W81K00-17-T-0485-01.pdf

PDF 61 KB Posted

Attached to
Prosthetic Supplies and Accessories
Solicitation number
W81K00-17-T-0485
Issued by

About this file

Questions and Answer have been added to the solicitation

View the file

Other files

File Type Posted
W81K00-17-T-0485.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

0011024555

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

This amendment is issued to publish Questions and Answ ers. See Summary of Changes.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 25-Sep-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W81K00-17-T-0485

X 9B. DATED (SEE ITEM 11)

19-Sep-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

22-Sep-2017

CODE

W40M USA HLTH CONTRACTING ACT

SOUTHERN REG CONTR OFC

3551 ROGER BROOK DR BLDG 3600

FORT SAM HOUSTON TX 78234-6200

W81K00 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W81K00-17-T-0485

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

SOLICITATION/CONTRACT FORM

The required response date/time has changed from 25-Sep-2017 12:00 PM to 26-Sep-2017 12:00 PM.

The following have been added by full text:

QUESTIONS AND ANSWERS

Q1) Item 1: Technically both the DA and DA TMR / plus use an axon bus controller, but in different ways. DA it is just internal communication between the elbow lock and motor, and the Plus / TMR has a "master" that you plug your inputs into like the Michelangelo system.

A1) Are we referring to the TMR / Plus version? What Salient are referring to?

We are referring to both DA and DA+. They both operate off of an axon bus control system.

Q2) It would also be good to confirm that they are NOT talking about the Michelangelo system, bc that is also confusingly called Axon Bus.

A2) Are we NOT talking about the Michelangelo system. What Salient are referring to?

No, we are not referring to the Michelangelo.

Q3) The Autograsp: Lots of hands claim the autograsp feature, (bebionic does, I believe) but only the Sensor Hand has the original, true autograsp with thumb sensor. Is it possible to confirm that is what they mean?

A3) What Salient are referring to?

Yes we are referring to the thumb sensor auto grasp. (F) under externally powered elbows is direct reference to the sensor hand speed.

Q4) Also, do you know the hand size? If not we can pick a size for the wrist connection and glove and change it at time of order if needed.

What item on the item list are referring to?

(F) under externally powered elbows is a direct reference to sensor hand speed.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .