TECHNICAL_EXHIBIT_1_QASP.docx

DOCX document 18 KB Posted

Attached to
Preventive Maintenance
Solicitation number
W81XWH-16-T-0371
Issued by

About this file

QASP

View the file

Other files

File Type Posted
TECHNICAL_EXHIBIT_03_EQUIPMENT_LISTING.docx DOCX document
W81XWH-16-T-0371.docx DOCX document
TECHNICAL_EXHIBIT_2_DELIVERABLES_SCHEDULE.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUALITY ASSURANCE PLAN

1. Quality Assurance Surveillance Plan.

0. Quality Control.

0. The contractor shall establish and maintain a Quality Control Program and document in a Quality Control Plan, to ensure that all services are provided and include timeliness and level of quality.

0. The approved plan is as follows. This plan shall be updated hereafter as approved changes occur. When the Technician completes the repairs he/she shall inform WRAIR’s maintenance personnel and the COR. In addition to the technician's time, all repair parts necessary to complete repairs shall be indicated by part number, nomenclature, and price on the invoice. The technician shall provide a field service report indicating what measures were taken to repair the equipment and demonstrate to the user and maintenance personnel that the system is fully functional.

0. Quality Assurance. The Government will monitor the contractor’s performance under this contract. The Government retains the rights provided in FAR 52.246-4. The Government’s Quality Assurance Surveillance Plan follows:

1.2.1 The WRAIR user and maintenance personnel shall ensure that the Field Service Report provides the technician’s time and lists all repair parts necessary to complete the repairs, including part number, nomenclature, and price. They shall also ensure that the field service report indicates what measures technician took to repair the equipment. The user and maintenance personnel shall also view the demonstration to ensure that the system is fully functional. Performance shall be as required in Technical Exhibit 1.

TECHNICAL EXHIBIT 1

Quality Assurance Surveillance Plan

Performance Objective
Performance Standard

(Minimum Acceptable Standard) (MAS)

Method of Surveillance
Sample Size
Frequency
1. Perform emergency and scheduled maintenance
Emergency maintenance performed within 48 hours & 1 onsite PM should be performed /year.
100% inspection by user and medical maintenance personnel. , Log books inspected for completion & satisfactory resolution.
100%
When task completed
2.Qualified service(factory trained) personnel
Factory trained personnel familiar with equipment & software to test HPLC 1100 system
100% (by user and medical maintenance personnel)
100%
During maintenance activity
3.Parts
Provide certified parts guaranteed to meet or exceed original specifications as described in PWS
100% (by user and medical maintenance personnel)
100%
When task completed
4. Field service reports and invoices
Copies of reports & invoices of all field services provided to medical maintenance
100% inspection (by user and medical maintenance personnel)
100%
When task completed

OPSEC AT Level 1 Training

Has Contractor personnel received the required AT Level 1 OPSEC training as required by section 7 of the PWS
100% by COR Within 90 days of contract award
100%
Upon assignment of new personnel
Quality Control Program
100%
100% by receipt of QCP
100%
Two weeks after Contract Award

File details come from the government source that posted it. Updated .