F3J3CE8144AW01

"CONSTRUCT HYDRAZINE FACILITY, OSAN AIR BASE"

THIS IS WORK PLAN MATOC RFP FOR THE FOLLOWING CONTRACTORS ONLY:

CONTRACT NO.: W91QVN-18-D-0053, -0054, -0055, -0056, -0060, -0062, -0063, -0064, -0072, -0095, -0096, -0097, -0098, -0099.

OFFERORS MUST COMPLY WITH THE FOLLOWING:

A. Site Visit: Offerors w ho intend to propose on this solicitation are strongly encouraged to attend the site visit.

See site visit clause in Section L for the schedule.

B. Submission of Proposals

(1) Proposal Packet: It shall be submitted by 1500 hours on the closing date of RFP through FBO.

a. Pricing proposal

b. Offer breakdow n

c. Design data

d. Completition of Section K (5152.204-4032, Representations and Certif icaitons).

C. If the contractor is unable to submit the proposal in response to the RFP, the contractor shall submit a "No-Offer Letter" by date and time specif ied in this solicitation.

MR. YI, CHAE YONG 031-661-8977

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

25-Jun-2018

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________360 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

YES X NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________ copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________25 Jul 2018 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee is, X is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______120 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

411TH CONTRACTING SUPPORT BRIGADE, KOREA

RCO OSAN, UNIT #2039

APO AP 96278-2039

UNITED STATES

W90VN6

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

03:00 PM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: TEL: FAX:

W90VN618R0027 28

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued)

(Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

W90VN618R0027

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job Construct Hydrazine Facility, Osan AB

FFP

FOB: Destination

PURCHASE REQUEST NUMBER: F3J3CE8144AW01

PSC CD: Y1GC

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0002 1 Lot War Hazard

FFP

Estimated Cost for War Hazard Losses is Zero (0).

FOB: Destination

NET AMT

Section C - Descriptions and Specifications

TECHNICAL PROVISIONS - I

STATEMENT OF WORK

PROJECT NO. TITLE LOCATION

SMYU 18-1066 CONSTRUCT HYDRAZINE FACILITY OSAN AB

1. GENERAL: The work to be performed for completion of this project shall be as described below, and executed by the contractor. The Contractor shall provide all labor, tools, equipment, transportation, materials and other necessary resources for the project “Construct Hydrazine Facility”, in accordance with the Statement of Work (SOW), technical detail specifications, drawings, terms and conditions of this task order. Unless otherwise specified in this task order, the contractor shall comply the terms and conditions of Indefinite Delivery, Indefinite Quantity (IDIQ) Multiple Award Task Order Contract (MATOC) issued by 411th CSB, Korea.

*CONTRACT TYPE: This is an individual Work Plan Task Order of Indefinite Delivery, Indefinite Quantity (IDIQ) Multiple Award Task Order Contract (MATOC) issued by 411th CSB, Korea.

1.1 Work by Contractor: The contractor shall provide all labor, tools, equipment, supplies and any other resources necessary to accomplish the scope of work contained herein as listed below and in accordance with the drawings, sketches and specifications.

1.2 Work by In-House Forces: Not applicable to this project.

1.3 Work by Troop Labor: Not applicable to this project.

2. SCOPE OF WORK (SOW): All works shall be in accordance with the attached particular specifications and drawings.

a. Civil Works:

1. Install security fence (Approx. 72” height, 316 LF) and double swing gate (Approx. 16’ width) with galvanized fabric chain link fence conforming to ASTM A392. Install 3 stands barbed wires on the top of fence. (Approx. 316 LF) All fence posts must be frangible and maximum impact load shall be upon sudden impact (approximately zero rise time), the structural system must be designed to fail at a peak force of no higher than 2275 kilograms (5000 pounds) acting for approximately 0.008 second (8 milliseconds) and absorbing not more than 949 joules (700 foot-pounds) of energy. (See details, C-3)

2. Provide Portland Cement Concrete (PCC) pavement within the area enclosed by chain link fence. (Approx.

5,200 SF, Thk. 5.5” Min) (UFC 3-250-01)

3. Install new access road and Connect access road to adjacent existing road. (Approx. 2,500 SF) AC pavement. (See details, C-3)

4. Install steel guard posts with concrete encasement. (15 EA, 8” Diameter, 4’ height) (See details, C-3)

5. Provide PVC (Poly Vinyl Chloride) water lines to connect existing water line. Provide new fire water line (Approx. 50 LF, 6” diameter) and new water line (Approx. 50 LF, 2” diameter) tapping from adjacent existing

10” diameter water line and connect to new facility mechanical room. Install 2 EA gate valve and 2 EA post indicator valve with valve boxes. (See details, C-3)

6. Install HVAC (Heating, Ventilating, and Air Conditioning) equipment concrete pad next hydrazine facility (Thk. 6” Min, Size as required) (Location: See site plan, C-1).

7. Provide sanitary PVC pipe line. (Approx. 35 LF) Install a septic tank. (Approx. 1,000 gal) Provide 2” diameter PVC sewer pipe from the building and connect to new septic tank as indicated in site plan.

