This document provides information on an upcoming virtual industry day hosted by the Army Contracting Command - Aberdeen Proving Ground in conjunction with the Product Manager Mobile Electric Power Systems. The industry day is to engage companies for the Small Tactical Electric Power (STEP) 3kW EMD requirement and allow an opportunity for questions. Interested parties must pre-register no later than August 17th by providing attendee information and submitting any questions in the specified format prior to the August 18th industry day. The event will include an overview of the STEP 3kW program objectives, draft solicitation documentation, and time for questions. The goal is to promote understanding of key solicitation requirements for the modernization of current tactical power fleets.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Industry Day Question Submissions.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Small Tactical Electric Power (STEP) Program Industry Day Presentation
LTC Anthony Leach
Product Manager Mobile Electric Power Systems
(PM MEPS)
18 August 2021
• Welcome & Opening Remarks
• Ground Rules
• Purpose
• Disclosures
• PM E2S2 Leadership Overview
• Overview of STEP Program and Program Objectives
• Draft Solicitation Documentation Overview
• BREAK ‐‐ 15 MINUTES ‐‐
• Pre‐Submitted Q&A
• Industry Day Q&A
• Closing Remarks
STEP Virtual Industry Day Agenda
• This session is being recorded to help the Program Office record questions but the recorded session won’t be distributed to meeting participants.
• If you have a question, please type it into the meeting room chat box.
• Questions will be addressed in the order they appear in the chat box.
• After a response has been provided to your question, you’ll be asked if the answer was sufficient, you can use your microphone to respond verbally or to provide a clarification. If nothing is heard, it will be assumed that the answer was sufficient.
• Please place and keep your microphones on mute, except during the time you’re talking. For example, if you’re providing clarification to a question you’ve submitted via the Chat function in the MS Teams meeting.
• If you do need to talk via an unmuted microphone, please state your name and organization. This will help identify you to the other conference participants, and assist our note takers.
• Turn off your camera. This will help prevent connection issues due to the large audience size.
• All presented information and conversations will be unclassified.
Industry Day Admin Notes
The goal of this event is to:
1. Provide potential Offeror's with an overview of the Small Tactical Electric Power (STEP) 3kW program and its objectives.
2. Provide a walk through of the STEP 3kW EMD draft solicitation and answer industry questions regarding the draft solicitation.
3. Promote an understanding of key solicitation requirements.
Industry Day Purpose
•The Government will not hear formal proposals from industry during this event as the purpose of the Industry Day is only to facilitate communications and answer questions regarding the program and solicitation.
•The formal solicitation for the proposed STEP 3kW requirement is currently in coordination.
•Everything discussed today is NOTIONAL and is NOT to be considered binding. Everything discussed today, including the solicitation and any Q&A, is subject to change or cancellation.
Disclosures (1 of 2)
•Offeror's shall refer ONLY to the final solicitation.
•The draft solicitation is not a request for proposals and is not an authorization to begin work, and does not represent a commitment by the Government to award a contract.
Disclosures (2 of 2)
Deputy Project Manager
Victor Hernandez
Staff SupportFunctional Leadership Lines of Business
Expeditionary Energy & Sustainment Systems (PM E2S2) Leadership Overview
Chief, Operations
Shane Whitlock
Chief, Technical Mgmt Div
Cory Goetz
Chief, Business Mgmt Div
Michael Allen
CIVILIAN MILITARY
MISSION
Provide integrated, scalable, and affordable expeditionary energy and force sustainment capabilities that increase mission endurance, reach, and survivability for Warfighters across a range of multi-domain operations.
VISION
Serve as the DoD lead standardization activity for emerging tactical power and sustainment solutions; be a key enabler of Army CFTs through advanced and reliable force modernization.
VALUES
PM E2S2 is committed to Reliability, Innovation, and Collaboration.
Project Manager
COL Kathy Brown
Chief, Logistics Mgmt Div
Jon Buonerba
Product Manager MEPS
LTC Anthony Leach
Product Manager FSS
LTC Daniel O’Neill
Product Lead LTP
Bob Thoens
Product Manager (PM) – LTC Anthony Leach
Deputy PM – Ms. Chenxi Dong-O’Malley
19 JULY 20218
PM MEPS Organization
Deputy PM
Chenxi Dong-O’Malley
Logistics Management Technical Management Operations
Power DistributionMedium Power & Trailers
Product Manager MEPS
LTC Anthony Leach
PPGSTEP 3kWSTEP LW
Business Management
Program Officer Medium Power Team
Program Officer Small Power Team
CIVILIAN MILITARY
STEP Industry Day Points‐of‐Contact
Position Name Email APM, STEP 3kW Terry Wicherski terrence.p.wicherski.civ@mail.mil STEP Lead Engineer Casey Huffman casey.h.huffman.civ@mail.mil APM, STEP LW Brandon Sparks brandon.g.sparks2.civ@mail.mil Procurement Manager Dawn Carie dawn.m.carie.civ@mail.mil Legal Advisor Michael Pangia michael.d.pangia.civ@mail.mil Contracting Officer Darbye Rivera darbye.t.rivera.civ@mail.mil Contract Specialist Tifphany Cantey tifphany.n.cantey.civ@mail.mil
PM MEPS Portfolio
• Platoon Power Generation (PPG)
• Small Tactical Electric Power (STEP)
Lightweight 2kW
• STEP 3kW
• STEP Hybrid
Portfolio Lifecycle Status
Sustainment:
• 2kW Military Tactical Generator (MTG)
• 5-200kW Tactical Quiet Generator (TQG)
Production:
• 5-60kW Advanced Medium Mobile
Power Sources (AMMPS)
• 3kW Tactical Quiet Generator (TQG)
• Power Distribution Illumination Systems
Electrical (PDISE)
Future Capabilities:
• AMMPS Microgrid(s)
• AMMPS Hybrid Solutions
• IFCN Relay
• PDISE Expansion
AMMPS
Microgrid
AMMPS Hybrid
Development:
Power Distribution Illumination Systems Electrical (PDISE)
2kW MTG / 5-60kW TQG
Advanced Medium Mobile Power Sources (AMMPS)
Small Tactical Electric Power (STEP)
Platoon Power Generation (PPG)
3kW Tactical Quiet Generator (TQG)
• The Small Tactical Electric Power (STEP) program is needed to modernize the current fleet of <5kW generators in the Army inventory. Those Legacy systems utilize technology from the 1990s and are reaching the end of their useful life.
• The STEP systems will provide electricity to equipment used by Army units engaged in Multi‐Domain Operations (MDO) and operating under the full‐range of operational environments. They will be essential for communications, battery charging for Soldier systems, sensors, and other systems as Army formations execute complex missions.
• The STEP family of systems will include the 3kW, the 2kW Light Weight (LW), and the Hybrid Augmentation System (HAS).
18 Aug 2112
Small Tactical Electric Power (STEP) Program
18 Aug 2113
Program Objectives
• The solution must address the Government’s need for a generator set rated at 3kW or greater, but less than 5kW, and which operates on common military fuels: fuel conforming to STANAG 3747, Jet Propulsion (JP)‐8 fuel conforming to MIL‐DTL‐83133, or diesel fuel conforming to ASTM 27 D975.
• The intent of this project is to utilize a new (or existing) design and improve it to meet or exceed the requirements delineated in the Performance Specification, Item Specification for the Generator, Small Tactical Electric Power: 3 < Kilowatts < 5 (PRF 31 6115‐0133) and provide novel enhancements.
• Solutions should include prototype improvements for increased reliability, operation on common military fuels, remote control through the Tactical Microgrid Standard (TMS), and diverse paralleling capabilities. It is desired that proposed solutions support early achievement of initial operational capabilities for support of an expanding user community.
18 Aug 2114
Possible STEP Contracting Opportunities
Fiscal Year Projected Acquisition
FY21 ‐‐
FY22 STEP 3kW EMD
FY23 STEP LW Production
FY24 STEP HAS EMD
FY25 STEP 3kW Production
18 Aug 2115
STEP 3kW Draft RFP
Draft Notice: Released via betaSAM on 30 July 2021 Classification Code: 6115 NAICS Code: 335312 – Motor and Generator Manufacturing Solicitation Number: W909MY‐21‐R‐0008 Contract Type: TBD
Released Documents:
• Statement of Objectives (SOO)
• Performance Specification
• Contract Deliverable Requirement List (CDRLs)
• Contractual Provisions (Sections L & M)
18 Aug 2116
SOO
Para # Title
1. Scope Determination
2. Program Objectives
3. Background
4. Period of Performance
5. Configuration Management
5.1. Product Drawings & Lists
6. Quality Control
7. Logistics Support Package
7.1. Logistics Support Package
7.2. Data Deliverables
Para # Title
8. Management Objectives
9. Security
9.1‐9.7. Other Security Requirements
App Title
A AutoCAD Drawings
B TDP Selection Worksheet
C Acronym Reference
18 Aug 2117
Possible 3kW EMD Contract Phasing
18 Aug 2118
CDRLs CDRL # Deliverable Frequency/Expected Delivery
C001 Critical Design Review (CDR) Presentation Material Twice: 14‐days prior to CDR; 7 days following
CDR
C002 Product Drawings and Associated Lists Twice: 7‐days following CDR; end of phase 2
C003 Quality Control Plan Once; 90‐days after contract award
C004 Electronic Technical Manual (ETM) Three times; at 30%, 70% and at final draft completion
C005 Failure Modes, Effects, and Criticality Analysis (FMECA) Report
Once: 14‐days prior to end of phase 1
C006 Maintenance Analysis Report Once: 14‐days prior to end of phase 2
C007 Engineering Data for Provisioning (EDFP) Once: 14‐days prior to end of phase 2
C008 Kick‐Off Meeting Presentation Materials Once: 30‐days after contract award
C009 Bi‐monthly Progress Report Bi‐monthly with first submission due at the end of the second calendar month after award and subsequent submissions due at the end of every other month
C010 End of Phase Report Twice: 14‐days prior to end of phase 1 & 2
18 Aug 2119
Performance Specification
• New generator set to replace the legacy 3kW TQG
• Rated at 3‐5kW
• 3kW is the threshold (T) requirement, no published objective (O) requirement
• Electrical outputs:
• 120/240 VAC at 60 Hz (T)
• 120/240 VAC at 50 and 400 Hz (O)
• 28 VDC (O)
• External converters for O outputs will not be part of this solicitation (change from draft
RFP)
• Compliance with Tactical Microgrid Standard (TMS) for remote communication/operation (T)
• Paralleling capability: 3 sets minimum (T)
• Mean Time Between Failure: 687 hours (T), 2,290 (O)
• Fuel: JP‐8, F‐24, Diesel (2‐D), JP‐5 (limited hours) (T)
• Fuel Consumption: <0.36 gph (T)
• Weight: 308 pounds (w/ oil and battery, no fuel or coolant) (T)
• Stackable 2 high for either storage or transport (O)
18 Aug 2120
Questions
1. Pre‐Submitted Questions
• Is there room for a lightweight rotary engine as the primary powerplant that operates on the various fuels and no additional oil for the internal seals?
• The SAM announcement for (V) Industry Day reflects this opportunity will be Total Small Business Set Aside. Is this accurate and will the formal RFP also have that requirement? If so, this may jeopardize a large company from competing its technology.
2. STEP Virtual Industry Day Questions (MS Teams Chat)
18 Aug 2121
Closing Comments
Closing Remarks
File details come from the government source that posted it. Updated .