W90VN7-16-T-0009-0001.pdf

PDF 63 KB Posted

Attached to
Bullet Trap System Maintenance (Korean Local Contractors Only)
Solicitation number
W90VN7-16-T-0009
Issued by

About this file

Amendment 0001

View the file

Other files

File Type Posted
W90VN7-16-T-0009.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F2L3SF6098AQ01

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

A. The purpose of this amendment is to change/clarify Section L. Instruction to Offerors and Section M. Basis of Aw ard.

B. Technical subfactor 2 is revised for Korea -Wide registration requirement. For more details, see change of summary in this document.

C. All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 13-Jun-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W90VN7-16-T-0009

X 9B. DATED (SEE ITEM 11)

10-Jun-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

13-Jun-2016

CODE

411TH CONTRACTING SUPPORT BRIGADE, KOREA

RCO KUNSAN, UNIT #2112

APO AP 96264-2112

UNITED STATES OF AMERICA (THE)

W90VN7 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W90VN7-16-T-0009

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

The following have been modified:

INSTRUCTIO FOR OFFERORS

1. Proposals must adhere to the following instructions:

a. Offerors are cautioned to follow the detailed instructions fully and carefully, as the Government reserves the right to make award based on initial offers received, without discussions of such offers.

b. Offerors may, at the discretion of the Government, be asked to provide more information and clarification regarding their proposals. The Government may make a final determination as to whether an offer is acceptable or unacceptable solely on the basis of the proposals as submitted, without requesting any further information. However, if it is deemed necessary the Government may, at its sole discretion, request additional information clarifying or supplementing but not substantially changing any proposal as submitted. The proposal are intended to be evaluated, and award made, without discussions with the offerors (other than discussion conducted for the purpose of minor clarification), unless discussions are determined to be necessary. If the Government conducts discussions, the Government shall conduct discussions with all offerors in the competitive range.

2. The PRICING PROPOSAL with the detailed offer breakdown shall be submitted by 1300 hours on the closing date of RFP through https://www.fbo.gov/. Each offeror shall be required to submit an offer breakdown that identifies Materials (Local), Labor, and Transportation and Equipment (T&E), and other resources upon which the offeror intends to rely to perform this contract in accordance with the statement of work. The offer breakdown must demonstrate that the offeror understands the requirement in the RFP by listing an appropriate amount of materials, labor, and transportation and equipment required to perform the contract IAW Statement of Work. Failure to include a significant element in the data may indicate that the offeror fails to understand the requirement, and will be grounds for finding the proposal to be technically unacceptable. The Government reserves the right to make a technical acceptability determination without any discussion with the offeror.

3. Section K: Offers must complete all portions of Section K and submit it through https://www.fbo.gov by 1300 hrs on the closing date of RFP. If unable to complete the Submission via FBO due to system error, the Offerors shall provide a copy of the screenshot depicting the error and submit this along with the proposal via email to kilchae.song.ln@mail.mil Offerors must use the solicitation number as the beginning of subject line in.

4. Offerors shall submit an offer breakdown with their proposal. Price analysis will be performed to determine the extent, to which it is adequate, reasonable, realistic and complete the project described in the solicitation IAW FAR 15.404-1, Price Analysis.

Proposals, which are unreasonably high or low in price, may be rejected when it deemed to be reflective of an inherent lack of technical competence or indicative of a failure to comprehend the solicitation requirements.

5. Technical Capability- Solicitation Submittal Requirements:

a). Contractor's Quarterly Inspection/Maintenance Report Format - The Offeror shall submit a Contractor's Quarterly Inspection Maintenance Report Format describing its technical approach which clearly demonstrates its understanding of and approach to accomplishing the complexity and magnitude of technical requirements set forth in the Statement of Work in this RFP. The report format shall be concise, clear and written in English.

b). Business Registration/License: The offeror shall provide a copy of the primary or sub contractors' valid and current business Registration / License that is specifically related to the solicited requirement such as Construction -용역업(Service Industry) or 청소업 (Cleaning Service) issued by Korean Local Governmemt.

SECTION M - EVALUATION FACTORS FOR AWARD

The following have been modified:

BASIS OF AWARD

The proposal(s) will be evaluated by Lowest Price Technically Acceptable (LPTA) Approach as below.

FACTOR A. Technical acceptability.

Sub Factor 1. “Contractor's Quarterly Inspection/Maintenance Report Format”

Contractor's Quarterly Inspection/Maintenance Report Format which reflects statement of work in this RFP- Goivernment will evaluate contractor's quarterly inspection report format as specified in the "statement of work" of this RFP if the format is meeting the Government’s minimum requirement and desired minimum service.

Sub Factor 2. "Business Registration Certificates" The contractor shall possess a Business Registration Certificate (사업자 등록증) for 용역업(Service Industry) or 청소업 (Cleaning Service) issued by the Republic of Korea (ROK) Government. The Government will evaluate Business Registration Certificates if the contractor is able to provide manpowers for the cleaning/maintenance service.

FACTOR B. Price(s)

Price analysis will be performed to determine the extent, to which it is adequate, reasonable, realistic and complete the project described in the solicitation IAW FAR

15.404-1, Price Analysis. Proposals, which are unreasonably high or low in price, may be rejected when it deemed to be reflective of an inherent lack of technical competence or indicative of a failure to comprehend the solicitation requirements.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .