W91QVN-18-D-0085_W90VN718F0050_Released.pdf
PDF 284 KB Posted
- Attached to
- REPLACE DORM, B-1401
- Solicitation number
- W90VN7-18-R-0013
About this file
Award Task Order.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
6 . ISSUE D BY CODE
W91QV N18D0085
1 . CO N TRA CT/P U RCH . O RD E R/
A G RE E M E N T N O .
W 90VN 7
2 . D E L IVE RY O RD E R/ CA L L N O .
W90V N718F0050
27P AGE 1 OF
5 . P RIO RITY
CODE W 90VN 7
8 . DEL IVERY FOB
DEST INAT ION
OT HE R
(See Sch edule if o t h er)
OR D ER FOR SUPPLIES OR SER VICES
3 . D A TE O F O RD E R/CA L L
2018 Jul 20
4 . RE Q ./ P U RCH . RE Q U E ST N O .
F2L3C E8008AW02
411TH C SB, KOR EA - R C O KU N SAN
POC : MS. KO, KY ON G-OK
TEL: 0503-355-9315
KY ON G.O.KO.LN @ MAIL.MIL
APO AP 96264-2112
U N ITED STATES
X
411TH C ON TR AC TIN G SU PPOR T BR IGAD E, KOR EA
R C O KU N SAN , U N IT #2112
APO AP 96264-2112
U N ITED STATES
7 . ADM INIST E RE D BY (if o th er th a n 6 )
( YYYYM M M D D )
1 0 . D E L IVE R TO FO B P O IN T BY (D ate)
( YYYYM M M D D )
J AN GH AK E&C
H ON G J U , LEE
59 H AN N AM-D AER O, Y ON GSAN -GU
SEOU L 04401
KOR EA, SOU TH
CODE 1W37F9 . CONT RACT OR FACIL IT Y
SEE SCHEDULE
1 2 . D ISCO U N T TE RM S
N et 30 D ays
M A RK IF BU SIN E SS IS1 1 .
SM A L L
SM A L L
D ISA D VA N TA G E D
W O M E N -O W N E D
1 3 . M AIL INVOICE S T O T HE ADDRESS IN BLOCK
See Item 15
2 5 . T OT AL KRW428,013,391.00
8 C ES/C EAC F
MR . KIM Y ON G H Y U N
8 C ES/C EX
KU N SAN AIR BASE KOR EA
APO AP 96264
KOR EA, SOU TH
X
1 7 . ACCOUNT ING AND AP P ROP RIAT ION DAT A/ L OCAL USE
CODE
1 8 . IT E M NO. 1 9 . SCHEDUL E OF SUP P LIE S/ SERVICE S
* If q u a n t i ty a ccep ted b y th e G o ver n m en t is s a m e a s q u a n t i ty a ccep ted b elo w q u a n t i ty o r d er ed a n d en cir cle.
DE L IVE RY/1 6 .
1 4 . SHIP T O
Se e Sche dule
F 2L3C E F 87700
MARK ALL
P AC KAG ES AND
P AP ERS W ITH
IDENTIFIC ATIO N
NUMB ERS IN
B LO C KS 1 AND 2 .
2 3 . AM OUNT
1 5 . P AYM ENT W IL L BE M ADE BY CODE
D F AS D EAMS-F 87700
AC C TG D ISB STA N R 387700
D F AS D EAMS
27 AR KAN SAS R D
LIMESTON E ME 04751-6216
U N ITED STATES
Th is d el iv ery o rd er/cal l i s i s s u ed o n an o th er G o v ern men t ag en cy o r in acco rd an ce w i th an d s u b ject to terms an d co n d i t io n s o f ab o v e n u mb ered co n tract .
T YP E CAL L
OF P URCHASE
ORDE R
SEE SCHEDULE
24. UNITED STATES OF AMERICA
TEL: 063-470-5629
EMAIL: kilchae.song.ln@mail.mil
CONTRACTING / ORDERING OFFICER
q u a n t i ty o r d er ed , in d ica te b y X . If d i f f er en t , en ter a ctu a l
BY: MR. SONG, KIL-CHAE
If t h is bo x is m ark ed, sup p lier m ust sign Accep t an ce an d ret urn t h e fo llo win g n um ber o f co p ies:
NAM E OF CONT RACT OR SIGNAT URE T YP E D NAM E AND T IT L E
( YYYYM M M D D )
DAT E SIGNE D
ACCE P T ANCE. T HE CONT RACT OR HE REBY ACCE P T S T HE OFFE R REP RESE NT ED BY T HE NUM BE RED P URCHASE ORDE R AS IT M AY P REVIOUSL Y HAVE BEE N OR IS NOW M ODIFIE D, SUBJE CT T O AL L OF T HE T E RM S
AND CONDIT IONS SE T FORT H, AND AGRE ES T O P ERFORM T HE SAM E.
Referen ce y o u r q u o te d ated
Fu rn is h th e fo l lo w in g o n terms s p eci fied h erein . REF :
2 0 . QUANT IT Y
ORDERE D/
ACCE P T ED*
2 1 . UNIT 2 2 . UNIT P RICE
D IFFE RE N CE S
2 6 .
INSP E CT E D RE CE IVED ACCEP T E D, AND CONFORM S T O T HE
CONT RACT EXCEP T AS NOT E D
2 7 a. QUANT IT Y IN COL UM N 2 0 HAS BE E N
( YYYYM M M D D )
c. DAT E d. P RINT E D NAM E AND T IT L E OF AUT HORIZ ED
GOVERNM E NT RE P RE SENT AT IVE
b. SIGNAT URE OF AUT HORIZ E D GOVE RNM E NT RE P RE SENT AT IVE
e. M AIL ING ADDRE SS OF AUT HORIZ ED GOVE RNM ENT REP RESE NT AT IVE
36. I ce r tify th is account is cor re ct and prope r for paym e nt.
g. E -M AIL ADDRESSf. T EL EP HONE NUM BE R
a. DAT E
( YYYYM M M D D )
b. SIGNAT URE AND T IT LE OF CE RT IFYING OFFICE R
2 8 . SHIP NO. 2 9 . DO VOUCHER NO. 3 0 .
INIT IAL S
3 2 . P AID BY 3 3 . AM OUNT VE RIFIED
CORRE CT FOR
3 5 . BIL L OF LADING NO.
3 4 . CHE CK NUM BE R
3 7 . RE CEIVED AT 3 8 . RECE IVE D BY
( YYYYM M M D D )
3 1 . P AYM E NT
COM P L ET E
P ART IAL
FINAL
P ART IAL
FINAL
DD For m 1155, DEC 2001 P RE VIOUS EDIT ION IS OBSOL ET E .
3 9 . DAT E RE CE IVED 4 0 . T OT AL
CONT AINERS
4 1 . S/R ACCOUNT NO. 4 2 . S/R VOUCHE R NO.
AD D R ESS
AN D
N AME
W91QVN18D0085
W90VN718F0050
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 KRW0.00
Base Year
FFP
General Construction for Area IV, DAEGU AB, GIMHAE AB, GWANGJU AB, KUNSAN AB, and CHINHAE Navy compound.
(Operation and Maintenance Fund)
Both Non-Work Plan (NWP) and Work Plan (WP)
The Contractor shall provide all labor, tools, equipment, supplies and any other resources necessary to upgrade USFK facilities (Including New Construction Work under $1,000,000.00) located in the Republic of Korea. Actual work to be performed will be identified by individual Task Order.
NET AMT KRW0.00
0001AA 1 Lot KRW428,013,391.00 KRW428,013,391.00 NTE Maximum Contract Amount - K Work
FFP
The Contractor shall provide all labor, tools, equipment, transportation, materials and other necessary resources for Project MLWR18-1011, REPLACE DORM, B- 1401 at Kunsan AB. in accordance with the Statement of Work (SOW), technical detail specifications, drawings, and terms and conditions of this task order.
FOB: Destination
PURCHASE REQUEST NUMBER: F2L3CE8008AW02
PSC CD: Z2AA
NET AMT KRW428,013,391.00
ACRN AA
CIN: 0000000000000000003228162
$370,215.37
0002 NSP
War hazard
FFP
Estimated Cost for War Hazard Losses is Zero (0).
NET AMT KRW0.00
Section C - Descriptions and Specifications
STATEMENT OF WORK
TECHNICAL SPECIFICATIONS
FOR
MLWR18-1011, REPAIR DORMITORY 1401
(Non-Work Plan of Task Order MATOC)
DETAILED-SPECIFICATION
The specification sections listed below are applicable to this project. The specifications are from the “Standard Technical Specifications for O&MA Projects, Korea”, dated Jan 2014, located on the 411th CSB Web Page, https://www.usfk.mil/ Resources/ContractingwithUSFK.aspx. The electronic version of the specifications is Acrobat® PDF format and can be read with the Acrobat Reader software.
INDEX
SECTION NO TITLE
DIVISION 01 - GENERAL REQUIREMENTS
013000 Administrative Requirements 013300 Submittal Procedures 013526 Government Safety Requirements 013529 Heath and Emergency Response Procedures for Contaminated Sites 014200 Sources for Reference Publications 014500 Quality Control 015000 Temporary Construction Facilities 015720 Environment Protection 015800 Project Identification 017800 Closeout Submittals 017823 Operation and Maintenance Data
DIVISION 02 – EXIST CONDITIONS
024100 Demolition and Deconstruction 028100 Transportation and Disposal of Hazardous Material
DIVISION 05 – METALS
050523 Welding, Structural 051200 Structural Steel 052123 Steel Joist Girder Framing 055013 Miscellaneous Metal Fabrications 055013 Structural Metal Fabrications
DIVISION 06 –WOOD, PLASTICS AND COMPOSITES
061000 Rough Carpentry 062000 Finish Carpentry
DIVISION 07 – THERMAL AND MOISTURE PROTECTION
076000 Flashing and Sheet Metal 072116 Mineral Fiber Blanket Insulation 074113 Metal Roof Panels 076000 Flashing and Sheet Metal 078400 Fire Stopping 079200 Joint Sealing
DIVISION 09 - FINISHES
092200 Support for Plaster and Gypsum Board 092423 Stucco 095100 Acoustical Ceiling 096800 Carpet 099000 Paints and Coatings
NOTE: Wherever "Special Clause" or "Special Provisions" appears in OM&A sections substitute "clauses and/or special provisions of this contract."
DIVISION 1 GENERAL REQUIREMENTS
SECTION 1A STATEMENT OF WORK
INDEX
1A-1 DESCRIPTION OF WORK
1A-2 PRINCIPAL FEATURES
1A-3 PROJECT DURATION
1A-4 LIST OF DRAWINGS
1A-5 GENERAL CONDITIONS
1A-6 CONTRACT DATA REQUIREMENTS LIST (CDRL)
1A-7. ENVIRONMENTAL PROTECTION SPECIFICATION
1A-1. Description of Work: The work under project MLWR18-1011, Repair Dormitory 1401, consists of furnishing all labor, equipment, materials, transportation and supervision necessary to perform all the work as shown on the drawings and indicated herein.
1A-2. Principal Features: The description of the work is includes the principal features only.
This general outline does not in anyway limit the responsibility of the contractor from performing all work indicated herein and on the drawings.
Scope of Work
A. Architectural Works
1. Replace existing rubber floor tile, rubber stair treads, stringers and base with new at interior stairwell of 1st floor thru 4th floor as shown on the construction drawings.
2. New 2-coats paint on surface of gypsum board, concrete and CMU walls, and gypsum board ceiling, concrete exposed ceiling in stairwells, and interior door frames to entire building as shown on the construction drawings.
3. New 2-coats paint for exterior bicycle rack, picnic shelter including barbecue pits, fuel oil tank enclosure and trash enclosure including steel bollards at B-1401dormitory area as
4. New paint on metal frame of lighting fixtures after to be removed rusted area to entire buildings.
5. Replace existing metal roofing with new standing seam metal roof system (SSMR) including new roof steel structure of beam and post, etc. (Slope: 100/20), roof insulation, protected metal fascia and soffit, gutter and downspout including concrete splash block as
6. Install new double scaffolding system to entire building to replace roof work in accordance with safety manual
7. Install new temporary fence (Min. 10 feet high) around B-1401 at construction area and shall to provide the shop drawings to be approved by BCE.
8. Restore any damaged materials caused by this work to its original condition.
9. Remove and dispose of all construction rubbish and debris, off Kunsan Air Base, at the contractor’s own expense, in strict accordance with existing Korean/U.S. Environmental Laws and Regulations.
10. Contractors shall submit the report on the weight of Construction and Demolition (C&D) debris diverted and the weight of C&D debris disposed to COR in accordance with section
3.3.2 and 3.8.1.4. of the AFI 32-7042, data on the weight of C&D debris diverted and the weight of C&D debris disposed must be documented and reported. All C&D debris disposal contracts must be reviewed to ensure this requirement is being met. This information must be reported to 8th Civil Engineering Squadron Environmental Flight (8CES/ CEAN). The contractor could obtain the data from landfill and /or recycling company
1A-3. PROJECT DURATION: 180 Days.
3.1 Highly recommend the contractor to attend the site orientation hosted by 8 CES before applying for bid.
3.2 Contractor shall attend pre-construction conference prior to notice to proceed (NTP) being issued and needs to submit construction schedule prior to pre-construction conference.
A1-5. GENERAL CONDITIONS
1. SPECIFICATIONS: The project shall comply with the MLWR 18-1011, Repair Dormitory 1401, Kunsan AB, Korea, Contract (100%) Submittal Specifications shall comply with the “Standard Technical Specifications for O&MA (Operation & Maintenance Army) Projects, Korea dated 24 January 2014”, “Standard Detail drawings for O&MA Project Korea dated 01 October 2003” are available on the 411th CSB Web Page, hhttps://www.usfk.mil/ Resources/ContractingwithUSFK.aspx or the specification electronic files are available at the 8th Civil Engineering Squadron, Kunsan Air.
2. ALERTS: During military alerts or special operations, anticipated not to exceed forty (40) working days per year of contract duration, the contractor may be denied access to the base or the work areas. When the contractor is prohibited from access to the base or worksite for one (1) day or less per month, no adjustment in the contract time will be made. When the contractor is prohibited access for more than one (1) day per month, an adjustment to the contractor’s schedule will be made by the Contracting Officer (KO).
3. DAILY REPORTING: The contractor Project Manager shall be responsible to report to the COR or Government project inspector at 0800 during normal work days, or at 1700 during night shifts . The contractor project manager shall provide the COR or Government project inspector with a daily report detailing the work which is being accomplished at the worksite. Failure on the project manager’s part to report to the COR or Government project inspector will result in a letter being forwarded to the KO recommending appropriate action by the KO for the contractor’s lack of coordinating the daily work report.
4. NOTIFICATION OF INSPECTIONS: Prior to starting work at the work site, the contractor shall inform the COR of the actual date that the contractor intends to start work. The contractor shall also give the COR or project inspector no less than a seven (7) work day notice prior to each concrete placement, asphalt placement field test, protective coating, or any other work deemed necessary by the COR or project inspector. The contractor shall also give at least a seven (7) work day written notification of the pre-final and final inspections to the COR. The Construction Management Element of the 8th Civil Engineering Squadron is located in building #705, Kunsan Air Base, Korea; base phone extension is 782-6197 or commercial (063) 470-6197
5. CLOSE-OUT/TURNOVER MATERIALS: The contractor shall be responsible for providing the following materials as part of final turnover to the U.S. Government: AS-built drawings shall be submitted to COR for review and acceptance in electronic format utilizing AutoCAD 2010 or higher and submitted on CD/DVD format (3 copies).
Operations and Maintenance (O&M) training shall be provided to U.S. Government personnel on new mechanical systems NLT (7) work days, not counting weekends, prior to final acceptance. O&M Manuals shall be submitted in both electronic and hard copy format (3 copies each) (7) work days prior to final acceptance. Turnover of all new facility keys and salvageable material (if any) shall be submitted to COR or project inspector. Contractor shall prepare DD form 1354 (Transfer and Acceptance of DOD Real Property) with type and quantity of construction material installed. When all materials have been turned over, the COR or project inspector will notify the KO so that the final payment may be released. Up to fifteen (15%) percent of the total contract amount may be withheld pending complete turnover of material stated in this paragraph
6. AIR FORCE MATERIALS: All salvageable materials removed from the worksite shall remain the property of the U.S. Government. All other such materials shall be disposed of by the contractor IAW AF regulations, upon coordination with the COR or project inspector. Applicable AF regulations include AFI 32-7001 (Environmental Management), AFPAM 32-7043 (Hazardous Waste Management Guide), AFI 32-1052 (Facility Asbestos Management), AFI 32-7042 (Waste Management), UFC 4-451-10N (Hazardous Waste Storage, and UFC 1-900-01 (Methods for the Reduction, Reuse, and Recycling of Demolition Waste) and their source reference documents.
Unclear or conflicting information between these documents can be clarified via RFI from the contractor to 8
CES/CENMC.
7. CONTRACTOR’S EQUIPMENT: All contractor equipment used in the performance of this contract shall be subject to a functional and safety inspection(s) at any time by the COR or project inspector IAW U.S. Air Force Safety Regulations and EM 385-1-1, U.S. Army Corps of Engineers Safety and Health Requirements Manual. Any equipment found not to be functional or safe shall be immediately repaired, replaced, or removed from the worksite by the contractor. Additionally, the contractor will provide the COR or construction inspector a listing of all equipment to be used on site prior to the start of work, NLT (10) days after NTP. Applicable U.S. Air Force Safety Regulations include UFC 3-560-01 (Electrical Safety, O&M; with Change 4), AFI 32-1064 (Electrical Safe Practices), AFI 91-302 (Air Force Occupational and Environmental Safety, Fire Protection, and Health Standards) and AFPAM 91-210 (Contract Safety... although this is more for our use in setting up contracts than for the contractor in executing them) and their source reference documents. Unclear or conflicting information between these documents can be clarified via RFI from the contractor to 8 CES/CEPMC.
8. MATERIAL COMPLIANCE: The contractor shall be responsible to ensure that all materials used in the performances of the contract meet the specifications and requirements of this contract. Material(s) not meeting the specifications or not approved on AF Form 3000, Material Approval Submittal (or shall not be transported to the worksite. The COR or project inspector will be the approving authority for all materials used in the performance of this contract. All material(s) shall be new and the standard product of a manufacturer who is regularly engaged in the manufacturing of such products. Any materials used in the performance of this contract not approved on an AF Form 3000 shall be removed and replaced, at the expense of the contractor, and not the U.S. Government unless the government determines that the item does meet the specifications in the contract.
9. CONTRACTOR-FURNISHED MATERIAL AND CONTRACTOR-FURNISHED EQUIPMENT
(CFM/CFE): All CFM/CFE, including construction equipment, will not be permitted to enter Kunsan Air Base unless each item is approved on a DD Form 1149, Requisition and Invoice/Shipping Document. The contractor shall be responsible to notify the COR or project manager at least three (3) work days prior to the arrival of, or removal of, any CFM/CFE at Kunsan Air Base. DD Form 1149 is available on open source internet (http://www.dcma.mil/dcman/NPP/files/dd1149.pdf).
10. CONTRACTOR’S TEMPORARY FACILITES: Erection of any facility by the contractor shall be coordinated with the COR or project inspector. An approved U.S. Government Real Estate Permit from the Base Civil Engineer (BCE) shall be in the contractor’s possession before erection of any facility. Any contractor erected facility shall be removed and the area cleaned within seven (7) calendar days in normal installation access areas and
(5) duty days in installation restricted areas after completion of the contract requirements and prior to final invoice payment.
11. Air Force (AF) FORM 103, BASE CIVIL ENGINEERING WORK CLEARANCE REQUEST:
Prior to starting any work, The contractor shall be responsible to have a valid AF Form 103, Base Civil Engineering Work Clearance Request (dig permit) in his possession. No work shall be performed under this contract without a valid AF Form 103 in the contract’s possession. Request for a Base Civil Engineering Work Clearance Request shall be submitted to the COR or project inspector a minimum of ten (10) calendar days prior to starting any work under the terms of this contract.
12. SAFETY: AFOSHSTD91-501 (Air Force Occupational and Environmental Safety, Fire Protection, and Health Standard) shall be complied with. All AFOSH standards shall be complied with as applicable. The contractor shall also comply with applicable sections of EM 385-1-1, U.S. Army Corps of Engineers Safety and Health Requirements Manual.
13. FIRE PROTECTION: The contractor shall comply with the provisions of the Base Fire Protection program, 607 AOGI (Air Operations Group Instruction) 32-2001. The contractor shall provide suitable fire extinguishers at any material storage area constructed by the contractor as well as at the work site(s). The contractor shall ensure that all contractor employees understand that there will be no smoking inside or within 50 feet of any U.S. Government facility, at any time, during performance of work under this contract. The COR or project inspector will identify to the contractor the designated smoking area(s) for the contractor’s employees prior to starting any work. The contractor shall ensure that all contractor employees are aware of the designated smoking area(s) and shall ensure that all contractor employees use the designated smoking area. Any contractor employee found smoking in any U.S.
Government facility, at any time, will be removed from the work site by the COR or project inspector. The COR or project inspector will notify the KO of the removal of any contractor employee for violation of the “no smoking” policy.
14. BURNING/WELDING OPERATIONS: The contractor shall be responsible to obtain a burning/ welding permit prior to any burning or welding operation. The contractor shall notify the COR or project inspector not less than five (5) work days prior to such operations and shall return the permit to the U.S. Government inspector at the completion of the permit period. Contractor shall provide fire watch during all open flame/ welding work.
15. VERIFICATION OF ACTUALITIES: (FAR Clause 52.236-2 Site Visit)
16. HOUSEKEEPING: (FAR Clause 52.236-12 Cleaning Up / 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities and Improvement & 52.236-13 Accident Prevention)
17. BASE ACCESS: The contractor shall be required to obtain base access to Kunsan Air Base to perform the requirements of this contract. The contractor shall be responsible to submit a base access request letter no later than five (5) calendar days prior to start this contract. It shall be the responsibility of the contractor to prepare the necessary base access paperwork IAW USFKregulation 190-7, Installation Access Control, and submit it to the COR or project inspector. USFK regulation 190-7 is available on open source internet (http://8tharmy.korea.army.mil/g1_AG/Programs_Policy/PublicationsRecords/Regu lations/USFK/USFK%20Reg%20190-7%20Installation%20Access%20Control2013.pdf
18. REPAIR WORK: It shall be the contractor’s responsibility to repair all areas of patch work to match existing areas. This work shall include all areas inside of the facility as well as any other areas that the contractor may have damaged during the performance of work under the terms of this contract.
19. CONTRACTOR’S RESPONSIBILITIES: It shall be the responsibility of the contractor to have full control of all contractor personnel during the performance of work under the terms of the contract. The contractor shall be responsible to ensure that no contractor personnel receive any instructions for addition/deletion of work from any Government personnel including the COR or project inspector. Any instructions for additional work shall only be issued by the KO. The contractor shall be responsible for any cost incurred for any additional work, which is not identified in the contract documents to include the specifications or on the contract drawings. The contractor shall be responsible to inform the COR or project inspector of any request form any Government personnel for additional work. The contractor shall provide the COR or project inspector with name and office of the individual requesting the additional work and the type of additional work being requested. The COR or project inspector will take the necessary actions to inform the KO to prevent such situation.
20. PROGRESS SCHEDULE: The contractor shall prepare and submit the AF Form 3064, Contract Progress Schedule no later than ten (10) calendar days after notice to proceed is issued. The contractor shall submit three (3) copies of the AF Form 3064 for approval by the COR or project inspector and KO.
21. DRAWING SUBMITTALS: All drawings shall be submitted prior to the start of any work. Any additional drawings (As-built, field changes, etc.) shall be submitted to the COR or project inspector no later than ten (45) calendar days prior to contract completion for delivery orders with period of performances (PoP) less than 180 days and (60) days prior to contract completion delivery orders with PoP’s greater than 180 days. If submittal cannot be submitted within the timeframe the contractor must notify the COR or project inspector in writing why he/she cannot meet the requirement.
22. UTILITY OUTAGES/ROAD CLOSURES: The Contractor shall be the responsibility of the contractor to request, in writing, to the COR or project inspector, a minimum of thirty (30) calendar days in advance for any water outage, electrical outage, or road closure. The contractor shall provide a requested date and estimated time for the water outage, electrical outage, or road closure. The COR or project inspector will be responsible for determining the impact of the water outage, electrical outage, or road closure. The COR or project inspector will also be responsible for the processing of the contractor’s request for a water outage, electrical outage, or road closure. The contractor shall have written approval from the COR or project inspector before any water outage, electrical outage, or road closure.
23. ASBESTOS CONTAINING MATERIALS: No asbestos containing materials (ACM) shall be used under this contract. ACM is any material containing more than 1% asbestos by weight, either along or mixed with other fibrous on non-fibrous materials.
24. OZONE DEPLETING SUBSTANCES: No Class I ODS shall be used in the performance of this contract, nor be provided as a part of the equipment. This prohibition shall prevail over any other provision, specification, drawings or referenced documents.
25. MATERIAL SAFETY DATA SHEETS (MSDS): It shall be the responsibility of the contractor to furnish Material Safety Data Sheets (MSDS), in English and Korean, for all hazardous material(s) used under the terms and conditions of this contract. The type of materials that the contractor shall submit MSDSs for include, but is not limited to, paint, primer, lacquer, stain, joint compound, caulking, exterior insulation systems, emergency exit lights, cleaning fluids, oil, etc., and any other type of product deemed necessary by the Contracting Officer’s
Representative (COR) or project inspector, required by U.S. Government Environment Laws and Regulations, or Korean Environmental Laws and Regulations.
a) SUBMITTAL REQUIRMENTS:
(1) The contractor shall be responsible to process these Material Safety Data Sheets (MSDS) on an AF Form 3000, Material Approval Submittal. The AF Form 3000 shall be submitted to the COR or project inspector no later than fifteen (15) calendar days after the Notice to Proceed (NTP) is issued by the Contracting Officer (KO). The contractor shall submit four (4) copies of the AF Form 3000 with carbon paper. The contractor shall submit the AF Form 3000 to the COR or project inspector for review prior to submitting the AF Form 3000 with carbon paper. It will be the responsibility of the COR or project inspector to verify the AF Form 3000 to ensure that all hazardous materials are submitted in the proper format.
(2) It shall be the responsibility of the contractor to list each type of hazardous material on the AF Form 3000.
The contractor shall also be responsible to list the quantity, unit of measure (i.e.: each, liter, gallon, etc.), and size of container(s). It will be the responsibility of the COR or project inspector to verify these quantities and containers prior to initialing off on the AF Form 3000.
(3) After verification of all hazardous materials by the COR or project inspector and the contractor, the COR or project inspector will then be responsible to process this AF Form 3000. After receiving approval for all hazardous materials, it will be the responsibility of the COR or project inspector to provide the KO and contractor with a copy of the signed AF Form 3000 for the official files.
(4) After receiving approval of all hazardous materials required under the terms and conditions of this contract, the contractor shall be responsible to process these Material Safety Data Sheets (MSDS) through the HazMart Pharmacy located in building #823, military telephone DSN 782-5247, commercial telephone (063) 470-5247.
The HazMart Pharmacy will be responsible to issue a bar code for each hazardous material that shall be affixed to each container by the contractor. The contractor shall be responsible to post an approved copy of the AF Form 3000 at the worksite storage area as well as keep a signed copy by AF Form 3000 in the contractor’s field office.
(5) It shall be the responsibility of the contractor to provide the COR with a new AF Form 3000 for any additional hazardous materials brought onto Kunsan Air Base throughout the term of the contract. This shall include any new materials as well as any additional quantities over and above the originally quantities.
(a) HAZARDOUS MATERIALS STORAGE: The contractor shall be responsible to store all hazardous materials in an approved storage container or storage area. This storage container may be either a metal or wood locker which is capable of being secured when not in use as well as at the end of each workday. The contractor shall be responsible to provide an approved storage location for large quantities of hazardous materials which can also be secured when not in use as well as at the end of each workday. The contractor shall be responsible to keep an approved AF Form 3000 on the inside of the door to the storage container and also keep a copy of the approved AF Form 3000 posted at the storage area
(b) DISPOSAL REQUIREMENTS FOR HAZARDOUS MATERIALS: The contractor shall be the responsibility of the contractor to remove and dispose of any remaining hazardous materials upon completion of the contract to include the removal of hazardous materials from the worksite as well as the contractor’s field office area. The contractor shall be responsible to dispose of these remaining hazardous materials, off the installation, at the contractor’s own expense, in strict accordance with existing Korean Environmental Laws and Regulations. The contractor shall be responsible to notify the COR or project inspector prior to disposing of any hazardous materials off the installation to ensure that all hazardous materials are properly handled and disposed of correctly. After use of final disposal of all hazardous materials, it will be the responsibility of the COR or project inspector to notify the HazMart Pharmacy of the final disposition of the hazardous material in order for the HazMart Pharmacy to update the AF-EMIS database.
(c) HAZARDOUS MATERIAL SPILLS: In the event that the contractor accidentally spills any hazardous materials at the worksite, the contractor shall be the responsibility of the contractor to immediately notify 8 CES/CEAN, Environmental section located in Building #705, military telephone DSN 782-6239/6240, commercial telephone (063) 470-2312/6337. The contractor shall be responsible to identify the location of the spilled material, the quantity of spilled material, and the type of spilled material. The contractor shall also be responsible to notify the COR or project inspector. The contractor shall not under any conditions, remove and dispose of any spilled hazardous material(s) without prior approval of 8 CES/CEAN.
26. DISPOSAL REQUIRMENTS: The contractor shall be responsible to designate, in writing, to the COR or project inspector the exact location(s) for the disposal of the steel revetment, soil, and concrete. The contractor shall also be responsible to provide the COR or project inspector with a copy of the license for the disposal location(s) issued by the Korean Government. The contractor shall be responsible to accompany the COR or project inspector on a site visit of the disposal location(s) prior to the removal and disposal of any steel revetment, soil, or concrete.
The COR or project inspector will be responsible to complete a DD Form 1901, Plant Visit Request/Report for each of the disposal locations. The COR or project inspector will be responsible to provide the KO with a copy of the DD Form 1901 identifying any discrepancies which may not conform to the contract requirements. It will be the responsibility of the KO to review this DD Form 1901 and to determine any corrective actions that the contractor shall be responsible to comply with. The contractor shall also be responsible to notify the COR immediately in the event that the disposal location(s) are no longer licensed or capable of disposing of the steel revetment, soil, or concrete in accordance with AFI 32-7042 (Waste Management).
27. ESCORT PRIVILEGE: Personnel of the Contractor or any representative of the contractor entering Kunsan AB shall abide by all security regulations imposed by Installation Commander at all times and shall be subject to security checks. Contractor personnel and property shall be subject to search and seizure upon entering the confines of the installation, while on, and upon leaving the confines of Kunsan AB.
a. Escort Privileges: The Contractor shall be responsible to obtain escorting privileges on base passes for the
Contract Manager (CM), Quality Control (QC) Manager, Safety Manager with a limit of three (3) persons and one
(1) vehicle pass per base pass. It is the Contractor’s responsibility to ensure that the escorting official has full control over all escorted individuals at all times. Any individual found on the installations unescorted will be removed from the installation and the escort official’s escorting privileges will be immediately withdrawn. Any individual removed from these installations will not be authorized further access to these installations.
b. Return Post Passes: On the contract completion date, the contractor shall turn in all passes that were issued for this contract to the sponsor and final payment will not be processed until such items are returned.
A1-6. CONTRACT DATA REQUIREMENTS LIST (CDRL)
Provide the data as indicated below to the COR. All reports, submittals, logs, and information provided to the Government shall be electronic and compatible with Microsoft Office 2007™ such as Excel™, Word™, and others. “Compatible” means the document can be opened using the appropriate Microsoft Office™ component without any discernible effect on the text (e.g.,loss of data) or the formatting of the document:
Item No.
Description Format Frequency Paragraph Reference
The Written Notification of Pre-final and Final
Contractor’s Format (one
A minimum of 7 work days in advance for
General Condition
Inspection copy) inspection Para. 4.
002 As-Built Drawings
Contractor’s Format (one hard copy and three CD copies)
Prior to final acceptance
General Condition Para. 5.
List of Equipment to Be Used on Site
Contractor’s Format (one copy)
NLT (10) days after
NTP
General Condition Para. 7.
004 Progress Schedule AF Form 3064 (three copies)
NLT (10) calendar days after NTP
General Condition Para. 20.
Utility Outage/Road Closures Request
Contractor’s Format (one copy)
A minimum of 30 calendar days in advance for outage
General Condition Para. 22.
006 Material Approval Submittal AF Form (four copies)
NLT 15 calendar days after NTP
General Condition Para. 25. a. 1.
1A-7. ENVIRONMENTAL PROTECTION SPECIFICATION
PART 1 GENERAL
1.1 ENVIRONMENTAL MANAGEMENT SYSTEM
a. Contractor shall ensure all workers are familiar with the goals of the Kunsan AB
Environmental Management System (EMS) as stated in the installation’s Environmental Policy Statement and have an awareness of EMS.
b. The Environmental Policy Statement commits the installation 1) to compliance with the requirements of USFK regulation 201-1, Korea Environmental Governing Standards (KEGS) and other applicable legal and policy requirements, 2) for continued environmental improvement and pollution prevention, 3) to reduce risk from environmental impacts of base activities, and 4) understanding that everyone on the installation is responsible for complying with the environmental regulations.
c. The Contractor's work under this contract shall conform with all operational controls identified in Kunsan AB EMS and provide monitoring and measurement information necessary for the Government to address environmental performance relative to the goals of the EMS.
d. Where environmental training is required for contractor employees to complete contract tasks, the Contractor shall provide proof of completion of training to the contracting officer when requested.
1.2 AIR EMISSIONS
a. Dust Control: The Contractor shall take appropriate measures to minimize the generation of dust as a result of their works, operations and activities IAW KEGS Section 2-3.l during and after construction until the site is reclaimed. These measures shall include regular and effective treatment of gravel roads and working areas, use of dust extractors on drilling equipment, wet drilling equipment and operation, water sprays on aggregate crushing and screening operation etc. Dump trucks to be used in the transportation of materials are to be fitted with tarpaulins to prevent dust or other material spilling during transportation.
b. Ozone Depleting Substance (ODS) Control: The Contractor is prohibited from installing any new equipment using Class I & II ODS. The contractor shall not intentionally release any Class I or Class II ODS refrigerant in the course of maintaining, servicing, repairing, or disposing of appliances, industrial process refrigeration units, air conditioning units, or motor vehicle air conditioners.
Contractor shall collect refrigerant from all potential sources, including, but not limited to, air conditioners, refrigerators, freezers, and chillers, found remaining in the work areas prior to commencing removal or demolition. If collection is not possible, all equipment containing chemical refrigerants will be appropriately moved and placed into segregated storage areas for either re-use or recycling.
c. Volatile Organic Compound Control: The contractor shall use low concentration volatile organic compound (VOC) materials where possible to reduce/minimize VOC emissions, and maintain fossil fuel burning equipment to reduce nitrogen oxides emissions in an effort to not increase ambient ozone levels
1.3 STORMWATER POLLUTION PREVENTION MEASURES
The Contractor will ensure all workers are familiar with the applicable Storm water Pollution Prevention Best Management Practices in KEGS Section 4-3.f(1) and Table 4-
8. Hazardous materials must be stored indoors, in non-rusty drums or under a man-made cover sufficient to provide protection from sun, wind, and precipitation events and painting clean-up materials (thinners, rinsates) must be captured. Oil leaks or spills from all equipment and vehicles must be captured using drip pans. Spill response pads and booms must be available where hazardous materials, including fuel, are stored, used and transferred. Sediment, trash, litter, wash water and any solid objects must be kept out of the storm water sewers. Contractors will implement Air Force Civil Engineer Support Agency (AFCESA) ETL 03-1, Storm Water Construction Standards, specifically Sections 7, 8, 9 & 10, excluding CONUS requirements in 8.5, 8.5.1, 8.5.2.
1.4 EROSION AND SEDIMENT CONTROL
Contractor is required to submit an erosion control plan to 8 CES/CEIE for approval prior to any site work. The erosion control plan is required to implement erosion control IAW the KEGS, the Kunsan AB Storm Water Pollution Prevention Plan and the Kunsan AB Integrated Natural Resources Management Plan, including site stabilization in accordance with KEGS Section 13-3, j. Key elements to address are the control of dust, prevention of sediment leaving the site and on roads, vegetation cover and slope stabilization. Some examples of control methods include silt fences, terraces, interceptor channels, sediment traps, inlet and outfall protection, diversion channels and sedimentation basins. Any temporary measures shall be removed after the area has been stabilized. 8 CES/CEIE will inspect construction sites to ensure the approved erosion control measures are implemented, adequate and effective.
1.5 HAZARDOUS MATERIALS
a. The Contractor using hazardous materials (HAZMAT) on base must comply with the authorization procedures IAW AFI 32-7086, Hazardous Materials Management.
b. Prior to commencement of the project, the Contractor shall submit the information and AF Form 3952, Chemical Hazardous Material Request Authorization (including Safety Data Sheets, formally known as material safety data sheets, written in English and Hangul) to obtain HAZMAT usage approval from the CE Environmental Office.
c. The Contractor shall submit a current monthly quantitative and qualitative inventory of all HAZMAT brought onto the installation to Environmental Office beginning within 5 days after the first HAZMAT are delivered. The monthly inventory must include the following: name of HAZMAT and a common name, if applicable; major use of HAZMAT (paint, lubricant, adhesive, etc.); quantity (number of containers and volume of each container); and verification that the shelf-life has not expired.
The approved AF Form 3952, and SDSs for all HAZMAT must be on file near the HAZMAT storage area.
d. After the contracted work is completed and before contract closeout, the Contractor must remove all HAZMAT from the installation and arrange a final environmental site-visit so 8 CES/CEIE personnel can inspect the area for HAZMAT spills or solid waste violations.
e. The Contractor is required to store HAZMAT in accordance with requirements in Chapter 5 of the KEGS and other DoD policies including the Joint Service Publication on Storage and Handling of Hazardous Materials and AFMAN 23-209.
f. Common storage requirements include keeping the storage area neat and orderly and ensuring incompatible materials (for example, flammables and oxidizers) are not stored together. All HAZMATs must be stored in a locked enclosure with a current inventory posted nearby.
g. A sign with emergency response actions in English and Hangul must be posted where HAZMAT is stored. Containers of hazardous materials must be legibly labeled and closed when not in use.
h. Appropriate spill kits and fire extinguishers must be located near the HAZMAT storage areas.
1.6 WASTE MANAGEMENT AND DISPOSAL
1.6.1 Disposal of Hazardous Waste
Contractors are prohibited by 10 U.S. Code 2692 from storage, treatment, or disposal of any contractor owned hazardous waste (HW) on the installation. Contractors may seek approval from the HW Program Manager, 8 CES/CEIE, for HW accumulation at a hazardous waste accumulation point (HWAP) on the installation if the waste will be or has been generated on-site in connection with a contract activity. When the contractor obtains approval for a HWAP on the installation, he/she shall:
a. Be responsible for ensuring compliance with all US Air Force, KEGS, and host nation HW laws and regulations.
b. Ensure HW are managed and transported IAW the KEGS and local requirements to a certified disposal facility.
c. Ensure proper labeling, handling, segregation, collection and accumulation of HW
IAW Hazardous Waste Management Plan of Kunsan Air Base.
d. Ensure all personnel are properly trained for handling the HW they generate.
e. Provide proper documentation for HW disposal to the installation Environmental
Office.
1.6.2 Disposal of Asbestos Containing Materials (ACM)
a. Asbestos, to include friable/non-friable will be disposed of in accordance with the KEGS, including adequately wetted, sealed in a leak-proof container and properly disposed of through a licensed Designated Waste Disposal contractor.
b. All asbestos and asbestos-contaminated materials will be collected and placed in double-sealed impermeable 6-millimeter plastic bags with duct tape. Asbestos containers shall be labeled in both English and Hangul language “DANGER –
CONTAINS ASBESTOS FIBERS – AVOID CREATING DUST – CANCER AND
LUNG DISEASE HAZARD.”
c. The contractor shall submit records of disposal at the licensed Korean disposal facility to the Environmental Office through the Contracting Office for review and records. In addition, the contractor who performs asbestos abatement/removal activities shall submit documentation (e.g., Summary of the abatement/removal project, List of abatement workers and their certification information, Clearance testing results, Waste manifest records) to the Environmental Office.
1.6.3 Disposal of Electric Light Fixtures, Ballasts and Polychlorinated biphenyls (PCB) transformers
a. The Contractor shall segregate the light bulbs and ballasts by brand and type.
Florescent lights containing mercury shall be disposed of in accordance with the
KEGS.
b. Removed PCB containing equipment shall be turned in to the Kunsan AB Hazardous Waste Storage Area (Bldg. 843). The contractor shall comply with UN Standards for Performance Oriented Packaging (POP) and any additional requirements established by DLA. For example; PCB Transformers shall be set on a drip pan large enough to hold 125% of the remaining liquid and crated by processed wood packaging materials IAW DoD Directive 4140.1.
c. Disposal of PCB items shall only be conducted through the servicing DLA IAW DOD 4160.21-M. Disposal of PCBs within Korea requires coordination with and concurrence of appropriate Korean authorities.
1.6.4 Disposal of Construction and Demolition Debris:
All construction and demolition (C&D) debris will be disposed of or recycled in accordance with the KEGS at licensed disposal/recycling facilities. The contractor shall be responsible for all disposal costs of any C&D debris left on the base at completion of a project.
For each project, the Contractor shall report the metrics for construction and demolition materials, including the total metric tons removed from the base, cost and the total metric tons deposited in a landfill or incinerated. The Contractor shall submit to the Qualified Recycling Program (QRP) Manager in the Environmental Office at DSN 782-3704 or 063-470-3704, legible copies, including English translation, of delivery weight tickets at a landfill facility to show the total metric tons of all debris legally land-filled in accordance with all applicable regulations.
1.7 HISTORICAL & ARCHEOLOGICAL FINDS
All items having any apparent historical or archeological interest, which are discovered in the course of any construction activity shall be carefully preserved and reported to the Environmental Office through the Contracting Officer.
1.8 NATURAL RESOURCES
The Contractor shall perform all work and take such steps required to minimize interference with or disturbances to flora and fauna. Protected species, which include the Narrow-mouthed Frog and the Korean Golden Frog, are present on Kunsan AB. If trees and bushes interfere with the construction work and need to be relocated or removed, consult with the installation Environmental office for proper clearance prior to relocating or removing.
1.9 POLYCHLORINATED BIPHENYLS (PCB) FREE EQUIPMENT
The Contractor is required to assure that all electrical equipment including, but not limited to transformers, capacitors, circuit breakers, re-closers, voltage regulators, switches, electromagnets, and cable, shall be PCB free or not be contaminated with PCBs in detectable concentrations in accordance with the KEGS. In addition, newly procured transformers and equipment shall have permanent labels affixed stating they are PCB free (no detectable PCBs). The contractor shall submit PCB Free certification prepared by the manufacturer for the equipment installed under the project to the Kunsan AB Environmental Office.
1.10 ASBESTOS REQUIREMENTS
The Contractor is required to use "asbestos free" materials (less than 0.1 percent by weight) during the execution of this project. The Contractor shall provide a certificate or SDS, written in English, from the manufacturer verifying the product is asbestos free.
If contactor work is in close proximity to known asbestos-containing material (ACM), the contactor should avoid creating dust from the material, causing fibers to become airborne.
If suspected ACM is discovered, the Contractor shall cease work in the affected area and notify the Contracting Officer. The work area shall be evaluated/surveyed for ACM risk and exposure hazards prior to work recommencing. All identified ACM hazards are required to be removed or controlled in accordance with the KEGS. If ACM sampling or surveying is necessary, the contractor shall provide the survey report and asbestos removal documentation to the installation Environmental Office.
1.11 LEAD BASED PAINT
The Contractor is required to use “lead free” coatings (liquid paints or coatings with less than 0.05 percent lead by weight of the non-volatile solids) during project execution. The Contractor shall provide a certificate or SDS, written in English, from the manufacturer showing the product is lead free.
1.12SPILL PREVENTION AND RESPONSE PLANNING
a. In the event of a fuel or other hazardous substance spill during the performance of this contract, the Contractor shall be responsible for its containment, clean up, and related disposal costs. Maximum effort must be made to keep the spill from reaching the storm water or sanitary sewers and the contractor must have sufficient spill containment supplies readily available on vehicles and/or at the work site to contain any spillage.
Refer to the installation Spill Prevention, Control, and Countermeasure (SPCC) Plan.
b. In the event of a Contractor-related release, the Contractor shall immediately notify the Fire Department (911), Environmental Office (DSN 782-6240/3701 or 063-470- 6240/3701), and the Contracting Officer and take appropriate actions to correct its cause and prevent future recurrence.
c. The Contractor will submit a completed spill report within 24 hours to the installation Environmental Office detailing the spill location, type of material and quantity spilled, the cause of the spill and description of the event, whether the spill reached the storm water or sanitary sewer, the containment and cleanup actions and the POC and contact number.
1.13ABOVE GROUND STORAGE TANKS
Any above ground storage tank (AST) allowed on site shall have secondary containment capable of holding the entire volume of the largest single tank plus sufficient freeboard to allow for precipitation and expansion of product. ASTs must be equipped with vent pipes and spill/overfill protection. Contractor shall notify the Environmental Office with the capacity, contents, and a schematic drawing for each AST prior to bringing the tank on the installation. All ASTs shall be installed or erected in accordance with applicable laws and regulations. Drainage of storm water from inside the secondary containment areas shall be controlled by a valve that is locked in the closed position when not in active use.