A07_Attachment_1,_Combined_Drawings-pdf.pdf
PDF 1 MB Posted
- Attached to
- Replace Carpet, FSS
- Solicitation number
- W90VN7-17-R-0039
About this file
Attachment 1, Combined Drawings
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W90VN7-17-R-0039-0001.pdf | ||
| W90VN7-17-R-0039_(final).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TRANSIENT PAD
PANTON PAD
ROKAF
NORTH
LOOP
NORTH DV PAD
SOUTH DV PAD
WRM PARKING AREA
TREE
AREA
CARGO
PAD
JUVAT
PAD
SOUTH
LOOP
REPLACE CARPET AT BLDG 755
NOT TO SCALE
NORTH
SHT. NO. REF. NO. DESCRIPTION
DRAWING SCHEDULE
DRAWN BY:
DESIGNED BY:
CHECKED BY:
SCALE:
DRAWING NO:
PROJECT NO:
REF. NO:
CHIEF, CONSTRUCTION MANAGEMENT
CHIEF OF DESIGN
CHIEF OF CONTRACTS
ENVIRONMENTAL FLIGHT
FIRE DEPARTMENT
CORROSION ENGINEER
COMMUNICATIONS
BIOENVIRONMENTAL ENGINEERING
SAFETY
SECURITY POLICE
USING AGENCY
CHIEF, OPERATIONS FLIGHT
CHIEF, ENGINEERING FLIGHT
BASE CIVIL ENGINEER
MAIN GATE
AS SHOWN
KUNSAN AB, KOREA
COVER SHEET
MLWR 17-1064
YUN
LOCATION MAP
REPLACE CARET AT BLDG 755 AND 1104
MLWR 17-1064
SHEET 1 OF 4
C 1
NEW 1ST FLOOR PLAN FOR B-755
C-1
A-1
CORPS OF ENGINEERS
BASE HOSPITAL
BASE CIVIL ENGINEER
ENGINEERING FLIGHT
CONSTRUCTION MANAGEMENT
YUN
KIM, YH
UNITED STATES AIR FORCE
8th CIVIL ENGINEER SQUADRON
KUNSAN AIR BASE, REPUBLIC OF KOREA
THIS PROJECT
B-755 & 1104
AND 1104
NEW 2ND AND 3RD FLOOR PLAN FOR B-755
NEW FLOOR PLAN FOR B-1104
A-2
A-3
| 1_MLWR17-1064C-1, (Location Map)-Layout1 |
| 2_MLWR17-1064 (New 1st Floor Plan for B-755)-1ST FLOOR PLAN |
| 3_MLWR17-1064 (New 2nd & 3rd Floor Plan for B-755)-2ND-3RD FLOOR PLAN |
| 4_MLWR17-1064 (New Floor Plan for B-1104)-Layout1 |
File details come from the government source that posted it. Updated .