W58RGZ16R0329.pdf
PDF 143 KB Posted
- Attached to
- WINCH, AIRCRAFT
- Solicitation number
- W58RGZ-16-R-0329
About this file
SOLITICATION W58RGZ-16-R-0329
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER AND AWARD 1. This Contract Is A Rated Order Under
DPAS (15 CFR 700)
Rating Page of Pages
2. Contract Number 3. Solicitation Number 4. Type of Solicitation 5. Date Issued 6. Requisition/Purchase Number Sealed Bid (IFB)
Negotiated (RFP)
7. Issued By Code 8. Address Offer To (If Other Than Item 7)
NOTE: In sealed bid solicitations ‘offer’ and ‘offeror’ mean ‘bid’ and ‘bidder’.
SOLICITATION
9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in item 8, or if handcarried, in the depository located in until (hour) local time (Date).
Caution - Late Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. For Information A. Name B. Telephone (No Collect Calls) C. E-mail Address
Call: Area Code Number Ext.
11. Table Of Contents
(X) Sec. Description Page(s) (X) Sec. Description Page(s)
Part I - The Schedule Part II - Contract Clauses A Solicitation/Contract Form I Contract Clauses
B Supplies or Services and Prices/Costs Part III - List Of Documents, Exhibits, And Other Attach.
C Description/Specs./Work Statement J List of Attachments D Packaging and Marking Part IV - Representations And Instructions E Inspection and Acceptance K Representations, Certifications, and F Deliveries or Performance Other Statements of Offerors G Contract Administration Data L Instrs., Conds., and Notices to Offerors H Special Contract Requirements M Evaluation Factors for Award
OFFER (Must be fully completed by offeror) NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
12. In compliance with the above, the undersigned agrees, if this offer is accepted within _____ calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. Discount For Prompt Payment 10 Calendar Days (%) 20 Calendar Days (%) 30 Calendar Days (%) Calendar Days (%) (See Section I, Clause No. 52.232-8)
14. Acknowledgment of Amendments (The offeror acknowledges Amendment No. Date Amendment No. Date receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):
15A. Name and Code Facility 16. Name and Title of Person Authorized to Sign Offer Address of (Type or Print) Offeror
15B. Telephone Number 15C. Check if Remittance Address is 17. Signature 18. Offer Date Area Code Number Ext. Different From Above – Enter such
Address In Schedule
AWARD (To be completed by Government)
19. Accepted As To Items Numbered 20. Amount 21. Accounting And Appropriation
22. Authority For Using Other Than Full And Open Competition: 23. Submit Invoices To Address Shown In Item
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
24. Administered By (If other than Item 7) Code 25. Payment Will Be Made By Code
26. Name of Contracting Officer (Type or Print) 27. United States Of America 28. Award Date
(Signature of Contracting Officer)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 33 (Rev. 9-97) Previous edition is unusable Prescribed By GSA-FAR (48 CFR) 53.214(c)
W58RGZ-16-R-0329
X
2016OCT21
2016NOV2304:30pm
DOA1
2016OCT21 SEE SCHEDULE
W58RGZ
ARMY CONTRACTING COMMAND-REDSTONE
REDSTONE ARSENAL AL 35898-5280
MELANIE H. EARLEY
(256)876-2047
CCAM-ALL
MELANIE.D.HELSEREARLEY.CIV@MAIL.MIL
1 74
X 1
X 4 X 12
X 14 X 15 X 19
X 28
X 31
X 34
X 50
X 51
X 61
X 72
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
Buyer Name: MELANIE H. EARLEY
Buyer Office Symbol/Telephone Number: CCAM-ALL/(256)876-2047
Type of Contract 1: Firm Fixed Price
Kind of Contract: Supply Contracts and Priced Orders
*** End of Narrative A0000 ***
THIS REQUIREMENT IS A 100% SMALL BUSINESS SET-ASIDE.____________________________________________________
ALL PROPOSALS ARE DUE BY CLOSE OF BUSINESS 23 NOVEMBER 2016 CENTRAL STANDARD TIME.
THIS WILL BE A 5 YEAR FIRM-FIXED PRICE INDEFINITE DELIVERY INDEFINITE QUANTITY (IDIQ) CONTRACT PURSUANT TO FAR 52.216-22.
SUBJECT TO THE AVAILABILITY OF FUNDS, ANY QUANTITIES ORDERED WILL BE PRICED AT THE UNIT PRICE ESTABLISHED FOR THE ORDERING PERIOD IN
WHICH THEY ARE ORDERED. FUNDS SHALL BE OBLIGATED BY ISSUANCE OF DELIVERY ORDERS AND NOT BY THE CONTRACT ITSELF.
SHIPPING INSTRUCTIONS WILL BE PROVIDED IN EACH INDIVIDUAL DELIVERY ORDER.
THE YEARLY ESTIMATED QUANTITIES LISTED HEREIN DO NOT COMMIT THE GOVERNMENT TO ORDERING THAT OR ANY QUANTITY ABOVE THE MINIMUM QUANTITY.
CH-47
NOUN: WINCH, AIRCRAFT
INPUT NSN & PART NUMBERS (P/N)
NSN: 1680-01-141-7615
P/N: 114E6040-6
P/N: 4067R215
OUTPUT NSN & PART NUMBER (P/N)
NSN: 1680-01-141-7615
P/N: 114E6040-6
MINIMUM QUANTITY: 30
MAXIMUM QUANTITY: 420
THE MAXIMUM QUANTITY INCLUDES 60 EACH RESERVED FOR FOREIGN MILITARY SALES (FMS). HOWEVER, IF NO FMS CUSTOMERS REQUIRE THIS ITEM, THE
UNITED STATES ARMY REQUIRER MAY UTILIZE THE FMS QUANTITY.
US QUANTITIES (CLIN 0002AA) FOR NSN: 1680-01-141-7616, WINCH, AIRCRAFT FOR ORDERING PERIODS 1 THRU 5 ARE AS FOLLOWS:
1st _30_ MINIMUM
2nd _70_ ESTIMATED
3rd _80_ ESTIMATED
4th _90_ ESTIMATED
5th _90_ ESTIMATED
FMS QUANTITIES (CLIN 0003AA)FOR NSN: 1680-01-141-7616, WINCH, AIRCRAFT FOR ORDERING PERIODS 1 THRU 5 ARE AS FOLLOWS:
1st _ 0_ ESTIMATED
2nd _10_ ESTIMATED
3rd _10_ ESTIMATED
4th _20_ ESTIMATED
5th _20_ ESTIMATED
THE MINIMUM QUANTITY SET FOR HEREIN SHALL BE OBLIGATED ON DELIVERY ORDER 0001, TO BE ISSUED SIMULTANEOUSLY WITH THE AWARD OF THE
2 74
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
CONTRACT. ANY ADDITIONAL QUANTITIES ORDERED WILL BE PRICED AT THE FIRM FIXED UNIT PRICE IN EFFECT DURING THE ORDERING PERIOD IN WHICH
THEY ARE ORDERED.
ALL ORDER PERIODS ARE IN INCREMENTS OF 12 MONTHS FROM THE DATE OF AWARD.
ORDERING PERIODS:
THE FIRST ORDERING PERIOD IS FROM DATE OF CONTRACT AWARD THROUGH 365 DAYS AFTER CONTRACT AWARD.
THE SECOND ORDERING PERIOD IS FROM 366 DAYS AFTER CONTRACT AWARD THROUGH 730 DAYS AFTER CONTRACT AWARD.
THE THIRD ORDERING PERIOD IS FROM 731 DAYS AFTER CONTRACT AWARD THROUGH 1095 DAYS AFTER CONTRACT AWARD.
THE FOURTH ORDERING PERIOD IS FROM 1096 DAYS AFTER CONTRACT AWARD THROUGH 1460 DAYS AFTER CONTRACT AWARD.
THE FIFTH ORDERING PERIOD IS FROM 1461 DAYS AFTER CONTRACT AWARD THROUGH 1825 DAYS AFTER CONTRACT AWARD.
PLEASE INSERT YOUR FIRM FIXED UNIT PRICE FOR THE 1st, 2nd, 3rd, 4th, and 5th YEAR IN THE SPACES PROVIDED UNDER EACH CLIN/SUBCLIN.
NOTE: THE OFFERORS ATTENTION IS CALLED TO AMCOM REGULATION 52.245-4005, PROCEDURES FOR RECEIPT OF REPARABLES, WHICH FOLLOWS AND IS ALSO
IN SECTION G:
TWO (2) RECEIPTED COPIES OF DD FORM 1348-1A OF ALL SHIPMENTS OF REPARABLE ITEMS RECEIVED SHALL BE MAILED DIRECTLY TO COMMANDER, US ARMY
AVIATION AND MISSILE COMMAND, REDSTONE ARSENAL, AL 35898-5000, ONE (1) COPY SENT ATTN: AMSAM-AC-LS AND ONE (1) COPY SENT ATTN: AMSAM-
MMCLS-MDC, WITHIN THEN (10) WORKING DAYS AFTER RECEIPT. THE DD FORM 1348-1A WILL BE STAMPED DIAGONALLY ACROSS THE CENTER REPARABLE IN
BOLD LETTERS, VERIFYING DATA THEREON AND ANNOTATING TO WHICH CONTRACT/DELIVERY ORDER ASSETS WILL BE APPLIED.
WHEN APPLICABLE, THE CONTRACTOR IS REMINDED TO COMPLETE THE FOREIGN MILITARY SALES (FMS) CUSTOMER DA FORM 2410 (COMPONENT REMOVAL AND
REPAIR OVERHAUL RECORD), SUBMITTED WITH THE ITEM FOR REPAIR, IN ACCORDANCE WITH DA PAMPHLET 738-751 AND TB-1500-341-01. UPON COMPLETION
OF REPAIR, IF AUTHORIZED, THE CONTRACTOR IS REMINDED TO FILL OUT DA FORM 2410 AND RETURN IT TO THE FMS CUSTOMER WITH THE REPAIRED
ASSET(S), ALONG WITH THE FMS CUSTOMER VERSION OF THE DA FORM 2410.
THE NATIONAL DEFENSE AUTHORIZATION ACT FOR FISCAL YEAR 1993, PUBLIC LAW 102-484, SECTION 326, PROHIBITS USE OF OTHER DIRECT COSTS (ODC)
IN DEPARTMENT OF DEFENSE CONTRACTS AWARDED ON OR AFTER 01 JUNE 1993, UNLESS APPROPRIATE AUTHORITY IS GRANTED.
THE FOLLOWING WEBSITES ARE PROVIDED FOR THE PURPOSE OF OBTAINING/REVIEWING VARIOUS DA PAMPHLETS AND ARMY REGULATIONS AND TECHNICAL
MANUALS/BULLETINS:
- https://www.logsa.army.mil/etms/online.htm
- http://www.usapa.army.mil/
NO GOVERNMENT FURNISHED MATERIALS (GFM), OTHER THAN THE REPARABLE ASSET, WILL BE PROVIDED.
*** END OF NARRATIVE A0001 ***
3 74
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
0001 PVA
0001AA PRODUCT VERIFICATION AUDIT $ __________________________ __________________
SERVICE REQUESTED: PVA
CLIN CONTRACT TYPE:
Firm Fixed Price
THIS IS A FIRM FIXED PRICE CLIN.
THIS EFFORT IS FOR THE PERFORMANCE OF THE
PRODUCT VERIFICATION AUDIT (PVA).
PVA SHALL BE IN ACCORDANCE WITH AMCOM
REGULATION 52.209-4723, PRODUCT VERIFICATION
AUDIT (PVA) STATEMENT OF WORK.
PVA SHALL BE CONDUCTED WITHIN 90 DAYS AFTER
RECEIPT OF ASSETS. AFTER AWARD OF CONTRACT,
CONTRACTOR SHALL PREPARE THREE (3)
UNITS FOR PVA. CONTRACTOR IS REQUIRED TO
NOTIFY THE CONTRACT SPECIALIST FOR SCHEDULING
OF THE PVA. POC IS
MELANIE.D.HELSEREARLEY.CIV@MAIL.MIL, 256-876-2047.
SEE SECTION F FOR THE DELIVERY SCHEDULE.
THE CONTRACTOR WILL PREPARE AND FORWARD,
THROUGH THE COGNIZANT GOVERNMENT QUALITY ELEMENT,
FINALIZED AUDIT REPORTS WITHIN 10
WORKING DAYS AFTER COMPLETION OF THE PVA TO
THE FOLLOWING:
EMAIL ADDRESS: QS-contracts@amrdec.army.mil
FAILURE TO PASS PVA MAY LEAD TO TERMINATION OF
THE CONTRACT.
THE CONTRACTOR WILL GO INTO WIDE AREA WORK
FLOW (WAWF) TO RECEIVE PAYMENT FOR THE PVA.
THE CONTRACTOR SHALL USE CODE W58H0Z.
THE CONTRACTING OFFICER WILL APPROVE THE PVA INVOICE
IN WAWF.
(End of narrative C001)
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
Deliveries or Performance _________________________
4 74
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0002 WINCH, AIRCRAFT
NSN: 1680-01-141-7615
Mfr CAGE: 77272
Mfr Part Number: 114E6040-6
0002AA OVERHAUL/REPAIR WINCH, AIRCRAFT (US QUANTITY) $ $ _____________________________________________ ______________ __________________
COMMODITY NAME: WINCH, AIRCRAFT
CLIN CONTRACT TYPE:
Firm Fixed Price
SYSTEM: CH-47
INPUT NSN: 1680-01-141-7615
INPUT PART NUMBERS: 114E6040-6
4067R215
OUTPUT NSN: 1680-01-141-7615
OUTPUT PART NUMBER: 114E6040-6
Overhaul/Repair shall be in accordance with clause
52.211-4003 in Section C entitled 'Statement of Work/Specifications-Contractor
Specifications'.
This Firm Fixed Price (FFP) CLIN includes all mandatory and non-mandatory parts, labor charges, preservation, packaging, packing, marking, and data items necessary to return the unit, to a serviceable condition, as stated in section C, Statement of Work.
OFFEROR IS REQUIRED TO FILL IN PROPOSED FIRM
FIXED UNIT PRICE:
ORDERING PERIOD 1 - U/P $_________ (FFP) Min Qty 30
EA
ORDERING PERIOD 2 - U/P $_________ (FFP) Est Qty 70
EA
ORDERING PERIOD 3 - U/P $_________ (FFP) Est Qty 80
EA
ORDERING PERIOD 4 - U/P $_________ (FFP) Est Qty 90
EA
ORDERING PERIOD 5 - U/P $_________ (FFP) Est Qty 90
EA
(End of narrative C001)
Packaging and Marking _____________________
5 74
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
PACKAGING/PACKING/SPECIFICATIONS:
IAW PACKAGING INSTRUCTIONS SECTION J
UNIT PACK: 001 INTERMEDIATE PACK: 000
LEVEL PRESERVATION: Military
LEVEL PACKING: A
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
FOB POINT: Origin
0003 WINCH, AIRCRAFT
NSN: 1680-01-141-7615
Mfr CAGE: 77272
Mfr Part Number: 114E6040-6
0003AA OVERHAUL/REPAIR WINCH, AIRCRAFT (FMS QUANTITY) $ $ ______________________________________________ ______________ __________________
COMMODITY NAME: WINCH, AIRCRAFT
CLIN CONTRACT TYPE:
Firm Fixed Price
SYSTEM: CH-47
INPUT NSN: 1680-01-141-7615
INPUT PART NUMBERS: 114E6040-6
4067R215
OUTPUT NSN: 1680-01-141-7615
OUTPUT PART NUMBER: 903209-1
Overhaul/Repair shall be in accordance with clause
52.211-4003 in Section C entitled 'Statement of Work/Specifications-Contractor
Specifications'.
This Firm Fixed Price (FFP) CLIN includes all mandatory and non-mandatory parts, labor charges, preservation, packaging, packing, marking, and data items necessary to return the unit, to a serviceable condition, as stated in section C, Statement of Work.
This CLIN will be used if an FMS customer requires this item.
If no FMS customers are identified, the United States Army requirer may utilize the FMS quantity. The estimated quantities are listed below. The FMS customer and geographical locations for deliveries, inspection
6 74
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
and acceptance points are unknown at this time. Total
FMS
quantities cannot exceed 60 each.
OFFEROR IS REQUIRED TO FILL IN PROPOSED FIRM
FIXED UNIT PRICE:
ORDERING PERIOD 1 - U/P $_________ (FFP) Est Qty 0 EA
ORDERING PERIOD 2 - U/P $_________ (FFP) Est Qty 10
EA
ORDERING PERIOD 3 - U/P $_________ (FFP) Est Qty 10
EA
ORDERING PERIOD 4 - U/P $_________ (FFP) Est Qty 20
EA
ORDERING PERIOD 5 - U/P $_________ (FFP) Est Qty 20
EA
(End of narrative C001)
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
IAW PACKAGING INSTRUCTIONS SECTION J
UNIT PACK: 001 INTERMEDIATE PACK: 000
LEVEL PRESERVATION: Military
LEVEL PACKING: A
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
FOB POINT: Origin
0004 SCRAP
0004AA SCRAP OF 1680-01-141-7615 $ _________________________ __________________
SERVICE REQUESTED: SCRAP
CLIN CONTRACT TYPE:
Firm Fixed Price
THIS CLIN APPLIES TO U.S. AND FMS ASSETS________________________________________
SECTION C - Description/Specifications/Work Statement_________
Units from CLIN 0002AA and 0003AA shall be scrapped or returned in accordance with Section C, Statement
7 74
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
of Work/Specifications - Contractor Specifications.
