Amend 0001 W90VN921T0003.pdf
PDF 197 KB Posted
- Attached to
- NTV (Bongo truck and Van 9 passengers)
- Solicitation number
- W90VN921T0003
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFQ W90VN921T0003.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
M599011100LCS001
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
See next pages.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 12-May-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W90VN921T0003
X 9B. DATED (SEE ITEM 11)
30-Apr-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
12-May-2021
CODE
411TH CONTRACTING SUPPORT BRIGADE, KOREA
RCO DAEGU, UNIT #15682
APO AP 96218-5682
UNITED STATES
W90VN9 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W90VN921T0003
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMEND #1
A. The purpose of this amendment is to answer the offeror’s question, as below:
Q1: Item 0002. Truck, 1.2Ton,
- Bumper-guard is also a non-selectable item.
- There is one option that does not apply. Can't select auto mission for item 0002, Manual missions are only possible
A1: Bumper guard remove from option and Manual mission is OK (Accepted).
Q2: Item 003. Carnival 9 Passenger
- There is a leather seat in the specification, but is artificial leather sheet also available?(It's a default option.) Or does it have to be a leather seat?(It's an option that costs extra.)
A2: Yes, as checked carnival catalog, artificial leather sheet is OK (Accepted).
Q3: For the RFQ W90VN9-21-T-0003, the manufacturer does not make the Bongo III, 1.2 ton
(2WD) with "AUTOMATIC 5 Speed". They only make the truck with 'Manual 5 Speed'.
Please confirm if the requirement of automatic 5 speed is correct?
A3: The 1.2 ton Bongo truck; 5 speed manual mission is OK (Accepted)
Q4: In the solicitation, page 27-28, it requires Bongo III 1.2 ton (2WD) King Cap GLS model with automatic 5 speed. However, as per asking KIA Corp. and research, Bongo III 1.2 ton model does not have an automatic gear. It only has a manual gear. Therefore, please check again whether the solicitation does not have an error. If it does not, I would like to ask if it is possible to submit Bongo III 1.2 ton (2WD) King Cap GLS model with manual gear.
A4: Manual gear is OK (Accepted). There is no product auto mission for 1.2 ton bongo truck from Mfg Co (Kia).
We need to 5 step Auto Mission required and unaccepted manual gear for 1 ton bongo truck.
Q5: (1). According to the solicitation page 29, the contractor must provide the vehicle manufacturer's certificate and temporary plates, and shall submit a plan.
- Q: Please explain in detail about the "plan".
- A: Plan means; as below Q&A
- Q: What documents should we include in the plan?
- A: Invoice and delivery ticket
- Q: Do we need to include the plan in the proposal or could we submit the plan after the award?
- A: Yes, submit after contract awarded, when the vehicle delivery day
Q6: What is exact meaning of "vehicle manufacturer's certificate" in Korean? is this 자동차 제작증 or 자동차
등록증?
A6: It does mean to ““자동차 제작증”
W90VN921T0003
Q7: About Warranty on page 29, do we need to include the manufacturer's warranty in the proposal or submit it after the award?
A7: Should be submit after contract awarded, “when the vehicle delivery day”.
B. Due date is extended to 19 May 2021, 01:00PM
C. All other terms and conditions remain unchanged.
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 14-May-2021 01:00 PM to 19-May-2021 01:00 PM.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .