W58RGZ19R0200.pdf
PDF 150 KB Posted
- Attached to
- Overhaul / Repair of Altimeter Encoder
- Solicitation number
- W58RGZ19R0200
About this file
This is a solicitation for the overhaul and repair of an altimeter encoder. The solicitation is for a five-year IDIQ contract for a minimum of 180 units and maximum of 1200 units, including 1000 units for US Army requirements and 200 units for foreign military sales. Offerors must provide firm fixed unit prices for each of the five ordering periods. The period of performance includes a 30-day input period after receipt of order and specified output quantities within 150 to 240 days. The solicitation includes provisions for product verification audits, reporting requirements, and terms for scrap and contractor-furnished containers.
0200
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W58RGZ19R0200-0002.pdf | ||
| AX102-2_CDRL_A001.pdf | ||
| AX102-2_PACKAGING.pdf | ||
| Attachment_0004_-_1348-1A_Guidance.pdf | ||
| Attachment_0002_SF-364.pdf | ||
| AX102-2_CDRL_A003.pdf | ||
| Copy_of_Attachment_0005_MO_Plan_Guidance.xlsx | XLSX spreadsheet | |
| AX102-2_CDRL_A002.pdf | ||
| Attachment_0003_-_Report_of_Discrepancy_Guidance.pdf | ||
| 0200_Doc_Summary_List.pdf | ||
| W58RGZ19R0200.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER AND AWARD 1. This Contract Is A Rated Order Under
DPAS (15 CFR 700)
Rating Page of Pages
2. Contract Number 3. Solicitation Number 4. Type of Solicitation 5. Date Issued 6. Requisition/Purchase Number Sealed Bid (IFB)
Negotiated (RFP)
7. Issued By Code 8. Address Offer To (If Other Than Item 7)
NOTE: In sealed bid solicitations ‘offer’ and ‘offeror’ mean ‘bid’ and ‘bidder’.
SOLICITATION
9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in item 8, or if handcarried, in the depository located in until (hour) local time (Date).
Caution - Late Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. For Information A. Name B. Telephone (No Collect Calls) C. E-mail Address
Call: Area Code Number Ext.
11. Table Of Contents
(X) Sec. Description Page(s) (X) Sec. Description Page(s)
Part I - The Schedule Part II - Contract Clauses A Solicitation/Contract Form I Contract Clauses
B Supplies or Services and Prices/Costs Part III - List Of Documents, Exhibits, And Other Attach.
C Description/Specs./Work Statement J List of Attachments D Packaging and Marking Part IV - Representations And Instructions E Inspection and Acceptance K Representations, Certifications, and F Deliveries or Performance Other Statements of Offerors G Contract Administration Data L Instrs., Conds., and Notices to Offerors H Special Contract Requirements M Evaluation Factors for Award
OFFER (Must be fully completed by offeror) NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
12. In compliance with the above, the undersigned agrees, if this offer is accepted within _____ calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. Discount For Prompt Payment 10 Calendar Days (%) 20 Calendar Days (%) 30 Calendar Days (%) Calendar Days (%) (See Section I, Clause No. 52.232-8)
14. Acknowledgment of Amendments (The offeror acknowledges Amendment No. Date Amendment No. Date receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):
15A. Name and Code Facility 16. Name and Title of Person Authorized to Sign Offer Address of (Type or Print) Offeror
15B. Telephone Number 15C. Check if Remittance Address is 17. Signature 18. Offer Date Area Code Number Ext. Different From Above – Enter such
Address In Schedule
AWARD (To be completed by Government)
19. Accepted As To Items Numbered 20. Amount 21. Accounting And Appropriation
22. Authority For Using Other Than Full And Open Competition: 23. Submit Invoices To Address Shown In Item
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
24. Administered By (If other than Item 7) Code 25. Payment Will Be Made By Code
26. Name of Contracting Officer (Type or Print) 27. United States Of America 28. Award Date
(Signature of Contracting Officer)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 33 (Rev. 9-97) Previous edition is unusable Prescribed By GSA-FAR (48 CFR) 53.214(c)
W58RGZ-19-R-0200
X
2019MAR13
2019APR1206:00pm
DOA1
2019MAR13 SEE SCHEDULE
W58RGZ
ARMY CONTRACTING COMMAND-REDSTONE
REDSTONE ARSENAL AL 35898-5280
ANTHONY T. GIDEON
(256)842-1722
CCAM-CAB-C
ANTHONY.T.GIDEON.CIV@MAIL.MIL
1 58
X 1
X 5 X 13
X 19 X 20 X 24
X 28
X 30
X 32
X 42
X 43
X 48
X 57
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
THE FOLLOWING AMENDMENTS HAVE BEEN INCORPORATED
Buyer Name: ANTHONY T. GIDEON
Buyer Office Symbol/Telephone Number: CCAM-CAB-C/(256)842-1722
Type of Contract 1: Firm Fixed Price
Kind of Contract: Maintenance Contracts
*** End of Narrative A0000 ***
DEPOT MAINTENANCE WORK REQUIREMENT (DMWR) FOR THIS MAINTENANCE AND OVERHAUL EFFORT IS ADEQUATE TO SUPPORT FULL AND OPEN COMPETITIVE
SOLICITATION.
THIS WILL BE A 5 YEAR FIRM-FIXED PRICE INDEFINITE DELIVERY INDEFINITE QUANTITY (IDIQ) CONTRACT PURSUANT TO FAR 52.216-22. THE
MINIMUN/MAXIMUN QUANTITY 180 EA MINIMUM AND 1200 EA MAXIMUN WHICH INCLUDES THE US QUANTITY OF 1000 EA AND 200 EA FMS.
ACCESS TO DEFENSE LOGISTICS AGENCY EMAIL IS NOT AUTHORIZED.
THE GOVERNMENT IS ONLY OBLIGATED TO PURCHASE THE MINIMUM QUANTY. SUBJECT TO THE AVAILABILITY OF FUNDS, ANY QUANTITIES ORDERED WILL BE
PRICED AT THE UNIT PRICE ESTABLISHED FOR THE ORDERING PERIOD IN WHICH THEY ARE ORDERED. FUNDS SHALL BE OBLIGATED BY ISSUANCE OF DELIVERY
ORDERS AND NOT BY THE CONTRACT ITSELF.
SHIPPING INSTRUCTIONS WILL BE PROVIDED IN EACH INDIVIDUAL DELIVERY ORDER.
THE CONTRACTOR MAY BE REQUESTED TO SUBMIT ADDITIONAL COST OR PRICING DATA IF ONLY ONE OFFER IS RECEIVED IAW DFARS CLAUSE 252-215-7008, ENTITLED "ONLY ONE OFFER."
THE YEARLY ESTIMATED QUANTITIES LISTED HEREIN DO NOT COMMIT THE GOVERNMENT TO ORDERING THAT OR ANY QUANTITY ABOVE THE MINIMUM QUANTITY.
THE MAXIMUM QUANTITY IS 1200 EACH WHICH INCLUDES 200 EACH RESERVED FOR FOREIGN MILITARY SALES (FMS). HOWEVER, IF NO FMS CUSTOMERS
REQUIRE THIS ITEM, THE UNITED STATES ARMY REQUIRER MAY UTILIZE THE FMS QUANTITY.
THE MINIMUM QUANTITY SET FOR HEREIN SHALL BE OBLIGATED ON THE FIRST DELIVERY ORDER, TO BE ISSUED SIMULTANEOUSLY WITH THE AWARD OF THE
CONTRACT. ANY ADDITIONAL QUANTITIES ORDERED WILL BE PRICED AT THE FIRM FIXED UNIT PRICE IN EFFECT DURING THE ORDERING PERIOD IN WHICH
THEY ARE ORDERED.
ALL ORDER PERIODS ARE IN INCREMENTS OF 12 MONTHS FROM THE DATE OF AWARD.
ORDERING PERIODS:_________________
THE FIRST ORDERING PERIOD IS FROM DATE OF CONTRACT AWARD THROUGH 365 DAYS AFTER CONTRACT AWARD.
THE SECOND ORDERING PERIOD IS FROM 366 DAYS AFTER CONTRACT AWARD THROUGH 730 DAYS AFTER CONTRACT AWARD.
THE THIRD ORDERING PERIOD IS FROM 731 DAYS AFTER CONTRACT AWARD THROUGH 1095 DAYS AFTER CONTRACT AWARD.
THE FOURTH ORDERING PERIOD IS FROM 1096 DAYS AFTER CONTRACT AWARD THROUGH 1460 DAYS AFTER CONTRACT AWARD.
THE FIFTH ORDERING PERIOD IS FROM 1461 DAYS AFTER CONTRACT AWARD THROUGH 1825 DAYS AFTER CONTRACT AWARD.
PLEASE INSERT YOUR FIRM FIXED UNIT PRICE FOR THE 1st, 2nd, 3rd, 4th, and 5th YEAR IN THE SPACES PROVIDED UNDER EACH CLIN/SUBCLIN.
NOTE: THE OFFERORS ATTENTION IS CALLED TO AMCOM PROCEDURES FOR RECEIPT OF REPARABLES, WHICH FOLLOWS:
TWO (2) RECEIPTED COPIES OF DD FORM 1348-1A OF ALL SHIPMENTS OF REPARABLE ITEMS RECEIVED SHALL BE MAILED DIRECTLY TO COMMANDER, US ARMY
AVIATION AND MISSILE COMMAND, REDSTONE ARSENAL, AL 35898-5000, ONE (1) COPY SENT ATTN: AMSAM-AC-LS AND ONE (1) COPY SENT ATTN: AMSAM-
MMCLS-MDC, WITHIN THEN (10) WORKING DAYS AFTER RECEIPT. THE DD FORM 1348-1A WILL BE STAMPED DIAGONALLY ACROSS THE CENTER REPARABLE IN
2 58
W58RGZ-19-R-0200 REPRINT
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
BOLD LETTERS, VERIFYING DATA THEREON AND ANNOTATING TO WHICH CONTRACT/DELIVERY ORDER ASSETS WILL BE APPLIED.
AN ELECTRONIC COPY OF DD FORM 1348-1A FOR ALL SHIPMENTS OF REPARABLES SHALL BE FORWARDED TO 1) THE EMAIL ADDRESS IN BLOCK 10 ON PAGE 1
OF THE BASIC CONTRACT/DELIVERY ORDER/MODIFICATION AND ALSO TO 2) . THE DD FORM 1348-1A SHALL ANNOTATE TO WHICH CONTRACT/DELIVERY ORDER
THE ASSETS WILL BE APPLIED AS REPARABLES.
THE DD FORM 1348-1A GUIDANCE AS FOLLOWS:
A. MAINTAIN ANY RECEIPT DOCUMENTATION RECEIVED FROM THE DEPOTS
B. UPON RECEIPT OF MATERIAL, FILL IN BLOCK 10 TO INDICATE THE QUANTITY RECEIVED AND PROVIDE A SIGNATURE AND DATE ON THE DD FORM 1348-1A.
PRINTED NAMES, NAME/DATE STAMPS, AND INITIALS ARE NOT ACCEPTABLE.
C. IF A DD FORM 1348-1A IS NOT RECEIVED, A 1348-1A MUST BE CREATED WITH THE CORRESPONDING RECEIPT INFORMATION TO CONTAIN INFORMATION
CONTAIN THE FOLLOWING:
I. UNIT OF ISSUE AND QUANTITY- (POSITIONS 23-29)
II. DOCUMENT NUMBER- ( POSITIONS 30-43)
III. NATIONAL STOCK NUMBER (NSN)- (POSITIONS 8-22)
IV. CONDITION CODE- ( POSITION 71)
V. UNIT PRICE- ( POSITIONS 74-80)
VI. TOTAL PRICE- (BLOCK 1)
VII. ACTUAL QUANTITY RECEIVED- (BLOCK 10)
VIII. NOMENCLATURE- (BLOCK 17)
IX. SIGNATURE AND DATE- (BLOCKS 22 AND 23)
D. COMPLETED 1348S SHOULD BE SENT TO THE FOLLOWING MAILBOX UPON RECEIPT OF MATERIAL:
USARMY. REDSTONE . MBX .IMMC- SMBAMMO@MAIL.MIL
WHEN APPLICABLE, THE CONTRACTOR IS REMINDED TO COMPLETE THE FOREIGN MILITARY SALES (FMS) CUSTOMER DA FORM 2410 (COMPONENT REMOVAL AND
REPAIR OVERHAUL RECORD), SUBMITTED WITH THE ITEM FOR REPAIR, IN ACCORDANCE WITH DA PAMPHLET 738-751 AND TB-1500-341-01. UPON COMPLETION
OF REPAIR, IF AUTHORIZED, THE CONTRACTOR IS REMINDED TO FILL OUT DA FORM 2410 AND RETURN IT TO THE FMS CUSTOMER WITH THE REPAIRED
ASSET(S), ALONG WITH THE FMS CUSTOMER VERSION OF THE DA FORM 2410.
THE NATIONAL DEFENSE AUTHORIZATION ACT FOR FISCAL YEAR 1993, PUBLIC LAW 102-484, SECTION 326, PROHIBITS USE OF OTHER DIRECT COSTS (ODC)
IN DEPARTMENT OF DEFENSE CONTRACTS AWARDED ON OR AFTER 01 JUNE 1993, UNLESS APPROPRIATE AUTHORITY IS GRANTED.
THE FOLLOWING WEBSITES ARE PROVIDED FOR THE PURPOSE OF OBTAINING/REVIEWING VARIOUS DA PAMPHLETS AND ARMY REGULATIONS AND TECHNICAL
MANUALS/BULLETINS:
- https://www.logsa.army.mil/etms/online.htm
- http://www.usapa.army.mil/
NO GOVERNMENT FURNISHED MATERIALS (GFM), OTHER THAN THE REPARABLE ASSET, WILL BE PROVIDED.
ALL PROPOSALS/RESPONSES SHALL INCLUDE A SPECIAL TOOLING AND TEST EQUIPMENT SECTION THAT ADDRESSES THE CONTRACTOR'S PLAN TO MEET ALL
GOVERNMENT SPECIAL TOOLING AND TEST EQUIPMENT REQUIREMENTS WITH EITHER:
1. PHYSICAL POSSESSION OF THE REQUIRED TOOLS.
2. CONFIRMED REQUISITIONS FOR THE REQUIRED TOOLS.
3. CONFIRMED ARRANGEMENTS FOR SUBCONTRACTING THE PROCESSES REQUIRING THE SPECIAL TOOLS OR,
4. SPECIFIC PLANS DESCRIBING THEIR TECHNICAL APPROACH TO DEVELOP EQUIVALENT TOOLS.
PROPOSALS SHALL BE SUBMITTED IN ACCORDANCE WITH FAR CLAUSE 52.215-1.
PROPOSALS SHALL BE EMAILED TO: ANTHONY.T.GIDEON.CIV@MAIL.MIL.
THE GOVERNMENT INTENDS TO AWARD ONLY ONE CONTRACT AS A RESULT OF THIS SOLICITATION.
COMPLETE THE FOLLOWING CONTRACTOR POINT OF CONTACT INFORMATION:
NAME: _________________________________________________________
3 58
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
TELEPHONE NUMBER: _____________________________________________
FAX NUMBER: ____________________________________________________
E-MAIL ADDRESS: _________________________________________________
IF ANY OFFEROR CHOOSES TO HAND CARRY THEIR PROPOSAL, THE OFFEROR MUST REACH THE APPOINTED LOCATION (IDENTIFIED AS BUILDING 5303, 5300
MARTIN ROAD, REDSTONE ARSENAL, AL 35898, FOYER) BY THE DATE AND TIME AS STATED IN BLOCK 9 ON PAGE 1 OF THE SOLICITATION. PLEASE BE
ADVISED THAT REDSTONE ARSENAL IS A RESTRICTED FACILITY AND SHOULD AN OFFEROR CHOOSE TO HAND CARRY A PROPOSAL, A MINIMUM OF 72 HOURS
NOTICE TO THE CONTRACTING OFFICER IS REQUIRED IN ORDER TO ENSURE ACCESS BY THE CLOSING DATE/TIME OF THE SOLICITATION. ANY UNAUTHORIZED
ENTITY MUST BE IDENTIFIED AS HAVING A NEED, AS VALIDATED BY THE CONTRACTING OFFICER, IN ORDER TO GAIN ACCESS TO THE POST. THE
CONTRACTING OFFICE MUST NOTIFY THE GATE PERSONNEL, WHO MONITOR POST ACCESS, A MINIMUM OF 48 HOURS PRIOR TO AN ENTITY GAINING ENTRANCE TO
THE RESTRICTED POST. PLEASE NOTE THAT ANY PROPOSALS DELIVERED LATE AS A RESULT OF FAILURE TO COMPLY WITH THE PROCEDURE WILL NOT BE
ACCEPTED, IAW FAR 52.215-1 ENTITLED "INSTRUCTIONS TO OFFERORS-COMPETITIVE ACQUISITION".
THE CONTRACTOR SHALL REPORT PRODUCTION STATUS REQUIREMENTS IAW CDRL DI-PSSS-81995. THE FOLLOW WEBSITE ARE PROVIDED FOR THE PURPOSE OF
OBTAINING/REVIEWING VARIOUR ARMY PUBLICATIONS ANS TECHNICAL MANUALS/BULLETINS:
A. TECHNICAL MANUALS AND BULLETINS
B. DA PAMPHLETS AND ARMY REGULATIONS
DMWR AND ASSOCIATED MAINTENANCE AND ENGINEERING ORDERS (MEO) CAN BE OBTAINED BY CONTACTING THE AMCOM PUBLICATIONS OFFICE VIA EMAIL AT
SANDRA.D.LOVE4.CTR@MAIL.MIL OR 256-842-6544. PLEASE NOTIFY THE CONTRACT SPECIALIST, ANTHONY GIDEON, AT ANTHONY.T.GIDEON.CIV@MAIL.MIL
WHEN THIS REQUEST IS MADE.
SOLICITATION PERIOD WILL NOT BE EXTENDED AS A RESULT OF LATE REQUESTS FOR TECHNICAL DATA.
A LIST OF APPLICABLE MEOs CAN BE FOUND IN ATTACHMENT 0001
*** END OF NARRATIVE A0001 ***
The purpose of Amendment 0001 to W58RGZ-19-R-0200 is to:
A-1. Change NSN/PN in CLIN 0005AA FROM:
6610-01-176-9314; P/N: 101450-243
TO:
8110-00-254-5722, P/N: MS27684-2, SP 17 &01
A-2. Change Narrative C0001, Statement of Work, Paragraph u. FROM:
u. Shipping Containers NSN: 6610-01-1769314, P/N: 101450-31243 shall be utilized. If containers are not reparable or if assets are not delivered in the approved containers, the containers shall be Contractor Furnished Materiel. Shipment: The method of shipment must use a procedure so that the package can be tracked in case the shipment is not received by AMCOM.
Remarks: Contractor will be responsible for purchasing the containers needed.
TO:
u. Shipping Containers NSN: 8110-00-254-5722, P/N: MS27684-2, SP 17 &01 shall be utilized. If containers are not reparable or if assets are not delivered in the approved containers, the containers shall be Contractor Furnished Materiel. Shipment: The method of shipment must use a procedure so that the package can be tracked in case the shipment is not received by AMCOM.
Remarks: Contractor will be responsible for purchasing the containers needed.
All other terms and conditions remain unchanged.
*** END OF NARRATIVE A0002 ***
4 58
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
0001 PVA
Note: The contractor must submit an M&O plan, in accordance with the attached "M&O Plan Guidance"
(Attachment 0005). This plan must be submitted no later than 30 days after award. The plan must be______________________________ approved before the assets for PVA will be shipped.
This CLIN represents the Product Verification Audit
(PVA) for the FAN CENTRIFUGAL, output NSN: 6610-01-
176-9314 as shown in CLINs 0002AA and 0003AA.
This is a Firm Fixed Price CLIN.
Offeror is required to fill in a proposed firm fixed unit price for the PVA:
PVA shall be in accordance with The "Product
Verification Audit (PVA) Statement of Work".
PVA shall be conducted within 90 days after receipt of reparables. The Contractor shall prepare 3 assets _________ for PVA. The Contractor is required to notify the__________
Government Quality Office for scheduling of the PVA by email to the following address:
QS-Contracts@amrdec.army.mil
With copy emailed to the Contract Specialist at:
anthony.t.gideon.civ@mail.mil_____________________________
The Contractor will prepare and forward, through the cognizant Government Quality Element, finalized audit reports within 10 working days after completion of the PVA to the email address above.
NOTE: A copy of the cover letter for the report shall be forwarded to the Contract Specialist at:anthony.t.gideon.civ@mail.mil
U.S. Army Contracting Command - Redstone
Bldg 5303, 2nd Floor
ATTN:CCAM-AL-A, Anthony.t.Gideon
Redstone Arsenal, Alabama 35898-5000 or emailed to:
anthony.t.gideon.civ@mail.mi
PVA requires approval prior to Government acceptance of contract deliverable assets.
Failure to pass the PVA may lead to Termination for____________________________________________________
5 58
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Default of the contract.________________________
Payment Instructions: The Contractor will go into_____________________
Wide Area Work Flow (WAWF) to receive payment for the
PVA. The Contractor shall use DODAAC W58RGZ when submitting the PVA invoice in WAWF, making it to the attention of Monty Teasley. The Contracting Officer will approve the PVA invoice.
(End of narrative A001)
0001AA PRODUCT VERIFICATION AUDIT $ __________________________ __________________
SERVICE REQUESTED: PVA
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Destination
Deliveries or Performance _________________________
0002 ALTIMETER, ENCODER
NSN: 6610-01-176-9314
0002AA OVERHAUL/REPAIR OF ALTIMETER, ENCODER $ $ _____________________________________ ______________ __________________
COMMODITY NAME: ALTIMETER, ENCODER
CLIN CONTRACT TYPE:
Firm Fixed Price
CLIN 0002AA is for the overhaul/repair of the
ALTIMETER, ENCODER for US Army requirements.
INPUT/OUTPUT NSN: 6610-01-176-9314
INPUT/OUTPUT PART NUMBER: 101450-31243
Overhaul shall be in accordance with Section C entitled "Statement of Work/Specifications-Contractor
Specifications".
This Firm Fixed Price (FFP) CLIN includes all mandatory and nonmandatory parts, labor charges, preservation, packaging, packing, marking, and data items necessary to return the unit, to a serviceable condition, as stated in section C, Statement of Work.
6 58
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
OFFEROR IS REQUIRED TO FILL IN PROPOSED FIRM FIXED
UNIT PRICE: OVERHAUL US QUANTITY
ORDERING PERIOD 1 $_________ (FFP) Qty 177 ea
ORDERING PERIOD 2 $_________ (FFP) Qty 205 ea
ORDERING PERIOD 3 $_________ (FFP) Qty 205 ea
ORDERING PERIOD 4 $_________ (FFP) Qty 205 ea
ORDERING PERIOD 5 $_________ (FFP) Qty 205 ea
(End of narrative B001)
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
MIL-STD-129 MARKINGS & MIL-STD-2073-1
UNIT PACK: 001 INTERMEDIATE PACK: 000
LEVEL PRESERVATION: Military
LEVEL PACKING: A
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
FOB POINT: Origin
0003 ALTIMETER, ENCODER
NSN: 6610-01-176-9314
0003AA OVER/REPAIR OF ALTIMETER, ENCODER $ $ _________________________________ ______________ __________________
COMMODITY NAME: ALTIMETER, ENCODER
CLIN 0003AA is for the overhaul/REPAIR of the
ALTIMETER, ENCODER for FMS requirements.
INPUT/OUTPUT NSN: 6610-01-176-9314
INPUT/OUTPUT PART NUMBER: 101450-31243
Overhaul shall be in accordance with Section C entitled "Statement of Work/Specifications-Contractor
Specifications".
This Firm Fixed Price (FFP) CLIN includes all mandatory and nonmandatory parts, labor charges, preservation, packaging, packing, marking, and data items necessary to return the unit, to a serviceable condition, as stated in section C, Statement of Work.
OFFEROR IS REQUIRED TO FILL IN PROPOSED FIRM FIXED
UNIT PRICE: OVERHAUL US QUANTITY
7 58
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
ORDERING PERIOD 1 $_________ (FFP) Qty 40 ea
ORDERING PERIOD 2 $_________ (FFP) Qty 40 ea
ORDERING PERIOD 3 $_________ (FFP) Qty 40 ea
ORDERING PERIOD 4 $_________ (FFP) Qty 40 ea
ORDERING PERIOD 5 $_________ (FFP) Qty 40 ea
(End of narrative B001)
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
MIL-STD-129 MARKINGS & MIL-STD-2073-1
UNIT PACK: 001 INTERMEDIATE PACK: 000
LEVEL PRESERVATION: Military
LEVEL PACKING: A
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
FOB POINT: Origin
0004 SCRAP
0004AA SCRAP OF ALTIMETER ENCODER $ __________________________ __________________
SERVICE REQUESTED: SCRAP
CLIN CONTRACT TYPE:
Firm Fixed Price
THIS CLIN APPLIES TO US AND FMS QUANTITY._________________________________________
ORDERING PERIOD 1 $ __________ (FFP) Est Qty 1 ea
ORDERING PERIOD 2 $ __________ (FFP) Est Qty 1 ea
ORDERING PERIOD 3 $ _________ (FFP) Est Qty 1 ea
ORDERING PERIOD 4 $ _________ (FFP) Est Qty 1 ea
ORDERING PERIOD 5 $ ________ (FFP) Est Qty 1 ea
ESTIMATED QUANTITY ARE PROVIDED FOR EVALUATION
PURPOSE ONLY.
OFFEROR IS REQUIRED TO FILL IN PROPOSED FIRM FIXED
UNIT PRICE:
(End of narrative B001)
THIS CLIN APPLIES TO US AND FMS QUANTITY.
8 58
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Units from CLIN 0002AA AND 0003AA shall be scrapped or returned in accordance with Section C, Statement of Work/Specifications -Contractor Specifications.
Units determined to be scrap IAW Section C shall be reflected as an increase to CLIN 0004AA with a corresponding decrease in quantity and funds to CLIN
0002AA, 0003AA, as appropriate. In the event the PCO determines that certain items are scrap the
Contractor shall make disposition IAW the contractors approved Government property procedures. Scrapped items shall count toward the minimum quantities ordered hereunder. The Government may, at its own discretion, reduce any items determined scrap by input of additional assets and said scrap quantities will not count as part of the total maximum quantity.
Scrap requires authorization by the Contracting
Officer via formal modification. In no event shall the Contractor scrap an item prior to receiving a contractual modification for a unit.
DATA ACQUISITION DOCUMENT NUMBER: DI-MGMT-80503
submission of the report of shipping and packaging discrepancy shall occur within 10 days after receipt ______________ of reparables.
(End of narrative C001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
0005 CONTRACTOR FURNISHED CONTAINE
0005AA CONTRACTOR FURNISHED CONTAINERS $ _______________________________ __________________
SERVICE REQUESTED: CONTRACTOR FURNISHED CONTAINE
CLIN CONTRACT TYPE:
Firm Fixed Price
SHIPPING CONTAINERS
THE GOVERNMENT ESTIMATED QUANTITY PER ORDERING PERIOD IS
1 EACH.
OFFEROR IS REQUIRED TO FILL IN PROPOSED FIRM FIXED UNIT
PRICE FOR ALL 5 ORDERING PERIODS:
ORDERING PERIOD 1 $________(FFP) ________
ORDERING PERIOD 2 $________(FFP) ________
ORDERING PERIOD 3 $________(FFP) ________
ORDERING PERIOD 4 $________(FFP) ________
9 58
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
ORDERING PERIOD 5 $________(FFP) ________
THE ESTIMATED QUANTITY OF 1 EA IS FOR EVALUATION PURPOSES
ONLY.
THE CONTRACTOR SHALL PROVIDE CONTAINERS, IN ACCORDANCE
WITH ATTACHMENT 0006, PACKAGING REQUIREMENT INSTRUCTIONS
AND SECTION C, ENTITLED 'STATEMENT OF WORK/SPECIFICATIONS
- CONTRACTOR SPECIFICATIONS' AND 'REUSABLE CONTAINERS'.
SUPPLEMENTAL INFORMATION:
NSN: 8110-00-254-5722; P/N: MS27684-2 SP 17 & 01
THE GOVERNMENT CANNOT DETERMINE, AT THE TIME OF CONTRACT
AWARD, HOW MANY OF THE ASSETS TO BE REPAIRED WILL BE
RECEIVED BY THE CONTRACTOR IN UNSERVICEABLE CONTAINERS OR
RECEIVED WITHOUT CONTAINERS.
THE CONTRACTOR, IAW SECTION C, 'STATEMENT OF WORK', SHALL
SUBMIT A REPORT OF DISCREPANCY (ROD), SF FORM 364,
THROUGH THEIR GOVERNMENT DCMA QAR FOR VERIFICATION WITHIN
10 WORKING DAYS TO THE ADDRESS SHOWN ON DATA ITEM A002.
ASSETS RECEIVED IN UNSERVICEABLE CONTAINERS OR WITHOUT A
CONTAINER, REQUIRE THE PRIOR APPROVAL OF THE PCO TO BE
PURCHASED.
This CLIN covers containers for CLINs 0002AA,0003AA THIS
IS A FIRM-FIXED-PRICE CLIN.
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 0 AS REQUIRED
0006 CDRLS _____
A001 REPORT OF SHIPPING (ITEM) AND PACKAGING _______________________________________
DISCREPANCY $ ** NSP ** ___________ __________________
SERVICE REQUESTED: CDRL A001
CLIN CONTRACT TYPE:
Firm Fixed Price
DATA ITEM A001 - DATA ACQUISITION DOCUMENT NUMBER :
DI-MGMT-80503 (AS REQUIRED)
10 58
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Submission of the Report of Shipping and Packaging
Discrepancy shall occur within 10 days of discovering the discrepancy. Refer to attachments
0002 (Standard Form 364) and 0003 (Report of
Discrepancy Guidance) for completing the Report of
Discrepancy.
(End of narrative B001)
Deliveries or Performance _________________________
A002 CONTRACT DEPOT MAINTENANCE (CDM) PRODUCTION REPORT $ ** NSP ** __________________________________________________ __________________
SERVICE REQUESTED: CDRL A002
CLIN CONTRACT TYPE:
Firm Fixed Price
DATA ACQUISITION DOCUMENT NUMBER: DI-PSSS-81995
Date of first submission is 5 working days after receipt of reparables.
Frequency of submission is monthly.
Date of subsequent submissions - No later than 10 days after the end of the month.
Data shall be prepared in Microsoft excel Spreadsheet format to: usarmy.redstone.usamc.mbx.immc-ammo@mail.mil.
(End of narrative B001)
Deliveries or Performance _________________________
A003 QUSALITY DEFICIENCY REPORT $ ** NSP ** __________________________ __________________
SERVICE REQUESTED: CDRL A003
CLIN CONTRACT TYPE:
Firm Fixed Price
DATA ACQUISITION DOCUMENT NUMBER: DI-QCIC-80736
No report is necessary unless there is a deficiency.
Contractor shall submit NO LATER THAN 10 days after discovery of deficiency. The Contractor shall
11 58
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
coordinate quality deficiency with the Cognizant
Goverment Representative.
(End of narrative B001)
Deliveries or Performance _________________________
12 58
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
\*\'02\'00.;\'01;\'02\'01.;\'01;\*C-1 STATEMENT OF WORK / SPECIFICATIONS - CONTRACTOR SPECIFICATIONS
a. The Contractor, as an independent Contractor, and not as an agent or employee of the Government, shall furnish all services, facilities, labor, parts, materials, equipment, tools and data necessary to accomplish the inspection and overhaul for CENTRIFUGAL FAN that is required to return the items as specified in Section B, to condition code A as defined by Army Regulation 725-50. The input/output configuration shall be as defined in Section B herein. Upon completion of the overhaul, as applicable, the items shall be packaged as defined in Section D of this contract and shipped to the destination(s) specified in Section F.
b. Prior to commencement of overhaul, the Contractor shall disassemble and inspect the item to the extent necessary to determine if the item is physically unrepairable or has suffered abnormal or catastrophic damage. If the latter conditions exists, the contractor shall notify the Procuring Contracting Officer (PCO) through cognizant Administrative Contra ting Officer (ACO) and shall stop work on the item(s) until given further instructions or disposition of the item.
c. In the event that PROCUREMENT CONTRACTING OFFICER determines that the certain items should be scrapped, the contractor shall scrap such items at the fixed unit price in Section B hereof and make disposition in accordance with (IAW) the Contractor's approved
Government property procedures. Such scrapped items shall count toward the quantities ordered hereunder.
d. Overhaul shall be accomplished IAW Depot maintenace Work requirement (DMWR) DMWR-55-6610-394.
e. Critical Safety Item: N/A
f. Upon receipt of the reparables, containers shall be reviewed for serviceability. Containers shall be considered serviceable unless one or more of the following conditions exist: (1) containers are structurally damaged to include functional damage to the suspension system, cracks or holes to the container hull, hull deformity to the extent the container cannot be closed (or sealed where required), or dents that will interfere with the item envelope; (2) corrosion has progressed to the point where fit, function or the life of the container is affected. Items received without containers or containers determined to be unserviceable shall be processed IAW the
Contractor's locally approved Government Property procedures. Components received improperly packaged, damaged with corrosion/ deterioration or those with shipping discrepancies shall be reported IAW DI-MGMT-80503.
g. Any Contractor paint facility which is used in the performance of this contract shall comply with the Environmental Protection Agency and Occupational Safety and Health Administration standards for painting as implemented by TM 55-1500-345-23, w/chg12, Painting and Marking of Army Aircraft.
h. Data and reports shall be submitted IAW the Contract Data Requirements List, DD Form 1423, Exhibit A. Data shall be packaged, packed and marked as necessary to assure safe delivery to the addresses indicated on the DD Forms(s) 1423.
i. Product Verification Audit (PVA): The Contractor shall conduct the PVA in accordance with AMCOM FAR CLAUSE 52.209-4723 as specified in the solicitation/contract attachment.
j. The Army Maintenance Management System - Aviation (TAMMS-A): The Contractor shall prepare TAMMS data IAW DI-SESS-81758 and the TAMMS instructions attached to the solicitation/contract. The Contractor shall complete the forms and records as specified in DA PAM 738-751, TB 1-1500-341-01, TM 1-1500-328-23.
k. Serial Number Report Requirement (SNRR): N/A
l. The items the Contractor shall overhaul are identified below:
INPUT NSN P/N
6610-01-176-9314 101450-31243
OUTPUT NSN
6610-01-176-9314 101450-31243
m. The overhaul planned quantity for 5 years is minimum 180, maximum 1200. Input will be 30 days after receipt of order (ARO). Output shall be as specified in the solicitation/contract schedule. Serviceable assets shall be returned to DODAAC- W25G1U, PLANT 7002.
(1) 1st year qty 220
(2) 2nd year qty 245
(3) 3rd year qty 245
(4) 4th year qty 245
(5) 5th year qty 245
13 58
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
n. The contractor shall prepare the following reports:
1. The contractor shall prepare a Contract Depot Maintenance Production Report IAW DI-PSSS-81995.
2. The contractor shall complete and maintain the DD Form 1348-1A receipt for repairables on all shipments IAW DI-MISC-80508 and DD
Form 1348-1A. The contractor shall complete the DD Form 1348-1A, Block 10 (indicates the quantity received), along with Block 22
(signature), and Block 23 (date). Printed names, name/date stamps, and initials shall not be acceptable. If a DD Form 1348-1A is not delivered with the shipment, a DD Form 1348-1A is located at:
http://www.dtic.mil/whs/directives/forms/eforms/dd13481a.pdf
The contractor shall prepare this form to include the following corresponding receipt information:
A. Document Number - (Positions 30-44)
B. National Stock Number (NSN) - (Positions 8-22)
C. Condition Code - (Position 71)
D. Unit Price - (Positions 74-80)
E. Total Price - (Block 1)
F. Actual Quantity Received - (Block 10)
G. Nomenclature - (Block 17)
H. Signature and Date - (Blocks 22 and 23)
If there are any questions with the above information please contact: "<"mailto:usarmy.redstone.usamc.mbx.immc-smb-ammo@mail.mil
3. The contractor shall perform a 100% physical inventory of general supplies on an annual basis per AR 740-26, Physical Inventory
Control. The contractor shall perform a 100% physical inventory of missiles/ammunition on a bi-annual basis per AMCR 740-27, Ammunition Inventory and Accountability.
The contractor shall perform special inventory requests the same day as a government request is received from the responsible inventory manager.
The contractor shall prepare a physical inventory report IAW DI-MGMT-80441. Along with this report, an inventory memorandum to include count type, date performed, total count of lines, and signature shall be provided. The contractor shall ensure that the total lines inventoried correlates with lines present on count sheets.
If the physical inventory shows less than 97% of general supplies or less than 98% of missiles/ammunition are accounted for, the accountable Property Officer, Item Manager, or Contracting Officer is authorized to schedule a 100% physical inventory by a government official.
o. Foreign Military Sales (FMS): These total requirements meet or exceed the requirements for the Security Assistance Management
Directorate (SAMD) per the Acquisition Center Directorate IAW SAMD and Integrated Material Management Center (IMMC) Method of
Understanding (MOU) document dated 4 December 2004. The IMMC is responsible for conducting Weapons System Team (WST) reviews of SAMD's FMS Aviation hardware, allowing 20% over the Army's maximum quantity during the life of the contract specifically for FMS requirements. SAMD and IMMC will negotiate provisions for FMS critical items that exceed the standard 20% onc ase by case basis
p. The replacement cost is $8,007.46 for the subject item. When price of overhaul exceeds $6,239.81, a review of disposition will be made by AMCOM.
q. The Government reserves the right to replace any items scrapped
r. Overhaul Repair Report: N/A
s. Quality Deficiency Report: The Contractor shall prepare the Quality Deficiency Report IAW DI-QCIC-80736.
t. Supplier Interface and Oversight: N/A
u. Shipping Containers NSN: 8110-00-254-5722, P/N: MS27684-2 SP 17 & 01 shall be utilized. If containers are not reparable or if assets are not delivered in the approved containers, the containers shall be Contractor Furnished Materiel. Shipment: The method of shipment must use a procedure so that the package can be tracked in case the shipment is not received by AMCOM.