Units determined to be scrap IAW Section C shall be reflected as an increase to CLIN 0004AA with a corresponding decrease in quantity and funds to CLIN
0002AA and 0003AA as appropriate. In the event the
PCO determines that certain items are scrap the
Contractor shall make disposition IAW the contractors approved Government property procedures. Scrapped items shall count toward the minimum quantities ordered hereunder. The Government may, at its own discretion, reduce any items determined scrap by input of additional assets and said scrap quantities will not count as part of the total maximum quantity.
Scrap requires authorization by the Contracting
Officer via formal modification. In no event shall the Contractor scrap an item prior to receiving a contractual modification for a unit.
OFFEROR IS REQUIRED TO FILL IN PROPOSED FIRM FIXED
UNIT PRICE:
Ordering Period 1 - $ ____________(FFP) Est Qty 10 EA
Ordering Period 2 - $ ____________(FFP) Est Qty 10 EA
Ordering Period 3 - $ ____________(FFP) Est Qty 10 EA
Ordering Period 4 - $ ____________(FFP) Est Qty 10 EA
Ordering Period 5 - $ ____________(FFP) Est Qty 10 EA
(End of narrative C001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
0005 SHIPPING CONTAINERS
0005AA CONTRACTOR FURNISHED CONTAINERS FOR ___________________________________
1680-01-141-7615 $ ________________ __________________
SERVICE REQUESTED: SHIPPING CONTAINERS
CLIN CONTRACT TYPE:
Firm Fixed Price
SHIPPING CONTAINERS
THE PROPOSED PRICES APPLY TO REUSABLE CONTAINERS
8 74
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
FOR WINCH, AIRCRAFT.
OFFEROR IS REQUIRED TO FILL IN PROPOSED FIRM FIXED
UNIT PRICE FOR ALL 5 YEARS:
ORDERING PERIOD 1 - U/P $__________(FFP) 10 EA, EST
QTY
ORDERING PERIOD 2 - U/P $__________(FFP) 10 EA, EST
QTY
ORDERING PERIOD 3 - U/P $__________(FFP) 10 EA, EST
QTY
ORDERING PERIOD 4 - U/P $__________(FFP) 10 EA, EST
QTY
ORDERING PERIOD 5 - U/P $__________(FFP) 10 EA, EST
QTY
THE CONTRACTOR SHALL PROVIDE CONTAINERS, IN
ACCORDANCE WITH ATTACHMENT 0003, PACKAGING
REQUIREMENT INSTRUCTIONS AND SECTION C, ENTITLED
'STATEMENT OF WORK/SPECIFICATIONS - CONTRACTOR
SPECIFICATIONS' AND 'REUSABLE CONTAINERS'.
SUPPLEMENTAL INFORMATION:
Z=A/R SNUG FIT; ZZ=PRELUBE BEARING; NZ=8145-00-499-
9808, 13414-125
THE GOVERNMENT CANNOT DETERMINE, AT THE TIME OF
CONTRACT AWARD, HOW MANY OF THE ASSETS TO BE
REPAIRED WILL BE RECEIVED BY THE CONTRACTOR IN
UNSERVICEABLE CONTAINERS OR RECEIVED WITHOUT
CONTAINERS. THE CONTRACTOR, IAW SECTION C,
'STATEMENT OF WORK', SHALL SUBMIT A REPORT OF
DISCREPANCY (ROD), SF FORM 364, THROUGH THEIR
GOVERNMENT QAR FOR VERIFICATION WITHIN 7 WORKING
DAYS TO THE ADDRESS SHOWN ON DATA ITEM A001. ASSETS
RECEIVED IN UNSERVICEABLE CONTAINERS OR WITHOUT A
CONTAINER, REQUIRE THE PRIOR APPROVAL OF THE PCO
BEFORE CONTAINERS CAN BE PURCHASED.
(End of narrative C001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
0006 CONTRACT DATA REQUIREMENTS LIST (CDRLS) _______________________________________
THIS CLIN IS "NOT SEPARATELY PRICED" (NSP)
PRICING FOR DATA SHALL BE INCLUDED IN THE UNIT
PRICE OF CLINS 0002AA AND 0003AA.
THE CONTRACTOR SHALL PROVIDE DATA ITEMS A001 - A003
9 74
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
IN ACCORDANCE WITH CONTRACT DATA REQUIREMENTS LIST
(CDRL) - SEE EXHIBITS A-C.
(End of narrative A001)
A001 REPORT OF SHIPPING AND PACKAGING DISCREPANCY $ ** NSP ** ____________________________________________ __________________
SERVICE REQUESTED: REPORT OF SHIPPING AND PACKAG
CLIN CONTRACT TYPE:
Firm Fixed Price
DATA ACQUISITION DOCUMENT NUMBER : DI-MGMT-80503
Submission of the Report of Shipping and Packaging
Discrepancy shall occur within 10 days of discovery of the discrepancy.
(End of narrative C001)
Deliveries or Performance _________________________
A002 CONTRACT DEPOT MAINTENANCE PRODUCTION REPORT $ ** NSP ** ____________________________________________ __________________
SERVICE REQUESTED: DEPOT MAINTENANCE PRODUCTION
CLIN CONTRACT TYPE:
Firm Fixed Price
DATA ACQUISITION DOCUMENT NUMBER : DI-PSSS-81995
Date of first submission is 3 working days after receipt of reparables.
Frequency of submission is monthly.
Date of subsequent submissions - No later than 10 days after the end of the month.
Data shall be provided in digital format to:
usarmy.redstone.usamc.mbx.immc-smb-ammo@mail.mil
(End of narrative C001)
Deliveries or Performance _________________________
10 74
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
A003 QUALITY DEFICIENCY REPORT $ ** NSP ** _________________________ __________________
SERVICE REQUESTED: QUALITY DEFICIENCY REPORT
DATA ACQUISITION DOCUMENT NUMBER : DI-QCIC-80736
No report is necessary unless there is a discrepancy.
Contractor shall submit NO LATER THAN 10 days after discovery of deficiency.
(End of narrative C001)
Deliveries or Performance _________________________
11 74
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
C-1 52.211-4003 STATEMENT OF WORK/SPECIFICATIONS - CONTRACTOR SPECIFICATIONS JUL/2001
a. The Contractor, as an independent Contractor, and not as an agent or employee of the Government, shall furnish all services, facilities, labor, parts, materials, equipment, tools, and data (other than Government Furnished Property), necessary to accomplish the inspection and overhaul for WINCH, AIRCRAFT that is required to return the items as specified by Section B, to condition code A as defined by Army Regulation 725-50. The input/output configuration shall be as defined in Section B herein. Upon completion of the overhaul, as applicable, the items shall be packaged as defined in each individual delivery order of the contract and shipped to the destination(s) specified in each individual delivery order.
b. Prior to commencement of overhaul, the Contractor shall disassemble and inspect the item to the extent necessary to determine if the item is physically unrepairable or has suffered abnormal or catastrophic damage. If the latter condition exists, the Contractor shall notify the Procuring Contracting Officer (PCO) through the cognizant Administrative Contracting Officer
(ACO) and shall stop work on the item(s) until given further instructions or disposition of the item(s) by the PCO.
c. In the event the PCO determines that certain items should be scrapped, the contractor shall scrap such items at the fixed unit price in Section B hereof and make disposition in accordance with (IAW) the Contractor's approved Government property procedures. Such scrapped items shall count toward the quantities ordered hereunder.
d. Overhaul shall be accomplished IAW Depot Maintenance Work Requirement (DMWR)
DMWR-55-1680-133
REVISION DATE 06/07/2013
e. Critical Safety Item: N/A
f. Upon receipt of the reparables, containers shall be reviewed for serviceability. Containers shall be considered serviceable unless one or more of the following conditions exist: (1) containers are structurally damaged to include functional damage to the suspension system, cracks or holes to the container hull, hull deformity to the extent the container cannot be closed (or sealed where required), or dents that will interfere with the item envelope; (2) corrosion has progressed to the point where fit, function or the life of the container is affected. Items received without containers or containers determined to be unserviceable shall be processed IAW the
Contractor's locally approved Government Property procedures. Components received improperly packaged, damaged with corrosion/deterioration or those with shipping discrepancies shall be reported IAW DI-MGMT-80503.
g. Any Contractor paint facility which is used in the performance of this contract shall comply with the Environmental Protection Agency and Occupational Safety and Health Administration standards for painting as implemented by TM 55-1500-345-23, CH12, Painting and Marking of Army Aircraft.
h. Data and reports shall be submitted IAW the Contract Data Requirements List, DD Form 1423, Exhibit A. Data shall be packaged, packed and marked as necessary to assure safe delivery to the addresses indicated on the DD Forms(s) 1423.
i. Product Verification Audit (PVA): The Contractor shall conduct the PVA in accordance with AMCOM FAR CLAUSE 52.209-4723 as specified in the solicitation/contract attachment.
j. The Army Maintenance Management System - Aviation (TAMMS-A): The Contractor shall complete the forms and records as specified in DA
PAM 738-751.
k. Serial Number Report Requirement (SNRR): N/A
l. The items the Contractor shall overhaul are identified below:
Input P/Ns: 114E6040-6
4067R215
Output P/N: 114E6040-6
Input NSN: 1680-01-141-7615
Output NSN: 1680-01-141-7615
m. The overhaul planned quantity for 5 years is minimum 30, maximum 420. Input will be 30 days after receipt of order (ARO). Output shall be as specified in the solicitation/contract schedule. Serviceable assets shall be returned to W25G1W.
(1) 1st year qty 30 (4) 4th year qty 110
(2) 2nd year qty 80 (5) 5th year qty 110
(3) 3rd year qty 90
n. Inventory Transactions - The contractor shall prepare the following reports:
12 74
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
1. The contractor shall prepare a Contract Depot Maintenance Production Report IAW DI-PSSS-81995.
2. The contractor shall complete and maintain the DD Form 1348-1A receipt for repairables on all shipments IAW DI-MISC-80508 and DD Form
1348-1A. The contractor shall complete the DD Form 1348-1A, Block 10 (indicates the quantity received), along with Block
22 (signature), and Block 23 (date). Printed names, name/date stamps, and initials shall not be acceptable. If a DD Form 1348-1A is not delivered with the shipment, a DD Form 1348-1A is located at:
http://www.acq.osd.mil/dpap/ccap/cc/jcchb/files/formspubsregs/dod_funding_documents/dd13481a.pdf
The contractor shall prepare this data to include the following corresponding receipt information:
A. National Stock Number (NSN) - (Positions 8-22)
B. Condition Code - (Position 71)
C. Unit Price - (Positions 74-80)
D. Total Price - (Block 1)
E. Actual Quantity Received - (Block 10)
F. Nomenclature - (Block 17)
G. Signature and Date - (Blocks 22 and 23)
If there are any questions with the above information please contact: usarmy.redstone.usamc.mbx.immc-smb-ammo@mail.mil
o. Foreign Military Sales (FMS): These total requirements meet or exceed the requirements for the Security Assistance Management
Directorate (SAMD) per the Acquisition Center Directorate IAW SAMD and Integrated Material Management Center (IMMC) Method of
Understanding (MOU) document dated 4 December 2004. The IMMC is responsible for conducting Weapons System Team (WST) reviews of SAMD's
FMS Aviation hardware, allowing 20% over the Army's maximum quantity during the life of the contract specifically for FMS requirements.
SAMD and IMMC will negotiate provisions for FMS critical items that exceed the standard 20% on case-by-case basis.
p. Reserved
q. The Government reserves the right to replace any items scrapped.
r. Overhaul Repair Report: N/A
s. Quality Deficiency Report: The Contractor shall prepare the Quality Deficiency Report IAW DI-QCIC-80736.
t. Supplier Interface and Oversight: N/A
u. Shipping Containers NSN: 8145-00-499-9808, P/N: 13414-125 shall be utilized. If containers are not reparable or if assets are not delivered in the approved containers, the containers shall be Contractor Furnished Materiel. Shipment: The method of shipment must use a procedure so that the package can be tracked in case the shipment is not received by AMCOM.
(End of Clause)
13 74
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION D - PACKAGING AND MARKING
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
D-1 52.247-4700 BAR CODE MARKINGS JUN/2003
Bar Code Markings are required in accordance with the latest revision of MIL-STD-129 and ISO/IEC 16388 - Information Technology -
Automatic Identification and Data Capture Techniques - Bar Code Symbology Specification - Code 39.
(End of Clause)
14 74
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION E - INSPECTION AND ACCEPTANCE
This document incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:
http://farsite.hill.af.mil/VFFARA.HTM or http://farsite.hill.af.mil/VFDFARA.HTM or http://farsite.hill.af.mil/VFAFARa.HTM
If the clause requires additional or unique information, then that information is provided immediately after the clause title.
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
E-1 52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE AUG/1996
E-2 52.246-4 INSPECTION OF SERVICES--FIXED-PRICE AUG/1996
E-3 52.246-15 CERTIFICATE OF CONFORMANCE APR/1984
E-4 52.246-16 RESPONSIBILITY FOR SUPPLIES APR/1984
E-5 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT DEC/2014
(a) The contractor shall comply with the higher-level quality standard ISO 9001:2000 or equivalent.
(b) The contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts in--
(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or
(2) When the technical requirements of a subcontract require--
(i) Control of such things as design, work operations, in-process control, testing and inspection; or
(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.
(End of clause)
E-6 52.209-4723 PRODUCT VERIFICATION AUDIT (PVA) STATEMENT OF WORK DEC/2006
Purpose: The purpose of this PVA SOW is to provide guidance to the contractor in the preparation for and execution of the PVA. The primary concept of the PVA is to validate that the contractor's overhaul processes and procedures comply with contract technical requirements. The PVA candidate(s) are used to evaluate that the contractor processes and procedures are adequate to ensure component integrity.
(a) The Contractor shall perform overhaul and present for acceptance THREE units of Lot/Item 0001AA as specified in this contract.
This clause does not supersede instructions contained in depot overhaul work requirements, commercial overhaul manuals, or other applicable documents. It does not relieve the contractor from maintaining a quality system that will assure overhauled items conform to contractual requirements. Contractors may request to delay scheduled PVAs in frequency or waive PVA requirements of selected items in cases where accumulated objective evidence indicates that a consistent quality item is being delivered. The Command's actions will be based on the overall performance history, failure impact, supply impact, length of program, and nonscheduled PVAs accomplished by the
AMRDEC Engineering Directorate (ED). Like or similar items may be grouped for these purposes provided concurrence is obtained from
AMRDEC ED. The contractor may be directed by the Contracting Officer (CO) to increase or decrease the scope of a PVA pursuant to the
"Changes" clause of the contract.
(b) The Contractor shall:
(1) With the concurrence of the cognizant government quality element and AMCOM, schedule and perform PVA as required by the terms of the contract or as otherwise required.
(2) Notify AMCOM through the cognizant government quality assurance element, with information copy to the AMRDEC ED, ATTN: QS-
Contracts@amrdec.army.mil, of the date the PVA candidates will be available. Notification shall be provided at least 20 working days prior to the selected date if facilities are within the Continental United States. If facilities are outside the Continental United
States, notification shall be provided at least 95 working days prior to the selected date to allow sufficient time for travelers to gain theater clearance.
(3) Provide technical personnel, tooling, measuring and test equipment, work area, forms, and clerical assistance, as required, to perform the PVA. If test cell or other specialized equipment is required; notification of readiness for PVA shall include the availability of these.
(c) The initial PVA will be performed on one of the first three (3) items overhauled. The PVA candidate will be selected by the AMRDEC
PVA Team Chairman at random from the three (3) tendered for acceptance to the Government. For reoccurring audits, if any, the audit candidate will be selected by the PVA Team Chairman from all completed items currently available.
15 74
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(d) The item selected for PVA will be inspected for adherence to preservation, packaging, packing, and marking requirements prior to removal from the shipping container. A visual inspection and functional test will be performed prior to disassembly.
(e) The PVA Team will review the shop travelers, production processes, procedures, tooling, and equipment used to overhaul the item being audited for adequacy and conformance to the contractual requirements. The PVA will include verification through objective evidence that all of the inspection, testing, measuring and diagnostic equipment used in the inspection/test of the PVA candidate are maintained in accordance with applicable calibration standards.
(f) Disassembly will be performed in an area accessible only to audit personnel. Normally, audit participation will be limited to specified production and quality assurance personnel of the contractor activity, the cognizant government Quality Assurance
Representative (QAR), and the AMRDEC PVA Team Chairman and team personnel.
(g) Visual inspection, dimensional checks (such as backlash, end clearance, running clearance, etc.) and nondestructive testing are accomplished during and after disassembly IAW applicable technical directives. Findings are recorded for comparison with historical data and conformance evaluation. A 100% inspection (or as set forth in relevant specifications) of all physical characteristics, to include but not limited to, any dimensions, certifications for materials, processes and/or procedures, as well as any other requirements which may be set forth by other applicable specifications, or in any procurement packages, technical drawings. Depot Maintenance Work
Requirements (DMWRs), Maintenance Engineering Orders (MEOs), and/or any other special/functional testing as set forth in this contract.
(h) Applicable accessories and components will be functionally tested and inspected to contractual/work specifications. The PVA team will review subcontractor certifications for testing and inspections. At the request of the PVA Team Chairman, processes (such as shotpeening, heat treating, etc.) performed by subcontractors will also be audited. Contractor shall be able to demonstrate that all testing, inspection procedures, and acceptance methods are documented in the appropriate area of the overhaul documents, and are approved and controlled by management.
(i) The PVA item shall be reassembled and functionally tested IAW applicable specifications and made ready for government aceptance including preservation, packing, packaging, marking, and update of historical records and all applicable documentation.
(j) Conduct of the PVA will be planned in a manner that adequately allows examination/audit of all procedures involved. Each step in the process shall be analyzed to determine compliance to specifications. It may not be logical or possible, due to time constraints, to track the same item throughout the PVA; therefore, at the AMRDEC PVA Team Chairman's discretion, examination of representative assemblies amy be used as evidence of compliance to specification requirements. The AMRDEC PVA Team Chairman will determine the scope and detail of the PVA process. The AMRDEC PVA Team Chairman may delegate follow-up actions to the government QAR, when it is determined to be prudent to the PVA.
(k) During the course of the PVA, the PVA Team Chairman may request progress meetings to provide status to the contractor. After the
PVA is completed, the AMRDEC PVA Team Chairman will conduct an exit critique attended by all concerned contractor personnel and the cognizant government QAR. The context of the audit findings and corrective actions will be discussed and any disputes will be resolved.
Findings, classifications, and corrective actions will be discussed and determinations made as to cause of defect established (i.e., workmanship, tooling, technical requirements, etc.). The contractor's management personnel shall take immediate action to correct and preclude recurrence of all defects attributable to failure to comply with requirements.
(l) All defects will be recorded on the AMRDEC PVA Audit Finding Record by the PVA Team. The PVA Team Chairman will provide copies of each Finding to the contractor quality assurance element and the cognizant government QAR. This will allow immediate actions to begin in the resolution of the defect. Corrective actions as well as actions taken to prevent recurrence shall also be documented on this form by the contractor. The form shall be signed, as a minimum, by the contractor's quality manager or designated representative and the AMRDEC PVA Team Chairman. Further actions outlined below pertain to specific actions required by the contractor depending on the classification of the defects.
1. Observation: In the event an observation Finding is discovered, the contractor is not required to provide a written response, but it is encouraged to do so.
2. Minor: In the event a minor defect is discovered, the following actions shall be taken:
a. The contractor shall isolate the cause of the defect and initiate corrective actions.
b. All minor defects shall require a written response addressing corrective actions taken and actions taken to prevent recurrence.
c. In the event a minor defect is a recurring deficiency, regardless of weapon system or date when original discrepancy was noted, it will be written into the report as a minor defect, but the corrective actions required below for a major defect will apply.
3. Major: In the event a major defect is discovered, the following actions shall be taken:
a. The contractor shall halt any work in progress at the responsible station until corrective action is acceptable to the PVA Chairman.
b. The contractor shall provide the QAR information reflecting the total quantity shipped, if any, and to what destination pertaining to any item that could contain the identified defect.
16 74
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
c. The contractor shall determine impact of the defect on products previously delivered under this contract, if any, and initiate corrective action to address those units at no additional cost to AMCOM.
d. The contractor shall isolate the cause of the defect and initiate corrective actions. All findings shall require an in-depth written response outlining corrective actions to prevent recurrence.
e. The contractor shall review/revise work documents for the specified operation responsible for the defect to ascertain that they are complete, adequate, and sufficiently defined to assure that, if followed and completed by both production, maintenance and inspection personnel, they will provide objective evidence of a quality operation.
f. The contractor shall assure the cognizant QAR and the AMRDEC PVA Team Chairman that positive, effective, corrective action has been initiated that will prevent recurrence of the cited defect. This assurance can be verbal at first, however, a written report from the contractor quality element containing all corrective actions completed and actions taken to prevent recurrence shall be provided to the QAR and the AMRDEC PVA Team Chairman within 24 hours after the verbal response.
4. Critical: In the event a critical defect is discovered, the following actions shall be taken:
a. All actions outlined in paragraph 3 above shall be completed.
b. Upon request, the contractor shall provide the AMRDEC Aviation Engineering Directorate technical information necessary for the issuance of a Safety of Flight Message or Aviation Safety Action Message to the field (if necessary).
c. Government acceptance/release of product will cease immediately until corrective actions are acceptable to the contracting officer.
NOTE: Systemic quality and overhaul process discrepancies that affect the outcome of product(s) outside the scope of the PVA will require the cognizant QAR to issue a Corrective Action Request.
(m). Upon completion of the disassembly and testing portion of the selected PVA candidate, without finding any critical or major defects, the other two completed candidates will be released as PVA candidates. In the event that a critical or major defect is found in the audit candidate, the contractor shall satisfy the PVA Team Chairman that such a defect does not exist in the other 2 PVA candidates prior to acceptance, and effective corrective action has been initiated to preclude reoccurrence of the defect.
(n). The contractor shall prepare and forward, through the cognizant government quality element, finalized audit reports within ten
(10) working days after completion of the PVA to Commander, U.S. Army Research Development and Engineering Command, ATTN: QS-
Contracts@amrdec.army.mil, Redstone Arsenal, AL 35898-5000 and the Acquisition Center address as shown on Order 0001. (In the event reorganization changes this address, the contractor will be notified of the new, correct address by the CO). The report shall include:
1. Name and location of contractor
2. Contract number or equivalent
3. Descriptive noun, national stock number, part number, and serial number of the item audited
4. Complete description of each audit finding, with corrective action taken, and action taken to prevent recurrence.
5. The audit report shall be signed, as a minimum, by the contractor's quality manager or his designated representative.
Objections, accompanied with explanations, on any audit finding(s) shall be specifically annotated and forwarded to AMCOM for resolution. Objection by the contractor as to the existence of a defect or as to its classification will be resolved by the PVA
Chairman. Further non-concurrence will be referred to the PCO for final resolution IAW the clause entitled "Disputes" as stated in the contract.
(o) The AMRDEC PVA Chairman will acknowledge receipt of the Final Audit Report and complete the following within 10 working days of receipt:
1. Review the Final PVA Report for compliance and completeness
2. Review the report for acceptance/rejection of corrective action and actions taken to prevent recurrence.
3. Forward a written reply to the AMCOM CO and/or cognizant government quality element, recommending acceptance or rejection of the Final Audit Report.
4. If the Final Audit Report is disapproved, the Contractor shall repeat any or all PVA tests, per Government request. If deemed in the best interests of the government, contract termination may be initiated. Upon request for additional tests, the
Contractor shall make any necessary changes, modifications, or repairs to the PVA item. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following disapproval. The Contractor shall then conduct the tests and deliver a revised report to the Government under the terms and conditions and within the time specified by the Government.
These actions must be coordinated with the cognizant government QAR. The Government shall take action on this report within 10 working days. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule, or for any additional costs to the Government related to these tests.
(p) The PVA unit is to be representative of the deliverable quantity. The Contractor shall overhaul both the PVA item and the contractual quantity at the same facility. In the event that there is a change to the process planning (i.e. changes in process sources, parts sources, or location where work is to be performed) after approval of the Final Audit Report, the contractor is required to provide notification of such changes to the CO, so that a determination can be made whether a new PVA is warranted. Notification is required 10 business days prior to shipment of the next delivery.
(q) The PVA candidates shall be shipped IAW contract delivery schedules or released to supply activity upon acceptance of the Final
Audit Report. The Contractor SHALL NOT retain the PVA item approved under this contract to serve as the manufacturing standard of acceptance.
17 74
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(r) If the Contractor fails to deliver any PVA on time, or the Contracting Officer disapproves any PVA, the Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.
(s) Before PVA approval, the acquisition of materials or components for, or the commencement of overhaul of, the balance of the contract quantity is at the sole risk of the Contractor. Before PVA approval, the costs thereof shall not be allocable to this contract for (1)
Progress payments, or (2) termination settlements if the contract is terminated for the convenience of the Government.
(t) In cases where this PVA is a part of the Source Approval Request (SAR) process, the process planning will be considered approved upon receipt of an approval memorandum from AMRDEC Aviation Engineering Directorate (AED). If the component is a Critical Safety Item
(CSI), see those specific contract clauses for other requirements that may also be audited during the PVA. PVA approval is contingent on contractor submission and AED approval of changes to manufacturing planning, to correct defects identified during PVA.
(u) Unless otherwise specified in this contract, any end item destroyed or exceeds reparable limites during the PVA process is not to be considered as part of the contract quantity. The full quantity of acceptable and serviceable items must be delivered.
(End of clause)
E-7 52.246-4003 CALIBRATION JAN/2012
The calibration of Test, Measurement and Diagnostic Equipment shall be in accordance with American National Standards Institute/National
Conference of Standards Laboratories (ANSI/NCSL) Z540-3-2006 (General Requirements for Calibration Laboratories and Measuring and Test
Equipment) or ISO 10012:2003 (Quality Assurance Requirements for Measuring Equipment). Terminology shall be as defined by International
Organization for Standardization (ISO) 8402, Quality Management and Quality Assurance - Vocabulary.
18 74
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION F - DELIVERIES OR PERFORMANCE
This document incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:
http://farsite.hill.af.mil/VFFARA.HTM or http://farsite.hill.af.mil/VFDFARA.HTM or http://farsite.hill.af.mil/VFAFARa.HTM
If the clause requires additional or unique information, then that information is provided immediately after the clause title.
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
F-1 52.242-15 STOP-WORK ORDER AUG/1989
F-2 52.242-17 GOVERNMENT DELAY OF WORK APR/1984
F-3 52.247-29 F.O.B. ORIGIN FEB/2006
F-4 52.247-52 CLEARANCE AND DOCUMENTATION REQUIREMENTS--SHIPMENTS TO DOD AIR OR FEB/2006
WATER TERMINAL TRANSSHIPMENT POINTS
F-5 52.247-55 F.O.B. POINT FOR DELIVERY OF GOVERNMENT-FURNISHED PROPERTY JUN/2003
F-6 52.247-65 F.O.B. ORIGIN, PREPAID FREIGHT--SMALL PACKAGE SHIPMENTS JAN/1991
F-7 252.211-7007 REPORTING OF GOVERNMENT-FURNISHED PROPERTY AUG/2012
F-8 252.211-7003 ITEM UNIQUE IDENTIFICATION AND VALUATION MAR/2016
(a) Definitions. As used in this clause--
"Automatic identification device" means a device, such as a reader or interrogator, used to retrieve data encoded on machine-readable media.
"Concatenated unique item identifier" means
(1) For items that are serialized within the enterprise identifier, the linking together of the unique identifier data elements in order of the issuing agency code, enterprise identifier, and unique serial number within the enterprise identifier; or
(2) For items that are serialized within the original part, lot, or batch number, the linking together of the unique identifier data elements in order of the issuing agency code; enterprise identifier; original part, lot, or batch number; and serial number within the original part, lot, or batch number.
"Data matrix" means a two-dimensional matrix symbology, which is made up of square or, in some cases, round modules arranged within a perimeter finder pattern and uses the Error Checking and Correction 200 (ECC200) specification found within International Standards
Organization (ISO)/International Electrotechnical Commission (IEC) 16022.
"Data qualifier" means a specified character (or string of characters) that immediately precedes a data field that defines the general category or intended use of the data that follows.
"DoD recognized unique identification equivalent" means a unique identification method that is in commercial use and has been recognized by DoD. All DoD recognized unique identification equivalents are listed at http://www.acq.osd.mil/dpap/pdi/uid/iuid_equivalents.html.
"DoD item unique identification" means a system of marking items delivered to DoD with unique item identifiers that have machine-readable data elements to distinguish an item from all other like and unlike items. For items that are serialized within the enterprise identifier, the unique item identifier shall include the data elements of the enterprise identifier and a unique serial number. For items that are serialized within the part, lot, or batch number within the enterprise identifier, the unique item identifier shall include the data elements of the enterprise identifier; the original part, lot, or batch number; and the serial number.
"Enterprise" means the entity (e.g., a manufacturer or vendor) responsible for assigning unique item identifiers to items.
"Enterprise identifier" means a code that is uniquely assigned to an enterprise by an issuing agency.
"Governments unit acquisition cost" means
(1) For fixed-price type line, subline,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .