Renovate HVAC System in Bldg 33012 Federal contract opportunity
Solicitation number
W91151-17-B-0032
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort Hood

About this file

Agenda

View the file

Other files for this federal contract opportunity

Other files attached to Renovate HVAC System in Bldg 33012, newest first.
File Type Posted
Solicitation_Amendment_W91151_17_B_0032_0003.pdf PDF
Updated_Technical_Exhibit_B.pdf PDF
W9115117B0032_Solicitation_Amendment.pdf PDF
Solicitation_Amendment__2_Change_Bid_Opening_Date.pdf PDF
Site_Visit_Sign_In_Roster.pdf PDF
TechnicalExhibitA.pdf PDF
AppendixA.pdf PDF
W9115117C0032ReplaceAHU'sBLDG33012.pdf PDF
TechnicalExhibitB.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Agenda – Site Visit 17-B-0032 Replace AHU’s BLDG 33012

11 August 2017, 9:30 am

a. Sign-In attendees

b. Introduction of Government Personnel

c. Description of Work: The purpose of this project is to renovate the HVAC system at building 33012. Work shall include demolishing six existing split systems and one packaged unit; installing two new split systems (above ceiling) and five new packaged units (on roof); reconfiguring existing supply ductwork;

demolishing an existing boiler and two hot-water pumps; and installing a partition for the existing greenhouse dining area.

d. Administrative Matters

- Side bars need to be kept to a minimum during the site visit as not to miss important information from the Program Manager.

- No paper copies of the specifications and/or drawings will be provided. This information is available via email or on the disk provided.

- All questions resulting from this meeting and site visit will be submitted in the form of a Request for Information (RFI). Any changes discussed here or the site will not be official unless an RFI is submitted.

- RFIs must be submitted through email. RFI’s shall be emailed to the

Contract Specialist. No RFIs should go to the program manager. RFIs will be consolidated and responses coordinated with the PM prior to issuing an amendment with the RFI responses.

daniel.w.wagner.mil@mail.mil

- Any communication with the Program Manager and/or COR between this site visit and the award of the contract could cause your company to be ineligible for award.

- In accordance with FAR 52.236-6 you will have a superintendent on every job. The QC is required to provide adequate quality control, but the superintendent must be on site whenever work is being performed. Please bid accordingly.

- When you turn in your BID be sure to turn in the line item estimate like RS Means.

- The site visit is your time and your subcontractors’ time to take all measurements and pictures, view the existing site conditions and conditions of area surrounding the job site. This is the only authorized visit to the job mailto:daniel.w.wagner.mil@mail.mil site. Please do not allow your subcontractors to group up and talk about other projects and/or outside business.

- If you need access to an area that is not accessible please bring it to my attention during this site visit and I will let the PM know.

e. Project Info:

a. Magnitude: Between $250,000.00 - $500,000.00 (See FAR 36.204)

b. Period of Performance: 150 days; this includes 30 days for admin and

120 for performance

c. Liquidated Damages: $1,058.00 (52.211-12)

f. Dates:

a. RFIs by email no later than 12:00 pm on 17 August 2017

b. Bid Opening is 2:00 pm on 6 September 2017