Remarks: Contractor will be responsible for purchasing the containers needed.
C-2 PRODUCT VERIFICATION AUDIT (PVA) STATEMENT OF WORK
Purpose: The purpose of this PVA SOW is to provide guidance to the contractor in the preparation for and execution of the PVA. The
14 58
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
primary concept of the PVA is to validate that the contractor's overhaul processes and procedures comply with contract technical requirements. The PVA candidate(s) are used to evaluate that the contractor processes and procedures are adequate to ensure component integrity.
(a) The Contractor shall perform overhaul and present for acceptance THREE units of Lot/Item 0001AA as specified in this contract. This clause does not supersede instructions contained in depot overhaul work requirements, commercial overhaul manuals, or other applicable documents. It does not relieve the contractor from maintaining a quality system that will assure overhauled items conform to contractual requirements. Contractors may request to delay scheduled PVAs in frequency or waive PVA requirements of selected items in cases where accumulated objective evidence indicates that a consistent quality item is being delivered. The Command's actions will be based on the overall performance history, failure impact, supply impact, length of program, and nonscheduled PVAs accomplished by the
AMRDEC Engineering Directorate (ED). Like or similar items may be grouped for these purposes provided concurrence is obtained from
AMRDEC ED. The contractor may be directed by the Contracting Officer (CO) to increase or decrease the scope of a PVA pursuant to the
"Changes" clause of the contract.
(b) The Contractor shall:
(1) With the concurrence of the cognizant government quality element and AMCOM, schedule and perform PVA as required by the terms of the contract or as otherwise required.
(2) Notify AMCOM through the cognizant government quality assurance element, with information copy to the AMRDEC ED, ATTN:
QSContracts@amrdec.army.mil, of the date the PVA candidates will be available. Notification shall be provided at least 20 working days prior to the selected date if facilities are within the Continental United States. If facilities are outside the Continental United
States, notification shall be provided at least 95 working days prior to the selected date to allow sufficient time for travelers to gain theater clearance.
(3) Provide technical personnel, tooling, measuring and test equipment, work area, forms, and clerical assistance, as required, to perform the PVA. If test cell or other specialized equipment is required; notification of readiness for PVA shall include the availability of these.
(c) The initial PVA will be performed on one of the first three (3) items overhauled. The PVA candidate will be selected by the AMRDEC
PVA Team Chairman at random from the three (3) tendered for acceptance to the Government. For reoccurring audits, if any, the audit candidate will be selected by the PVA Team Chairman from all completed items currently available.
(d) The item selected for PVA will be inspected for adherence to preservation, packaging, packing, and marking requirements prior to removal from the shipping container. A visual inspection and functional test will be performed prior to disassembly.
(e) The PVA Team will review the shop travelers, production processes, procedures, tooling, and equipment used to overhaul the item being audited for adequacy and conformance to the contractual requirements. The PVA will include verification through objective evidence that all of the inspection, testing, measuring and diagnostic equipment used in the inspection/test of the PVA candidate are maintained in accordance with applicable calibration standards.
(f) Disassembly will be performed in an area accessible only to audit personnel. Normally, audit participation will be limited to specified production and quality assurance personnel of the contractor activity, the cognizant government Quality Assurance
Representative (QAR), and the AMRDEC PVA Team Chairman and team personnel.
(g) Visual inspection, dimensional checks (such as backlash, end clearance, running clearance, etc.) and nondestructive testing are accomplished during and after disassembly IAW applicable technical directives. Findings are recorded for comparison with historical data and conformance evaluation. A 100% inspection (or as set forth in relevant specifications) of all physical characteristics, to include but not limited to, any dimensions, certifications for materials, processes and/or procedures, as well as any other requirements which may be set forth by other applicable specifications, or in any procurement packages, technical drawings. Depot Maintenance Work
Requirements (DMWRs), Maintenance Engineering Orders (MEOs), and/or any other special/functional testing as set forth in this contract.
(h) Applicable accessories and components will be functionally tested and inspected to contractual/work specifications. The PVA team will review subcontractor certifications for testing and inspections. At the request of the PVA Team Chairman, processes (such as shotpeening, heat treating, etc.) performed by subcontractors will also be audited. Contractor shall be able to demonstrate that all testing, inspection procedures, and acceptance methods are documented in the appropriate area of the overhaul documents, and are approved and controlled by management.
(i) The PVA item shall be reassembled and functionally tested IAW applicable specifications and made ready for government acceptance including preservation, packing, packaging, marking, and update of historical records and all applicable documentation.
(j) Conduct of the PVA will be planned in a manner that adequately allows examination/audit of all procedures involved. Each step in the process shall be analyzed to determine compliance to specifications. It may not be logical or possible, due to time constraints, to track the same item throughout the PVA; therefore, at the AMRDEC PVA Team Chairman's discretion, examination of representative assemblies amy be used as evidence of compliance to specification requirements. The AMRDEC PVA Team Chairman will determine the scope
15 58
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
and detail of the PVA process. The AMRDEC PVA Team Chairman may delegate follow-up actions to the government QAR, when it is determined to be prudent to the PVA.
(k) During the course of the PVA, the PVA Team Chairman may request progress meetings to provide status to the contractor. After the PVA is completed, the AMRDEC PVA Team Chairman will conduct an exit critique attended by all concerned contractor personnel and the cognizant government QAR. The context of the audit findings and corrective actions will be discussed and any disputes will be resolved.
Findings, classifications, and corrective actions will be discussed and determinations made as to cause of defect established (i.e., workmanship, tooling, technical requirements, etc.). The contractor's management personnel shall take immediate action to correct and preclude recurrence of all defects attributable to failure to comply with requirements.
(l) All defects will be recorded on the AMRDEC PVA Audit Finding Record by the PVA Team. The PVA Team Chairman will provide copies of each Finding to the contractor quality assurance element and the cognizant government QAR. This will allow immediate actions to begin in the resolution of the defect. Corrective actions as well as actions taken to prevent recurrence shall also be documented on this form by the contractor. The form shall be signed, as a minimum, by the contractor's quality manager or designated representative and the
AMRDEC PVA Team Chairman. Further actions outlined below pertain to specific actions required by the contractor depending on the classification of the defects.
1. Observation: In the event an observation Finding is discovered, the contractor is not required to provide a written response, but it is encouraged to do so.
2. Minor: In the event a minor defect is discovered, the following actions shall be taken:
a. The contractor shall isolate the cause of the defect and initiate corrective actions.
b. All minor defects shall require a written response addressing corrective actions taken and actions taken to prevent recurrence.
c. In the event a minor defect is a recurring deficiency, regardless of weapon system or date when original discrepancy was noted, it will be written into the report as a minor defect, but the corrective actions required below for a major defect will apply.
3. Major: In the event a major defect is discovered, the following actions shall be taken:
a. The contractor shall halt any work in progress at the responsible station until corrective action is acceptable to the PVA Chairman.
b. The contractor shall provide the QAR information reflecting the total quantity shipped, if any, and to what destination pertaining to any item that could contain the identified defect.
c. The contractor shall determine impact of the defect on products previously delivered under this contract, if any, and initiate corrective action to address those units at no additional cost to AMCOM.
d. The contractor shall isolate the cause of the defect and initiate corrective actions. All findings shall require an in-depth written response outlining corrective actions to prevent recurrence.
e. The contractor shall review/revise work documents for the specified operation responsible for the defect to ascertain that they are complete, adequate, and sufficiently defined to assure that, if followed and completed by both production, maintenance and inspection personnel, they will provide objective evidence of a quality operation.
f. The contractor shall assure the cognizant QAR and the AMRDEC PVA Team Chairman that positive, effective, corrective action has been initiated that will prevent recurrence of the cited defect. This assurance can be verbal at first, however, a written report from the contractor quality element containing all corrective actions completed and actions taken to prevent recurrence shall be provided to the QAR and the AMRDEC PVA Team Chairman within 24 hours after the verbal response.
4. Critical: In the event a critical defect is discovered, the following actions shall be taken:
a. All actions outlined in paragraph 3 above shall be completed.
b. Upon request, the contractor shall provide the AMRDEC Aviation Engineering Directorate technical information necessary for the issuance of a Safety of Flight Message or Aviation Safety Action Message to the field (if necessary).
c. Government acceptance/release of product will cease immediately until corrective actions are acceptable to the contracting officer.
NOTE: Systemic quality and overhaul process discrepancies that affect the outcome of product(s) outside the scope of the PVA will require the cognizant QAR to issue a Corrective Action Request.
16 58
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(m). Upon completion of the disassembly and testing portion of the selected PVA candidate, without finding any critical or major defects, the other two completed candidates will be released as PVA candidates. In the event that a critical or major defect is found in the audit candidate, the contractor shall satisfy the PVA Team Chairman that such a defect does not exist in the other 2 PVA candidates prior to acceptance, and effective corrective action has been initiated to preclude reoccurrence of the defect.
(n). The contractor shall prepare and forward, through the cognizant government quality element, finalized audit reports within ten (10) working days after completion of the PVA to Commander, U.S. Army Research Development and Engineering Command, ATTN:
QSContracts@amrdec.army.mil, Redstone Arsenal, AL 35898-5000 and the Acquisition Center address as shown on Order 0001. (In the event reorganization changes this address, the contractor will be notified of the new, correct address by the CO). The report shall include:
1. Name and location of contractor
2. Contract number or equivalent
3. Descriptive noun, national stock number, part number, and serial number of the item audited
4. Complete description of each audit finding, with corrective action taken, and action taken to prevent recurrence.
5. The audit report shall be signed, as a minimum, by the contractor's quality manager or his designated representative.
Objections, accompanied with explanations, on any audit finding(s) shall be specifically annotated and forwarded to AMCOM for resolution. Objection by the contractor as to the existence of a defect or as to its classification will be resolved by the PVA
Chairman. Further non-concurrence will be referred to the PCO for final resolution IAW the clause entitled "Disputes" as stated in the contract.
(o) The AMRDEC PVA Chairman will acknowledge receipt of the Final Audit Report and complete the following within 10 working days of receipt:
1. Review the Final PVA Report for compliance and completeness
2. Review the report for acceptance/rejection of corrective action and actions taken to prevent recurrence.
3. Forward a written reply to the AMCOM CO and/or cognizant government quality element, recommending acceptance or rejection of the Final Audit Report.
4. If the Final Audit Report is disapproved, the Contractor shall repeat any or all PVA tests, per Government request. If deemed in the best interests of the government, contract termination may be initiated. Upon request for additional tests, the Contractor shall make any necessary changes, modifications, or repairs to the PVA item. All costs related to these tests are to be borne by the
Contractor, including any and all costs for additional tests following disapproval. The Contractor shall then conduct the tests and deliver a revised report to the Government under the terms and conditions and within the time specified by the Government. These actions must be coordinated with the cognizant government QAR. The Government shall take action on this report within 10 working days. The
Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule, or for any additional costs to the Government related to these tests.
(p) The PVA unit is to be representative of the deliverable quantity. The Contractor shall overhaul both the PVA item and the contractual quantity at the same facility. In the event that there is a change to the process planning (i.e. changes in process sources, parts sources, or location where work is to be performed) after approval of the Final Audit Report, the contractor is required to provide notification of such changes to the CO, so that a determination can be made whether a new PVA is warranted. Notification is required 10 business days prior to shipment of the next delivery.
(q) The PVA candidates shall be shipped IAW contract delivery schedules or released to supply activity upon acceptance of the Final
Audit Report. The Contractor SHALL NOT retain the PVA item approved under this contract to serve as the manufacturing standard of acceptance.
(r) If the Contractor fails to deliver any PVA on time, or the Contracting Officer disapproves any PVA, the Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.
(s) Before PVA approval, the acquisition of materials or components for, or the commencement of overhaul of, the balance of the contract quantity is at the sole risk of the Contractor. Before PVA approval, the costs thereof shall not be allocable to this contract for (1)
Progress payments, or (2) termination settlements if the contract is terminated for the convenience of the Government.
(t) In cases where this PVA is a part of the Source Approval Request (SAR) process, the process planning will be considered approved upon receipt of an approval memorandum from AMRDEC Aviation Engineering Directorate (AED). If the component is a Critical Safety Item
(CSI), see those specific contract clauses for other requirements that may also be audited during the PVA. PVA approval is contingent on contractor submission and AED approval of changes to manufacturing planning, to correct defects identified during PVA.
(u) Unless otherwise specified in this contract, any end item destroyed or exceeds reparable limits during the PVA process is not to be considered as part of the contract quantity. The full quantity of acceptable and serviceable items must be delivered.
17 58
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
*** END OF NARRATIVE C0001 ***
18 58
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION D - PACKAGING AND MARKING
D-1 BAR CODE…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .