TECHNICAL_EXHIBIT_1_QASP.docx
DOCX document 18 KB Posted
- Attached to
- Preventive Maintenance
- Solicitation number
- W81XWH-16-T-0371
- Issued by
-
Department of the Army Medical Command
About this file
QASP
View the file
Other files
| File | Type | Posted |
|---|---|---|
| TECHNICAL_EXHIBIT_03_EQUIPMENT_LISTING.docx | DOCX document | |
| W81XWH-16-T-0371.docx | DOCX document | |
| TECHNICAL_EXHIBIT_2_DELIVERABLES_SCHEDULE.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUALITY ASSURANCE PLAN
1. Quality Assurance Surveillance Plan.
0. Quality Control.
0. The contractor shall establish and maintain a Quality Control Program and document in a Quality Control Plan, to ensure that all services are provided and include timeliness and level of quality.
0. The approved plan is as follows. This plan shall be updated hereafter as approved changes occur. When the Technician completes the repairs he/she shall inform WRAIR’s maintenance personnel and the COR. In addition to the technician's time, all repair parts necessary to complete repairs shall be indicated by part number, nomenclature, and price on the invoice. The technician shall provide a field service report indicating what measures were taken to repair the equipment and demonstrate to the user and maintenance personnel that the system is fully functional.
0. Quality Assurance. The Government will monitor the contractor’s performance under this contract. The Government retains the rights provided in FAR 52.246-4. The Government’s Quality Assurance Surveillance Plan follows:
1.2.1 The WRAIR user and maintenance personnel shall ensure that the Field Service Report provides the technician’s time and lists all repair parts necessary to complete the repairs, including part number, nomenclature, and price. They shall also ensure that the field service report indicates what measures technician took to repair the equipment. The user and maintenance personnel shall also view the demonstration to ensure that the system is fully functional. Performance shall be as required in Technical Exhibit 1.
TECHNICAL EXHIBIT 1
Quality Assurance Surveillance Plan
| Performance Objective | |
| Performance Standard |
(Minimum Acceptable Standard) (MAS)
| Method of Surveillance |
| Sample Size |
| Frequency |
| 1. Perform emergency and scheduled maintenance |
| Emergency maintenance performed within 48 hours & 1 onsite PM should be performed /year. |
| 100% inspection by user and medical maintenance personnel. , Log books inspected for completion & satisfactory resolution. |
| 100% |
| When task completed |
| 2.Qualified service(factory trained) personnel |
| Factory trained personnel familiar with equipment & software to test HPLC 1100 system |
| 100% (by user and medical maintenance personnel) |
| 100% |
| During maintenance activity |
| 3.Parts |
| Provide certified parts guaranteed to meet or exceed original specifications as described in PWS |
| 100% (by user and medical maintenance personnel) |
| 100% |
| When task completed |
| 4. Field service reports and invoices |
| Copies of reports & invoices of all field services provided to medical maintenance |
| 100% inspection (by user and medical maintenance personnel) |
| 100% |
| When task completed |
OPSEC AT Level 1 Training
| Has Contractor personnel received the required AT Level 1 OPSEC training as required by section 7 of the PWS |
| 100% by COR Within 90 days of contract award |
| 100% |
| Upon assignment of new personnel |
| Quality Control Program |
| 100% |
| 100% by receipt of QCP |
| 100% |
| Two weeks after Contract Award |
File details come from the government source that posted it. Updated .