiating battery capacity

1.3.2Open-area smoke detectors calculations

SD-06 Test Reports 3.5.1Preliminary tests

SD-07 Certificates 1.5.1Qualifications of installer

SD-10 Operation and Maintenance Data Discharge head

2.6.5Control panel 21 21 03.00 10 SD-02 Shop Drawings

1.4.3 GInstallation Drawings

SD-03 Product Data

1.4Similar Services

2.1 GStandard Products

3.2 GPreliminary Tests

3.3 GFinal Acceptance Tests

3.4Field Training

SD-06 Test Reports 3.2Preliminary Tests 3.3Final Acceptance Tests

SD-07 Certificates

1.4.2 GInstallation Technician

1.4.3 GInstallation Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 140 PAGES

21 21 03.00 10 SD-10 Operation and Maintenance Data

3.4Operation and Maintenance Instructions

21 30 00 SD-01 Preconstruction Submittals 1.3Fire Pump Installation Related

Submittals

1.7.1 GFire Protection Specialist

SD-02 Shop Drawings

3.3.1 GInstallation Drawings

3.11.2 GAs-Built Drawings

3.3.2 GPiping Layout

3.3.2 GPump Room

SD-03 Product Data

2.1 GCatalog Data

1.6Spare Parts 3.8.2Preliminary Tests

3.8 GField Tests

1.7.6 GManufacturer's Representative

3.11.1 GField Training

3.8.3Army Final Acceptance Test

Navy Formal Inspection and Tests

SD-06 Test Reports 3.8.2Preliminary Tests 3.8.3Army Final Acceptance Test

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 140 PAGES

21 30 00 SD-07 Certificates 1.7.1Fire Protection Specialist 1.7.2Qualifications of Welders 1.7.3Qualifications of Installer 1.7.4Preliminary Test Certification 1.7.5Final Test Certification

SD-10 Operation and Maintenance Data

3.11.1Operating and Maintenance Instructions

2.17Flow Meter 22 00 00 SD-03 Product Data

2.4Fixtures 2.4.1Flush valve water closets 2.4.2Flush valve urinals

Flush tank water closets 2.4.4Wall hung lavatories 2.4.5Countertop lavatories 2.4.6Kitchen sinks

Service sinks 2.4.8Drinking-water coolers

Plastic shower stalls Plastic bathtub liners Plastic bathtub wall surrounds

2.10Water heaters 2.12Pumps

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 140 PAGES

22 00 00 Backflow prevention assemblies 2.6.2Shower Faucets

Swimming Pool [and Spa ]Suction Fittings

Pool Water Pump safety vacuum release system

3.4Vibration-Absorbing Features SD-06 Test Reports

3.8Tests, Flushing and Disinfection 3.8.1.1Test of Backflow Prevention

Assemblies SD-07 Certificates Materials and Equipment

SD-10 Operation and Maintenance Data

3.8.1Plumbing System 22 05 48.00 20 SD-02 Shop Drawings

2.7Inertia bases 2.6Machinery bases 2.6Platforms 2.6Rails 2.6Saddles

SD-03 Product Data 2.3Isolators 2.8Flexible connectors 2.9Flexible duct connectors

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 140 PAGES

22 05 48.00 20 2.11Pipe guides 2.10Seismic snubbers 3.1.3Vertical stops 2.12Thrust restraints 2.7Inertia bases 2.6Machinery bases 3.1.13Machinery foundations and subbases 2.6Platforms 2.6Rails 2.6Saddles 1.4.2Machinery manufacturer's sound data SD-05 Design Data

2.7Inertia bases 2.6Machinery bases 2.6Platforms 2.6Rails 2.6Saddles 1.4.3machinery 1.4.4machinery over 300 pounds

SD-06 Test Reports 2.10Seismic snubbers 3.2.3.1Equipment vibration tests 3.2.3.2Equipment sound level tests 2.4Protected spring isolators

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 140 PAGES

22 05 48.00 20 SD-08 Manufacturer’s Instructions 3.1.1Vibration and noise isolation components 2.13Seismic protection components

22 07 19.00 40 SD-03 Product Data 2.3Adhesives 2.3Coatings

Insulating Cement 2.3Insulation Materials 2.3Jacketing 2.3Tape

SD-08 Manufacturer’s Instructions 1.2Installation Manual

22 14 29.00 40 SD-03 Product Data 2.1Manufacturer's Catalog Data 2.2.1Pump Performance Curve 2.2.1Pump and Motor Specifications 1.5Spare Parts 1.5Special Tools 2.2Wet-Pit Sump Pumps 2.3Submersible Pumps 2.3Accessories

SD-06 Test Reports 3.2.2Hydrostatic Leak 3.2.2Static Heads 3.2.2Pump Flow Capacity

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 39 OF 140 PAGES

22 14 29.00 40 SD-07 Certificates Manufacturer's Certification of Bearing Life

SD-08 Manufacturer’s Instructions 2.1Manufacturer's Installation

Instructions 2.1Vibration Specifications

22 15 14.00 40 SD-03 Product Data 1.4Equipment and Performance

Data Underground Piping Materials

2.1Aboveground Piping Materials 2.2Piping Specialties 2.5Supporting Elements

Air Compressors 2.3Valves 3.1.1Accessories 2.4Miscellaneous Materials 3.1.5Vibration Isolation

SD-06 Test Reports 3.2.1Hydrostatic Testing 3.2Compressed Air Systems Testing 3.2.1Valve-Operating Tests 3.2.1Drainage Tests 3.2.1Pneumatic Testing

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 40 OF 140 PAGES

22 15 14.00 40 SD-10 Operation and Maintenance Data

1.5Operation and Maintenance Manuals

22 31 00 SD-02 Shop Drawings 3.2Installation

SD-03 Product Data 2.2Softening Equipment 1.4Spare Parts 3.3.2Field Instructions

SD-06 Test Reports 2.2Softening Equipment 3.4.2Piping

SD-10 Operation and Maintenance Data

3.3.2Operating and Maintenance Instructions

23 00 00 SD-03 Product Data 2.8.1.1Metallic Flexible Duct

Insulated Nonmetallic Flexible Duct Runouts

Duct Connectors 2.8.2Duct Access Doors 2.8.3Fire Dampers 2.8.4Manual Balancing Dampers

Automatic Smoke-Fire Dampers

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 41 OF 140 PAGES

23 00 00 Automatic Smoke Dampers 2.8.8Sound Attenuation Equipment 2.8.8.2Acoustical Duct Liner 2.8.9.1Diffusers

Registers and Grilles 2.8.10Louvers 2.8.11Air Vents, Penthouses, and

Goosenecks 2.9.1.1Centrifugal Fans 2.9.1.2In-Line Centrifugal Fans 2.9.1.3Axial Flow Fans 2.9.1.4Panel Type Power Wall

Ventilators 2.9.1.5Centrifugal Type Power Wall

Ventilators 2.9.1.6Centrifugal Type Power Roof

Ventilators 2.9.1.7Propeller Type Power Roof

Ventilators 2.9.1.8Air-Curtain Fans 2.9.1.9Ceiling Exhaust Fans 2.10Air Handling Units 2.11.1Room Fan-Coil Units

Coil Induction Units 2.11.2.1Constant Volume, Single Duct

Terminal Units

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 42 OF 140 PAGES

23 00 00 2.11.2.2Variable Volume, Single Duct Terminal Units

2.11.2.3Variable Volume, Single Duct, Fan-Powered Terminal Units

Dual Duct Terminal Units Ceiling Induction Terminal Units

2.11.2.5Reheat Units 2.11.3Unit Ventilators 2.12Energy Recovery Devices 1.4.5Test Procedures

Diagrams SD-06 Test Reports

3.11Performance Tests 3.9Damper Acceptance Test

SD-08 Manufacturer’s Instructions 3.2Manufacturer's Installation

Instructions 3.13.2Operation and Maintenance

Training SD-10 Operation and Maintenance Data

3.13.1Operation and Maintenance Manuals

2.8.3Fire Dampers 2.8.4Manual Balancing Dampers

Automatic Smoke-Fire Dampers

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 43 OF 140 PAGES

23 00 00 Automatic Smoke Dampers 2.9.1.1Centrifugal Fans 2.9.1.2In-Line Centrifugal Fans 2.9.1.3Axial Flow Fans 2.9.1.4Panel Type Power Wall

Ventilators 2.9.1.5Centrifugal Type Power Wall

Ventilators 2.9.1.6Centrifugal Type Power Roof

Ventilators 2.9.1.7Propeller Type Power Roof

Ventilators 2.9.1.8Air-Curtain Fans 2.9.1.9Ceiling Exhaust Fans 2.10Air Handling Units 2.11.1Room Fan-Coil Units

Coil Induction Units 2.11.2.1Constant Volume, Single Duct

Terminal Units 2.11.2.2Variable Volume, Single Duct

Terminal Units 2.11.2.3Variable Volume, Single Duct, Fan-Powered Terminal Units Dual Duct Terminal Units Ceiling Induction Terminal Units

2.11.2.5Reheat Units

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

I…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .