DEPARTMENT OF THE AIR FORCE
AIR NATIONAL GUARD
10 September 2018
To Whom It May Concern,
1. The Air National Guard, Civil Engineering Technical Services Center (CETSC) in Minot, North Dakota has a requirement to upgrade existing Fairlead Beams. The contractor is responsible for the pick-up and delivery of these beams. Each beam weighs approximately 2,000 lbs. All eleven beams to be modified will be available for picked up on an agreed date after contract award. Vendor can accept beams all at once or on an “as needed basis” with coordination. CETSC has the capability to load and unload the beams with a forklift. Delivery of finished product shall be coordinated with CETSC and may be returned in multiple visits. The following fabricated parts are required for this RFQ:
Materials necessary to upgrade 11 beams:
1 - top plate per beam = 11 2 - hand hold access covers per beam = 22 4 - bent plates for mounting lifting rings per beam = 44 12 gussets per beam = 132 28 - ¾” x 2” Grade 8 Machine bolt per beam =308 28 - ¾” Grade 8 Hexagon nut per beam =308 28 - ¾” Grade 8 Lock washer per beam =308 4 - 3/8” x ¾” Grade 8 UNC Machine Bolt per beam =44 4 - 3/8” Grade 8 Lock Washer per beam = 44 Sherwin Williams Zinc Clad IV Sherwin Williams Acrolon 218 HS polyurethane topcoat, color to match existing beam
*Please also see Statement of work for additional information.*
2. Award will be made to only one vendor. All offerors shall submit complete specifications of the items offered with their offer. The Government will award to the responsible offeror whose offer, conforming to the request for quote, will be most advantageous to the Government (price and other factors considered). The following factors shall be used to evaluate offers: price and delivery. All evaluation factors other than cost or price, when combined, are approximately equal to cost or price. The Contracting Officer will evaluate products on the basis of information furnished by the quote or identified in the quote and reasonably available to the Contracting Officer. The Contracting Officer is not responsible for locating or obtaining any information not identified in the quote. FOB Destination: ANG, CETSC, 3420 2nd Street NE, Minot, ND 58703.
*The procedure for a “first article” inspection will be determined by mutual agreement of the parties.
3. Complete the information below and return it with your quote. Quotes are due no later than 11:00 AM CDT on 21 September 2018. All late quotes will be rejected. Point of contact for this acquisition is:
Heidi Sigl
ANG, CETSC
Email: Heidi.l.sigl.mil@mail.mil Phone: 701-333-2226 Fax: 701-333-223
4. Per FAR Part 19, this acquisition is set aside for Small Businesses. NAICS Code 333992 applies to this action.
All offerors must be registered in the System for Award Management (SAM) database. Lack of registration in SAM will make an offeror ineligible for award. Registration information can be found at http://www.sam.gov.
The Department of Defense requires vendors to submit invoices in the Wide Area Workflow System (WAWF); please go to https://wawf.eb.mil/ for more information. Information concerning FAR clauses can be obtained at http://farsite.hill.af.mil.
Point of Contact for this combined synopsis/solicitation is Heidi Sigl, 701-333-2226.
Heidi Sigl Contract Specialist mailto:Heidi.l.sigl.mil@mail.mil http://www.sam.gov/ http://farsite.hill.af.mil/
COMPANY NAME: ______________________________________________________
DUNS NUMBER: ______________________TAX ID: _________________________
CAGE CODE: _____________________________________________________________
BEAM FABRICATION, ASSEMBLY AND COATING TOTAL:
SHIPPING: $ ____________________________________________________________
CRMA: $ ________________________________________________________________
DELIVERY (Days/Weeks after Receipt of Order): _______________________________
(Signature)
(Date)
Printed Name:
Statement of Work Fairlead Beams
General requirements
1. Performing modifications to the Fairlead Beam (FLB) in accordance with drawings, procedures, and material specifications. Reference PDF files titles “Fairlead Beam Upgrade Fabrication Drawings”. Only certified welders may perform welding on the Beams.
Certificates must be provided with quotes. Follow American Welding Society D1.1, table 3.1 for welding requirements on ASTM A36 steel. Minimum yield strength 36Ksi, minimum tensile strength 58Ksi.
2. Use ONLY Sherwin Williams Zinc Clad IV. For Zinc Clad IV primed surfaces, Paint standard for steels will be one coat of Zinc clad IV (3.0-5.0 mils dry film thickness) followed by two coats of Sherwin Williams Acrolon 218 HS polyurethane topcoat (3.0-6.0 mils dry film thickness). The topcoat color will duplicate the original dark green color. The vendor shall follow the manufacturer’s recommendations for surface preparation and coating application.
3. Assuring the quality of work being performed on the FLB (first article test) is acceptable, when the first FLB is assembled, prior to painting, CETSC should be contacted and scheduled for an inspection to assure contract compliance. If accepted, modification on the remaining FLB’s can continue. If vendor desires, CETSC will consider a second inspection to observe a finished painted product to acknowledge acceptable quality workmanship.
4. Contract Manpower Reporting Application (CMRA) Requirements:
The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contractor for the North Dakota National Guard via a secure data collection site. The contractor is required to completely fill in all required data fields using the following web address: http://www.ecmra.mil/
Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. Contractors may direct questions to the Help Desk at http://www.ecmra.mil/.
If the vendor determines there will be a charge for this requirement, the amount will be included as a separate line item on the offer schedule.
Anticipated Work Sequence
1. Degrease and power wash units as necessary to prepare for media blasting, welding, & painting.
2. Each existing Fairlead beam will come with 4 lifting rings. The lifting rings will need to be removed and beam surface ground smooth. The lifting rings shall be re-installed at similar location on new top plate, by attaching with the newly fabricated bent plates (as indicated in Fig. 5-17). Bent plates sizing should replicate existing.
http://www.ecmra.mil/ http://www.ecmra.mil/
3. Media blasting Fairlead Beams (FLB) of all paint coating down to the bare metal. Please note that some of the existing FLB’s paint may contain lead. The intent is to blast all areas down to the bare metal so a good bond is obtained between the metal and coatings and all surfaces coating protects the metal from the outdoor environment that they will be exposed to. There are areas that have limited accessibility, that getting down to bare metal and providing paint coverage is near impossible. Doing the best you can is all that will be expected in these confined areas. The top surfaces of the existing FLB that will be receiving the top plate cover does not require media blasting and can remain as it.
Figure 1 shows 2 beams that are typical of disassembled configuration, which will be sent for modifications.
Figure 1 - Disassembled Fairlead Beams
Additional accessories are being sent for each beam requiring media blasting, painting and coating. They include the following:
• Retainer cover plate as shown in Figures 2.
Figure 2 - Retainer Cover Plate
• Brush holders and Retainer Ring shown in Figure 3.
Figure 3 - Brush Holder and Retainer Ring
• End Roller Housing shown in Figures 4-6.
Figure 4 - End Roller Housing
Figure 5 - End Roller Housing
Figure 6 - End Roller Housing
4. Fabrication of top plate as shown in Fig 5-20a thru 5-20c.
5. Hand hole covers as shown in Figure 5-19.
6. Side gusset plate shown in figure 5-21.
Note: Plate B is welded around its perimeter to Plate A
7. Assemble by bolting and welding in accordance with Figure 5-17 (shown earlier).
Note that the top of existing beam and bottom of the new top plate do not require painting prior to assembly.
8. Contact CETSC for First Article Inspection.
9. Upon satisfactory inspection, prime and paint with topcoat.
Figure 7 is attached as a visual image for reference showing a completed product. Note that the completed product image includes work which would not be required of this contract
Figure 7 - Completed Product
| 2018-09-17T16:23:39-0500 | |
| SIGL.HEIDI.LOUISE.1146531675 |