C-Arm_QASP_v1.docx

DOCX document 36 KB Posted

Attached to
C Arm Maintenance
Solicitation number
W81XWH19Q0145
Issued by

About this file

QASP

View the file

Other files

File Type Posted
ORGANIZATIONAL_CONFLICT_OF_INTEREST.docx DOCX document
C-ARM_PWS_v5.doc DOC document
Solicitation_C_Arm.docx DOCX document
C-ARM_PWS_v4.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Quality Assurance Surveillance Plan for Siemen’s ARCADIS Avantic C-Arm Calibration/Maintenance Services

1. PURPOSE.

This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:

· What will be monitored?

· How monitoring will take place?

· Who will conduct the monitoring?

· How monitoring efforts and results will be documented?

This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance. In addition, the QASP should recognize that unforeseen and uncontrollable situations may occur.

This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the contractor. Updates shall ensure that the QASP remains a valid, useful, and enforceable document. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.

2. GOVERNMENT ROLES AND RESPONSIBILITIES.

The following personnel shall oversee and coordinate surveillance activities.

a. Contracting Officer (KO) - The KO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The KO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The KO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.

Assigned KO:

Organization or Agency: US Army Medical Research Acquisition Activity Telephone: Phone:

Email:

b. Contracting Officer’s Representative (COR) – The COR is located at the U.S. Army Aeromedical Research Laboratory. The COR will be responsible for technical administration of this contract and shall assure proper Government surveillance of the contractor’s performance. The COR shall keep a quality assurance file. At the conclusion of the contract or when requested by the KO, the COR shall provide documentation to the KO. A COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf. The contractor shall refer any changes they deem may affect contract price, terms, or conditions to the KO for action.

COR: Kimberly Vasquez Telephone: 334-255-6949 Email: kimberly.b.vasquez.civ@mail.mil

3. CONTRACTOR REPRESENTATIVES:

The following employee of the contractor will serve as the contractor’s Program Manager for this contract.

Program Manager: TBD Title: TBD Telephone: TBD Email: TBD

4. PERFORMANCE STANDARDS.

Performance standards define desired services. The Government performs surveillance to determine if the contractor exceeds, meets or does not meet these standards.

Table 1. Performance Requirements

Performance Objective
PWS
Performance Standard
Acceptable Quality Level (AQL)
Surveillance Method
1. Calibration
3.1.1.
a. The Contractor shall inspect the system for general operational function.
AQL: The contractor shall be onsite to calibrate the C-Arm once annually.
Observation and 100% Inspection by the IBPG POC.
b. The Contractor shall calibrate the C-arm in conformance with Federal Radiation Performance Standards 21 CFR Subchapter J Paragraph 1020.30 (h).
AQL: The Contractor shall supply a calibration report within 15 days of successful calibration.
100% Inspection by the IBPG POC.
2. Repairs
3.1.2.1

3.1.2.3

a. Upon inspection, the Contractor shall identify hardware/software failures and provide failure report and quote to COR.

AQL: The Contractor shall provide failure report and quote within 15 days of identification of failure.
Observation and 100% Inspection by the IBPG POC.

3.1.2.1 3.1.2.3

b. Upon COR approval, the Contractor shall implement corrective action to repair the hardware/software failures.
AQL: Repairs shall be completed within 3 days of part availability.
100% Inspection by the IBPG POC.
3. Service calls
3.1.2.2

The contractor shall provide onsite service as requested by the Government.

AQL: The Contractor shall be onsite within 8 hours of request by Government.
Observation and 100% Inspection by the IBPG POC.
4. Warranty
3.1.3
The contractor shall provide warranty and part replacement of parts determined defective by the manufacturer or parts that failed inspection by the contractor and covered under warranty (See 3.1.3.).
AQL: The contractor replaces/repairs parts covered by warranty.
Observation by IBPG POC.
5. Maintenance and Support
3.1.4.1
a. The Contractor shall provide upgrades to the software they become available.
AQL: Software upgrades, if available, shall be installed during annual calibration.
Observation by the IBPG POC.
3.1.4.2
b. The Contractor shall provide modifications or enhancements to equipment to improve safety and/or performance.
AQL: The contractor shall provide a modification report within 15 days of updating.
Observation and 100% Inspection by the IBPG POC.
3.1.4.3
c. The Contractor shall provide telephone support during normal business hours for troubleshooting, technical support, and fast diagnosis.
AQL: The contractor shall respond within 1 hour to provide technical support over the phone.
Observation by the IBPG POC.

Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP.

· Feedback from Oversight Board

· Feedback from Government Users

· Feedback from Property Book Officers

· Direct Observation

· 100% Inspection

· Review of Quarterly Reports (various)

· Review of Monthly Reports (various)

Regardless of the surveillance method, the COR shall always contact the contractor's task manager or on-site representative when a defect is identified and inform the manager of the specifics of the problem. The COR shall be responsible for monitoring the contractor’s performance in meeting a specific performance standard/AQL.

· DIRECT OBSERVATION. (Can be performed periodically or through 100% surveillance.)

· MANAGEMENT INFORMATION SYSTEMS (MIS). (Evaluates outputs through the use of management information reports. Best used for general surveillance and may need to be supplemented by periodic inspections.)

· PERIODIC INSPECTION. Uses a comprehensive evaluation of selected outputs. Inspections may be scheduled as required.

· Analysis of contractor's progress reports. (Evaluate cost, schedule, etc.)

· Performance reporting.

Surveillance results may be used as the basis for actions (to include payment deductions) against the contractor. In such cases, the Inspection of Services clause and the Inspection of Supplies clause in the Contract becomes the basis for the KO’s actions.

6. RATINGS.

Metrics and methods are designed to determine if performance exceeds, meets, or does not meet a given standard and acceptable quality level. A rating scale shall be used to determine a positive, neutral, or negative outcome. The following ratings shall be used:

Example 1:

EXCEPTIONAL:
Performance significantly exceeds contract requirements to the Government’s benefit.
SATISFACTORY:
Performance meets contractual requirements.
UNSATISFACTORY:
Performance does not meet contractual requirements.

7. DOCUMENTING PERFORMANCE.

a. ACCEPTABLE PERFORMANCE.

The Government shall document positive performance. A report template is attached. Any report may become a part of the supporting documentation for fixed fee payments, award fee payments, or other actions.

b. UNACCEPTABLE PERFORMANCE.

When unacceptable performance occurs, the COR shall inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. In any case the COR shall document the discussion and place it in the COR file.

When the COR determines formal written communication is required, the COR shall prepare a Contract Discrepancy Report (CDR), and present it to the contractor's task manager or on-site representative. A CDR template is attached to this QASP.

The contractor shall acknowledge receipt of the CDR in writing. The CDR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CDR will also state how long after receipt the contractor has to present this corrective action plan to the COR. The Government shall review the contractor's corrective action plan to determine acceptability.

Any CDRs may become a part of the supporting documentation for contract payment deductions, fixed fee deductions, award fee nonpayment, or other actions deemed necessary by the KO.

8. FREQUENCY OF MEASUREMENT.

a. Frequency of Performance Assessment Meetings.

The COR shall inspect once a year, at a minimum, after calibration and shall take periodic measurements as specified in the AQL column of the Performance Standards Summary Matrix.

PERFORMANCE REPORT

1. Contract Number: TBD

2. Prepared by: COR Name Entered At Time of Award

3. Date and time of observation:

4. Observation:

<Examples of items to include in a report are:

- Method of surveillance.

- How frequently you conducted surveillance.

- Surveillance results.

- Number of observations.>

Prepared by: COR

_______________________________________________________
Signature – Contracting Officer’s RepresentativeDate

CONTRACT DISCREPANCY REPORT (CDR)

1. Contract Number: TBD

2. To: (Contractor Task Manager or on-site representative) Philippe Deschamps

3. From: TBD

4. Date and time observed discrepancy:

5. Discrepancy or Problem:

<Describe in detail. Identify any attachments.>

6. Corrective action plan:

A written corrective action plan < is / is not > required.

< If a written corrective action plan is required include the following. > The written Corrective Action Plan will be provided to the undersigned not later than < # days after receipt of this

CDR. >

Prepared by: COR

________________________________________________________________
Signature – Contracting Officer’s RepresentativeDate

Received by:

_________________________________________________________________
Signature - Contractor Task Manager or on-site representativeDate

The COR may initiate a CDR at any time, including whenever the number of monthly recorded defects for a performance standard exceeds the allowable number of defects; anytime unacceptable performance is determined critical in nature and requires formal corrective action; and whenever an unfavorable trend is detected in contractor performance.

File details come from the government source that posted it.