8. Provide concrete ditch with steel grating (Approx. 280 LF, 12” width) and concrete covered ditch. (Approx.

20 LF, 12” width) Install 1EA surface inlet with steel grating. Connect drainage pipe with adjacent box culvert.

(Approx. 20 LF, 18” Diameter)

9. Provide sodding work to restore existing condition in accordance with UFC 3-201-02

b. Architectural Works:

1. Remove existing DFP bunker structure in the site and excavate ground, perform compaction for ground improvement, lay granular fill and vapor barrier for footing and foundation in accordance with contract drawing, approved proposal submittals and specifications. Perform ground improvement if needed according to the geological survey report that contractor is supposed to submit.

2. Install concrete continuous footing, stem wall, slab on grade, stoops, tank/equipment pads including steel reinforcing bars, 4ea steel guard posts for roll up doors and trench drain with open stainless steel grate cover in accordance with contract drawing, approved proposal submittals and specifications.

3. Install walls/openings including EIFS (Exterior Insulation Finish System, drainable type) in accordance with contract drawing, approved proposal submittals and specification. Exterior wall shall be made of reinforced concrete considering seismic requirements in the contract drawing and structural calculation report which is supposed to submit after award.

4. Install doors/frames, louvers, roll-up doors and windows including all hardware in accordance with contract drawing, approved proposal submittals and specification.

5. Install gypsum board suspended ceiling system in R-102, 103 and 104 in accordance with contract drawing, approved proposal submittals and specification.

6. Install steel roof frames, SSMR (Standing Seam Metal Roofing) system, fascia, coping, flashing, rain gutter, downspout, splash blocks and insulation in accordance with contract drawing, approved proposal submittals and specification.

7. Provide fire extinguisher cabinet and Clean Change Room including ceramic wall tiles, mosaic floor tiles, shower booth, vanity cabinets/countertops, wooden bench and toilet accessories in accordance with contract drawing, approved proposal submittals and specification.

8. Apply paint/coating to the building entirely in accordance with contract drawing, approved proposal submittals and specification. Install interior/exterior signage in accordance with user and BCE directions.

c. Mechanical Works:

1. Provide HVAC systems such as make up air unit with electric duct heating coil, exhaust fans, electric heaters, and all associate duct, piping, insulation, sensors, accessories, parts and control as shown on the drawings and the particular specifications.

2. Provide plumbing systems such as High Density Polyethylene (HDPE) containment tanks, electrical water heater, backflow prevention, and water pressure reducing station, plumbing fixtures, emergency shower and eyewash station, electric heat trace and all associate water and sewer piping including acid resistant drains and vents, insulation, sensors, accessories, parts and control as shown on the drawings and the particular specifications.

3. Provide HVAC commissioning and Testing, Adjusting and Balancing (TAB) report.

4. Provide automatic wet pipe fire sprinkler system including interface with fire detection and alarm system, and all associate piping, accessories, parts and control as shown on the drawings.

5. Provide fire extinguishers of a type approved for use in combating hydrocarbon fuel fires in regulated areas.

6. The testing of fire sprinkler system shall be performed after installation and got approval from the Fire Station representative at Osan AB.

d. Electrical Works:

Lighting System

1. Install Lighting fixtures, pendant type, Hazardous Location Class 1, Division 2, Group C as shown on the drawing E-3

2. Install fluorescent lighting fixtures, surface mounting type, weather proof

3. Install fluorescent lighting fixtures, same as above except with emergency battery

4. Install wall mounting type on top of entrance door

5. Install lighting fixtures, same as above #1, lighting fixture except emergency battery

6. Install EXIT light, factory sealed explosion-proof housing, Class 1, Div. 2, Group C

7. Install LED EXIT light

8. Description for all lighting fixtures, see LUMINAIR SCHEDULE on the drawing sheet number E-4

9. Install tumbler switches, 3-way, “EP” type in the room #101 as shown on the drawing

10. Install tumbler switch, “EP” type in room#100, and #104

11. Install tumbler switch, 3-way, general type in room #103

12. Install tumbler switch, general type in room #102

13. Install lighting panelboard “LP” in room #102 with panelboard schedule as shown on the drawing #E-4.

Load schedule is not 100%. Contractor shall develop 100% load schedule.

14. Install lighting contactor on the wall in room 102 as shown on the drawing

15. Indicate the conduit, wire size, and circuit number on the drawing according to the 100% panelboard schedule.

Power System

1. Replace existing radial type transformer T1768, 3PH, 200kVA, 13.8kV-208/120V with 225kVA loop type transformer to feed the power to new 112.5kVA pad mounted transformer.

2. Install new loop type transformer 3PH, 60Hz, 13.8kV-208Y/120V, 112.5kVA w/concrete pad as indicated on the drawing

3. Install the underground ductbank w/concrete encasement 2-way of 125mmPVC SCH 40, 1-way 15kV, XLP, 3-#1 and spare 1-way for primary of 112.5kVA transformer

4. Install underground secondary line of new transformer 112.5kVA to panelboard “LP” in room #102, 4- #400 kCMIL in 103mm dia. PVC SCH 40.

5. Install magnetic motor starters, manual motor starters and disconnect switches for mech equipment.

Disconnect switches shall be provided to every mech equipment. Disconnect switch or built-in disconnect switch is acceptable.

6. Install receptacles as shown on the drawing.

7. Install Watt-Hour Meter and Current Transformer(CT) cabinet.

Telephone

1. Install telephone outlet box on the wall in room #104 as shown on the drawing.

2. Install telephone terminal box on the wall in room #104 as shown on the drawing.

3. Install one (1) underground empty conduit from telephone terminal box to exterior wall.

4. Install explosion-proof telephone.

Grounding/Lightning Protection System

1. Install grounding system as shown on the drawing

2. Static grounding system shall be provided.

3. Lightning protection system shall be provided on the roof for this facility.

4. Down conductor and ground test well shall be installed at each corner of facility.

5. Connect down conductors into the building ground grid.

6. Air terminals are 24” length.

7. Install the ground ring in accordance with UFC 3-550-01. The ring to be installed at a minimum depth of 30 inches (762 mm) rather than the minimum 18-inch (457 mm) depth required by NFPA 780.

8. Bond metallic objects that are within the hazardous areas and within 10 ft (3 m) of a LPS to the nearest LPS down conductor. Bond metal frames of doors and windows within hazardous areas to the LPS. Bond doors to metal frames using flexible braid- type copper conductors. Where tested resistance is less than 1 ohm between doors and door frames, and a test plan is maintained identifying that location, a flexible braid-type copper conductor connection is not required.

9. Down conductors and roof conductors needing high compression or exothermic-weld type connectors.

10. UFC 3-575-01Lightning and Static Electricity Protection Systems and NFPA 780 will be applied.

11. All components for lightning protection/grounding system shall be UL listed.

Fire Alarm System

1. Install Fire Alarm Control Panel, addressable, semi-flush mounted w/built-in digital communicator, 127points built-in, 120/240VAC, support Class A configuration w/batteries (2EA), battery cabinet as shown on the drawing.

2. Fire Alarm system in room #100, #101, and #104 will be explosion-proof type, Class 1, Div. 2, Group C.

3. Building Transceiver provide with MONACO BT-XM type.

4. Install duct smoke detector, “EP” type with addressable mini input module.

5. Install vapor detector “EP” type as shown on the drawing

6. Install manual pull station “EP” type with addressable mini input module

7. Install manual pull station with addressable mini input module

8. Install fire alarm strobe “EP” type

9. Install fire alarm horn “EP” type

10. Install fire alarm strobe

11. Install addressable input module

12. Install building transceiver MONCO BT-XM

COMM/FO CABLE WORK

1. Install concrete encased 2 x 4” conduit from manhole 1763 to Hydrazine facility. One 4” conduit will be installed with two (2) of 3 cell Maxwell innerducts and the other is spare with pull cable. Splicing and pull the copper cable CA15, 25pair from MH 100‐6 to new facility thru HH111, HH110, HH109, and MH1763 as shown on the drawing. Splicing and pull the fiber optic cable SM, 12core from MH1763 to new facility as shown on the drawing.

2. New ducts, comm cabinet, and copper/fiber splicing kit must follow the base comm installation standard (Tab-K).

3. Install the telephone terminal cabinet “TTC” with plywood backboard 96”x48”x3/4”thk, NEMA 1 enclosure include 1-25pair terminal block, telecomm ground bus bar (TMGB)-1EA, surge protection type quadruplex receptacle 2P-3W-20A-125V--1EA.

4. The site condition will be same as before with surrounding environment after excavation, backfill work performed.

3. CONTRACT PERFORMANCE PERIOD: 360 Calendar Days after Notice to Proceed (NTP) except for the Temporary Airfield Construction Waiver (TACW) approval process and unexpected base operation or exercise period.

4. TIME ON TARGET OF THE SITE RELEASE DATE: Will be discussed with user at the pre-con meeting after award.

5. REMARKS:

Taking part in the site visit orientation is strongly recommended. This site orientation will allow the offerors to check out the actual field conditions for them to prepare proper proposals and more visibility in providing an Offer Breakdown which meets the requirements. No modification shall be executed to allow differing site conditions or design deficiencies during contract performance.

Special Requirements for Submittals (Technical Proposal Evaluation Factor): This is the Request for Proposal (RFP) for an LPTA (lowest priced, technically acceptable) based MATOC work plan task order contract. Therefore offerors shall submit the below submittals for government’s technical evaluations:

1. Submittal Drawing (Sub-Factor #1 for Technical Proposal): Reproduction or resubmission of this project contract drawings will be rated as unacceptable.

1.1 Structural Drawing: Typical Concrete Details, Typical Steel Details, Typical CMU Details, Exterior Concrete Wall Section.

1.2 Architectural Drawing: Interior/Exterior Finish Schedule, Door and Frame Schedule, Door Elevation and Types, Hardware Set Schedule.

1.3 Mechanical Drawing: HVAC Equipment Schedule, HVAC Plan, Plumbing Plan and Schedule, Fire Sprinkler System Plan.

Final Site Adapted Drawing (100% Design): The awarded contractor shall complete final site adapted drawings in accordance with actual field condition. Also some contract drawings provided by Government may not match existing field condition and requirements specified in the project. Therefore the final adapted drawing submitted by the awarded contractor shall reflect on the actual field condition and requirements specified in the project accurately and meet the Government’s design intent and achieves the desired quality end-products. The contractor shall be responsible for its own design, work quality, full compliance with the solicitation and its accepted proposal, and shall be liable for its faults. The contractor shall complete the 100% design package in 30 calendar days after receipt of notice to proceed (NTP) for the contract. The 100% design package must be approved by the Government prior to commence of any construction.

1. Submittal Drawing:

1.1 Civil Drawing: Removal Plan, Site Layout Plan, Site Details, Chain Link Fence Details, Road Layout Plan, Utilities Plan, Containment Tank Details, Equipment Pad Details.

1.2 Structural Drawing: Typical Concrete Details, Typical Steel Details, Typical CMU Details, Foundation Plan, Concrete Slab Schedule, Wall Section, Roof Framing Plan, Building Section, Truss Elevation/Section/Details, Steel Frame Details/Section (All structural drawing shall be signed and sealed by a registered professional structural engineer).

1.3 Architectural Drawing: Floor Plan, Roof Plan, Reflected Ceiling Plan, Partial Enlarged Plan, Elevation, Building Section, Exterior Wall Section, Interior Elevation, Toilet Accessory Height Schedule, Roof Details, Interior/Exterior Finish Schedule, Door/Frame and Window Schedule, Door/Window Elevation and Types, Hardware Set Schedule. Door/Window Details, Louver Schedule/Elevation/Types/Details, Drainable EIFS Details, Gypsum board Ceiling Details, Cabinet Section and Elevation, Signage Plan/Schedule/Elevation/Details.

1.4 Mechanical Drawing: HVAC Equipment schedule, HVAC Plan and Ventilation Schedule, HVAC Duct Section, HVAC System Control Diagram, HVAC System Sequence of Operation, HVAC Details, Plumbing Plan and Schedule, Domestic Hot Water Heater Control and Sequence of operation, Plumbing Isometric Diagram, Plumbing Details, Fire Sprinkler System Plan (Fire), Fire Sprinkler Details (Fire).

Mechanical Design Notes:

The outside air intake shall be located greater than 10 feet (3 meters) above the ground as required by UFC 4-010-01.

HVAC emergency shutoff switches shall be installed and identified with signage.

Outside and exhaust air dampers shall have max leakage rate of 3 CFM/FT (max) at 1” WG.

All fire protection system shall be provided in accordance with the latest fire protection codes and standards.

The fire protection system is designed to the requirements of UFC 3-600-01, Fire Protection

Engineering for Facilities, Change 2, 25 March 2018, and all applicable codes and standards including but not limited to NFPA 13, 30, 45, 70, 72, 80, 90A, 90B, 101, UFGS Section 21 21 00 Fire Extinguishing Sprinkler Systems, UFGS Section 28 31 76 Interior Fire Alarm and Mass Notification Systems, and etc.

In accordance with the UFC 3-600-01, 1-7.1.1, fire protection engineering service, major projects require the design, review and oversight services of a QFPE. A QFPE must be involved in every aspect of the design, construction, and testing/commissioning as it relates to fire protection and life safety. This includes, but is not limited to, building code analysis, life safety code analysis, design of automatic fire alarm, detection and suppression systems, water supply analysis, a multi-discipline review for the entire project, construction inspections and witnessing of fire protection acceptance testing/commissioning.

In accordance with the UFC 3-600-01, 1-7.1.2, this requirement is applicable to engineering services for design-bid-build projects as well as all phases of design-build projects including RFP development, design development, and construction.

In accordance with the UFC 3-600-01, 9-6.3.2, shop drawings and calculations must be prepared by an individual that has obtained National Institute for Certification in Engineering Technologies, Automatic Sprinkler Systems, Level III certification or Special Hazards Suppression Systems, Level IV certification, as applicable to the project. The QFPE must review the shop drawings, hydraulic calculations and material submittals. The shop drawings must bear the Review Stamp of the QFPE prior to submitting to the Designated Fire Protection Engineer (DFPE).

Contractor shall complete the design according to below electrical design criteria.

10.1. UFC 3-401-01 Mechanical Engineering, change 1, October 2015

10.2. UFC 3-410-01 Heating, Ventilating, and Air-conditioning Systems, change 3, 25 January 2017

10.3. UFC 3-420-01 Plumbing Systems, change 10, October 26, 2015

10.4. UFC 4-010-01 DOD Minimum Antiterrorism Standards for Building, change 1, 1 October

10.5. UFC 3-600-01 Fire Protection Engineering for Facilities, with change 2, 25 March 2018

10.6. UFC 3-460-01 Petroleum Fuel Facility change 2, 17 June 2015

10.7. ASHRAE 62.1 – 2007 ventilation for acceptable IAQ

1.5 Electrical Drawing: Abbreviations & General Notes (OSAN standard legends will be preferable), Site Plan (Elec & Comm), Lighting Floor Plan, Power Floor Plan, Fire Alarm Floor Plan, Comm Floor Plan, Power Single Line Diagram, Panelboard Load Schedules, Fire Alarm Riser Diagram w/ Matrix, Lighting Fixture Schedules and Details (Contractor shall submit finalized drawings and the drawings shall be approved by 51CES/CEN. Finalized drawings shall include detail drawings, control diagrams, updated plans and schedules).

Electrical Design Notes: Contractor shall design the project with below design criteria

UFC 3-460-01 Design: Petroleum Fuel Facilities, with Change 2 (06-17-2015) UFC 3-501-01 Electrical Engineering (10-06-2015) UFC 3-520-01 Interior Electrical Systems (10-06-2015) UFC 3-530-01 Interior and Exterior Lighting Systems and Controls, with Change 3 (06-01-2016) UFC 3-550-01 Exterior Electrical Power Distribution, with Change 1 (03-23-2017) UFC 3-570-01 Cathodic Protection (11-28-2016) UFC 3-575-01 Lightning and Static Electricity Protection Systems (07-01-2012) UFC 3-580-01 Telecommunications Interior Infrastructure Planning and Design, with Change 1

(06-01-2016) UFC 3-600-01 Fire Protection Engineering for Facilities, with Change 2 (03-25-2018) NFPA 70, National Electrical Code NFPA 70E, Standard for Electrical Safety in the Workplace NFPA 72, National Fire Alarm and Signaling Code NFPA 101, Code for Safety to Life from Fire in Buildings and Structures NFPA 780, Standard for the Installation of Lightning Protection Systems AFI 32-1065 Grounding System AFMAN 91-201 Explosives Safety Standards

2. Design Analysis:

2.1 Structural Calculation Report, which shall be signed and sealed by a registered professional structural engineer.

2.2 Geological survey report (soil exploration report) and soil bearing test report for demonstrating bearing force of soil including analysis/interpretation of test results. It shall be shall be signed and sealed by a registered professional engineer geology and geotechnics.

TECHNICAL PROVISIONS - II

TECHNICAL DETAIL SPECIFICATIONS

1. GENERAL: The project shall comply with the “Standard Technical Specifications for O&MA Projects, Korea (2014 OMA SPECS & SPEC REVISION 1)” the latest version issued by the Department of the Army, Installation Management Command and it can be downloaded from the website http://www.usfk.mil/Resources/ContractingwithUSFK.aspx.

2. OTHER APPLICABLE PARTICULAR SPECIFICATIONS OR GUIDES: The project shall comply with the “Osan AB Architectural Compatibility Plan (Osan AB ACP)” dated 01 January 2009 by the 51st Civil Engineer Squadron (51 CES), UFC 3-310-04 ”Seismic Design of Buildings”, UFC 3-301-01 “Structural Engineering”, UFC 3-460-01 “Petroleum Fuel Facilities”, UFC 1-200-01 “DOD Building Code” and the attached particular specification “SMYU 18-1066 Construct Hydrazine Facility, Osan AB”.

3. PARTICULAR SPECIFICATION FOR MECHANICAL WORK: The material, product, equipment, assembly, or method as specified in this Particular Specification has been selected for the design purpose for reference. If an alternative material, product, equipment, assembly, or method considered equal by the contractor in all characteristics (physical, technical, and functional) to those specified in this documents is submitted, it is subject to be considered as “Approved equal” as long as those items satisfy this Particular Specification and 2014 OMA SPECS & SPEC

REVISION 1.

TECHNICAL PROVISIONS - III

http://www.usfk.mil/Resources/ContractingwithUSFK.aspx

SPECIAL CONDITIONS

1. SECURITY REQUIRMENTS: (a) Contractor’s personnel or any representative of the contractor entering installation/base shall abide by all security regulations imposed by Installation Commander or Base Commander at all times and shall be subject to security checks. Contractor’s personnel and property shall be subject to search and seizure upon entering the confines of the installation/base, while on, and upon leaving confines of the installation/base. (b) Escort Privileges: The contractor shall be responsible for adhering to the escorting privileges on base passes for the Program Manager (PM), Contract Manager (CM), CQC System Manager (CQCSM), Site Safety Health Officer (SSHO) with a limitation of three persons and one vehicle access per base pass. It is the contractor’s responsibility to ensure that the escorting official has full control over all escorted individuals at all times. Any individual found on the installations unescorted will be removed from the installation or base and the escort officials escorting privileges will be immediately withdrawn. Any individual removed from these installations/bases will not be authorized further access to these installations/bases and may further be subject to other Government actions. (c) Return Post/Base Passes: On the contract completion date, the contractor shall turn in all passes to the sponsor that were issued for the contract and final payment will not be made until such items are returned.

Section I - Contract Clauses

CLAUSES INCORPORATED BY REFERENCE

52.232-18 Availability Of Funds APR 1984

CLAUSES INCORPORATED BY FULL TEXT

52.222-50 COMBATING TRAFFICKING IN PERSONS (MAR 2015) ALTERNATE I (MAR 2015)

(a) Definitions. As used in this clause—

“Agent” means any individual, including a director, an officer, an employee, or an independent contractor, authorized to act on behalf of the organization.

“Coercion” means—

(1) Threats of serious harm to or physical restraint against any person;

(2) Any scheme, plan, or pattern intended to cause a person to believe that failure to perform an act would result in serious harm to or physical restraint against any person; or

(3) The abuse or threatened abuse of the legal process.

“Commercial sex act” means any sex act on account of which anything of value is given to or received by any person.

“Commercially available off-the-shelf (COTS) item” means--

(1) Any item of supply (including construction material) that is—

(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.

“Debt bondage” means the status or condition of a debtor arising from a pledge by the debtor of his or her personal services or of those of a person under his or her control as a security for debt, if the value of those services as reasonably assessed is not applied toward the liquidation of the debt or the length and nature of those services are not respectively limited and defined.

“Employee” means an employee of the Contractor directly engaged in the performance of work under the contract who has other than a minimal impact or involvement in contract performance.

“Forced labor” means knowingly providing or obtaining the labor or services of a person—

(1) By threats of serious harm to, or physical restraint against, that person or another person;

(2) By means of any scheme, plan, or pattern intended to cause the person to believe that, if the person did not perform such labor or services, that person or another person would suffer serious harm or physical restraint; or

(3) By means of the abuse or threatened abuse of law or the legal process.

“Involuntary servitude” includes a condition of servitude induced by means of—

(1) Any scheme, plan, or pattern intended to cause a person to believe that, if the person did not enter into or continue in such conditions, that person or another person would suffer serious harm or physical restraint; or

(2) The abuse or threatened abuse of the legal process.

“Severe forms of trafficking in persons” means—

(1) Sex trafficking in which a commercial sex act is induced by force, fraud, or coercion, or in which the person induced to perform such act has not attained 18 years of age; or

(2) The recruitment, harboring, transportation, provision, or obtaining of a person for labor or services, through the use of force, fraud, or coercion for the purpose of subjection to involuntary servitude, peonage, debt bondage, or slavery.

“Sex trafficking” means the recruitment, harboring, transportation, provision, or obtaining of a person for the purpose of a commercial sex act.

“Subcontract” means any contract entered into by a subcontractor to furnish supplies or services for performance of a prime contract or a subcontract.

“Subcontractor” means any supplier, distributor, vendor, or firm that furnishes supplies or services to or for a prime contractor or another subcontractor.

“United States” means the 50 States, the District of Columbia, and outlying areas.

(b) Policy. The United States Government has adopted a policy prohibiting trafficking in persons including the trafficking-related activities of this clause. Contractors, contractor employees, and their agents shall not—

(1) Engage in severe forms of trafficking in persons during the period of performance of the contract;

(2) Procure commercial sex acts during the period of performance of the contract;

(3) Use forced labor in the performance of the contract;

(4) Destroy, conceal, confiscate, or otherwise deny access by an employee to the employee's identity or immigration documents, such as passports or drivers' licenses, regardless of issuing authority;

(5)(i) Use misleading or fraudulent practices during the recruitment of employees or offering of employment, such as failing to disclose, in a format and language accessible to the worker, basic information or making material misrepresentations during the recruitment of employees regarding the key terms and conditions of employment, including wages and fringe benefits, the location of work, the living conditions, housing and associated costs (if employer or agent provided or arranged), any significant cost to be charged to the employee, and, if applicable, the hazardous nature of the work;

(ii) Use recruiters that do not comply with local labor laws of the country in which the recruiting takes place;

(6) Charge employees recruitment fees;

(7)(i) Fail to provide return transportation or pay for the cost of return transportation upon the end of employment--

(A) For an employee who is not a national of the country in which the work is taking place and who was brought into that country for the purpose of working on a U.S. Government contract or subcontract (for portions of contracts performed outside the United States); or

(B) For an employee who is not a United States national and who was brought into the United States for the purpose of working on a U.S. Government contract or subcontract, if the payment of such costs is required under existing temporary worker programs or pursuant to a written agreement with the employee (for portions of contracts performed inside the United States); except that--

(ii) The requirements of paragraphs (b)(7)(i) of this clause shall not apply to an employee who is--

(A) Legally permitted to remain in the country of employment and who chooses to do so; or

(B) Exempted by an authorized official of the contracting agency from the requirement to provide return transportation or pay for the cost of return transportation;

(iii) The requirements of paragraph (b)(7)(i) of this clause are modified for a victim of trafficking in persons who is seeking victim services or legal redress in the country of employment, or for a witness in an enforcement action related to trafficking in persons. The contractor shall provide the return transportation or pay the cost of return transportation in a way that does not obstruct the victim services, legal redress, or witness activity. For example, the contractor shall not only offer return transportation to a witness at a time when the witness is still needed to testify.

This paragraph does not apply when the exemptions at paragraph (b)(7)(ii) of this clause apply.

(8) Provide or arrange housing that fails to meet the host country housing and safety standards; or

(9) If required by law or contract, fail to provide an employment contract, recruitment agreement, or other required work document in writing. Such written work document shall be in a language the employee understands. If the employee must relocate to perform the work, the work document shall be provided to the employee at least five days prior to the employee relocating. The employee's work document shall include, but is not limited to, details about work description, wages, prohibition on charging recruitment fees, work location(s), living accommodations and associated costs, time off, roundtrip transportation arrangements, grievance process, and the content of applicable laws and regulations that prohibit trafficking in persons.

(c) Contractor requirements. The Contractor shall—

(1) Notify its employees of—

(i) (A) The United States Government's policy prohibiting trafficking in persons described in paragraph (b) of this clause; and

(B) The following directive(s) or notice(s) applicable to employees performing work at the contract place(s) of performance as indicated below:

Document Title: USFK Regulation 190-2

Document may be obtained from:

http://8tharmy.korea.army.mil/g1_AG/Programs_Policy/UploadedFile/USFK/USFK_Reg_190-2_Off-

Limits_Areas_and_Establishmentse.pdf Applies Performance to in/at: Republic of Korea

Document Title: USFK Command Policy Letter #12

Document may be obtained from: http://www.usfk.mil/usfk/Uploads/140/USFK%20CPL12.pdf

Applies Performance to in/at: Republic of Korea

(ii) The actions that will be taken against employees or agents for violations of this policy. Such actions for employees may include, but are not limited to, removal from the contract, reduction in benefits, or termination of employment; and

(2) Take appropriate action, up to and including termination, against employees, agents, or subcontractors that violate the policy in paragraph (b) of this clause.

(d) Notification. (1) The Contractor shall inform the Contracting Officer and the agency Inspector General immediately of—

(i) Any credible information it receives from any source (including host country law enforcement) that alleges a

Contractor employee, subcontractor, subcontractor employee, or their agent has engaged in conduct that violates the policy in paragraph (b) of this clause (see also 18 U.S.C. 1351, Fraud in Foreign Labor Contracting, and 52.203-

13(b)(3)(i)(A), if that clause is included in the solicitation or contract, which requires disclosure to the agency Office of the Inspector General when the Contractor has credible evidence of fraud); and

(ii) Any actions taken against a Contractor employee, subcontractor, subcontractor employee, or their agent pursuant to this clause.

(2) If the allegation may be associated with more than one contract, the Contractor shall inform the contracting officer for the contract with the highest dollar value.

(e) Remedies. In addition to other remedies available to the Government, the Contractor's failure to comply with the requirements of paragraphs (c), (d), (g), (h), or (i) of this clause may result in—

(1) Requiring the Contractor to remove a Contractor employee or employees from the performance of the contract;

(2) Requiring the Contractor to terminate a subcontract;

(3) Suspension of contract payments until the Contractor has taken appropriate remedial action;

(4) Loss of award fee, consistent with the award fee plan, for the performance period in which the Government determined Contractor non-compliance;

(5) Declining to exercise available options under the contract;

(6) Termination of the contract for default or cause, in accordance with the termination clause of this contract; or

(7) Suspension or debarment.

http://www.usfk.mil/usfk/Uploads/140/USFK%20CPL12.pdf

(f) Mitigating and aggravating factors. When determining remedies, the Contracting Officer may consider the following:

(1) Mitigating factors. The Contractor had a Trafficking in Persons compliance plan or an awareness program at the time of the violation, was in compliance with the plan, and has taken appropriate remedial actions for the violation, that may include reparation to victims for such violations.

(2) Aggravating factors. The Contractor failed to abate an alleged violation or enforce the requirements of a compliance plan, when directed by the Contracting Officer to do so.

(g) Full cooperation.

(1) The Contractor shall, at a minimum—

(i) Disclose to the agency Inspector General information sufficient to identify the nature and extent of an offense and the individuals responsible for the conduct;

(ii) Provide timely and complete responses to Government auditors' and investigators' requests for documents;

(iii) Cooperate fully in providing reasonable access to its facilities and staff (both inside and outside the U.S.) to allow contracting agencies and other responsible Federal agencies to conduct audits, investigations, or other actions to ascertain compliance with the Trafficking Victims Protection Act of 2000 (22 U.S.C. chapter 78), E.O. 13627, or any other applicable law or regulation establishing restrictions on trafficking in persons, the procurement of commercial sex acts, or the use of forced labor; and

(iv) Protect all employees suspected of being victims of or witnesses to prohibited activities, prior to returning to the country from which the employee was recruited, and shall not prevent or hinder the ability of these employees from cooperating fully with Government authorities.

(2) The requirement for full cooperation does not foreclose any Contractor rights arising in law, the FAR, or the terms of the contract. It does not—

(i) Require the Contractor to waive its attorney-client privilege or the protections afforded by the attorney work product doctrine;

(ii) Require any officer, director, owner, employee, or agent of the Contractor, including a sole proprietor, to waive his or her attorney client privilege or Fifth Amendment rights; or

(iii) Restrict the Contractor from—

(A) Conducting an internal investigation; or

(B) Defending a proceeding or dispute arising under the contract or related to a potential or disclosed violation.

(h) Compliance plan.

(1) This paragraph (h) applies to any portion of the contract that—

(i) Is for supplies, other than commercially available off-the-shelf items, acquired outside the United States, or services to be performed outside the United States; and

(ii) Has an estimated value that exceeds $500,000.

(2) The Contractor shall maintain a compliance plan during the performance of the contract that is appropriate—

(i) To the size and complexity of the contract; and

(ii) To the nature and scope of the activities to be performed for the Government, including the number of non-

United States citizens expected to be employed and the risk that the contract or subcontract will involve services or supplies susceptible to trafficking in persons.

(3) Minimum requirements. The compliance plan must include, at a minimum, the following:

(i) An awareness program to inform contractor employees about the Government's policy prohibiting trafficking-related activities described in paragraph (b) of this clause, the activities prohibited, and the actions that will be taken against the employee for violations. Additional information about Trafficking in Persons and examples of awareness programs can be found at the Web site for the Department of State's Office to Monitor and Combat Trafficking in

Persons at http://www.state.gov/j/tip/.

(ii) A process for employees to report, without fear of retaliation, activity inconsistent with the policy prohibiting trafficking in persons, including a means to make available to all employees the hotline phone number of the Global

Human Trafficking Hotline at 1-844-888-FREE and its email address at help@befree.org.

(iii) A recruitment and wage plan that only permits the use of recruitment companies with trained employees, prohibits charging recruitment fees to the employee, and ensures that wages meet applicable host-country legal requirements or explains any variance.

(iv) A housing plan, if the Contractor or subcontractor intends to provide or arrange housing, that ensures that the housing meets host-country housing and safety standards.

(v) Procedures to prevent agents and subcontractors at any tier and at any dollar value from engaging in trafficking in persons (including activities in paragraph (b) of this clause) and to monitor, detect, and terminate any agents, subcontracts, or subcontractor employees that have engaged in such activities.

(4) Posting.

(i) The Contractor shall post the relevant contents of the compliance plan, no later than the initiation of contract performance, at the workplace (unless the work is to be performed in the field or not in a fixed location) and on the

Contractor's Web site (if one is maintained). If posting at the workplace or on the Web site is impracticable, the

Contractor shall provide the relevant contents of the compliance plan to each worker in writing.

(ii) The Contractor shall provide the compliance plan to the Contracting Officer upon request.

(5) Certification. Annually after receiving an award, the Contractor shall submit a certification to the Contracting

Officer that—

(i) It has implemented a compliance plan to prevent any prohibited activities identified at paragraph (b) of this clause and to monitor, detect, and terminate any agent, subcontract or subcontractor employee engaging in prohibited activities; and

(ii) After having conducted due diligence, either— http://www.state.gov/j/tip/ mailto:help@befree.org

(A) To the best of the Contractor's knowledge and belief, neither it nor any of its agents, subcontractors, or their agents is engaged in any such activities; or

(B) If abuses relating to any of the prohibited activities identified in paragraph (b) of this clause have been found, the Contractor or subcontractor has taken the appropriate remedial and referral actions.

(i) Subcontracts.

(1) The Contractor shall include the substance of this clause, including this paragraph (i), in all subcontracts and in all contracts with agents. The requirements in paragraph (h) of this clause apply only to any portion of the subcontract that—

(A) Is for supplies, other than commercially available off-the-shelf items, acquired outside the United States, or services to be performed outside the United States; and

(B) Has an estimated value that exceeds $500,000.

(2) If any subcontractor is required by this clause to submit a certification, the Contractor shall require submission prior to the award of the subcontract and annually thereafter. The certification shall cover the items in paragraph

(h)(5) of this clause.

(End of clause)

Section J - List of Documents, Exhibits and Other Attachments

APPENDIX "A"

LIST OF APPLICABLE CONTRACT DRAWINGS

GENERAL: The work shall conform to the drawings, all of which form a part of the specifications. The drawings are from the “Standard Detail Drawings for OMA Projects, Korea (OMA STD DETAIL DWG, 2014)” issued by the Department of the Army, Installation Management Agency, Korea Region Office which can be downloaded from website http://www.usfk.mil/Resources/ContractingwithUSFK.aspx and the attached Contract Drawing prepared by 51 CES which are attached on this solicitation. The below are list of drawings for reference.

Drawing Sheet Reference Number Number Number Description Date

18-1066 1 of 24 T-1 Title Sheet and Project Location 15 May 18

18-1066 2 of 24 G-1 Project Site Map 15 May 18

18-1066 3 of 24 G-2 Architectural/Civil Legend 15 May 18

18-1066 4 of 24 G-3 Structural General Notes 15 May 18

18-1066 5 of 24 G-3.1 Structural Design Criteria 15 May 18

18-1066 6 of 24 C-1 Civil Site Map 15 May 18

18-1066 7 of 24 C-2 Civil Utilities Plan 15 May 18

18-1066 8 of 24 C-3 Civil Details 15 May 18

18-1066 9 of 24 A-1 Architectural Floor Plan, Sections 15 May 18

18-1066 10 of 24 A-2 Architectural Reflected Ceiling Plan, etc. 15 May 18

18-1066 11 of 24 A-3 Architectural Elevations 15 May 18

18-1066 12 of 24 S-1 Structural Foundation Plan, Section, etc. 15 May 18

18-1066 13 of 24 S-1.1 Structural Underground Tank Plan, etc. 15 May 18

18-1066 14 of 24 M-G General Mechanical Legend 15 May 18

18-1066 15 of 24 M-1 HVAC Floor Plan, Details, etc. 15 May 18

18-1066 16 of 24 M-2 HVAC Schedules and Details 15 May 18

18-1066 17 of 24 M-3 Plumbing Floor Plan and Riser Diagram 15 May 18 http://www.usfk.mil/Resources/ContractingwithUSFK.aspx

18-1066 18 of 24…