SOLICITATION, OFFER AND AWARD 1. This Contract Is A Rated Order Under
DPAS (15 CFR 700)
Rating Page of Pages
2. Contract Number 3. Solicitation Number 4. Type of Solicitation 5. Date Issued 6. Requisition/Purchase Number Sealed Bid (IFB)
Negotiated (RFP)
7. Issued By Code 8. Address Offer To (If Other Than Item 7)
NOTE: In sealed bid solicitations ‘offer’ and ‘offeror’ mean ‘bid’ and ‘bidder’.
SOLICITATION
9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in item 8, or if handcarried, in the depository located in until (hour) local time (Date).
Caution - Late Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. For Information A. Name B. Telephone (No Collect Calls) C. E-mail Address
Call: Area Code Number Ext.
11. Table Of Contents
(X) Sec. Description Page(s) (X) Sec. Description Page(s)
Part I - The Schedule Part II - Contract Clauses A Solicitation/Contract Form I Contract Clauses
B Supplies or Services and Prices/Costs Part III - List Of Documents, Exhibits, And Other Attach.
C Description/Specs./Work Statement J List of Attachments D Packaging and Marking Part IV - Representations And Instructions E Inspection and Acceptance K Representations, Certifications, and F Deliveries or Performance Other Statements of Offerors G Contract Administration Data L Instrs., Conds., and Notices to Offerors H Special Contract Requirements M Evaluation Factors for Award
OFFER (Must be fully completed by offeror) NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
12. In compliance with the above, the undersigned agrees, if this offer is accepted within _____ calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. Discount For Prompt Payment 10 Calendar Days (%) 20 Calendar Days (%) 30 Calendar Days (%) Calendar Days (%) (See Section I, Clause No. 52.232-8)
14. Acknowledgment of Amendments (The offeror acknowledges Amendment No. Date Amendment No. Date receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):
15A. Name and Code Facility 16. Name and Title of Person Authorized to Sign Offer Address of (Type or Print) Offeror
15B. Telephone Number 15C. Check if Remittance Address is 17. Signature 18. Offer Date Area Code Number Ext. Different From Above – Enter such
Address In Schedule
AWARD (To be completed by Government)
19. Accepted As To Items Numbered 20. Amount 21. Accounting And Appropriation
22. Authority For Using Other Than Full And Open Competition: 23. Submit Invoices To Address Shown In Item
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
24. Administered By (If other than Item 7) Code 25. Payment Will Be Made By Code
26. Name of Contracting Officer (Type or Print) 27. United States Of America 28. Award Date
(Signature of Contracting Officer)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 33 (Rev. 9-97) Previous edition is unusable Prescribed By GSA-FAR (48 CFR) 53.214(c)
W58RGZ-23-B-0025 X 2022DEC29
1 signed
/SIGNED/
2023MAR2902:00pm
DOA1
2022DEC29 SEE SCHEDULE
W58RGZ
ARMY CONTRACTING COMMAND-REDSTONE
REDSTONE ARSENAL AL 35898-5280
MEAGAN MELTON
(256)842-7406
CCAM-ALA
MEAGAN.M.MELTON.CIV@MAIL.MIL
X 1 25
1 68
X 1
X 5 X 13
X 15 X 19
X 25
X 27
X 29
X 52
X 53
X 65
X 68
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
Buyer Name: MEAGAN MELTON
Buyer Office Symbol/Telephone Number: CCAM-ALA/(256)842-7406
Type of Contract 1: Firm Fixed Price
Kind of Contract: Maintenance Contracts
*** End of Narrative A0000 ***
W58RGZ-23-B-0025________________
A-1. This is a limited competition solicitation using Sealed Bidding procedures IAW PAR Part 14. The resulting contract will be a 5 Year
Firm-Fixed-Price (FFP) Maintenance and Overhaul (M&O) Indefinite Delivery Idefinite Quantity (IDIQ) contract pursuant to FAR 52.216-22.
A-2. The applicable North American Industry Classification Systems (NAICS) code is 336413 and the size standard is 1250 employees.
A-3. Technical data to include a Depot Maintenance Work Requirement (DMWR) is not available for the Hydraulic Accumulator overhaul and
Upgrade. This requirement is restricted to Parker-Hannifin (Cage Code 82106) and The Boeing Company (Cage Code 8V613).
A-4. If any bid price exceeds $9,279.51 each for overhaul and repair of the Hydraulic Accumulator, such bid will be deemed non-responsive and shall be rejected and will not be considered for award.
A-5. The Hydraulic Accumulator is not a Critical Safety Item (CSI). There is no adequate Depot Maintenance Work Requirement (DMWR).
A-6. No Government Furnished Material (GFM) other than the reparables will be provided.
A-7. Access to FedMall is not authorized.
A-8. Subject to the availability of funds, any quantities ordered will be priced at the unit price established for the ordering period in which they are ordered. Funds shall be obligated by issuance of delivery orders and not by the contract itself.
A-9. Shipping requirements will be provided in each individual Delivery Order.
A-10. The yearly estimated quantities listed herein do not commit the Government to ordering that or any quantity above the minimum quantity for the following:
AH-64 APACHE
Noun: HYDRAULIC ACCUMULATOR
Input NSN & Part Numbers (P/N)______________________________
NSN: 1650-01-205-8155
P/N: 266010-1003
Output NSN & Part Number (P/N)______________________________
NSN: 1650-01-205-8155
P/N: 266010-1003
Minimum quantity: 50
Maximum quantity: 396
The maximum quantity includes 66 reserved for Foreign Military Sales (FMS). However, if no FMS customers require this item, the United
States Army requirer may utilize the FMS quantity.
A-11. The minimum quantity set forth herein shall be obligated on the first delivery order, to be issued simultaneously with the award of the contract. Any additional quantities ordered will be priced at the Firm Fixed unit price in effect during the ordering period in which they are ordered.
A-12. All ordering periods are in increments of 12 months from the date of award.
Ordering periods:_________________
The first ordering period is from date of contract award through 366 days after contract award (DACA).
The second ordering period is from 367 DACA through 731 DACA.
2 68
W58RGZ-23-B-0025
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
The third ordering period is from 732 DACA through 1,096 DACA.
The fourth ordering period is from 1,097 DACA through 1,461 DACA.
The fifth ordering period is from 1,462 DACA through 1,826 DACA.
Please insert your Firm Fixed unit price for the 1st, 2nd, 3rd, 4th, and 5th year in the spaces provided under each CLIN/SubCLIN.
Note: The Offeror's attention is called to the requirements for receipt of reparables, which follows:
A-13. An electronic copy of DD Form 1348-1A for all shipments of reparables shall be forwarded to 1) the email address in block 10 on page 1 of the basic contract/delivery order/modification and 2) Usarmy.redstone.usamc.mbx.immc-smb-ammo@mail.mil. The DD Form 1348-1A shall annotate to which contract/delivery order the assets will be applied as reparables.
The DD Form 1348-1A guidance as follows:
A. Maintain any receipt documentation received from the depots
B. Upon receipt of material, fill in block 10 to indicate the quantity received and provide a signature and date on the DD Form
1348-1A. Printed names, name/date stamps, and initials are not acceptable.
C. If a DD Form 1348-1A is not received, a 1348-1A must be created with the corresponding receipt information to contain the following:
I. Unit of issue and quantity - (Positions 23-29)
Ii. Document number (Positions 30-43)
Iii. National stock number (NSN) Positions 8-22)
Iv. Condition code (Position 71)
V. Unit price (Positions 74-80)
Vi. Total price (Block 1)
Vii. Actual quantity received (Block 10)
Viii. Nomenclature (Block 17)
Ix. Signature and date (Blocks 22 and 23)
D. Completed 1348-1A should be sent to the following mailbox upon receipt of material:
Usarmy.redstone.usamc.mbx.immc-smb-ammo@mail.mil
An example of a 1348-1A filled out correctly is attached (see Attachment 0001).
A-14. When applicable, the contractor is reminded to complete the FMS customer DA Form 2410 (component removal and repair overhaul record), submitted with the item for repair, in accordance with DA Pamphlet 738-751 (2014) and TB 1-1500-341-01. Upon completion of repair, if authorized, the contractor is reminded to fill out DA Form 2410 and return it to the FMS customer with the repaired asset(s), along with the FMS customer version of the DA Form 2410.
A-15. The National Defense Authorization Act for Fiscal Year 1993, Public Law 102-484, Section 326, prohibits use of ozone depleting chemicals in Department of Defense contracts awarded on or after 01 June 1993, unless appropriate authority is granted.
The following website is provided for the purpose of obtaining/reviewing various pamphlets and army regulations and technical manuals/bulletins:
- "https://armypubs.army.mil/ProductMaps/PubForm/AR.aspx
A-16. The Government intends to award only one contract as a result of this solicitation.
A-17. The contractor shall comply with the Total Asset Visibility - Contractor (TAV-C) reporting instructions IAW Attachment 0004 -
Contractor Repair TAV-C Requirements.
A-18. Complete the following contractor point of contact information:
Name: _________________________________________________________
Telephone number: _____________________________________________
3 68
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
E-mail address: _________________________________________________
*** END OF NARRATIVE A0001 ***
4 68
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
0001 PVA
0001AA PRODUCT VERIFICATION AUDIT (PVA) $ ________________________________ __________________
SERVICE REQUESTED: PVA
CLIN CONTRACT TYPE:
Firm Fixed Price
This CLIN represents the Product Verification Audit
(PVA) for the Hydraulic Accumulator, Output NSN:
1650-01-205-8155 shown in CLINs 0002AA and 0003AA.
This is a Firm Fixed Price CLIN.
Offeror is required to fill in a proposed firm fixed unit price for the PVA:
PVA shall be in accordance with The Product
Verification Audit (PVA) Contract Requirements in
Section E.
PVA shall be conducted within 90 days after receipt of repairables. The Contractor shall prepare 3 __ assets for PVA. The Contractor is required to______ notify the Government Quality Office for scheduling of the PVA by email to the following address:
usarmy.redstone.devcom-avmc.mbx.amr-mqcontracts@ army.mil
With copy emailed to the Contract Specialist at:
usarmy.redstone.acc.mbx.acc-rsa-ccam-alacontracts@ army.mil
PVA requires approval prior to Government acceptance of contract deliverable assets.
Failure to pass the PVA may lead to Termination________________________________________________ for_Default of the contract.____________________________
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
5 68
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Deliveries or Performance _________________________
0002 HYDRUALIC ACCUMULATOR
NSN: 1650-01-205-8155
Mfr CAGE: 82106
Mfr Part Number: 266010-1003
0002AA OVERHAUL/REPAIR (US QTY) $ $ ________________________ ______________ __________________
COMMODITY NAME: HYDRUALIC ACCUMULATOR
This Firm-Fixed-Price (FFP) CLIN includes all mandatory and non-mandatory parts, labor charges, preservation, packaging, packing, marking, and data items necessary to return the unit to a serviceable conditions in accordance with Section C-1 - Statement of Work/Specifications-Contractor Specifications.
The minimum quantity set forth herein shall be obligated on the first Delivery Order, which will be issued concurrently with the award of the contract.
Any additional quantities ordered will be priced at the FFP in effect during the Ordering Period in which those quantities are ordered.
MINIMUM QUANTITY: 50
MAXIMUM QUANTITY*: 396
*CLIN 0003AA FMS quantity of 66 each is included in the maximum quantity above.
(End of narrative B001)
The Contractor is required to fill in the proposed
Firm-Fixed Unit Price: US QTY 330 EACH _______________
Ordering Period 1 U/P $_________ (FFP) MIN Qty 50 ea
Ordering Period 2 U/P $_________ (FFP) EST Qty 70 ea
Ordering Period 3 U/P $_________ (FFP) EST Qty 70 ea
Ordering Period 4 U/P $_________ (FFP) EST Qty 70 ea
Ordering Period 5 U/P $_________ (FFP) EST Qty 70 ea
(End of narrative B002)
6 68
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
SEE ATTACHMENT 0008 M&O PACKAGE REQUIREMENTS
LEVEL PRESERVATION: Military
LEVEL PACKING: A
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
FOB POINT: Origin
0003 HYDRUALIC ACCUMULATOR
NSN: 1650-01-205-8155
Mfr CAGE: 82106
Mfr Part Number: 266010-1003
0003AA OVERHAUL/REPAIR (FMS QTY) $ $ _________________________ ______________ __________________
COMMODITY NAME: HYDRUALIC ACCUMULATOR
CLIN CONTRACT TYPE:
Firm Fixed Price
The Contractor is required to fill in the proposed
Firm-Fixed Unit Price: FMS QTY 66 EACH _______________
Ordering Period 1 U/P $_________ (FFP) MIN Qty 13 ea
Ordering Period 2 U/P $_________ (FFP) EST Qty 13 ea
Ordering Period 3 U/P $_________ (FFP) EST Qty 13 ea
Ordering Period 4 U/P $_________ (FFP) EST Qty 13 ea
Ordering Period 5 U/P $_________ (FFP) EST Qty 14 ea
(End of narrative B001)
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
SEE ATTACHMENT 0008 M&O PACKAGING REQUIREMENTS
LEVEL PRESERVATION: Military
LEVEL PACKING: A
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
7 68
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Deliveries or Performance _________________________
FOB POINT: Origin
0004 SCRAP
0004AA SCRAP $ ______ __________________
SERVICE REQUESTED: SCRAP
CLIN CONTRACT TYPE:
Firm Fixed Price
THE GOVERNMENT'S ESTIMATED QUANTITY PER
ORDERING PERIOD IS 1 EACH FOR PROPOSAL
EVALUATION PURPOSES ONLY.
Offeror is required to fill in proposed firm-fixed-unit prices for ordering periods 1 through 5:
Ordering Period 1 U/P $_________ (FFP) EST Qty 1 ea
Ordering Period 2 U/P $_________ (FFP) EST Qty 1 ea
Ordering Period 3 U/P $_________ (FFP) EST Qty 1 ea
Ordering Period 4 U/P $_________ (FFP) EST Qty 1 ea
Ordering Period 5 U/P $_________ (FFP) EST Qty 1 ea
Scrap assets from CLINs 0002AA and 0003AA shall be in accordance with Section C clause entitled
Statement of Work/Specifications - Government
Specifications.
Units authorized to be scrapped in accordance with Section C shall be reflected as an increase in CLIN 0004AA with a corresponding decrease in quantity and funds in CLINs 0002AA and 0003AA.
In the event the Procuring Contracting Officer
(PCO) determines that certain items should be scrapped, the Contractor shall scrap such items at the fixed-unit price in Section B hereof and make disposition in accordance with the
Contractor's approved Government property procedures.
The Government may, at its discretion, replace any items scrapped by input of additional assets and said scrap quantities will not count as part of the total maximum quantity.
Scrap requires authorization by the PCO via formal modification. In no event shall the
8 68
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Contractor scrap an item prior to receiving a contractual modification for a unit.
Scrap items must be recorded in Procurement
Integrated Enterprise Environment (PIEE), https://piee.eb.mil
THIS IS A FIRM-FIXED-PRICE CLIN.
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
0005 CONTAINERS
0005AA CONTAINERS $ ___________ __________________
SERVICE REQUESTED: CONTAINERS
CLIN CONTRACT TYPE:
Firm Fixed Price
THE GOVERNMENT'S ESTIMATED QUANTITY PER
ORDERING PERIOD IS 1 EACH FOR PROPOSAL
EVALUATION PURPOSES ONLY.
Offeror is required to fill in proposed firm-fixed-unit prices for ordering periods 1 through 5:
Ordering Period 1 U/P $_________ (FFP) EST Qty 1 ea
Ordering Period 2 U/P $_________ (FFP) EST Qty 1 ea
Ordering Period 3 U/P $_________ (FFP) EST Qty 1 ea
Ordering Period 4 U/P $_________ (FFP) EST Qty 1 ea
Ordering Period 5 U/P $_________ (FFP) EST Qty 1 ea
There is no minimum quantity requirement. This line item will be used on an as needed basis.
The Contractor shall provide the container in accordance with Section C narrative titled
"Statement of Work/Specifications - Government
Specifications" and Section J, Attachment 0008 M&O
Packaging Requirements.
9 68
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
The Government cannot determine at the time of contract award, how many of the assets to be overhauled will be received by the Contractor in unserviceable containers or received without containers.
The Contractor, IAW Section C Statement of Work, should submit a Report of Discrepancy (ROD) SF Form
364 through the Defense Contract Management Agency
(DCMA) Quality Assurance Representative (QAR) for verification with 7 working days to the address shown on Data Item A001. When assets are received in unserviceable containers or without containers, approval of the PCO is required before replacement containers are purchased.
This CLIN covers containers for CLINs 0002AA and
0003AA.
THIS IS A FIRM-FIXED-PRICE CLIN.
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
0006 CONTRACT DATA REQUIREMENTS LIST (CDRLS) _______________________________________
A001 REPORT OF SHIPPING AND PACKAGING DISCREPANCY (ROD) $ ** NSP ** __________________________________________________ __________________
SERVICE REQUESTED: EXHIBIT A
CLIN CONTRACT TYPE:
Firm Fixed Price
DATA ACQUISITION DOCUMENT NUMBER: DI-MGMT-80503
Submission of the Report of Shipping and Packaging
Discrepancy shall occur within 10 days of discovering the discrepancy.
(End of narrative B001)
Deliveries or Performance _________________________
10 68
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
A002 TECHNICAL REPORT - STUDY/SERVICES $ ** NSP ** _________________________________ __________________
SERVICE REQUESTED: MAINTENANCE AND OVERHAUL PLAN
CLIN CONTRACT TYPE:
Firm Fixed Price
DATA ACQUISITION DOCUMENT NUMBER: DI-MISC-80508B
(End of narrative B001)
Deliveries or Performance _________________________
A003 TECHNICAL REPORT - STUDY/SERVICES - DD FORM ___________________________________________
1348-1A $ ** NSP ** _______ __________________
SERVICE REQUESTED: TECH RPT STUDY SERVICES
CLIN CONTRACT TYPE:
Firm Fixed Price
DATA ITEM A003 - DATA ACQUISITION DOCUMENT NUMBER:DI-
MISC 80508B
(End of narrative B001)
Deliveries or Performance _________________________
A004 CONTRACT GOVERNMENT FURNISHED MATERIAL (GFM) $ ** NSP ** ____________________________________________ __________________
SERVICE REQUESTED: EXHIBIT A
CLIN CONTRACT TYPE:
Firm Fixed Price
TOTAL ASSET VISIBILITY -
CONTRACTOR (TAV-C) / DI-MGMT-80438B
(End of narrative B001)
Deliveries or Performance _________________________
11 68
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
A005 QUALITY DEFICIENCY REPORT $ ** NSP ** _________________________ __________________
SERVICE REQUESTED: QDR
CLIN CONTRACT TYPE:
Firm Fixed Price
DATA ITEM A005 - DATA ACQUISITION DOCUMENT NUMBER:
DI-QCIC-80736
(End of narrative B001)
Deliveries or Performance _________________________
A006 GOVERNMENT PROPERTY (GP) INVENTORY REPORT $ ** NSP ** _________________________________________ __________________
SERVICE REQUESTED: GP INVENTORY REPORT
CLIN CONTRACT TYPE:
Firm Fixed Price
DATA ACQUISITION DOCUMENT NUMBER: DI-MGMT-80441D
(End of narrative B001)
Deliveries or Performance _________________________
12 68
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
Statement of Work (Limited Competitive) for
NSN: 1650-01-205-8155
PRID: 2021H544 PART NUMBER: 266010-1003 STATUS: U
a. The Contractor, as an independent Contractor, and not as an agent or employee of the Government, shall furnish all services, facilities, labor, parts, materials, equipment, tools, and data (other than Government Furnished Property), necessary to accomplish the inspection and overhaul/repair for ACCUMULATOR, HYDRAULIC that is required to return the items as specified in Section B, to condition code A as defined by Army Regulation 725-50. The input/output configuration shall be as defined in Section B herein. Upon completion of the overhaul/repair, as applicable, the items shall be packaged as defined in each individual delivery order of the contract and shipped to the destination(s) specified in each individual delivery order.
b. Prior to commencement of overhaul/repair, the Contractor shall disassemble and inspect the item to the extent necessary to determine if the item is physically unrepairable or has suffered abnormal or catastrophic damage. If the latter condition exists, the Contractor shall notify the Procuring Contracting Officer (PCO) through the cognizant Administrative Contracting
Officer (ACO) and shall stop work on the item(s) until given further instructions or disposition of the item(s) by the PCO.
c. In the event the PCO determines that certain items should be scrapped, the contractor shall scrap such items at the fixed unit price in Section B hereof and make disposition in accordance with (IAW) the Contractor's approved Government property procedures. Such scrapped items shall count toward the quantities ordered hereunder.
d. Overhaul/Repair shall be accomplished IAW:
Contractor approved M&O Plan.
There is no DMWR for this item.
The Subject NSN has no emerging airworthiness issues, new ECPs affecting CSIs, or concerns over reliability and durability. The solicitation/RFP shall require that all proposals/responses include a special tooling and test equipment section that addresses the contractor's plan to meet all government special tooling and test equipment requirements with either:
1. Physical possession of the required tools, 2. Confirmed requisitions for the required tools, 3. Confirmed arrangements for subcontracting the processes requiring the special tools, or 4. Specific plans describing their technical approach to develop equivalent tools.
e. Critical Safety Item: N/A
f. Upon receipt of the reparables, containers shall be reviewed for serviceability. Containers shall be considered serviceable unless one or more of the following conditions exist: (1) containers are structurally damaged to include functional damage to the suspension system, cracks or holes to the container hull, hull deformity to the extent the container cannot be closed (or sealed where required), or dents that will interfere with the item envelope; (2) corrosion has progressed to the point where fit, function or the life of the container is affected. Items received without containers or containers determined to be unserviceable shall be processed IAW the
Contractor's locally approved Government Property procedures. Components received improperly packaged, damaged with corrosion/deterioration or those with shipping discrepancies shall be reported IAW DI-MGMT-80503.
g. Reserved.
h. Data and reports shall be submitted IAW the Contract Data Requirements List, DD Form 1423, Exhibit A. Data shall be packaged, packed and marked as necessary to assure safe delivery to the addresses indicated on the DD Forms(s) 1423.
i. Product Verification Audit (PVA): The Contractor shall conduct the PVA as specified in Section E, PVA Contract Requirements, of the solicitation/contract.
j. Reserved.
k. Reserved.
l. The items the Contractor shall overhaul/repair are identified below:
Input NSN P/N
1650-01-205-8155 266010-1003
Output NSN P/N
1650-01-205-8155 266010-1003
13 68
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
m. The overhaul/repair planned quantity for 5 years is minimum 50, maximum 396. Input will be 30 days after receipt of order (ARO). Output shall be as specified in the solicitation/contract schedule.
(1) 1st year qty 63 (4) 4th year qty 83
(2) 2nd year qty 83 (5) 5th year qty 84
(3) 3rd year qty 83
n. Inventory Transactions - The contractor shall prepare the following reports:
1. The contractor shall complete and maintain the DD Form 1348-1A receipt for repairables on all shipments IAW Exhibit A, CDRL
A003. The contractor shall complete the DD Form 1348-1A, Block 10 (indicates the quantity received), along with Block 22 (signature), and Block 23 (date). Printed names, name/date stamps, and initials shall not be acceptable. If a DD Form 1348-1A is not delivered with the shipment, a DD Form 1348-1A is located at: http://www.dtic.mil/whs/directives/forms/eforms/dd13481a.pdf
The contractor shall prepare this form to include the following corresponding receipt information:
A. Document Number - (Positions 30-44)
B. National Stock Number (NSN) - (Positions 8-22)
C. Condition Code - (Position 71)
D. Unit Price - (Positions 74-80)
E. Total Price - (Block 1)
F. Actual Quantity Received - (Block 10)
G. Nomenclature - (Block 17)
H. Signature and Date - (Blocks 22 and 23)
If there are any questions with the above information please contact: usarmy.redstone.usamc.mbx.immc-smb-ammo@army.mil
2. The contractor shall prepare a physical inventory report IAW Exhibit A, CDRL A006.
3. The contractor shall comply with the Total Asset Visibility - Contractor (TAV-C) reporting instructions IAW Section J, Attachment 0004 "Contractor Repair TAV-C Requirements". The contractor shall prepare a Government Furnished Material (GFM) Consumption
Report IAW Exhibit A, CDRL A004.
o. Foreign Military Sales (FMS): Contractor shall, at all times, segregate Government Furnished Property that is Inventory of Foreign
Military Sales (FMS) and the Security Assistance Management Directorate (SAMD). Contractor cannot commingle this property and must segregate these items at all times at the contractor location or that of its subcontractors in storage and in shipment.
p. Reserved.
q. The Government reserves the right to replace any items scrapped.
r. The contractor shall record the acquisition, receipt, shipment, consumption, disposal of Government Furnished Property (GFP), and any transfer to another contract utilizing the GFP Module in the Procurement Integrated Enterprise Environment (PIEE), https://piee.eb.mil using the attached GFP attachment.
s. Quality Deficiency Report: The Contractor shall prepare a Quality Deficiency Report as required IAW Exhibit A, CDRL A005.
t. The Contractor shall apply a unique item identifier (UII) onto contract deliverables and report in accordance with the data submission procedures at https://dodprocurementtoolbox.com/cms/sites/default/files/resources/2021 -
09/GFP%20Reporting%20Guide_Vendors_June%202018.pdf.
u. Shipping Containers: Please refer to Attachment 0008, Packaging Requirements. If containers are not reparable or if assets are not delivered in the approved containers, the containers shall be Contractor Furnished Material. Shipment: The method of shipment must use a procedure so that the package can be tracked in case the shipment is not received by AMCOM.
v. Overhaul/Recapitalization/Upgrade/Repair (M&O Plan) Documentation: The contractor shall provide documentation IAW Exhibit A, CDRL
A002. The documentation shall include all legacy (existing) technical information, procedures, and processes (e.g., Overhaul/Repair travelers, workbooks, commercial manuals, drawings, specifications, planning, Federal Aviation Administration (FAA) approved documentation) that the contractor utilized or will utilize in the overhaul of the item. The documentation may be in contractor format.
The contractor shall mark the documentation IAW the contract and provide for reproduction cost only.
*** END OF NARRATIVE C0001 ***
14 68
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION E - INSPECTION AND ACCEPTANCE
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
E-1 52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE AUG/1996
E-2 52.246-4 INSPECTION OF SERVICES--FIXED-PRICE AUG/1996
E-3 52.246-15 CERTIFICATE OF CONFORMANCE APR/1984
E-4 52.246-16 RESPONSIBILITY FOR SUPPLIES APR/1984
E-5 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT DEC/2014
(a) The contractor shall comply with the higher-level quality standard(s) listed below.
ISO 9001:2000 OR EQUIVALENT
(b) The contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts in--
(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or
(2) When the technical requirements of a subcontract require--
(i) Control of such things as design, work operations, in-process control, testing and inspection; or
(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.
(End of clause)
E-6 PRODUCT VERIFICATION AUDIT (PVA) CONTRACT REQUIREMENTS (JUNE 2022) __________________________________________________________________
PURPOSE. This PVA requirement establishes/assigns responsibilities for insertion of PVA procedures into overhaul work directives, maintenance data packages, and contract documents along with procedures and instructions to be applied in performing PVAs during overhaul, maintenance, modification kit installation, rework, remanufacture, manufacturing, and new procurement contracts. The PVA candidate(s) are used to evaluate that the contractor processes and procedures are adequate to ensure component integrity.
A. The Contractor shall perform and present for acceptance THREE units as specified in this contract. This clause does not supersede instructions contained in depot overhaul work requirements, commercial overhaul manuals, new manufacture technical requirements or other applicable documents. It does not relieve the contractor from maintaining a quality system that will assure items conform to contractual requirements. Contractors may request to delay scheduled PVAs in frequency or waive PVA requirements of selected items in cases where accumulated objective evidence indicates that a consistent quality item is being delivered. PVA actions will be based on the overall performance history, failure impact, supply impact, length of program, and nonscheduled PVAs accomplished by the Systems
Readiness Directorate (SRD). Like or similar items may be grouped for these purposes provided concurrence is obtained from SRD Quality
Management Division. The contractor may be directed by the Procuring Contracting Officer (PCO) to increase or decrease the scope of a
PVA pursuant to the "Changes" clause of the contract for non-commercial items. If however this procurement is for a commercial item, the contractor and the Contracting Officer (CO) will need to enter into a bilateral contract modification to increase or decrease the scope of a PVA.
B. The Contractor shall,
1. With the concurrence of SRD Quality Management Division (QMD), schedule and perform PVA as required by the terms of the contract or as otherwise required.
2. Notify PCO with information copy to the SRD QMD, ATTN, "usarmy.redstone.devcom-avmc.mbx.qs-contracts@army.mil" of the date the
PVA candidates will be available. Notification shall be provided at least 20 working days prior to the selected date if facilities are within the Continental United States. If facilities are outside the Continental United States, notification shall be provided at least 95 working days prior to the selected date to allow sufficient time for travelers to gain theater clearance.
3. Provide technical personnel tooling, measuring and test equipment, work area, forms, and clerical assistance, as required, to perform the PVA. If test cell or other specialized equipment is required; notification of readiness for PVA shall include the availability of these.
C. The PVA candidate will be selected by the SRD PVA Team Chairman at random from the three (3) tendered candidates for acceptance to the Government. For reoccurring audits, if any, the audit candidate will be selected by the PVA Team Chairman from all completed items currently available.
1. Alternate Procedure. Normally, three assets are required to be completed at time of PVA. If in the PVA Team Chairman's judgment it is in the best interest of the Government, an alternative approach may be taken due to circumstances such as shortage of overhaul assets, shortage of replacement parts, time constraints, or other considerations. At the PVA Team Chairman's discretion, only one PVA candidate may be required to be completed while the other two assets can be in various stages of overhaul as agreed upon (prior to the beginning of the PVA) between the PVA Team Chairman and the facility to be audited. For instance, one asset could be disassembled and ready for Overhaul Inspection Procedures, while the other may be prepared for a critical process such as acceptance testing. (This approach is particularly helpful if the critical process is performed by a subcontractor.) For reoccurring audits, if any, the audit candidate will be selected by the PVA Team Chairman from all completed items currently available.
D. The item selected for PVA will be inspected for adherence to preservation, packaging, and marking requirements prior to removal
15 68
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
from the shipping container. A visual inspection and functional test will be performed prior to disassembly.
E. The PVA Team will review the shop travelers, production processes, procedures, tooling, and, equipment used to maintain, overhaul, repair, or manufacture the item being audited for adequacy and conformance to the contractual requirements. The PVA will include verification through objective evidence that all of the inspection, testing, measuring and diagnostic equipment used in the inspection/test of the PVA candidate are maintained in accordance with applicable calibration standards.
F. Disassembly for overhauled items will be performed in an area accessible only to audit personnel. Normally, audit participation will be limited to specified production and quality assurance personnel of the contractor activity, the cognizant government Quality
Assurance Representative (QAR), and the SRD PVA Team Chairman and team personnel.
G. Visual inspection, dimensional checks (such as backlash, end clearance, running clearance, etc.) and nondestructive testing are accomplished during and after disassembly IAW applicable technical directives. Findings are recorded for comparison with historical data and conformance evaluation. A 100% inspection (or as set forth in relevant specifications) of all physical characteristics, to include but not limited to any dimensions, certifications for materials, processes and/or procedures, as well as any other requirements which may be set forth by other applicable specifications, or in any procurement packages, technical drawings. Depot
Maintenance Work Requirements (DMWRs), Maintenance Engineering Orders (MEOs), and/or any other special/functional testing as set forth in this contract.
H. Applicable accessories and components will be functionally tested and inspected to contractual/work specifications. The PVA team will review subcontractor certifications for testing and inspections. At the request of the PVA Team Chairman, processes (such as
Shot peening, heat treating, etc.) performed by subcontractors may also be audited. Contractor shall be able to demonstrate that all testing/ inspection procedures, and acceptance methods are documented in the appropriate area of the overhaul documents, and are approved and controlled by management.
I. The PVA item shall be reassembled and functionally tested IAW applicable specifications and made ready for government acceptance including preservation, packaging, marking, and update of historical records and all applicable documentation.
J. Conduct of the PVA will be planned in a manner that adequately allows examination/audit of all procedures involved. Each step in the process shall be analyzed to determine compliance to specifications. It may not be logical or possible, due to time constraints, to track the same item throughout the PVA; therefore, at the SRD PVA Team Chairman's discretion, examination of representative assemblies any may be used as evidence of compliance to specification requirements. The SRD PVA Team Chairman will determine the scope and detail of the PVA process. The SRD PVA Team Chairman may delegate follow-up actions to the DCMA QAR, when it is determined to be prudent to the PVA.
K. During the course of the PVA, the PVA Team Chairman may request progress meetings to provide status to the contractor. After the
PVA is completed, the SRD PVA Team Chairman will conduct an exit critique attended by all concerned contractor personnel and the cognizant DCMA QAR and PM Representative. The context of the audit findings and corrective actions will be discussed and any disputes will be resolved. Findings, classifications, and corrective actions will be discussed and determinations made as to cause of defect established (i.e. workmanship, tooling, technical requirements, etc.). The contractor's management personnel shall take immediate action to correct and preclude recurrence of all defects attributable to failure to ensure compliance with requirements.
L. All defects will be recorded on the SRD PVA Audit Finding Record by the PVA Team. The PVA Team Chairman will provide copies of each finding to the contractor quality assurance element and the cognizant DCMA QAR and PM Representative. This will allow immediate actions to begin in the resolution of the defect. Corrective actions, as well as actions taken to prevent recurrence, shall also be documented on this form by the contractor. The form shall be signed, as a minimum, by the contractor quality manager or designated representative and the SRD PVA Team Chairman. Further actions outlined below pertain to specific actions required by the contractor depending on the classification of the defects:
1. Observation: In the event an observation is discovered, the contractor is not required to provide a written response, but it is encouraged to do so.
2. Minor: In the event a minor defect is discovered, the following actions shall be taken:
a. The contractor shall isolate the cause of the defect and initiate corrective actions.
b. All minor defects shall require a written response addressing corrective actions taken and actions taken to prevent recurrence.
c. In the event a minor defect is a recurrent deficiency, regardless of weapon system or date when original discrepancy was noted, it will be written into the report as a minor defect, but the corrective actions required below for a major defect will apply.
3. Major: In the event a major defect is discovered, the following actions shall be taken:
a. The contractor shall halt any work in progress at the responsible station until corrective action is acceptable to the PVA
Chairman.
b. The contractor shall provide the DCMA QAR information reflecting the total quantity shipped, if any, and to what destination pertaining to any item that could contain the identified defect.
c. The contractor shall determine impact of the defect on products previously delivered under this contract, if any, and initiate corrective action to address those units at no additional cost to the US Government.
16 68
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
d. The contractor shall isolate the cause of the defect and initiate corrective actions. All findings shall require an in-depth written response outlining corrective actions to prevent recurrence.
e. The contractor shall review/revise work documents for the specified operation responsible for the defect to ascertain that they are complete, adequate, and sufficiently defined to assure that, if followed and completed by both production, maintenance and inspection personnel, they will provide objective evidence of a quality operation.
f. The contractor shall assure the cognizant DCMA QAR and the SRD PVA Team Chairman that positive, effective, corrective action has been initiated that will prevent recurrence of the cited defect. This assurance can be verbal at first, however, a written report from the contractor quality element containing all corrective actions completed and actions taken to prevent recurrence shall be provided to the DCMA QAR and the SRD PVA Team Chairman within 24 hours after the verbal response.
4. Critical: In the event a critical defect is discovered, the following actions shall be taken:
a. All actions outlined in paragraph 3 above shall be completed.
b. Upon request, the contractor shall provide the SRD technical information necessary for the issuance of a Safety of Flight
Message or Aviation Safety Action Message to the field (if necessary).
c. Government acceptance/release of product will cease immediately until corrective actions are acceptable to the contracting officer.
NOTE: Systemic quality assurance process discrepancies that affect the outcome of product(s) outside the scope of the PVA will require the cognizant DCMA QAR to issue a Corrective Action Request.
M. FINDING DEFINITIONS:
Minor Finding: A defect or a departure from established processes or standards that may result in failure or reduced usability of the product, or a process noncompliance that holds the potential of causing a defect in the future.
Major Finding: A defect, other than critical, that will likely result in failure, or reduce the usability of the product for its intended purpose.
Critical Finding: A defect that would result in hazardous or unsafe conditions for individuals using, maintaining, or depending upon the product or a defect likely to prohibit the performance of a major end item or major part thereof. This classification requires immediate cessation of Government acceptance/release of product until corrective actions are acceptable to the contracting officer.
Observation: A condition or circumstance that is noted during the PVA that does not currently meet the aforementioned defect criteria. This category may also be used as suggestions for continuous improvement.
N. Upon completion of the disassembly and/or testing portion of the selected PVA candidate, without finding any critical or major defects, the other two completed candidates will be released as PVA candidates. In the event that a critical or major defect is found in the audit candidate, the contractor shall satisfy to the PVA Team Chairman that such a defect does not exist in the other 2 PVA candidates prior to acceptance, and an effective corrective action has been initiated to preclude re-occurrence of the defect.
O. If there are failures during the PVA, the Contractor shall repeat any or all tests, per Government request. If deemed in the best interests of the government, contract termination may be initiated. Upon request for additional tests, the Contractor shall make any necessary changes, modifications, or repairs to the PVA item. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following disapproval. These actions must be coordinated with the cognizant DCMA QAR. The Government shall take action within 10 working days. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule, or for any additional costs to the Government related to these tests.
P. The PVA unit is to be representative of the deliverable quantity. The Contractor shall overhaul both the PVA item and the contractual quantity at the same facility. In the event that there is a change to the process planning (i.e. changes in process sources, parts sources, or location where work is to be performed) after official PVA approval from Contracting Officer, the contractor is required to provide notification of such changes to the CO, so that a determination can be made whether a new PVA is warranted. Notification is required 10 business days prior to shipment of the next delivery.
Q. The PVA candidates shall be shipped IAW contract delivery schedules or released to supply activity upon receipt of the official PVA approval via the Contracting Officer. The Contractor SHALL NOT retain the PVA item approved under this contract to serve as the manufacturing standard of acceptance.
R. If the Contractor fails to deliver any PVA on time, or the Contracting Officer disapproves any PVA, the Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.
S. Before PVA approval, the acquisition of materials or components for, or the commencement of overhaul of, the balance of the contract quantity is at the sole risk of the Contractor. Before PVA approval, the costs thereof shall not be allocable to this contract for (1) Progress payments, or (2) termination settlements if the contract is terminated for the convenience of the government.
17 68
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
T. If the component is a Critical Safety Item (CSI), see those specific contract clauses for other requirements that may also be audited during the PVA. PVA approval is contingent on contractor submission and SRD Airworthiness approval of changes to manufacturing planning, to correct defects identified during PVA.
U. Unless otherwise specified in this contract, any end item destroyed or exceeds reparable limits during the PVA process is not to be considered as part of the contract quantity.
E-7 CALIBRATION ___________
The calibration of Test, Measurement and Diagnostic Equipment shall be in accordance with American National Standards Institute/National
Conference of Standards Laboratories (ANSI/NCSL) Z540-3-2006 (General Requirements for Calibration Laboratories and Measuring and Test
Equipment) or ISO 10012:1992 (Quality Assurance Requirements for Measuring Equipment). Terminology shall be as defined by International
Organization for Standardization (ISO) 8402, Quality Management and Quality Assurance - Vocabulary.
*** END OF NARRATIVE E0001 ***
18 68
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION F - DELIVERIES OR PERFORMANCE
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
F-1 52.211-17 DELIVERY OF EXCESS QUANTITIES SEP/1989
F-2 52.242-15 STOP-WORK ORDER AUG/1989
F-3 52.242-17 GOVERNMENT DELAY OF WORK APR/1984
F-4 52.247-29 F.O.B. ORIGIN FEB/2006
F-5 52.247-34 F.O.B. DESTINATION NOV/1991
F-6 52.247-52 CLEARANCE AND DOCUMENTATION REQUIREMENTS--SHIPMENTS TO DOD AIR OR FEB/2006
WATER TERMINAL TRANSSHIPMENT POINTS
F-7 252.211-7007 REPORTING OF GOVERNMENT-FURNISHED PROPERTY MAR/2022
F-8 252.211-7008 USE OF GOVERNMENT-ASSIGNED SERIAL NUMBERS SEP/2010
F-9 252.211-7003 ITEM UNIQUE IDENTIFICATION AND VALUATION MAR/2022
(a) Definitions. As used in this clause--
"Automatic identification device" means a device, such as a reader or interrogator, used to retrieve data encoded on machine-readable media.
"Concatenated unique item identifier" means
(1) For items that are serialized within the enterprise identifier, the linking together of the unique identifier data elements in order of the issuing agency code, enterprise identifier, and unique serial number within the enterprise identifier; or
(2) For items that are serialized within the original part, lot, or batch number, the linking together of the unique identifier data elements in order of the issuing agency code; enterprise identifier; original part, lot, or batch number; and serial number within the original part, lot, or batch number.
"Data matrix" means a two-dimensional matrix symbology, which is made up of square or, in some cases, round modules arranged within a perimeter finder pattern and uses the Error Checking and Correction 200 (ECC200) specification found within International Standards
Organization (ISO)/International Electrotechnical Commission (IEC) 16022.
"Data qualifier" means a specified character (or string of characters) that immediately precedes a data field that defines the general category or intended use of the data that follows.
"DoD recognized unique identification equivalent" means a unique identification method that is in commercial use and has been recognized by DoD. All DoD recognized unique identification equivalents are listed at https://www.acq.osd.mil/asda/dpc/ce/ds/unique-id.html .
"DoD…