About this file
This amendment modifies a solicitation for a tunnel washer. It provides answers to questions received, revising one of the minimum essential characteristics to clarify that safety latches are required on the chamber doors. The response due date remains unchanged at 11:00 AM EST on September 8, 2022. The solicitation is issued by the Department of the Army Medical Command for a tunnel washer to thoroughly clean and sanitize rodent cages and equipment, washing up to 1,500 cages per hour. The amendment incorporates specifications for the washer components, controls, construction materials, and utilities required.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W81XWH22Q0130-0001.pdf | ||
| W81XWH22Q0130 (1).pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this Amendment is to:
1. Answ er Question received from Amendment 01
2. Revise MEC 22 The Response due date and time remain unchanged at 11:00 AM EST, 08 September 2022.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 06-Sep-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W81XWH22Q0130
X 9B. DATED (SEE ITEM 11)
24-Aug-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
06-Sep-2022
CODE
USA MED RESEARCH ACQ ACTIVITY
820 CHANDLER ST
FORT DETRICK MD 21702-5014
W81XWH 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W81XWH22Q0130
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
The following have been added by full text:
AMENDMENT 02
The purpose of this Amendment is to:
1. Answer Question received from Amendment 01
2. Revise MEC 22
QUESTION 9:
I think the spec was modified incorrectly.
QUESTION 3:
MEC 22 - Safety latches are frequently installed on rack washers. Is this item required for the Tunnel Washer?
RESPONSE 3:
Remove - Doors shall be equipped with spring loaded, explosion relief type safety latches that open readily when pushed from inside the chamber.
Is this actual spec change correct? It appears the wrong sentence got the strikethrough.
1. All mechanical, piping, and electrical components will be readily accessible for maintenance.
Doors shall be equipped with spring loaded, explosion relief type safety latches that open readily when pushed from inside the chamber.
RESPONSE 9:
The wrong sentence received the strikethrough on the MEC’s.
MEC 22 Revised to: All mechanical, piping, and electrical components will be readily accessible for maintenance.
The following have been modified:
MINIMAL ESSENTIAL CHARACATERIS
Minimum Essential Characteristics (MEC) for Tunnel Washer
1. The tunnel washer shall be furnished and installed shall as a minimum be steam heated, pass-through, washer designed for thorough, efficient cleaning and sanitization of cages and equipment. Washer shall have left to right flow with the capability to washing up to 1500 rodent cages per hour.
2. Load and unload opening shall be no less than 37 inches across and 18 inches high
3. The washer shall include an inline cartridge filter and back-flushed to an existing holding tank. The machine shall be equipped with a pressure monitoring system that notifies the user of a clog at the interface panel.
4. The drying system will include high speed warm air blown over the load through a set of air knives.
5. The conveyor belt shall be constructed of chemical-resistant fiberglass filled PPA material. The user shall be have the ability to remove sections of the belt for replacement or to retrieve fallen objects.
6. The washer belt shall pause automatically when not in use and go in stand-by mode after a set period of inactivity.
7. The washer shall include a programmable self-start function to automatically turn on the unit at a set time.
8. The washer shall include a cycle option to rinse the chamber and flush the lines and tanks.
9. All parts exposed to water or chemicals shall be constructed of a minimum AISA 304 stainless steel where applicable. Belt, viewing ports, and interior curtains are exempt from this requirement, but shall be constructed of material resistant to water and chemical exposure.
10. Interior compartment/chamber size shall not be less than: 70” W x 185” L x 96” H (inside door to door) with the overall exterior dimensions no greater than 110”W x 198”L x 115”H
11. The interior of the tunnel washer shall be all stainless steel construction. All wetted parts shall be stainless steel or appropriate polymeric materials. All structural support including sump support frame shall be stainless steel.
12. The chamber shall be insulated to reduce hot surfaces and heat loss.
13. Tunnel washer shall provide a visual indication of machine status during wash phases.
14. Washer shall consist of five modules; loading, wash, pre-rinse and rinse, dryer, and unload.
15. Treatment schedules and cycle selections shall be made through an Operator Interface Terminal (OIT) and shall include supervisory access code security. The OIT shall provide process times, temperatures and sequence information during equipment operation.
16. All recirculated treatment phases shall have temperature set-point capability. Wash and rinse phases shall have temperature set-point guarantee capability. If temperature set-point guarantee is selected for any phase, that phase shall not begin timing until the set point is reached. Should the solution temperature drop below the set point the timer shall stop and begin again when the temperature rises above set point.
17. The tunnel washer shall be controlled by a touchscreen display, which shall control all times, temperatures, treatment cycles and operational control.
18. Treatment schedules and cycle selections shall be made through an Operator Interface Terminal (OIT) and shall include supervisory access code security. The OIT shall provide process times, temperatures and sequence information during equipment operation and control all times, temperatures, treatment cycles and operational control.
19. Contractor shall install a photo-electric conveyor stop on the government-provided discharge roller table.
20. Contractor shall align the unload end of the washer with a government provided discharge roller table.
21. Washer shall include an emergency stop feature at the load and unload end that can be easily access by the user. Emergency stop will immediately stop all washer operations. Washer shall also immediately stop operations when chamber access doors are opened.
22. All mechanical, piping, and electrical components will be readily accessible for maintenance.
23. Treatment schedules shall be configurable for their respective cycles. A minimum of ten (10) configurable cycles shall be provided.
24. Washer drain shall connect to an existing dedicated effluent drain line or in to a Government-furnished
(GFE) effluent holding/treatment tank located within 10 feet of equipment location.
25. Shall contain dosing pump for a minimum of three chemicals with ability to add additional pumps.
26. The sump shall contain a stainless steel, steam heat exchanger to maintain recirculated solution temperatures complete with steam supply and condensate controls and be easily removable for maintenance and cleaning.
27. The washer shall be inter-piped and inter-wired so that only one connection is required for each service utility.
28. Pump discharge, steam and water supply lines shall have pressure gauges and steam, water and condensate return lines shall terminate with unions and shut-off valves.
29. Hot and cold water supply lines shall include water hammer arrestors.
30. If requirement is greater than building-supplied compressed air, an integral air compressor shall be provided to operate the pneumatic components. The air compressor shall have ample capacity to provide for all compressed air requirements and be fitted with air dryer, automatic drains and filter/regulator/lubricator.
31. A stainless steel modular wall shall be provided as required for isolation between the clean and dirty sides of the washer.
32. If required, existing exhaust hoods at load and unload end shall be modified to capture exhaust from load and/or unload doors when opened.
(End of Summary of Changes)