Drawing.PDF
PDF 2 MB Posted
- Attached to
- Replace Filter Media, B5380, Yongsan
- Solicitation number
- W90VN819R0020
About this file
DRAWINGS
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W90VN8-19-R-0020.pdf | ||
| Supplement_Specification.PDF | ||
| Master_Material_Log-YSN-5380.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15333, APO AP 96205-5333
ENGINEERING DIVISON, DPW, USAG-YONGSAN
HEADQUARTERS, UNITED STATES ARMY GARRISON, YONGSAN
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
SCHEDULE OF DRAWINGS
REVISION STATUSDWG. NO. SHT. NO.REF. NO.
T - 1
RING NO.
CIVIL
DESCRIPTION OF DRAWINGS
TITLE SHEET1
C - 1
C - 2
LOCATION PLAN AND GENERAL NOTES
T-1
BLDG. NO. 5380
REPLACE FILTER MEDIA
FY19
CIVIL
196992
TITLE SHEET
3 OF 3 FLOOR PLAN, SECTION, DETAILS, NOTES AND SCOPE OF WORK
REPLACE FILTER MEDIA BLDG. NO. 5380
PWO. NO. 196992, YONGSAN
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15333, APO AP 96205-5333
ENGINEERING DIVISON, DPW, USAG-YONGSAN
HEADQUARTERS, UNITED STATES ARMY GARRISON, YONGSAN
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
A
B C D
E F G H
- 2
YI, KS
CIVIL
GRAPHIC SCALE
GREEN
HOUSE
D
IV
IS
IO
N
R O
A D
LODGE COMPLEX
DRAGON HILL
T-363
8 4
T411
SITE
MEMORIAL
SIGNS
X C O R P S B L V D .
loading arealoading arealoading area
TOWER
B O
IL
E R
O
O M
Driving Range
GREEN
HOUSE
TOWER
K E P C
O
LORING VILLAGE
BLACK HAWK AREA
H-264
MUSEUM
ITAEWONNO STREET
IT'AEWONNO STREET OVERPASS
GAS
STATI
ON
X C O R P S B L V D .
BLDG
ROK
JENSEN STREET
1ST MARINE DIVISION ROAD
1ST MARINE DIVISION ROAD
A
1ST MARINE DIVISION ROAD
T
H
41664164
41564158
4160 4162
MOOR ST.
M A T T
A
AV
ENUE
GUARD
HOUSE
KENNEL
T H
D I V I S I O
N
STATION
PUMP
SEWAGE
ARTI
LLERY
LOOP
4 7
A V
E N
U E
W I N
S T
E
RA
V E
N U
E
7050 7
A V
E N
U E
S T
O V
E S
ROAD
DI
V
IS
IO
N
3RD
T E
L E
F O
V
E N
U E
X C O R P S B L V D .
TOWER
S T
O R
A G
E
V I S I O
N
5 4
V I S I
N
A D
V A
U G
H N7073
V I S I
A D
STATIONPUMP
1#
2# 3#
IM
H
O F F
T A
N K S
S-
SwimmingPool
S-36
4333 4336
S-500
T-502
43354332
44144411
A R
M Y
R O
A D
Soccer Field
IX C
ORPS B
LVD.
A R
M Y
A D
T
H
4216 4
01 4730
ROSE STREET
L A
V A
T O
R Y
V I S I
A D
HAMMOND
SOFTBALL FIELD
R O
D G
E
S
E N
U E
S T
R E E T
71247
WALL W/FENCE
X
C
R P
B L
V D
ARTI
LLERY
LOOP70
0 7
DIVISION
3RD
ROAD
BOULEVARD
CORPS W
A
L K
E
E N
U E
83 7
WILBUR STREET
5107 5108
7 4419 4424
STREET
LYNDON
40354
Y
A D
0 4726
44574458
IX
C
O R P S
B L
V D .4455
MAYOSTREET
T
T
MOOR STREET
Multi - purpose Courts
W I L
L I A
E N
U E
MISSION
LOOP
ANTENNA TOW
ER
JOHNSON
W
ALL W
/FENCE
STREET
P A
R K I
G
L
T
STREET
PAINE
T5497 T5492
T5425
18 5
K R
Z Y
Z O
W S
K
L
L S
OWEN AVENUE
0 4
#1
#2
#3
#4
73027052
SKATEBOARD
C H I P P I
N G
MINIATURE
T-371
S-226
S-3739
P O
R T E R
GATE #4(was #8)
GATE
#1
4(w as #1
9)
G A T E #13(w as #17)
GATE #12(was #18)
GATE #11(was #39) GATE #10(was #38)
GATE #1(was #10)
GATE #6(was #52)
GATE #5(was #12)
J2 ANNEX
T411 loading arealoading arealoading area
41664164
41564158
4160 4162
MOOR ST.
IX C
ORPS B
LVD.
S T
R E E T
P O
R T E R
N
THIS PROJECTSOUTH POST
YONGSAN GARRISON
MAIN POST
CAMP
COINER
VICINITY MAP
NOT TO SCALE
N
GENERAL NOTES :
MILLIMETERS AND ELEVATIONS AND STATIONS ARE IN METERS.
9.UNLESS OTHERWISE NOTED ALL THE DIMENSIONS ARE IN
AND SECURED.
CONSTRUCTION WILL BE RELOCATED, REPAIRED, RE-STABILIZED
LINES, TREES, SHRUBS AND ETC AFFECTED BY THE
LINE AND SUCH AS SEWER, WATER, TELEPHONE, CATV, DRAIN
8.THRUST BLOCK AND CONC. ANCHOR BLOCK FOR THE WATER
BE COVERED WITH TOP SOIL AND SOLID SODDING.
7.ALL UNPAVED AREAS WITHIN THE GRADING LIMIT LINES SHALL
THE GOVERNMENT.
SHORING PROPERLY WITHOUT ANY ADDITIONAL COST TO
INCLUDING TEMPORARY WORK SUCH AS FORMWORK AND
6.CONTRACTOR SHOULD PROVIDE ANY NECESSARY RESOURCES
ADDITIONAL COST TO THE GOVERNMENT.
TO ACCOMPLISH THE CIVIL SCOPE OF WORK AT NO
2014 (DATED 30 NOVEMBER 2015). THE DETAILS WILL BE UTILIZED
DETAIL DRAWINGS, IS FOR OMA STANDARD DETAILED DRAWINGS,
5.THE CIVIL STANDARD DRAWINGS SHOWN IN THE "STANDARD
IF REQUIRED.
DETOUR ROAD FOR VEHICLES DURING CONSTRUCTION PERIOD
4.CONTRACTOR SHALL PROVIDE TEMPORARY ACCESS AND
THE CONTRACTOR'S EXPENSE.
DAMAGED BY DISMANTLING, DEMOLISHING, OR REMOVING AT
RESTORATION TO ORIGINAL CONDITIONS OF THE ITEMS
3.THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIR OR
COR PRIOR TO COMMENCING WORK ON THE PROJECT.
INDICATED BY THE COR AND SHALL BE APPROVED BY THE
UNDETAILED PORTION OF THE JOB INCLUDING OTHER AREAS
2.THE CONTRACTOR SHALL SUBMIT SHOP DRAWING(S) FOR ANY
TO SUBMISSION OF CONTRACT PROPOSAL.
AND DIMENSIONS AT THE PROJECT SITE ORIENTATION PRIOR
1.THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS
DEMOLITION NOTES :
STANDARDS FOR KOREA, USFK REG 201-1.
KOREAN ENVIRONMENTAL LAWS AND THE ENVIRONMENTAL GOVERNING
4. ALL DISPOSAL WORK, SHALL BE IN ACCORDANCE WITH APPLICABLE
BETTER CONDITION AT NO ADDITIONAL COST TO THE GOVERNMENT.
CONTRACTOR SHALL RESTORE THESE ITEMS TO THEIR ORIGINAL OR
CONTRACTOR'S NEGLIGENCE OR CONSTRUCTION OPERATIONS, THE
IMPROVEMENTS. SHOULD THESE ITEMS BECOME DAMAGED DUE TO
RECEIVE THE PROPOSED UTILITIES, STRUCTURES AND/OR
AS TO REMAIN SHALL BE MAINTAINED IN GOOD CONDITION TO
3. ALL UTILITIES, STRUCTURES AND/OR IMPROVEMENTS IDENTIFIED
LIMITS SHALL BE DEMOLISHED AND REMOVED AS INDICATED.
2. EXISTING ASPHALTIC CONCRETE PAVEMENT WITHIN THE PROJECT
OTHERWISE NOTED.
LIMITS INDICATED ON GRADING AND DRAINAGE PLAN UNLESS
1. ALL DEMOLITION WORK SHALL BE CONFINED WITHIN THE PROJECT
UTILITY NOTES :
LOCATION PLAN
SCALE : 1 / 5000
SCALE: 1:5000
100 200 300
WATER LINES LESS THAN MINIMUM EARTH COVER SHALL BE INSULATED.
8. MINIMUM EARTH COVER FOR WATER LINES SHALL BE 1.20 METERS
APPROVAL OF THE CONTRACTING OFFICER.
BLOCKS AND/OR MODIFYING HIS CONSTRUCTION METHOD, WITH THE
PROTECT THE WATER LINE, SUCH AS CONSTRUCTING SPECIAL REACTION
REACTION BLOCKS. TAKE WHATEVER MEASURES NECESSARY TO
DUE TO REMOVAL OF THE SUPPORTING EARTH BEYOND THE EXISTING
BENDS WHERE THERE IS A POSSIBILITY OF WATER LINE MOVEMENT
CAREFUL WHEN EXCAVATING ALONGSIDE WATER LINES, TEES AND
7. PROTECT ALL WATER LINES DURING CONSTRUCTION, BE ESPECIALLY
REMEDIAL ACTION.
UTILITIES, IMMEDIATELY INFORM THE CONTRACTING OFFICER FOR
UTILITIES ARE REQUIRED DUE TO UNFORESEEN CONFLICT WITH OTHER
6. WHENEVER ANY CHANGE IN ALIGNMENT OR GRADE FOR THE PROPOSED
DEPTH PRIOR TO EXCAVATING TRENCHES FOR THE NEW UTILITY LINES.
THE UTILITY BY HAND EXCAVATION TO VERIFY ITS LOCATION AND
UTILITIES CROSS EXISTING UTILITIES ARE SHOWN, CAREFULLY EXPOSE
5. WHENEVER CONNECTIONS TO EXISTING UTILITIES OR WHERE NEW
HAVE BEEN DAMAGED, TO THEIR ORIGINAL (OR BETTER) CONDITION.
4. RESTORE EXISTING UTILITIES (WHETHER SHOWN OR NOT) WHICH
3. PROTECT ALL EXISTING UTILITIES AT ALL TIMES.
DIRECTED.
DESCREPANCIES TO THE CONTRACTING OFFICER, AND PROCEED AS
2. VERIFY LOCATIONS, SIZES, AND INVERTS OF ALL UTILITIES. REPORT ANY
WHEN POSSIBLE BY FIELD SURVEYS.
RECORDS AND UTILITY MAPS. UTILITY LOCATIONS WERE ALSO VERIFIED
APPURTENANCES AND STRUCTURES SHOWN ARE BASED ON AVAILABLE
1. THE EXISTENCE AND LOCATION OF EXISTING UNDERGROUND UTILITIES,
LOCATION PLAN AND GENERAL NOTES
C-103
BLDG. NO. 5380
REPLACE FILTER MEDIA
FY19
196992
YONGSAN, KOREA
REPLACE FILTER MEDIA BLDG. NO. 5380
PWO#196992,
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15333, APO AP 96205-5333
ENGINEERING DIVISON, DPW, USAG-YONGSAN
HEADQUARTERS, UNITED STATES ARMY GARRISON, YONGSAN
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
A
B C D
E F G H
RM#2
FILTER
OFFICE AREA
RM#1
FILTER
RM#4
FILTER
RM#3
FILTER
A
B
DN
3'
6"
15'
15'
2'-6"
6"6"
2'-6"3" 2'-6"
1'-6"
2'2' 3'
3"2'-6"
6"
2'-6"
2' 1'-6"
1'1'5'1' 1'3"1'3'-4" 1' 5' 5'
24'-7"
20'-3"
25'-7"
1'3'-4"
1'
P.C. SLAB W/ PLASTIC EXPANDABLE STRAINER
NUT & WASHER
6" WIDTH CONC RECTANGULAR SPACE WALL
ANTHRACITE FILTER MEDIA
GRAVEL SUPPORT MEDIA
6" WIDTH CONC RECTANGULAR SPACE WALL
NUT & WASHER
P.C. SLAB W/ PLASTIC EXPANDABLE STRAINER
GRAVEL SUPPORT MEDIA
ANTHRACITE FILTER MEDIA
1/2"D x 2"LG SHIELDS EXPANSION BOLT @12"O.C.
1/4" THK, 3"x3" STL. ANGLE AND NON-TOXIC COAL TAR ENAMEL COATED
P.C. SLAB W/ PLASTIC EXPANDABLE STRAINER
1" THK 4"W GROUT FILLER
1/2" THK 5"W STL P NON-TOXIC COAL TARL
1/2" THK 10"W STL P NON-TOXIC
COAL TAR ENAMEL COATED
1" THK 6"X6" GROUT FILLER1"D PLASTIC FERRULE NIPPLE
CONC. SIDE WALL
3/4"D ANCHOR BOLT
GROUT CAP
SEE,
- 2
SCHEDULE #1 (REPAIR/MAINTENACE)
SCOPE OF WORK
11) CARBON CONTENT : 95% MIN
10) ACID SOLUBLE RATE : 6% OR LESS
9) ATTRITION RATE : 3% OR LESS
8) ASH CONTENT : 10% OR LESS
7) HARDNESS : 3.0-3.5 ON MOH SCALE
6) SPHERICITY : 0.46-0.60
- 2
- 2
SECTION 'A'
NOT TO SCALE
- 2
SECTION 'B'
NOT TO SCALE
2ND FLOOR PLAN, BLDG #5380
NOT TO SCALE
NOT TO SCALE
DETAIL
5) POROSITY : 0.50-0.60
4) SPECIFIC GRAVITY :1.65±0.05
3) DENSITY : 1.45-1.73g/cm3
2) UNIFORMITY COEFFICIENT : 1.4-1.8
1) EFFECTIVE SIZE : 0.6-1.0mm
* SPECIFICATION OF ANTHRACITE
NO.6 SIZE 15/16'' TO 13/16''
NO.5 SIZE 13/16'' TO 9/16''
NO.4 SIZE 9/16'' TO 5/16''
NO.3 SIZE 5/16'' TO 3/16''
NO.2 SIZE 3/16'' TO 3/32''
- 2
NOTE:
ENVIRONMENTAL PRESERVATION LAW AND APPLICABLE LOCAL CODE
MATERIAL OUT OF COMPOUND ACCORDING TO ROK WATER QUALITY
5. DISPOSE REMOVED ANTHRACITE AND GRAVELS AND OTHER CONSTRUCTION
STRAINERS, TO INSTALL NEW FILTER MATERIAL
PLATES, NUTS, WASHERS, GALVANIZED STEEL PLATES AND EXPANDABLE
EXPANSION BOLTS, GROUT FILLERS, PRECAST CONCRETE SLAB, STEEL
4. REPAIR AND RESTORE ALL APPURTENANCES INCLUDING STEEL ANGLE,
FILTER ROOMS INCLUDING ALL APPURTENANCES
3. DRAIN, CLEAN, INSPECT, AND DISINFECT INTERIOR SURFACES OF FOUR(4)
(ARMY FILTRATION OF LIQUIDS)
FILTER GRAVEL FOR WATER WORKS), ANSI/AWWA 100-89 AND UFC 3-280-04
OF FILTER SAND FOR WATER WORKS), KWWA F 102 (TESTING METHOD OF
GRAVEL SHALL MEET THE REQUIREMENT OF KWWA F 100 (TESTING METHOD
AT FOUR(4) FILTER ROOMS (REFER TO THE DRAWING FOR GRAVEL SIZES)
2. PROVIDE AND REPLACE EXISTING GRAVEL TOTAL APPROX 71CM(92CY)
WORKS), ANSI/AWWA 100-89 AND UFC 3-280-04(ARMY FILTRATION OF LIQUIDS)
OF KWWA F 101 (TESTING METHOD OF ANTHRACITE FOR WATER
AT FOUR(4) FILTER ROOMS ANTHRACITE SHALL MEET THE REQUIREMENT
1. PROVIDE AND REPLACE EXISTING ANTHRACITE TOTAL APPROX 71CM(92CY)
YI, KS
CIVIL
C-203
BLDG. NO. 5380
REPLACE FILTER MEDIA
FY19
196992
AND SCOPE OF WORK
FLOOR PLAN, SECTION, DETAILS, NOTES
EFFECTIVE SIZE
NO.1 SIZE 0.6mm TO 0.8mm2
IN AWWA STANDARDS C653-13 (DISINFECTION OF WATER TREATMENT).
DISINFECTED BY CHLORINE. THE DISINFECTION PROCEDURES ARE PRESENTED
THE FILTER IS PLACED IN SERVICE, THE ENTIRE FILTER BASIN SHOULD BE
9. AFTER FILTER MEDIA REPLACEMENT WORK IS COMPLETED AND BEFORE
8. THE CONTRACTOR SHALL PROVIDE WATER BYPASS LINES, IF NECESSARY.
FACILITIES AND EQUIPMENT.
7. THE CONTRACTOR SHALL PROVIDE, INSTALL, AND REMOVE ALL TEMPORARY
STORM DRAIN.
6. THE CONTRACTOR SHALL PREVENT DEBRIS AND WASTE WATER FLOW INTO
HAVE THE CERTIFICATE FOR WATER FILTRATION OR WATER PLANT.
REGIONAL CONSTRUCTION BUSINESS AS WATER AND WASTEWATER OR SHALL
5. THE CONTRACTOR OR SUB-CONTRACTOR MUST BE REGISTERED WITH KOREA
AMOUNT WILL BE PAID TO THE CONTRACTOR FOR THIS WORK.
THE CONTRACTOR SHALL VERIFY ACTUAL QUANTITIES. NO ADDITIONAL
4. QUANTITIES ARE PROVIDED FOR THE CONTRACTOR'S CONVENIENCE.
ENVIRONMENT PRESERVATION LAW TO VERIFY ITS PERFORMANCE.
STANDARD METHODS OF ANALYSIS DESCRIBED IN ROK WATER QUALITY
AND ANALYZE THE SAMPLES ACCURATELY BY WATER AND WASTEWATER
3. AFTER WHOLE WORK IS DONE, THE CONTRACTOR SHALL TAKE SAMPLES
REQUIREMENT.
FULFILL THE SETTLED SPACE WITH ANTHRACITE TO MEET VOLUME
TO REMOVE FOREIGN MATERIALS OR SMALL PARTICLES, WHILE DOING SO
2. PERFORM BACK WASH AT LEAST 3 TIMES TO SETTLE THE ANTHRACITE AND
REPORT TO COR.
IN THE EVENT THAT THE TEST OPERATION RESULT IS UNACCEPTABLE,
TURNS OUT TO BE ACCEPTABLE, CONTINUE TO WORK FOR REST OF ROOMS.
CONFIRM WITH THE CHIEF OF WATER PLANT. IF THE TEST OPERATION RESULT
VERIFY IT'S PERFORMANCE SUCH AS FLOW RATE AND TURBIDITY.
FILTER AND GRAVELS FOR ONE ROOM AND CONDUCT A TEST OPERATION TO
1. THE CONTRACTOR SHALL PERFORM REPLACEMENT WORK OF ANTHRACITE
| 1 |
| 2 |
| 3 |
File details come from the government source that posted it.